EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

State of Florida Department of Transportation logo
Florida Department of

TRANSPORTATION


Industry Review


Specification Development Procedure regulates the development and implementation of new or modified specifications and related pay items. The following files are in the developmental process and are posted for Industry Review.
If you have comments, please select the DESIRED REVISION using the drop-down menu below and then type in your comments.

To track the History of proposed revisions go to: Track the Status of Proposed Revisions

Note:Files on this page are in Adobe Acrobat (PDF) format.
File Sizes ranges from 23 to 30 kb.


Specification Description Origination Review End
1050404-MM6.2V2 Contractor Quality Control General Requirements – Compliance with the Materials Manual 1050404-MM6.2V2 July 12, 2018
1050404-MM63V2 Contractor Quality Control General Requirements – Compliance with the Materials Manual 1050404-MM63V2 July 12, 2018
1050404-MM8.1 Contractor Quality Control General Requirements – Compliance with the Materials Manual 1050404-MM8.1 July 12, 2018
1050404-MM8.2V2 Contractor Quality Control General Requirements – Compliance with the Materials Manual 1050404-MM8.2V2 July 12, 2018
1050404-MM8.4V2 Contractor Quality Control General Requirements – Compliance with the Materials Manual 1050404-MM8.4V2 July 12, 2018
1050404-MM9.2V2 Contractor Quality Control General Requirements – Compliance with the Materials Manual 1050404-MM9.2V2 July 12, 2018
3460000 Portland Cement Concrete 3460000 July 12, 2018
4500000 Precast Prestressed Concrete Construction 4500000 July 12, 2018
1020303 Maintenance of Traffic 1020303 July 5, 2018
5460000 Rumble Strips 5460000 July 5, 2018
7110401 Thermoplastic Pavement Markings 7110401 July 5, 2018
9600000 Post - Tensioning Components 9600000 July 5, 2018
0080302 Prosecution and Progress 0080302 June 28, 2018
SP0080302A Prosecution and Progress – Prosecution of Work (Submission of Working Schedule) SP0080302A June 28, 2018
1020917 Maintenance of Traffic 1020917 June 28, 2018
1050410 Contractor Quality Control General Requirements 1050410 June 28, 2018
SP5800201 Landscaping SP5800201 June 28, 2018
SP5800204FA Landscaping SP5800204FA June 28, 2018
6530202 Pedestrian Signal Assemblies 6530202 June 28, 2018
6540000 Midblock Crosswalk Enhancement Assemblies 6540000 June 28, 2018
6760206 Traffic Cabinets 6760206 June 28, 2018
6780200 Traffic Controller Accessories 6780200 June 28, 2018
7000302 Highway Signing 7000302 June 28, 2018
7010500 Profiled Thermoplastic Pavement Markings 7010500 June 28, 2018
7090500 Two Reactive Components Pavement Markings 7090500 June 28, 2018
7110500 Thermoplastic Pavement Markings 7110500 June 28, 2018
9900301 Temporary Traffic Control Device Materials 9900301 June 28, 2018
1021102 Maintenance of Traffic 1021102 June 21, 2018
1100301 Clearing and Grubbing 1100301 June 21, 2018
5440000 Crash Cushions 5440000 June 21, 2018
6200401 Grounding and Lightning Protection 6200401 June 21, 2018
6710000 Traffic Controllers 6710000 June 21, 2018
9850202 Geosynthetic Materials 9850202 June 21, 2018
9900201 Temporary Traffic Control Device Materials 9900201 June 21, 2018

 

Using the dropdown menu below, Please select the SPECIFIC SPECIFICATION you want to comment on.

 

Enter your comments in the space provided below:

Note: Time will expire in 20 minutes. If you are unsure of the length of time to enter your comment(s), please type your comment(s) in another application, then copy and paste below.



Tell us how to get in touch with you:(Optional)

 
   

 


Enter the following characters, then click "Submit" to send your Comments.