Design-Build Selection Results

Procurement Office Home Page
 
 
Pursuant to Sections 120.57(3) and 337.11, Florida Statutes, and Rule Chapter 28-110, Florida Administrative Code, any person adversely affected by the agency decision or intended decision shall file with the agency both a notice of protest in writing and bond within 72 hours after the posting of the notice of decision or intended decision, or posting of the solicitation with respect to a protest of the terms, conditions, and specifications contained in a solicitation, and will file a formal written protest within ten days after the filing of the notice of protest. The required notice of protest and bond, and formal written protest must each be timely filed with the Florida Department of Transportation, Clerk of Agency Proceedings 605 Suwannee St., Mail Station 58, Tallahassee, FL, 32399-0458. Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes.  
 

 
District Ads: 1 2 3 4 5 6 7 Turnpike Central Office
 
 
 
District Design-Build Addenda and Project Information:
 
 
Updated: Tuesday September 16 2014  
 
 

DISTRICT 1    
Financial Management Number(s):
  42391715201
Contract Number:  E1N21
Project Description:
  MANATEE OPERATIONS CENTER
PhaseI Selection Cmte. Meeting :  09DEC2013  Time:  09:30AM
ELOI Scores Notification Date  :  09DEC2013  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  11DEC2013  Time:  11:00AM
Posting of Shortlist           :  11DEC2013  Time:  01:00PM
Mand. Pre-Proposal Meeting Date:  30DEC2013  Time:  09:30AM
PhaseII Tech. Proposal Due Date:  13MAR2014  Time:  10:00AM
Price Proposal Due Date        :  09APR2014  Time:  11:00AM
Proposal Opening Date          :  09APR2014  Time:  11:00AM
Final Selection Meeting Date   :  16APR2014  Time:  10:00AM
Posting of Award               :  16APR2014  Time:  12:00PM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    THE HASKELL COMPANY                17.2   65.0    630  $14,700,000  178,832
2    DAVID NELSON CONSTRUCTION CO.      17.2   70.6    730  $16,317,750  185,851
3    CONE & GRAHAM INC                  16.4   66.8    600  $20,520,000  246,634
Firms not participating in PhaseII  PhaseI Score
  Ajax Building Corporation             14.4
  BILTMORE CONSTRUCTION CO,INC.         15.6
  DANA B. KENYON COMPANY                12.6
  OHL BUILDING, INC                     14.8
  TANDEM CONSTRUCTION, INC              14.2
  THE A.D. MORGAN CORPORATION           11.8
  Walbridge Aldinger Company            15.0
  WRIGHT CONSTRUCTION GROUP             15.4


DISTRICT 1    
Financial Management Number(s):
  43341215201 43341515201 43341615201 42732175201
  42739975201 42732185201 42739985201
Contract Number:  E1N86
Project Description:
  DISTRICT WIDE PUSH BUTTON
PhaseI Selection Cmte. Meeting :  28MAY2014  Time:  2:00PM
ELOI Scores Notification Date  :  28MAY2014  Time:  3:00PM
Deadline for Election to
Participate in Ph. II          :  30MAY2014  Time:  2:00PM
Posting of Shortlist           :  30MAY2014  Time:  4:00PM
PhaseII Tech. Proposal Due Date:  11AUG2014  Time:  4:00PM
Final Selection Meeting Date   :  16SEP2014  Time:  1:15PM


Shortlisted Firms                   PhaseI Score
  AMERICAN LIGHTING & SIGNALIZATION     14.0
  FLORIDA SAFETY CONTRACTORS,INC.       17.3
  HIGHWAY SAFETY DEVICES,INC.           16.0
Firms not participating in PhaseII  PhaseI Score
  TRAFFIC CONTROL DEVICES,INC.          14.7



DISTRICT 2    
Financial Management Number(s):
  20929415201 20929325201
Contract Number:  E2K95
Project Description:
  New ConstRUCTION N US1-9A/9B
Longlist(Tech. Rev. Cmte.) Date:  14SEP2007  Time:  02:00PM
Mand. Pre-Proposal Meeting Date:  15NOV2007  Time:  10:00AM
PhaseII Tech. Proposal Due Date:  08FEB2008  Time:   
Tech. Rev. Cmte Meeting        :  14MAR2008  Time:  09:00AM
Price Proposal Due Date        :  08FEB2008  Time:  05:00PM
Proposal Opening Date          :  18MAR2008  Time:  09:00AM
Final Selection Date Not Posted


     Project Pulled 7/26/207


DISTRICT 2    
Financial Management Number(s):
  21334575201 21334575601
Contract Number:  E2S01
Project Description:
  I-295 EXPRESS LANES
PhaseI Selection Cmte. Meeting :  10DEC2013  Time:  08:30AM
ELOI Scores Notification Date  :  10DEC2013  Time:  02:00PM
Deadline for Election to
Participate in Ph. II          :  12DEC2013  Time:  02:00PM
Posting of Shortlist           :  12DEC2013  Time:  04:15PM
Mand. Pre-Proposal Meeting Date:  19DEC2013  Time:  01:30PM
PhaseII Tech. Proposal Due Date:  25MAR2014  Time:  02:00PM
Price Proposal Due Date        :  01MAY2014  Time:  02:00PM
Proposal Opening Date          :  01MAY2014  Time:  02:00PM
Final Selection Meeting Date   :  06MAY2014  Time:  08:30AM
Posting of Award               :  12JUN2014  Time:  5:00PM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    Dragados USA                       15.6   69.6    670  $88,950,000  1008503
2    SUPERIOR CONSTRUCTION COMPANY      17.0   73.0    850  $99,295,000  1103277
3    RANGER CONSTRUCTION INDUSTRIES     18.0   73.6    790 $107,870,000  1164902
4    HUBBARD CONSTRUCTION COMPANY       16.0   67.8    670 $103,578,626  1193302


DISTRICT 2    
Financial Management Number(s):
  41650145201
Contract Number:  E2R91
Project Description:
  I-95 AT JTB
PhaseI Selection Cmte. Meeting :  12NOV2013  Time:  08:30AM
ELOI Scores Notification Date  :  12NOV2013  Time:  02:00PM
Deadline for Election to
Participate in Ph. II          :  14NOV2013  Time:  02:00PM
Posting of Shortlist           :  14NOV2013  Time:  4:15PM
PhaseII Tech. Proposal Due Date:  30APR2014  Time:  02:00PM
Final Selection Meeting Date   :  10JUN2014  Time:  08:30AM
Posting of Award               :  08JUL2014  Time:  10:01AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    SEMA CONSTRUCTION, INC.            17.8   75.5    900  $66,725,725  715557.
2    SUPERIOR CONSTRUCTION COMPANY      17.8   70.5    900  $67,595,000  765949 
3    HUBBARD CONSTRUCTION COMPANY       17.8   68.5    900  $69,116,000  801344 
4    ARCHER WESTERN CONTRACTORS,LTD     18.0   71.0    900  $73,989,346  831340 


DISTRICT 2    
Financial Management Number(s):
  42879625201 42879625601
Contract Number:  E2T09
Project Description:
  SR 116 (WONDERWOOD)
Pre-Bid Meeting Date           :  10APR2014  Time:  09:00AM
Bids Due Date                  :  12JUN2014  Time:  11:00AM
Bid Opening Date               :  12JUN2014  Time:  11:00AM
Tech. Rev. Cmte Meeting        :  24JUN2014  Time:  01:00PM
2nd Tech Rev. Cmte Meeting     :  26JUN2014  Time:  01:00PM
Final Selection Meeting Date   :  01JUL2014  Time:  08:30AM
Final Selection Date Not Posted




DISTRICT 2    
Financial Management Number(s):
  42879625201 42879625601
Contract Number:  E2T39
Project Description:
  SR 116 (WONDERWOOD)
Bids Due Date                  :  10SEP2014  Time:  11:00AM
Bid Opening Date               :  10SEP2014  Time:  11:00AM
Tech. Rev. Cmte Meeting        :  23SEP2014  Time:  11:00AM
2nd Tech Rev. Cmte Meeting     :  25SEP2014  Time:  10:00AM
Final Selection Meeting Date   :  29SEP2014  Time:  10:00AM




DISTRICT 2    
Financial Management Number(s):
  43182025201 43182025203 43182025204 43182035201
  43182035203
Contract Number:  E2R81
Project Description:
  DISTRICTWIDE SAFETY PUSHBUTTON
PhaseI Selection Cmte. Meeting :  17DEC2013  Time:  08:30AM
ELOI Scores Notification Date  :  17DEC2013  Time:  09:30AM
Deadline for Election to
Participate in Ph. II          :  19DEC2013  Time:  02:00PM
Posting of Shortlist           :  19DEC2013  Time:  04:15PM
PhaseII Tech. Proposal Due Date:  19FEB2014  Time:  02:00PM
Price Proposal Due Date        :  20MAR2013  Time:  02:00PM
Final Selection Meeting Date   :  25MAR2014  Time:  08:30AM
Posting of Award               :  01APR2014  Time:  9:24AM


Firms not participating in PhaseII  PhaseI Score
  PETTICOAT-SCHMITT CIVIL CONTRACTORS   17.0
  RANGER CONSTRUCTION INDUSTRIES,INC.   16.7


DISTRICT 2    
Financial Management Number(s):
  43351925201
Contract Number:  E2T10
Project Description:
  DW INTERSECTION IMPROVEMENTS
Pre-Bid Meeting Date           :  28APR2014  Time:  10:00AM
Bids Due Date                  :  26JUN2014  Time:  11:00AM
Bid Opening Date               :  26JUN2014  Time:  11:00AM
Tech. Rev. Cmte Meeting        :  07JUL2014  Time:  10:00AM
2nd Tech Rev. Cmte Meeting     :  09JUL2014  Time:  01:00PM
Final Selection Meeting Date   :  15JUL2014  Time:  08:30AM
Final Selection Date Not Posted





DISTRICT 3    
Financial Management Number(s):
  41403225201
Contract Number:  E3M94
Project Description:
  CR 372 MULTI-USE PATH/TRAIL
Pre-Bid Meeting Date           :  07MAY2014  Time:  10:00AM
Bids Due Date                  :  13JUN2014  Time:  10:00AM
Bid Opening Date               :  13JUN2014  Time:  10:30AM
Final Selection Meeting Date   :  30JUN2014  Time:  08:30AM
Final Selection Posting Date   :  30JUN2014



Meeting Location Notes:
  A Mandatory Pre-Proposal Meeting will be held for this
  project on Wednesday, May 7, 2014 at 10:00 a.m. local time,
  Florida Department of Transportation, 1074 Highway 90,
  Chipley, Florida.
Rank  Consultant                               Bid Amount
  1      M OF TALLAHASSEE,INC.                   $424,850
  2      C.W. ROBERTS CONTRACTING,INC.           $431,250


DISTRICT 3    
Financial Management Number(s):
  42429025201 42429125201
Contract Number:  E3M30
Project Description:
  SR 85 BRIDGE REPAIR/REHAB
PhaseI Selection Cmte. Meeting :  29SEP2014  Time:  08:30AM
ELOI Scores Notification Date  :  29SEP2014  Time:  10:00AM
Deadline for Election to
Participate in Ph. II          :  01OCT2014  Time:  10:00AM
Posting of Shortlist           :  01OCT2014  Time:  01:00PM
Mand. Pre-Proposal Meeting Date:  20OCT2014  Time:  01:30PM
PhaseII Tech. Proposal Due Date:  15JAN2015  Time:  02:00PM
Price Proposal Due Date        :  26FEB2015  Time:  10:00AM
Proposal Opening Date          :  26FEB2015  Time:  10:30AM
Final Selection Meeting Date   :  09MAR2015  Time:  08:30AM



Meeting Location Notes:
  A Mandatory Pre-Proposal Meeting will be held for this
  project on Monday, October 20, 2014 at 1:30 PM (local time)
  in the Design Conference Room located in the District Three
  Design Building at 1074 Highway 90, Chipley, FL.



DISTRICT 3    
Financial Management Number(s):
  42902475201 42902485201
Contract Number:  E3N16
Project Description:
  I-10 REST AREA REPAIR/REPLACE
PhaseI Selection Cmte. Meeting :  11AUG2014  Time:  08:30AM
ELOI Scores Notification Date  :  11AUG2014  Time:  10:00AM
Deadline for Election to
Participate in Ph. II          :  13AUG2014  Time:  10:00AM
Posting of Shortlist           :  13AUG2014  Time:  01:00PM
Mand. Pre-Proposal Meeting Date:  27AUG2014  Time:  01:30PM
PhaseII Tech. Proposal Due Date:  06NOV2014  Time:  02:00PM
Price Proposal Due Date        :  19DEC2014  Time:  10:00AM
Proposal Opening Date          :  19DEC2014  Time:  10:30AM
Final Selection Meeting Date   :  29DEC2014  Time:  08:30AM



Meeting Location Notes:
  A Mandatory Pre-Proposal Meeting will be held for this
  project on Wednesday, August 27, 2014 at 1:30 p.m. (local
  time) 1074 Highway 90, Chipley, Florida 32428.
Shortlisted Firms                   PhaseI Score
  Bell & Associates Construction, LP    13.3
  C.W. ROBERTS CONTRACTING,INC.         16.0
  CULPEPPER CONSTRUCTION CO., INC.      17.3
  GAC CONTRACTORS,INC.                  18.0
Firms not participating in PhaseII  PhaseI Score
  Reliant South Construction Group      16.7



DISTRICT 4    
Financial Management Number(s):
  22777515201 22777515601
Contract Number:  E4N82
Project Description:
  BROWARD CO. RECONSTRUCT SR 7
PhaseI Selection Cmte. Meeting :  13JAN2014  Time:  08:15AM
ELOI Scores Notification Date  :  13JAN2014  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  15JAN2014  Time:  05:00PM
Posting of Shortlist           :  16JAN2014  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  24JAN2014  Time:  01:00PM
PhaseII Tech. Proposal Due Date:  14APR2014  Time:  11:00AM
Price Proposal Due Date        :  20MAY2014  Time:  11:00AM
Proposal Opening Date          :  20MAY2014  Time:  11:00AM
Final Selection Meeting Date   :  27MAY2014  Time:  08:15AM
Posting of Award               :  27MAY2014  Time:  11:01AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
0    BERGERON LAND DEVELOPMENT, INC     17.0   73.0   1403  $29,142,095  323801 
0    PRINCE CONTRACTING, LLC.           17.3   69.3   1403  $35,637,950  411238 
1    COMMUNITY ASPHALT CORP.            18.7   74.0   1403  $29,568,100  319079 


DISTRICT 4    
Financial Management Number(s):
  23193225201 41273325201 41325725201 42978515201
  43093215201
Contract Number:  E4P04
Project Description:
  I-95 INTERCHANGE IMPROVEMENTS
PhaseI Selection Cmte. Meeting :  18NOV2013  Time:  8:15AM
ELOI Scores Notification Date  :  18NOV2013  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  20NOV2013  Time:  5:00PM
Posting of Shortlist           :  21NOV2013  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  03DEC2013  Time:  10:00AM
PhaseII Tech. Proposal Due Date:  13FEB2014  Time:  12:00PM
Price Proposal Due Date        :  16APR2014  Time:  1:00PM
Proposal Opening Date          :  16APR2014  Time:  1:00PM
Final Selection Meeting Date   :  21APR2014  Time:  8:15AM
Posting of Award               :  21APR2014  Time:  11:00AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    COMMUNITY ASPHALT CORP.            18.3   69.3    979  $32,540,300  351180 
2    CONE & GRAHAM INC                  18.3   71.0    978  $35,999,300  381632 
3    ASTALDI CONSTRUCTION CORP          16.7   68.0    979  $40,802,910  455049 
Firms not participating in PhaseII  PhaseI Score
  HUBBARD CONSTRUCTION COMPANY          15.3
  Munilla Construction Management LLC   16.3
  PRINCE CONTRACTING, LLC.              12.7


DISTRICT 4    
Financial Management Number(s):
  42170725201 42170735201 42170785201
Contract Number:  E4N84
Project Description:
  I-75 EXPRESS LANES-SEGMENT A/B
PhaseI Selection Cmte. Meeting :  19DEC2013  Time:  8:15AM
ELOI Scores Notification Date  :  19DEC2013  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  23DEC2013  Time:  5:00PM
Posting of Shortlist           :  26DEC2013  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  28JAN2014  Time:  10:00AM
PhaseII Tech. Proposal Due Date:  07MAY2014  Time:  12:00PM
Price Proposal Due Date        :  30JUN2014  Time:  11:00AM
Proposal Opening Date          :  30JUN2014  Time:  11:00AM
Final Selection Meeting Date   :  28JUL2014  Time:  8:15AM
Posting of Award               :  28JUL2014  Time:  9:01AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    COMMUNITY ASPHALT CORP.            18.5   71.3   1350 $153,256,400  1707592
2    Dragados USA                       15.3   63.0   1349 $140,005,400  1789206
3    CONDOTTE AMERICA, INC.             16.8   61.0   1350 $189,148,570  2432779
4    THE DE MOYA GROUP, INC.            17.5   73.3   1350 $240,256,400  2647543
Firms not participating in PhaseII  PhaseI Score
  ARCHER WESTERN CONTRACTORS,LTD.       16.3
  ASTALDI CONSTRUCTION CORP             15.5
  ODEBRECHT CONSTRUCTION, INC.          15.0
     Bid Alternative 2    PhaseI PhaseII Prop   Bid Price
     Rank Consultant      Score  Score   Time   Proposal
     1.Community Asphalt  18.50  71.25   1350   $193,256,400
     2.Dagrados USA       15.25  63.00   1349   $191,959,400
     3.The DeMoya Group   17.50  73.25   1350   $262,256,400
     4.Condotte America   16.75  61.00   1350   $228,178,000
     ========================================================
     Bid Alternative 3    PhaseI PhaseII Prop   Bid Price
     Rank Consultant      Score  Score   Time   Proposal
     1.Community Asphalt  18.50  71.25   1350   $215,256,400
     2.Dagrados USA       15.25  63.00   1349   $205,922,400
     3.The DeMoya Group   17.50  73.25   1350   $262,256,400
     4.Condotte America   16.75  61.00   1350   $242,320,980
     ========================================================
     Bid Alternative 4    PhaseI PhaseII Prop   Bid Price
     Rank Consultant      Score  Score   Time   Proposal
     1.Community Asphalt  18.50  71.25   1350   $228,256,400
     2.Dagrados USA       15.25  63.00   1349   $226,782,399
     3.The DeMoya Group   17.50  73.25   1350   $282,256,400
     4.Condotte America   16.75  61.00   1350   $262,996,690
     =======================================================
     Bid Alternative 5    PhaseI PhaseII Prop   Bid Price
     Rank Consultant      Score  Score   Time   Proposal
     1.Community Asphalt  18.50  71.25   1350   $233,756,400
     2.Dagrados USA       15.25  63.00   1349   $234,996,399
     3.The DeMoya Group   17.50  73.25   1350   $286,256,400
     4.Condotte America   16.75  61.00   1350   $271,639,159
     =======================================================
     The Department is awarding Bid Alternatives 1 through 5.
     The Department will enter into a contract for Bid Alternat-
     ive 1, with the option to authorize Bid Alternative 2, Bid
     Alternative 3, Bid Alternative 4 or Bid Alternative 5,
     pending a TIP/STIP amendment approval.


DISTRICT 4    
Financial Management Number(s):
  42170755201
Contract Number:  E4P08
Project Description:
  I-75 EXPRESS SEGMENT D
PhaseI Selection Cmte. Meeting :  28OCT2013  Time:  8:15AM
ELOI Scores Notification Date  :  28OCT2013  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  30OCT2013  Time:  5:00PM
Posting of Shortlist           :  31OCT2013  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  13NOV2013  Time:  10:30AM
PhaseII Tech. Proposal Due Date:  10FEB2014  Time:  12:00PM
Price Proposal Due Date        :  25MAR2014  Time:  3:00PM
Proposal Opening Date          :  25MAR2014  Time:  3:00PM
Final Selection Meeting Date   :  31MAR2014  Time:  8:15AM
Posting of Award               :  31MAR2014  Time:  11:01AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    RANGER CONSTRUCTION INDUSTRIES     17.0   65.5    850  $80,437,734  951926 
2    Dragados USA                       16.0   72.0    849  $96,450,000  1071667
3    COMMUNITY ASPHALT CORP.            18.0   66.3    850  $93,740,000  1086841
4    Bergeron Land Devel. & Johnson     17.3   59.8    850 $105,101,234  1330395
Firms not participating in PhaseII  PhaseI Score
  CONDOTTE AMERICA, INC.                14.5
  HUBBARD CONSTRUCTION COMPANY          15.8
  PRINCE CONTRACTING, LLC.              15.3
  THE DE MOYA GROUP, INC.               15.0


DISTRICT 4    
Financial Management Number(s):
  42170795201 42170775201
Contract Number:  E4Q16
Project Description:
  I-75 ITS/TOLLS IN BROWARD/DADE
PhaseI Selection Cmte. Meeting :  20OCT2014  Time:  08:15AM
ELOI Scores Notification Date  :  20OCT2014  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  22OCT2014  Time:  05:00PM
Posting of Shortlist           :  23OCT2014  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  06NOV2014  Time:  11:00AM
PhaseII Tech. Proposal Due Date:  22JAN2015  Time:  12:00PM
Price Proposal Due Date        :  11MAR2015  Time:  11:00AM
Proposal Opening Date          :  11MAR2015  Time:  11:00AM
Final Selection Meeting Date   :  16MAR2015  Time:  08:15AM



Meeting Location Notes:
  Mandatory pre-Proposal meeting location: Florida
  Department of Transportation (FDOT) District 4 Headquarters,
  at 3400 W. Commercial Blvd., Ft. Lauderdale, FL, 33309.
  .
  Technical proposal delivery location: Procurement Office
  on the first floor at the District 4 Headquarters, at
  3400 W. Commercial Blvd., Ft. Lauderdale, FL, 33309.



DISTRICT 4    
Financial Management Number(s):
  42776315201 42965515201
Contract Number:  E4P09
Project Description:
  LAUDERHILL BUS SHELTERS
Pre-Bid Meeting Date           :  03FEB2014  Time:  09:00AM
Bids Due Date                  :  07MAY2014  Time:  11:00AM
Bid Opening Date               :  07MAY2014  Time:  11:00AM
Tech. Rev. Cmte Meeting        :  13MAY2014  Time:  01:00PM
Final Selection Meeting Date   :  09JUN2014  Time:  08:15AM
Final Selection Posting Date   :  09JUN2014
Award Committee Meeting Date   :  09JUN2014  Time:  08:15AM


Rank  Consultant                               Bid Amount
  1      STATE CONTRACTING & ENG. CORP.          $922,045
  2      Enco, LLC.                            $1,013,325


DISTRICT 4    
Financial Management Number(s):
  43159015201 43159115201 43288315201 43330115201
  43394715201
Contract Number:  E4P11
Project Description:
  ATMS IN BROWARD/PALM BEACH
PhaseI Selection Cmte. Meeting :  16DEC2013  Time:  8:15AM
ELOI Scores Notification Date  :  16DEC2013  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  18DEC2013  Time:  5:00PM
Posting of Shortlist           :  19DEC2013  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  07JAN2014  Time:  1:30PM
PhaseII Tech. Proposal Due Date:  11MAR2014  Time:  12:00PM
Price Proposal Due Date        :  07MAY2014  Time:  11:00AM
Proposal Opening Date          :  07MAY2014  Time:  11:00AM
Final Selection Meeting Date   :  12MAY2014  Time:  8:15AM
Posting of Award               :  12MAY2014  Time:  2:01PM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    SICE, inc.                         13.8   64.3    646   $7,982,486  78     
2    WORLD FIBER TECHNOLOGIES, INC.     16.5   70.3    646  $15,064,024  86.75  
3    MILLER ELECTRIC COMPANY            17.3   50.3    556  $15,098,877  67.50  
Firms not participating in PhaseII  PhaseI Score
  TRAFFIC CONTROL DEVICES,INC.          15.8


DISTRICT 4    
Financial Management Number(s):
  43270415201 43270615201
Contract Number:  E4P38
Project Description:
  STATE ROAD 710 RECONSTRUCTION
PhaseI Selection Cmte. Meeting :  13FEB2014  Time:  8:15AM
ELOI Scores Notification Date  :  13FEB2014  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  17FEB2014  Time:  5:00PM
Posting of Shortlist           :  18FEB2014  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  27FEB2014  Time:  10:30AM
PhaseII Tech. Proposal Due Date:  18APR2014  Time:  12:00PM
Price Proposal Due Date        :  28MAY2014  Time:  11:00AM
Proposal Opening Date          :  28MAY2014  Time:  11:00AM
Final Selection Meeting Date   :  02JUN2014  Time:  8:15AM
Posting of Award               :  02JUN2014  Time:  11:01AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    RANGER CONSTRUCTION INDUSTRIES     17.8   70.5    688  $21,920,100  235,068
2    COMMUNITY ASPHALT CORP.            17.3   69.8    687  $22,720,100  246,958
3    PRINCE CONTRACTING, LLC.           16.3   64.8    688  $24,246,000  281,930
Firms not participating in PhaseII  PhaseI Score
  BERGERON LAND DEVELOPMENT, INC.       15.8
  HUBBARD CONSTRUCTION COMPANY          14.5
  J.W. Cheatham, LLC.                   13.5


DISTRICT 4    
Financial Management Number(s):
  43270715201
Contract Number:  E4P15
Project Description:
  ADD LANES BEELINE HIGHWAY
PhaseI Selection Cmte. Meeting :  09DEC2013  Time:  08:15AM
ELOI Scores Notification Date  :  09DEC2013  Time:  08:15AM
Deadline for Election to
Participate in Ph. II          :  11DEC2013  Time:  05:00PM
Posting of Shortlist           :  12DEC2013  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  20DEC2013  Time:  01:00PM
PhaseII Tech. Proposal Due Date:  10MAR2014  Time:  11:00AM
Price Proposal Due Date        :  30APR2014  Time:  11:00AM
Proposal Opening Date          :  30APR2014  Time:  11:00AM
Final Selection Meeting Date   :  05MAY2014  Time:  08:15AM
Posting of Award               :  05MAY2014  Time:  12:02PM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    HUBBARD CONSTRUCTION COMPANY       15.8   63.3    550   $6,920,878  87606.0
2    RANGER CONSTRUCTION INDUSTRIES     17.8   73.3    440   $8,909,114  97902.4
3    COMMUNITY ASPHALT CORP.            17.0   72.3    440   $9,689,114  108561.
Firms not participating in PhaseII  PhaseI Score
  CONALVIAS USA, LLC.                   14.5
  GIBBS & REGISTER,INC.                 12.8


DISTRICT 4    
Financial Management Number(s):
  43310845201 42800915201
Contract Number:  E4Q32
Project Description:
  I-95 EXPRESS LANES PHASE 3A-1
PhaseI Selection Cmte. Meeting :  13OCT2014  Time:  08:15AM
ELOI Scores Notification Date  :  13OCT2014  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  15OCT2014  Time:  05:00PM
Posting of Shortlist           :  16OCT2014  Time:  11:00AM
Mand. Pre-Proposal Meeting Date:  27OCT2014  Time:  09:30AM
PhaseII Tech. Proposal Due Date:  16FEB2015  Time:  11:00AM
Price Proposal Due Date        :  27APR2015  Time:  11:00AM
Proposal Opening Date          :  27APR2015  Time:  11:00AM
Final Selection Meeting Date   :  11MAY2015  Time:  08:15AM





DISTRICT 4    
Financial Management Number(s):
  43316515201
Contract Number:  E4N95
Project Description:
  ADD SIDEWALKS & BIKE LANES
Pre-Bid Meeting Date           :  12MAR2014  Time:  08:30AM
Bids Due Date                  :  28APR2014  Time:  11:00AM
Bid Opening Date               :  28APR2014  Time:  11:00AM
Tech. Rev. Cmte Meeting        :  12MAY2014  Time:  02:30PM
Final Selection Meeting Date   :  02JUN2014  Time:  08:15AM
Final Selection Posting Date   :  02JUN2014
Award Committee Meeting Date   :  02JUN2014  Time:  08:15AM


Rank  Consultant                               Bid Amount
  1      Construct Group Corp.                $15,085,307
  2      WEEKLEY ASPHALT PAVING,INC.          $15,578,224
  3      CONALVIAS USA, LLC.                  $16,777,050
  4      Halley Engineering Contractors, Inc  $16,986,000
  5      RANGER CONSTRUCTION INDUSTRIES,INC.  $18,656,000
  6      STATE CONTRACTING & ENG. CORP.       $19,899,486
  7      COMMUNITY ASPHALT CORP.              $20,960,192



DISTRICT 5    
Financial Management Number(s):
  24262625201
Contract Number:  E5W10
Project Description:
  I-75 FROM N OF HERNANDO CO
PhaseI Selection Cmte. Meeting :  25NOV2013  Time:  08:15AM
ELOI Scores Notification Date  :  25NOV2013  Time:  12:00PM
Deadline for Election to
Participate in Ph. II          :  27NOV2013  Time:  12:00PM
Posting of Shortlist           :  27NOV2013  Time:  04:00PM
Mand. Pre-Proposal Meeting Date:  09DEC2013  Time:  09:00AM
PhaseII Tech. Proposal Due Date:  12MAR2014  Time:  02:30PM
Price Proposal Due Date        :  23APR2014  Time:  02:30PM
Proposal Opening Date          :  23APR2014  Time:  02:30PM
Final Selection Meeting Date   :  30APR2014  Time:  08:15AM
Posting of Award               :  08JUL2014  Time:  12:02PM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    THE MIDDLESEX CORPORATION          17.0   77.3         $76,960,400  815834 
2    COMMUNITY ASPHALT CORP.            15.3   71.7         $80,800,000  928735 
Firms not participating in PhaseII  PhaseI Score
  ANDERSON COLUMBIA CO. INC.            12.3
  D.A.B. CONSTRUCTORS, INC.             10.7
  GRANITE CONSTRUCTION COMPANY          14.3
  HUBBARD CONSTRUCTION COMPANY          12.3
  LANE CONSTRUCTION CORPORATION         15.0
  PRINCE CONTRACTING, LLC.              14.7
  RANGER CONSTRUCTION INDUSTRIES,INC.   13.7
  SOUTHLAND CONSTRUCTION,INC.           13.3


DISTRICT 5    
Financial Management Number(s):
  24271525201
Contract Number:  E5W26
Project Description:
  I-95/I4 INTERCHANGE
PhaseI Selection Cmte. Meeting :  17MAR2014  Time:  08:15AM
ELOI Scores Notification Date  :  17MAR2014  Time:  12:00PM
Deadline for Election to
Participate in Ph. II          :  19MAR2014  Time:  12:00PM
Posting of Shortlist           :  19MAR2014  Time:  05:00PM
Mand. Pre-Proposal Meeting Date:  31MAR2014  Time:  09:00AM
PhaseII Tech. Proposal Due Date:  05SEP2014  Time:  02:30PM
Price Proposal Due Date        :  05SEP2014  Time:  02:30PM
Proposal Opening Date          :  05SEP2014  Time:  02:30PM
Final Selection Meeting Date   :  15SEP2014  Time:  08:15AM
Posting of Award               :  15SEP2014  Time:  11:01AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    ARCHER WESTERN CONTRACTORS,LTD     17.0   69.3   1100 $204,975,000  2751371
2    COMMUNITY ASPHALT CORP.            17.0   66.3   1300 $215,000,000  3041760
3    Lane-Middlesex, A Joint Ventur     18.0   71.7   1200 $273,330,000  3444424
4    HUBBARD CONSTRUCTION COMPANY       17.0   63.0   1400 $264,354,000  3822425


DISTRICT 5    
Financial Management Number(s):
  42821315201
Contract Number:  E5W64
Project Description:
  I-75 D/B SR 44 TO US 27
Bids Due Date                  :  09JUN2014  Time:  02:00PM
Bid Opening Date               :  09JUN2014  Time:  02:00PM
Final Selection Meeting Date   :  16JUN2014  Time:  08:15AM
Final Selection Date Not Posted
Award Committee Meeting Date   :  16JUN2014  Time:  08:15AM




DISTRICT 5    
Financial Management Number(s):
  43360715201
Contract Number:  E5W31
Project Description:
  SR 50 OVER ECON RIVER
PhaseI Selection Cmte. Meeting :  10MAR2014  Time:  08:15AM
ELOI Scores Notification Date  :  10MAR2014  Time:  12:00PM
Deadline for Election to
Participate in Ph. II          :  12MAR2014  Time:  02:00PM
Posting of Shortlist           :  12MAR2014  Time:  04:00PM
PhaseII Tech. Proposal Due Date:  04AUG2014  Time:  02:30PM
Final Selection Meeting Date   :  11AUG2014  Time:  10:00AM
Posting of Award               :  28AUG2014  Time:  4:00PM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    HUBBARD CONSTRUCTION COMPANY       17.3   66.3         $11,820,000  141274.
2    LEWARE CONSTRUCTION COMPANY FL     18.0   72.3         $14,688,000  162597.
3    CONALVIAS USA, LLC.                13.0   59.3         $11,922,000  164820 
4    THE MIDDLESEX CORPORATION          18.3   74.3         $15,640,000  168776.


DISTRICT 5    
Financial Management Number(s):
  43487115201
Contract Number:  E5W32
Project Description:
  SR 600/US 92 PEDESTRIAN IMPR.
PhaseI Selection Cmte. Meeting :  03MAR2014  Time:  08:15AM
ELOI Scores Notification Date  :  03MAR2014  Time:  12:00PM
Deadline for Election to
Participate in Ph. II          :  05MAR2014  Time:  12:00PM
Posting of Shortlist           :  05MAR2014  Time:  05:00PM
Mand. Pre-Proposal Meeting Date:  17MAR2014  Time:  09:00AM
PhaseII Tech. Proposal Due Date:  28MAY2014  Time:  02:30PM
Price Proposal Due Date        :  10JUL2014  Time:  02:30PM
Proposal Opening Date          :  10JUL2014  Time:  02:30PM
Final Selection Meeting Date   :  14JUL2014  Time:  08:15AM
Posting of Award               :  14JUL2014  Time:  11:01AM


                                        PhaseI PhaseII Prop Bid Price    Adjusted
Rank Consultant                         Score  Score   Time Proposal     Score
1    P & S PAVING,INC.                  17.0   70.0    467  $17,212,700  87.00  
2    SOUTHLAND CONSTRUCTION,INC.        16.3   72.7    467  $18,375,000  89.00  
3    CONE & GRAHAM INC                  17.0   71.3    467  $19,280,000  88.33  
Firms not participating in PhaseII  PhaseI Score
  GIBBS & REGISTER,INC.                 11.7
  SEMA CONSTRUCTION, INC.               12.3



DISTRICT 6    
Financial Management Number(s):
  41774079201
Contract Number:  E6I85
Project Description:
  ARTERIAL DMS REPLACEMENT
Pre-Bid Meeting Date           :  06FEB2014  Time:  10:00AM
Bids Due Date                  :  27MAR2014  Time:  11:00AM
Bid Opening Date               :  27MAR2014  Time:  11:00AM
Final Selection Meeting Date   :  10APR2014  Time:  T.B.A
Final Selection Date Not Posted
Award Committee Meeting Date   :  07APR2014  Time:  10:00AM






DISTRICT 7    
Financial Management Number(s):
  25633925201
Contract Number:  E7I46
Project Description:
  SR 54 SUNCOAST PKWY TO US 41
Pre-Bid Meeting Date           :  17JUN2014  Time:  01:30 P
Bids Due Date                  :  14AUG2014  Time:  02:30 P
Bid Opening Date               :  14AUG2014  Time:  02:30 P
Final Selection Meeting Date   :  29AUG2014  Time:  10:00AM
Final Selection Posting Date   :  03SEP2014
Award Committee Meeting Date   :  29AUG2014  Time:  10:00AM


Rank  Consultant                               Bid Amount
  1      Pepper Contracting Services, Inc.    $15,723,500
  2      CONALVIAS USA, LLC.                  $16,000,500
  3      DAVID NELSON CONSTRUCTION CO.        $17,229,000
  4      HUBBARD CONSTRUCTION COMPANY         $18,329,500
  5      AJAX PAVING INDUSTRIES OF FL, LLC    $18,382,500
  6      D.A.B. CONSTRUCTORS, INC.            $19,768,389


DISTRICT 7    
Financial Management Number(s):
  40582225201 40582225601 40582225602
Contract Number:  E7J19
Project Description:
  US19 GREEN ACRES ST TO JUMP CT
PhaseI Selection Cmte. Meeting :  25APR2014  Time:  10:00AM
ELOI Scores Notification Date  :  25APR2014  Time:  05:00PM
Deadline for Election to
Participate in Ph. II          :  28APR2014  Time:  05:00PM
Posting of Shortlist           :  29APR2014  Time:  12:00PM
Mand. Pre-Proposal Meeting Date:  13MAY2014  Time:  10:00AM
PhaseII Tech. Proposal Due Date:  04AUG2014  Time:  02:30PM
Price Proposal Due Date        :  18SEP2014  Time:  02:30PM
Proposal Opening Date          :  18SEP2014  Time:  02:30PM
Final Selection Meeting Date   :  26SEP2014  Time:  10:00AM


Shortlisted Firms                   PhaseI Score
  AJAX PAVING INDUSTRIES OF FL, LLC     16.3
  CONE & GRAHAM INC                     17.3
  D.A.B. CONSTRUCTORS, INC.             14.3
  SOUTHLAND CONSTRUCTION,INC.           14.7


DISTRICT 7    
Financial Management Number(s):
  41101145201 41101225201 41101145603
Contract Number:  E7I42
Project Description:
  I-75 SR50 TO SUMTER CTY LINE
PhaseI Selection Cmte. Meeting :  25AUG2014  Time:  10:00AM
ELOI Scores Notification Date  :  29AUG2014  Time:  05:00PM
Deadline for Election to
Participate in Ph. II          :  02SEP2014  Time:  11:00AM
Posting of Shortlist           :  03SEP2014  Time:  12:00PM
PhaseII Tech. Proposal Due Date:  08DEC2014  Time:  02:30PM
Final Selection Meeting Date   :  30JAN2015  Time:  10:00AM


Shortlisted Firms                   PhaseI Score
  GRANITE CONSTRUCTION COMPANY          17.6
  LANE CONSTRUCTION CORPORATION         16.6
  PRINCE CONTRACTING, LLC.              15.6
  THE MIDDLESEX CORPORATION             16.0
Firms not participating in PhaseII  PhaseI Score
  CONE & GRAHAM INC                     15.4
  HUBBARD CONSTRUCTION COMPANY          16.4
  THE DE MOYA GROUP, INC.               14.8


DISTRICT 7    
Financial Management Number(s):
  41636125201 41636135201
Contract Number:  E7F49
Project Description:
  X-TOWN EXPWY DECK REPLACEMENT
Longlist(Tech. Rev. Cmte.) Date:  23FEB2010  Time:  0800AM
PhaseI Selection Cmte. Meeting :  12MAR2010  Time:  0830AM
Posting of Shortlist           :  12MAR2010  Time:   
Final Selection Date Not Posted


Responding  Firms                   PhaseI Score
  ALTALDI CONSTRUCTION CORP.                
  ARCHER WESTERN CONTRACTORS,LTD.           
  C & G / CC ENGINEER                       
  HUBBARD CONSTRUCTION COMPANY              
  LANE CONSTRUCTION CORPORATION             
  SUPERIOR CONSTRUCTION CO.,INC.            
Firms not participating in PhaseII  PhaseI Score
  ALTALDI CONSTRUCTION CORP.                
  ARCHER WESTERN CONTRACTORS,LTD.           
  C & G / CC ENGINEER                       
  HUBBARD CONSTRUCTION COMPANY              
  LANE CONSTRUCTION CORPORATION             
  SUPERIOR CONSTRUCTION CO.,INC.            



TURNPIKE      
Financial Management Number(s):
  40611015201 40611025201
Contract Number:  E8N75
Project Description:
  I-75 @ FL TPK - WILDWOOD INT.
PhaseI Selection Cmte. Meeting :  25AUG2014  Time:  02:00PM
ELOI Scores Notification Date  :  25AUG2014  Time:  05:00PM
Deadline for Election to
Participate in Ph. II          :  27AUG2014  Time:  05:00PM
Posting of Shortlist           :  28AUG2014  Time:  02:00PM
Mand. Pre-Proposal Meeting Date:  05SEP2014  Time:  10:00AM
PhaseII Tech. Proposal Due Date:  09DEC2014  Time:  05:00PM
Price Proposal Due Date        :  19FEB2015  Time:  02:30PM
Proposal Opening Date          :  19FEB2015  Time:  02:30PM
Final Selection Meeting Date   :  26FEB2015  Time:  11:00AM


     Notice of Protest Received. Procurement suspended until
     further notice.


TURNPIKE      
Financial Management Number(s):
  41505115201 43081115201
Contract Number:  E8N18
Project Description:
  HEFT WIDENING KILLIAN TO SW 72
PhaseI Selection Cmte. Meeting :  05DEC2013  Time:  01:30PM
ELOI Scores Notification Date  :  05DEC2013  Time:  04:00PM
Deadline for Election to
Participate in Ph. II          :  09DEC2013  Time:  05:00PM
Posting of Shortlist           :  10DEC2013  Time:  02:00PM
PhaseII Tech. Proposal Due Date:  11MAR2014  Time:  02:30PM
Price Proposal Due Date        :  21APR2014  Time:  02:30PM
Proposal Opening Date          :  21APR2014  Time:  02:30PM
Final Selection Meeting Date   :  28APR2014  Time:  11:00AM
Final Selection Date Not Posted




TURNPIKE      
Financial Management Number(s):
  41505145201
Contract Number:  E8N67
Project Description:
  WIDEN HEFT-BIRD RD TO SR836
PhaseI Selection Cmte. Meeting :  06OCT2014  Time:  01:00PM
ELOI Scores Notification Date  :  06OCT2014  Time:  04:00PM
Deadline for Election to
Participate in Ph. II          :  08OCT2014  Time:  05:00PM
Posting of Shortlist           :  09OCT2014  Time:  02:00PM
Mand. Pre-Proposal Meeting Date:  20OCT2014  Time:  11:00AM
PhaseII Tech. Proposal Due Date:  20JAN2015  Time:  05:OOPM
Price Proposal Due Date        :  24MAR2015  Time:  02:30PM
Proposal Opening Date          :  24MAR2015  Time:  02:30PM
Final Selection Meeting Date   :  31MAR2015  Time:  11:00AM





TURNPIKE      
Financial Management Number(s):
  42714615201
Contract Number:  E8N20
Project Description:
  WIDEN HEFT SW 72ND TO BIRD RD
PhaseI Selection Cmte. Meeting :  04FEB2014  Time:  11:00AM
ELOI Scores Notification Date  :  04FEB2014  Time:  04:00PM
Deadline for Election to
Participate in Ph. II          :  06FEB2014  Time:  05:00PM
Posting of Shortlist           :  07FEB2014  Time:  02:00PM
PhaseII Tech. Proposal Due Date:  06MAY2014  Time:  02:30PM
Final Selection Meeting Date   :  23JUN2014  Time:  11:00AM
Final Selection Date Not Posted




TURNPIKE      
Financial Management Number(s):
  42935015201
Contract Number:  E8N19
Project Description:
  VETERANS WIDENING
PhaseI Selection Cmte. Meeting :  17DEC2013  Time:  11:00AM
ELOI Scores Notification Date  :  17DEC2013  Time:  04:00PM
Deadline for Election to
Participate in Ph. II          :  19DEC2013  Time:  05:00PM
Posting of Shortlist           :  20DEC2013  Time:  02:00PM
Mand. Pre-Proposal Meeting Date:  16JAN2014  Time:  10:00AM
PhaseII Tech. Proposal Due Date:  03APR2014  Time:  02:30PM
Price Proposal Due Date        :  14MAY2014  Time:  02:30PM
Final Selection Meeting Date   :  20MAY2014  Time:  11:00AM
Final Selection Date Not Posted




TURNPIKE      
Financial Management Number(s):
  42935045201
Contract Number:  E8N52
Project Description:
  WIDEN VETERANS-SUGARWD-VANDYKE
PhaseI Selection Cmte. Meeting :  15APR2014  Time:  11:30AM
ELOI Scores Notification Date  :  15APR2014  Time:  04:00PM
Deadline for Election to
Participate in Ph. II          :  17APR2014  Time:  05:00PM
Posting of Shortlist           :  18APR2014  Time:  02:00PM
Mand. Pre-Proposal Meeting Date:  05MAY2014  Time:  10:00AM
PhaseII Tech. Proposal Due Date:  01AUG2014  Time:  02:30PM
Price Proposal Due Date        :  26SEP2014  Time:  02:30PM
Proposal Opening Date          :  26SEP2014  Time:  02:30PM
Final Selection Meeting Date   :  03OCT2014  Time:  01:30PM




            
 
 
  Back to Top