Professional Services Selection Results
 
Click Here to go to myFlorida.com   Link to the Florida Department of Transportation home page
 
 
 
PROCUREMENT OFFICE
Professional Services Selection Results

Procurement Office Home Page
 
 

Pursuant to Section 120.57(3), Florida Statutes, and Rule Chapter 28-110, Florida Administrative Code, any person adversely affected by the agency decision or intended decision shall file with the agency both a notice of protest in writing and bond within 72 hours after the posting of the notice of decision or intended decision, or posting of the solicitation with respect to a protest of the terms, conditions, and specifications contained in a solicitation and will file a formal written protest within ten days after the filing of the notice of protest. The required notice of protest and bond, and formal written protest must each be timely filed with the Florida Department of Transportation, Clerk of Agency Proceedings, 605 Suwannee St, Mail Station 58, Tallahassee FL 32399-0458. Failure to file a notice of protest or formal written protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes.

 
 

 
District: 1 2 3 4 5 6 7 Turnpike Central Office
 
 
Updated: Saturday March 25 2017  
 
 

DISTRICT 1    
Advertisement Number          : 17149
Financial Management Number(s):
  TBA
Project Description           :
  BRIDGE ENGINEERING DESIGN CONT
Longlist(Tech. Rev. Cmte.) Date:  02NOV2016  Time:  03:30PM
Shortlist Selection Date       :  15NOV2016  Time:  10:00AM
Shortlist Selection Posting    :  15NOV2016  Time:  5:00 P
Scope Meeting Date             :  29NOV2016  Time:  10:30AM
Tech. Rev. Cmte Meeting Date   :  12JAN2017  Time:  02:45PM
Final Selection Meeting Date   :  02FEB2017  Time:  10:00AM
Final Selection Posting Date   :  02FEB2017  Time:  11:13AM




Rank  Consultant
  1      AECOM TECHNICAL SERVICES, INC.     
  2      T.Y. LIN INTERNATIONAL             
  3      PARSONS BRINCKERHOFF, INC.         


DISTRICT 1    
Advertisement Number          : 18135
Financial Management Number(s):
  TBD
Project Description           :
  District Wide Minor Design
Longlist(Tech. Rev. Cmte.) Date:  08MAR2017  Time:  01:00PM
Shortlist Selection Date       :  14MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  14MAR2017  Time:  12:00 P
Tech. Rev. Cmte Meeting Date   :  11APR2017  Time:  04:00PM
Final Selection Meeting Date   :  04MAY2017  Time:  11:00AM





Shortlisted Firms:
  DRMP, INC.                         
  FALLER, DAVIS & ASSOCIATES, INC.   
  KIMLEY-HORN AND ASSOCIATES, INC.   
  SCALAR CONSULTING GROUP INC.       


DISTRICT 1    
Advertisement Number          : 18105
Financial Management Number(s):
  19821513210
Project Description           :
  D/W Subsurface Utility Designa
Longlist(Tech. Rev. Cmte.) Date:  20MAR2017  Time:  08:30AM
Shortlist Selection Date       :  30MAR2017  Time:  10:00AM
Scope Meeting Date             :  10APR2017  Time:  08:30AM
Tech. Rev. Cmte Meeting Date   :  01MAY2017  Time:  02:45PM
Final Selection Meeting Date   :  18MAY2017  Time:  01:30PM




DISTRICT 1    
Advertisement Number          : 18102
Financial Management Number(s):
  19834613205
Project Description           :
  TRAFFIC STUDIES CONSULTANT
Longlist(Tech. Rev. Cmte.) Date:  07MAR2017  Time:  08:30AM
Shortlist Selection Date       :  14MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  14MAR2017  Time:  12:00 P
Scope Meeting Date             :  22MAR2017  Time:  08:30AM
Tech. Rev. Cmte Meeting Date   :  13APR2017  Time:  02:45PM
Final Selection Meeting Date   :  04MAY2017  Time:  11:00AM





Shortlisted Firms:
  ICON CONSULTANT GROUP, INC.        
  S&ME, INC.                         
  VANASSE HANGEN BRUSTLIN, INC.      


DISTRICT 1    
Advertisement Number          : 17123
Financial Management Number(s):
  40403213210
Project Description           :
  Resurfacing Design Contract
Longlist(Tech. Rev. Cmte.) Date:  07MAR2017  Time:  02:00PM
Shortlist Selection Date       :  14MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  14MAR2017  Time:  12:00 P
Tech. Rev. Cmte Meeting Date   :  10APR2017  Time:  02:45PM
Final Selection Meeting Date   :  27APR2017  Time:  09:00AM





Shortlisted Firms:
  COMPREHENSIVE ENGINEERING SERVICES,
  DRMP, INC.                         
  Palmer & Associates, Inc.          


DISTRICT 1    
Advertisement Number          : 18140
Financial Management Number(s):
  40927813205
Project Description           :
  Access Management Design Support
Longlist(Tech. Rev. Cmte.) Date:  20MAR2017  Time:  01:30PM
Shortlist Selection Date       :  30MAR2017  Time:  10:00AM
Scope Meeting Date             :  11APR2017  Time:  01:30PM
Tech. Rev. Cmte Meeting Date   :  04MAY2017  Time:  02:45PM
Final Selection Meeting Date   :  18MAY2017  Time:  01:30PM




DISTRICT 1    
Advertisement Number          : 18127
Financial Management Number(s):
  41244611205
Project Description           :
  ETDM AND NEPA SUPPORT
Longlist(Tech. Rev. Cmte.) Date:  22MAR2017  Time:  09:30AM
Shortlist Selection Date       :  30MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  01JUN2017  Time:  01:30PM




DISTRICT 1    
Advertisement Number          : 18104
Financial Management Number(s):
  41304246201
Project Description           :
  I-75 from S of N. Jones Loop t
Longlist(Tech. Rev. Cmte.) Date:  23FEB2017  Time:  2:30PM
Shortlist Selection Date       :  02MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  02MAR2017  Time:  12:00 P
Final Selection Meeting Date   :  30MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  04APR2017  Time:  10:00AM





Shortlisted Firms:
  AIM ENGINEERING AND SURVEYING, INC.
  ATKINS NORTH AMERICA, INC.         
  METRIC ENGINEERING INC.            


DISTRICT 1    
Advertisement Number          : 17135
Financial Management Number(s):
  41773346201
Project Description           :
  ITS Equipment Dynamic Message Sign Replacement
Longlist(Tech. Rev. Cmte.) Date:  09FEB2017  Time:  02:30PM
Shortlist Selection Date       :  16FEB2017  Time:  01:30PM
Shortlist Selection Posting    :  16FEB2017  Time:  3:00 P
Final Selection Meeting Date   :  02MAR2017  Time:  10:00AM
Final Selection Posting Date   :  02MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  27MAR2017  Time:  10:00AM




Rank  Consultant
  1      AIM ENGINEERING AND SURVEYING, INC.
  2      CARNAHAN, PROCTOR AND CROSS, INC.  


DISTRICT 1    
Advertisement Number          : 17127
Financial Management Number(s):
  42271056201
Project Description           :
  US41 (SR45) from Salford Blvd to Sumter Blvd, Sarasota Count
Longlist(Tech. Rev. Cmte.) Date:  21DEC2016  Time:  01:30PM
Shortlist Selection Date       :  29DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  29DEC2016  Time:  12:00 P
Final Selection Meeting Date   :  17JAN2017  Time:  10:00PM
Final Selection Posting Date   :  17JAN2017  Time:  1:00PM




Rank  Consultant
  1      AMEC FOSTER WHEELER ENVIRONMENT & I
  2      AECOM TECHNICAL SERVICES, INC.     
  3      TETRA TECH, INC.                   


DISTRICT 1    
Advertisement Number          : 17144
Financial Management Number(s):
  42584116201
Project Description           :
  SR 82 from CR 884 (Lee Blvd) t
Longlist(Tech. Rev. Cmte.) Date:  11JAN2017  Time:  10:00 A
Shortlist Selection Date       :  17JAN2017  Time:  01:00 P
Shortlist Selection Posting    :  17JAN2017  Time:  11:39 A
Final Selection Meeting Date   :  02FEB2017  Time:  10:00 A
Final Selection Posting Date   :  02FEB2017  Time:  12:00PM
1st Negotiations Meeting Date  :  23FEB2017  Time:  10:00 A




Rank  Consultant
  1      KINARD-STONE, INC.                 
  2      METRIC ENGINEERING INC.            
  3      EISMAN & RUSSO, INC.               


DISTRICT 1    
Advertisement Number          : 17133
Financial Management Number(s):
  42838316201
Project Description           :
  SR45 (US41) FROM 10TH STREET TO 14TH STREET
Longlist(Tech. Rev. Cmte.) Date:  27FEB2017  Time:  10:00AM
Shortlist Selection Date       :  14MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  14MAR2017  Time:  12:00 P
Final Selection Meeting Date   :  30MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  20APR2017  Time:  10:00AM





Shortlisted Firms:
  AMEC FOSTER WHEELER ENVIRONMENT & I
  CDM SMITH INC.                     
  KINARD-STONE, INC.                 


DISTRICT 1    
Advertisement Number          : 18101
Financial Management Number(s):
  43020423201
Project Description           :
  SR 684 from SR 789 (Gulf Dr.)
Longlist(Tech. Rev. Cmte.) Date:  18JAN2017  Time:  09:30AM
Shortlist Selection Date       :  02FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  02FEB2017  Time:  12:00 P
Scope Meeting Date             :  08FEB2017  Time:  03:15PM
Tech. Rev. Cmte Meeting Date   :  27FEB2017  Time:  02:45PM
Final Selection Meeting Date   :  14MAR2017  Time:  10:00AM
Final Selection Posting Date   :  14MAR2017  Time:  1:00PM
1st Negotiations Meeting Date  :  04APR2017  Time:  09:00AM




Rank  Consultant
  1      H.W. LOCHNER INC                   
  2      PARSONS TRANSPORTATION GROUP INC.  
  3      JACOBS ENGINEERING GROUP INC.      


DISTRICT 1    
Advertisement Number          : 17129
Financial Management Number(s):
  43129812201
Project Description           :
  SR 31 Extension from SR 70 toUS 17
Longlist(Tech. Rev. Cmte.) Date:  14NOV2016  Time:  01:30PM
Shortlist Selection Date       :  01DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  01DEC2016  Time:  11:00 A
Scope Meeting Date             :  08DEC2016  Time:  03:15PM
Tech. Rev. Cmte Meeting Date   :  17JAN2017  Time:  02:45PM
Final Selection Meeting Date   :  02FEB2017  Time:  10:00AM
Final Selection Posting Date   :  02FEB2017  Time:  12:00PM
1st Negotiations Meeting Date  :  27FEB2017  Time:  09:00AM




Rank  Consultant
  1      RS&H, INC.                         
  2      H.W. LOCHNER INC                   
  3      AECOM TECHNICAL SERVICES, INC.     


DISTRICT 1    
Advertisement Number          : 17130
Financial Management Number(s):
  43135112201
Project Description           :
  US 17/92 Hinson Ave from SR 17
Longlist(Tech. Rev. Cmte.) Date:  08DEC2016  Time:  09:30AM
Shortlist Selection Date       :  13DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  13DEC2016  Time:  12:00 P
Scope Meeting Date             :  05JAN2017  Time:  01:30PM
Tech. Rev. Cmte Meeting Date   :  30JAN2017  Time:  02:45PM
Final Selection Meeting Date   :  16FEB2017  Time:  01:30PM
Final Selection Posting Date   :  16FEB2017  Time:  3:00PM
1st Negotiations Meeting Date  :  16MAR2017  Time:  09:00AM




Rank  Consultant
  1      AECOM TECHNICAL SERVICES, INC.     
  2      TRANSYSTEMS CORPORATION D/B/A TRANS
  3      TETRA TECH, INC.                   


DISTRICT 1    
Advertisement Number          : 18138
Financial Management Number(s):
  43318326203
Project Description           :
  CEI Continuing Services (inspe
Longlist(Tech. Rev. Cmte.) Date:  21FEB2017  Time:  11:00AM
Shortlist Selection Date       :  02MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  02MAR2017  Time:  11:00 A
Final Selection Meeting Date   :  30MAR2017  Time:  10:00AM





Shortlisted Firms:
  AECOM TECHNICAL SERVICES, INC.     
  JACOBS ENGINEERING GROUP INC.      


DISTRICT 1    
Advertisement Number          : 17128
Financial Management Number(s):
  43326823201
Project Description           :
  FT Fraser Trail Extension fm SR540/Winter Lake Rd to Combee
Longlist(Tech. Rev. Cmte.) Date:  21NOV2016  Time:  09:00AM
Shortlist Selection Date       :  01DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  01DEC2016  Time:  11:00 A
Scope Meeting Date             :  08DEC2016  Time:  01:45PM
Tech. Rev. Cmte Meeting Date   :  18JAN2017  Time:  02:45PM
Final Selection Meeting Date   :  02FEB2017  Time:  10:00AM
Final Selection Posting Date   :  02FEB2017  Time:  12:00PM
1st Negotiations Meeting Date  :  14MAR2017  Time:  09:00AM




Rank  Consultant
  1      WANTMAN GROUP, INC.                
  2      CARDNO, INC.                       
  3      THE BALMORAL GROUP, LLC            


DISTRICT 1    
Advertisement Number          : 17126
Financial Management Number(s):
  43493716201
Project Description           :
  SR 37 FROM CR 630 TO CR 640 (PINECREST RD) BDI
Longlist(Tech. Rev. Cmte.) Date:  19DEC2016  Time:  01:30PM
Shortlist Selection Date       :  29DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  29DEC2016  Time:  11:00 A
Final Selection Meeting Date   :  17JAN2017  Time:  10:00AM
Final Selection Posting Date   :  17JAN2017  Time:  1:00PM
1st Negotiations Meeting Date  :  09FEB2017  Time:  10:00AM




Rank  Consultant
  1      KEYSTONE CIVIL, INC.               
  2      JOHNSON-ADAMS & ASSOCIATES, LLC    
  3      CARNAHAN, PROCTOR AND CROSS, INC.  


DISTRICT 1    
Advertisement Number          : 17131
Financial Management Number(s):
  43493916201
Project Description           :
  SR 45 (US 41) from Alico Rd to Daniels Pkwy
Longlist(Tech. Rev. Cmte.) Date:  23JAN2017  Time:  01:30PM
Shortlist Selection Date       :  02FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  02FEB2017  Time:  12:00 P
Final Selection Meeting Date   :  16FEB2017  Time:  01:30PM
Final Selection Posting Date   :  16FEB2017  Time:  3:00PM
1st Negotiations Meeting Date  :  13MAR2017  Time:  10:00AM




Rank  Consultant
  1      EISMAN & RUSSO, INC.               
  2      VOLKERT, INC.                      
  3      KEITH AND SCHNARS, P.A.            


DISTRICT 1    
Advertisement Number          : 17134
Financial Management Number(s):
  43496512201
Project Description           :
  Harborview Road from Melbourne Rd to I-75
Longlist(Tech. Rev. Cmte.) Date:  29SEP2016  Time:  09:00AM
Shortlist Selection Date       :  11OCT2016  Time:  10:45AM
Shortlist Selection Posting    :  11OCT2016  Time:  12:00 P
Scope Meeting Date             :  24OCT2016  Time:  10:45AM
Tech. Rev. Cmte Meeting Date   :  15NOV2016  Time:  02:45PM
Final Selection Meeting Date   :  13DEC2016  Time:  10:00AM
Final Selection Posting Date   :  13DEC2016  Time:  12:00PM
1st Negotiations Meeting Date  :  01FEB2017  Time:  09:00AM




Rank  Consultant
  1      AIM ENGINEERING AND SURVEYING, INC.
  2      RUMMEL, KLEPPER & KAHL, LLP D/B/A R
  3      AMERICAN CONSULTING ENGINEERS OF FL


DISTRICT 1    
Advertisement Number          : 17125
Financial Management Number(s):
  43534812201
Project Description           :
  SR 78 (BAYSHORE RD) FROM PARK 78 DRIVE TO SR 31
Longlist(Tech. Rev. Cmte.) Date:  03OCT2016  Time:  08:30AM
Shortlist Selection Date       :  11OCT2016  Time:  10:45AM
Shortlist Selection Posting    :  11OCT2016  Time:  12:00 P
Scope Meeting Date             :  20OCT2016  Time:  01:15PM
Tech. Rev. Cmte Meeting Date   :  10NOV2016  Time:  02:45PM
Final Selection Meeting Date   :  01DEC2016  Time:  10:00AM
Final Selection Posting Date   :  01DEC2016  Time:  11:00AM
1st Negotiations Meeting Date  :  17JAN2017  Time:  09:00AM




Rank  Consultant
  1      SAM SCHWARTZ ENGINEERING, DPC, PA  
  2      AMERICAN CONSULTING ENGINEERS OF FL
  3      TETRA TECH, INC.                   


DISTRICT 1    
Advertisement Number          : 17124
Financial Management Number(s):
  43539112201
Project Description           :
  OLD DIXIE TRAIL FROM AUBURNDALE TO HAINES CITY
Longlist(Tech. Rev. Cmte.) Date:  19SEP2016  Time:  01:45PM
Shortlist Selection Date       :  29SEP2016  Time:  10:00AM
Shortlist Selection Posting    :  29SEP2016  Time:  1:00 P
Scope Meeting Date             :  12OCT2016  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  31OCT2016  Time:  02:45PM
Final Selection Meeting Date   :  15NOV2016  Time:  10:00AM
Final Selection Posting Date   :  15NOV2016  Time:  5:00PM
1st Negotiations Meeting Date  :  31JAN2017  Time:  10:00AM




Rank  Consultant
  1      HNTB CORPORATION                   
  2      GREENMAN-PEDERSEN, INC.            
  3      SAM SCHWARTZ ENGINEERING, DPC, PA  


DISTRICT 1    
Advertisement Number          : 18137
Financial Management Number(s):
  43631413202
Project Description           :
  Landscaping Design Contract
Longlist(Tech. Rev. Cmte.) Date:  07FEB2017  Time:  09:00AM
Shortlist Selection Date       :  16FEB2017  Time:  01:30PM
Shortlist Selection Posting    :  16FEB2017  Time:  3:00 P
Scope Meeting Date             :  01MAR2017  Time:  02:00PM
Tech. Rev. Cmte Meeting Date   :  27MAR2017  Time:  02:45PM
Final Selection Meeting Date   :  11APR2017  Time:  10:00AM





Shortlisted Firms:
  AECOM TECHNICAL SERVICES, INC.     
  KEITH AND SCHNARS, P.A.            
  KIMLEY-HORN AND ASSOCIATES, INC.   


DISTRICT 1    
Advertisement Number          : 18103
Financial Management Number(s):
  43659916201
Project Description           :
  SR 35 FROM BERMONT RD TO PINEGROVE CIRCLE- BDI
Longlist(Tech. Rev. Cmte.) Date:  22FEB2017  Time:  10:00AM
Shortlist Selection Date       :  02MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  02MAR2017  Time:  11:00 A
Final Selection Meeting Date   :  30MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  27APR2017  Time:  10:00AM





Shortlisted Firms:
  AE ENGINEERING, INC.               
  CARNAHAN, PROCTOR AND CROSS, INC.  
  KINARD-STONE, INC.                 


DISTRICT 1    
Advertisement Number          : 18108
Financial Management Number(s):
  43660213201
Project Description           :
  I-75 Rest Area in Charlotte Co
Longlist(Tech. Rev. Cmte.) Date:  27MAR2017  Time:  09:30AM
Shortlist Selection Date       :  30MAR2017  Time:  10:00AM
Scope Meeting Date             :  10APR2017  Time:  02:00PM
Tech. Rev. Cmte Meeting Date   :  09MAY2017  Time:  02:45PM
Final Selection Meeting Date   :  01JUN2017  Time:  01:30PM
1st Negotiations Meeting Date  :  27JUN2017  Time:  09:00AM





DISTRICT 2    
Advertisement Number          : 17253
Project Description           :
  District Wide Surveying and Ma
Shortlist Selection Date       :  29AUG2016  Time:  10:00AM
Shortlist Selection Posting    :  29AUG2016  Time:  11:00 A
Tech. Rev. Cmte Meeting Date   :  16AUG2016  Time:  09:00AM
Final Selection Meeting Date   :  17OCT2016  Time:  10:00AM
Final Selection Posting Date   :  17OCT2016  Time:  11:00AM




Rank  Consultant
  1      DONALD F. LEE & ASSOCIATES, INC.   
  2      BRADLEY SURVEYING & MAPPING, INC. D
  3      NOBLES CONSULTING GROUP, INC.      


DISTRICT 2    
Advertisement Number          : 18224
Project Description           :
  District Wide Surveying and Mapping.
Longlist(Tech. Rev. Cmte.) Date:  07MAR2017  Time:  09:00AM
Shortlist Selection Date       :  20MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  20MAR2017  Time:  12:00 P
Final Selection Meeting Date   :  08MAY2017  Time:  10:00AM
1st Negotiations Meeting Date  :  22MAY2017  Time:  02:00PM





Shortlisted Firms:
  BRADLEY SURVEYING & MAPPING, INC. D
  LOCHRANE ENGINEERING INCORPORATED  
  NOBLES CONSULTING GROUP, INC.      
  WANTMAN GROUP, INC.                


DISTRICT 2    
Advertisement Number          : 18249
Project Description           :
  Traffic Ops: Community Traffic
Shortlist Selection Date       :  27MAR2017  Time:  10:00AM
Scope Meeting Date             :  29MAR2017  Time:  11:00AM
Final Selection Meeting Date   :  22MAY2017  Time:  10:00AM
1st Negotiations Meeting Date  :  24MAY2017  Time:  01:00PM




DISTRICT 2    
Advertisement Number          : 17263
Financial Management Number(s):
  20781826201
Project Description           :
  SR 20 Add Lanes and Reconstruct
Longlist(Tech. Rev. Cmte.) Date:  13DEC2016  Time:  02:00PM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  17JAN2017  Time:  10:00AM
Final Selection Posting Date   :  17JAN2017  Time:  11:00AM




Rank  Consultant
  1      JEA CONSTRUCTION ENGINEERING SERVIC
  2      TARGET ENGINEERING GROUP, LLC      
  3      NORTH FLORIDA PROFESSIONAL SERVICES


DISTRICT 2    
Advertisement Number          : 17267
Financial Management Number(s):
  21028686201 42820236201 43579616201
Project Description           :
  SR 207 RAIL TRAIL (MAIN STREET
Longlist(Tech. Rev. Cmte.) Date:  01MAR2017  Time:  09:30AM
Shortlist Selection Date       :  06MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  06MAR2017  Time:  10:00AM
Final Selection Posting Date   :  06MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  13MAR2017  Time:  11:00AM




Rank  Consultant
  1      G-A-I CONSULTANTS, INC.            


DISTRICT 2    
Advertisement Number          : 17242
Financial Management Number(s):
  21045246201 43455616201
Project Description           :
  SR A1A (MAY ST) FR SAN MARCO T
Shortlist Selection Date       :  17APR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  23MAR2017  Time:  09:00AM
Final Selection Meeting Date   :  17APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  19APR2017  Time:  01:30PM




DISTRICT 2    
Advertisement Number          : 17225
Financial Management Number(s):
  21099616220
Project Description           :
  Business Development Initiative Materials Verification
Shortlist Selection Date       :  12DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  12DEC2016  Time:  8:00 A
Final Selection Meeting Date   :  23JAN2017  Time:  10:00AM
Final Selection Posting Date   :  23JAN2017  Time:  11:00AM




Rank  Consultant
  1      CSI GEO INC.                       
  2      PAGE ONE CONSULTANTS, INC.         
  3      BENSATEC GEOSCIENCES, INC.         


DISTRICT 2    
Advertisement Number          : 18225
Financial Management Number(s):
  21107953201
Project Description           :
  DISTRICT WIDE SAFETY STUDIES &
Shortlist Selection Date       :  20FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  3:00 P
Scope Meeting Date             :  23FEB2017  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  20MAR2017  Time:  10:30AM
2nd Tech Rev. Cmte Meeting     :  21MAR2017  Time:  11:30AM
Final Selection Meeting Date   :  03APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  09APR2017  Time:  10:00AM





Shortlisted Firms:
  ELEMENT ENGINEERING GROUP, LLC     
  METRIC ENGINEERING INC.            
  S&ME, INC.                         


DISTRICT 2    
Advertisement Number          : 17268
Financial Management Number(s):
  21425617226
Project Description           :
  Permit work in NPDES for MS4 i
Shortlist Selection Date       :  13MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  13MAR2017  Time:  12:00 P
Tech. Rev. Cmte Meeting Date   :  01MAR2017  Time:  01:30PM
2nd Tech Rev. Cmte Meeting     :  23MAR2017  Time:  10:30AM
Final Selection Meeting Date   :  17APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  20APR2017  Time:  01:30PM





Shortlisted Firms:
  AYRES ASSOCIATES INC               
  HATCH ASSOCIATES CONSULTANTS, INC. 
  METRIC ENGINEERING INC.            


DISTRICT 2    
Advertisement Number          : 18241
Financial Management Number(s):
  21481817218 21481827218
Project Description           :
  District Wide Overhead Sign Inspection (Cantilever)
Longlist(Tech. Rev. Cmte.) Date:  13FEB2017  Time:  02:00PM
Shortlist Selection Date       :  20FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  12:00 P
Tech. Rev. Cmte Meeting Date   :  16MAR2017  Time:  01:30PM
Final Selection Meeting Date   :  10APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  13APR2017  Time:  02:00PM





Shortlisted Firms:
  BURGESS & NIPLE, INC.              
  KISINGER CAMPO & ASSOCIATES, CORP. 
  VOLKERT, INC.                      


DISTRICT 2    
Advertisement Number          : 18242
Financial Management Number(s):
  21481877201 21481887201
Project Description           :
  District Wide Traffic Signal Mastarms & Highmast Lightpoles
Shortlist Selection Date       :  20FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  12:00 P
Final Selection Meeting Date   :  10APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  12APR2017  Time:  10:00AM





Shortlisted Firms:
  AYRES ASSOCIATES INC               
  INFRASTRUCTURE ENGINEERS, INC.     
  KISINGER CAMPO & ASSOCIATES, CORP. 


DISTRICT 2    
Advertisement Number          : 18243
Financial Management Number(s):
  21483837218 21483937218
Project Description           :
  Local Government Bridge Inspec
Shortlist Selection Date       :  20FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  12:00 P
Tech. Rev. Cmte Meeting Date   :  07FEB2017  Time:  10:30AM
2nd Tech Rev. Cmte Meeting     :  09MAR2017  Time:  01:30PM
Final Selection Meeting Date   :  10APR2017  Time:  10:00AM





Shortlisted Firms:
  AYRES ASSOCIATES INC               
  TRANSYSTEMS CORPORATION D/B/A TRANS
  VOLKERT, INC.                      


DISTRICT 2    
Advertisement Number          : 17226
Financial Management Number(s):
  41525216201 41525316201
Project Description           :
  Airport Road Bridge Replacement @ Daughtry Bayou Bridge
Longlist(Tech. Rev. Cmte.) Date:  17FEB2017  Time:  11:00AM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  13MAR2017  Time:  10:00AM
Final Selection Posting Date   :  13MAR2017  Time:  12:00PM
1st Negotiations Meeting Date  :  16MAR2017  Time:  01:30PM




Rank  Consultant
  1      JEA CONSTRUCTION ENGINEERING SERVIC
  2      PARSONS BRINCKERHOFF, INC.         


DISTRICT 2    
Advertisement Number          : 17247
Financial Management Number(s):
  43230916201 43429816201 43615616201
Project Description           :
  SR 200 Resurfacing (Andrews St. to NW 219th)
Longlist(Tech. Rev. Cmte.) Date:  04JAN2017  Time:  02:30PM
Shortlist Selection Date       :  30JAN2017  Time:  10:00AM
Final Selection Meeting Date   :  30JAN2017  Time:  10:00AM
Final Selection Posting Date   :  30JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  01FEB2017  Time:  03:00PM




Rank  Consultant
  1      NORTH FLORIDA PROFESSIONAL SERVICES
  2      TARGET ENGINEERING GROUP, LLC      
  3      CSI GEO INC.                       


DISTRICT 2    
Advertisement Number          : 17260
Financial Management Number(s):
  43240413201
Project Description           :
  SR212 (BEACH BLVD) PARENTAL HO
Longlist(Tech. Rev. Cmte.) Date:  28NOV2016  Time:  01:00PM
Shortlist Selection Date       :  05DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  05DEC2016  Time:  12:00 P
Final Selection Meeting Date   :  23JAN2017  Time:  10:00AM
Final Selection Posting Date   :  23JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  25JAN2016  Time:  10:30AM




Rank  Consultant
  1      PETERS AND YAFFEE, INC.            
  2      POND & COMPANY CORPORATION         
  3      DRMP, INC.                         


DISTRICT 2    
Advertisement Number          : 17258
Financial Management Number(s):
  43381116217
Project Description           :
  Continuing Services-Construction Inspection
Longlist(Tech. Rev. Cmte.) Date:  23NOV2016  Time:  03:30PM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  05DEC2016  Time:  10:00AM
Final Selection Posting Date   :  05DEC2016  Time:  11:00AM
1st Negotiations Meeting Date  :  07DEC2016  Time:  03:00PM




Rank  Consultant
  1      ENGLAND, THIMS & MILLER, INC.      


DISTRICT 2    
Advertisement Number          : 17261
Financial Management Number(s):
  43384322201
Project Description           :
  SR 5 (US1) AT OYSTER CREEK BRI
Longlist(Tech. Rev. Cmte.) Date:  20DEC2016  Time:  10:00AM
Shortlist Selection Date       :  09JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  09JAN2017  Time:  12:00 P
Scope Meeting Date             :  12JAN2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  31JAN2017  Time:  10:00AM
2nd Tech Rev. Cmte Meeting     :  02FEB2017  Time:  11:30AM
Final Selection Meeting Date   :  20FEB2017  Time:  10:00AM
Final Selection Posting Date   :  20FEB2017  Time:  11:00AM
1st Negotiations Meeting Date  :  23FEB2017  Time:  10:00AM




Rank  Consultant
  1      INFRASTRUCTURE ENGINEERS, INC.     
  2      HARDESTY & HANOVER, LLC            
  3      SAI CONSULTING ENGINEERS, INC.     


DISTRICT 2    
Advertisement Number          : 17269
Financial Management Number(s):
  43389912201
Project Description           :
  I-95 at US 1/MLK Jr. Parkway/20th Street Expressway
Longlist(Tech. Rev. Cmte.) Date:  27MAR2017  Time:  02:00PM
Shortlist Selection Date       :  03APR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  10APR2017  Time:  01:00PM
2nd Tech Rev. Cmte Meeting     :  12APR2017  Time:  11:45AM
Final Selection Meeting Date   :  24APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  27APR2017  Time:  11:00AM




DISTRICT 2    
Advertisement Number          : 17236
Financial Management Number(s):
  43430316201 43430016201
Project Description           :
  SR 104 Resurfacing (I-295 to Biscayne Blvd.)
Longlist(Tech. Rev. Cmte.) Date:  19DEC2016  Time:  03:30PM
Shortlist Selection Date       :  03JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  03JAN2017  Time:  12:00 P
Final Selection Meeting Date   :  23JAN2017  Time:  10:00AM
Final Selection Posting Date   :  23JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  26JAN2017  Time:  03:30PM




Rank  Consultant
  1      HILL INTERNATIONAL, INC.           
  2      GANNETT FLEMING, INC.              
  3      G-A-I CONSULTANTS, INC.            


DISTRICT 2    
Advertisement Number          : 18203
Financial Management Number(s):
  43440013201
Project Description           :
  DESIGN: TRAFFIC SIGNAL UPDATE SR25 (US441) @ SW 14TH DRIVE
Shortlist Selection Date       :  27FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  11:00 A
Tech. Rev. Cmte Meeting Date   :  29MAR2017  Time:  08:30AM
Final Selection Meeting Date   :  17APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  04APR2017  Time:  10:00AM





Shortlisted Firms:
  GARRETT ENGINEERING GROUP, INC.    
  GHYABI & ASSOCIATES, INC.          
  ICON CONSULTANT GROUP, INC.        


DISTRICT 2    
Advertisement Number          : 17265
Financial Management Number(s):
  43526716201 43526816201 43769616201 43244816201
  43772816201 43772826201 43769716201
Project Description           :
  I-295 at Alta Drive Interchange Landscaping
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  30JAN2017  Time:  10:00AM
Final Selection Posting Date   :  30JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  02FEB2017  Time:  01:30PM




Rank  Consultant
  1      TARGET ENGINEERING GROUP, LLC      


DISTRICT 2    
Advertisement Number          : 18207
Financial Management Number(s):
  43593213201
Project Description           :
  Design of State Road 9B from I
Longlist(Tech. Rev. Cmte.) Date:  14FEB2017  Time:  09:30AM
Shortlist Selection Date       :  27FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  11:00 A
Scope Meeting Date             :  02MAR2017  Time:  10:30AM
Tech. Rev. Cmte Meeting Date   :  22MAR2017  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  29MAR2017  Time:  11:30AM
Final Selection Meeting Date   :  17APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  25APR2017  Time:  09:30AM





Shortlisted Firms:
  ENGLAND, THIMS & MILLER, INC.      
  G-A-I CONSULTANTS, INC.            
  PROSSER, INC. D/B/A PROSSER HALLOCK


DISTRICT 2    
Advertisement Number          : 18210
Financial Management Number(s):
  43617613201
Project Description           :
  SR20(SE Hawthorne Rd) from SE
Longlist(Tech. Rev. Cmte.) Date:  13FEB2017  Time:  02:00PM
Shortlist Selection Date       :  20FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  1:00 P
Scope Meeting Date             :  28FEB2017  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  22MAR2017  Time:  01:30PM
2nd Tech Rev. Cmte Meeting     :  28MAR2017  Time:  11:45AM
Final Selection Meeting Date   :  25APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  20APR2017  Time:  09:00AM





Shortlisted Firms:
  FISHER AND ARNOLD, INC.            
  MOTT MACDONALD FLORIDA, LLC.       
  REGISTE SLIGER ENGINEERING, INC.   


DISTRICT 2    
Advertisement Number          : 17264
Financial Management Number(s):
  43742512201
Project Description           :
  Island Drive over Picket Lake
Shortlist Selection Date       :  23JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  23JAN2017  Time:  10:00AM
Scope Meeting Date             :  25JAN2017  Time:  02:00PM
Tech. Rev. Cmte Meeting Date   :  09FEB2017  Time:  02:00PM
2nd Tech Rev. Cmte Meeting     :  16MAR2017  Time:  11:30AM
Final Selection Meeting Date   :  10APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  09MAR2017  Time:  02:00PM





Shortlisted Firms:
  LANDMARK ENGINEERING INC.          
  PATEL, GREENE AND ASSOCIATES, PLLC 
  STANTEC CONSULTING SERVICES INC.   


DISTRICT 2    
Advertisement Number          : 17259
Financial Management Number(s):
  43761313201
Project Description           :
  SR 228 from South of I-10 to US90 in Baker County
Longlist(Tech. Rev. Cmte.) Date:  01DEC2016  Time:  11:00AM
Shortlist Selection Date       :  12DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  13DEC2016  Time:  10:00 A
Tech. Rev. Cmte Meeting Date   :  11JAN2017  Time:  01:30PM
Final Selection Meeting Date   :  30JAN2017  Time:  10:00AM
Final Selection Posting Date   :  30JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  02FEB2017  Time:  02:00PM




Rank  Consultant
  1      CIVIL SERVICES INC.                
  2      ELTONALAN, INCORPORATED            
  3      WANTMAN GROUP, INC.                


DISTRICT 2    
Advertisement Number          : 17239
Financial Management Number(s):
  43859916201 43860016201 43860116201 43860216201
  43860316201 43860416201 43860516201 43860616201
  43860716201 43864816201 44030216201
Project Description           :
  I-75 HAMILTON COUNTY HVAC WELC
Longlist(Tech. Rev. Cmte.) Date:  05DEC2016  Time:  01:30PM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  09JAN2017  Time:  10:00AM
Final Selection Posting Date   :  09JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  11JAN2017  Time:  01:30PM




Rank  Consultant
  1      JACOBS ENGINEERING GROUP INC.      
  2      GRAEF-USA INC.                     
  3      MICHAEL BAKER INTERNATIONAL, INC. D
  4      NORTH FLORIDA PROFESSIONAL SERVICES
  5      CAUSSEAUX, HEWETT & WALPOLE, INC.  


DISTRICT 2    
Advertisement Number          : 18252
Financial Management Number(s):
  43891812201
Project Description           :
  SR 16 from First Coast Expressway to Oakridge Lane
Longlist(Tech. Rev. Cmte.) Date:  28MAR2017  Time:  03:00PM
Shortlist Selection Date       :  10APR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  25APR2017  Time:  03:00PM
2nd Tech Rev. Cmte Meeting     :  03MAY2017  Time:  11:45AM
Final Selection Meeting Date   :  22MAY2017  Time:  10:00AM
1st Negotiations Meeting Date  :  25MAY2017  Time:  11:00AM




DISTRICT 2    
Advertisement Number          : 18216
Financial Management Number(s):
  43939913201
Project Description           :
  SR21 PUTNAM COUNTY LINE TO COM
Longlist(Tech. Rev. Cmte.) Date:  27FEB2017  Time:  09:00AM
Shortlist Selection Date       :  06MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  06MAR2017  Time:  11:00 A
Tech. Rev. Cmte Meeting Date   :  13MAR2017  Time:  01:30PM
2nd Tech Rev. Cmte Meeting     :  22MAR2017  Time:  03:30PM
Final Selection Meeting Date   :  03APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  10APR2017  Time:  01:30PM





Shortlisted Firms:
  MCCRANIE & ASSOCIATES, INC.        
  PROTEAN DESIGN GROUP, INC.         
  WBQ DESIGN & ENGINEERING, INC.     


DISTRICT 2    
Advertisement Number          : 18218
Financial Management Number(s):
  43948413201
Project Description           :
  I-295 Interchange at Collins Road
Longlist(Tech. Rev. Cmte.) Date:  29MAR2017  Time:  09:00AM
Shortlist Selection Date       :  10APR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  11MAY2017  Time:  01:30PM
2nd Tech Rev. Cmte Meeting     :  15MAY2017  Time:  11:45AM
Final Selection Meeting Date   :  29MAY2017  Time:  10:00AM
1st Negotiations Meeting Date  :  01JUN2017  Time:  09:00AM




DISTRICT 2    
Advertisement Number          : 17262
Financial Management Number(s):
  43993413201
Project Description           :
  SR 24 Archer Road from SW 75th Terrace to SW 41st Blvd
Shortlist Selection Date       :  19DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  19DEC2016  Time:  11:00 A
Tech. Rev. Cmte Meeting Date   :  08DEC2016  Time:  10:00AM
2nd Tech Rev. Cmte Meeting     :  09JAN2017  Time:  01:30PM
Final Selection Meeting Date   :  06FEB2017  Time:  10:00AM
Final Selection Posting Date   :  06FEB2017  Time:  11:00AM
1st Negotiations Meeting Date  :  09FEB2017  Time:  02:30PM




Rank  Consultant
  1      BASLEE ENGINEERING SOLUTIONS (BES),
  2      PROSSER, INC. D/B/A PROSSER HALLOCK
  3      STONE ENGINEERING GROUP, INC.      



DISTRICT 3    
Advertisement Number          : 17340
Financial Management Number(s):
  21787526201 21787536201
Project Description           :
  CEI Group 17-C in Bay County
Shortlist Selection Date       :  30JAN2017  Time:  08:30AM
Shortlist Selection Posting    :  30JAN2017  Time:  11:00 A
Final Selection Meeting Date   :  20FEB2017  Time:  09:00AM
Final Selection Posting Date   :  20FEB2017  Time:  11:00AM
1st Negotiations Meeting Date  :  07MAR2017  Time:  10:00AM



Meeting Location Notes:
  Negotiation Meeting will be held in the Production
  Conference Room


Rank  Consultant
  1      RS&H, INC.                         
  2      HNTB CORPORATION                   
  3      PARSONS TRANSPORTATION GROUP INC.  


DISTRICT 3    
Advertisement Number          : 17360
Financial Management Number(s):
  21876423201
Project Description           :
  SR 65 GRAHAM CREEK BRIDGE REPL
Shortlist Selection Date       :  07NOV2016  Time:  08:30AM
Shortlist Selection Posting    :  07NOV2016  Time:  11:00 A
Final Selection Meeting Date   :  03JAN2017  Time:  08:00AM
Final Selection Posting Date   :  03JAN2017  Time:  10:39AM




Rank  Consultant
  1      FLORIDA BRIDGE AND TRANSPORTATION  
  2      REGISTE SLIGER ENGINEERING, INC.   
  3      DEWBERRY ENGINEERS INC.            


DISTRICT 3    
Advertisement Number          : 18301
Financial Management Number(s):
  22081813207
Project Description           :
  GENERAL ENGINEERING CONSULTANT
Shortlist Selection Date       :  20FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  11:00 A
Final Selection Meeting Date   :  22MAY2017  Time:  09:00AM





Shortlisted Firms:
  HNTB CORPORATION                   
  VANASSE HANGEN BRUSTLIN, INC.      


DISTRICT 3    
Advertisement Number          : 17362
Financial Management Number(s):
  22089833202
Project Description           :
  TRAFFIC STUDIES/ACCESS MANAGEMENT
Shortlist Selection Date       :  15FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  15FEB2017  Time:  12:01 P
Final Selection Meeting Date   :  03APR2017  Time:  09:00AM





Shortlisted Firms:
  GRESHAM, SMITH AND PARTNERS        
  SOUTHERN TRAFFIC SERVICES, INC.    
  VOLKERT, INC.                      


DISTRICT 3    
Advertisement Number          : 17368
Financial Management Number(s):
  22089843203 VARIOUS
Project Description           :
  D/W ITS & ATMS Consultant
Shortlist Selection Date       :  07MAR2017  Time:  08:00AM
Shortlist Selection Posting    :  07MAR2017  Time:  11:00 A
Scope Meeting Date             :  20MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  01MAY2017  Time:  09:00AM





Shortlisted Firms:
  ATKINS NORTH AMERICA, INC.         
  HNTB CORPORATION                   
  KIMLEY-HORN AND ASSOCIATES, INC.   


DISTRICT 3    
Advertisement Number          : 17346
Financial Management Number(s):
  22096836202
Project Description           :
  High/low Strain Testing
Shortlist Selection Date       :  15FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  15FEB2017  Time:  12:01 P
Final Selection Meeting Date   :  20MAR2017  Time:  09:00AM
Final Selection Posting Date   :  20MAR2017  Time:  11:00AM




Rank  Consultant
  1      GRL ENGINEERS, INC.                
  2      FOUNDATION & GEOTECHNICAL ENGINEERI
  3      TERRACON CONSULTANTS, INC.         


DISTRICT 3    
Advertisement Number          : 17344
Financial Management Number(s):
  41344836201 43255216201
Project Description           :
  CEI Group 17-E
Shortlist Selection Date       :  30JAN2017  Time:  08:00AM
Shortlist Selection Posting    :  30JAN2017  Time:  11:00 A
Final Selection Meeting Date   :  15FEB2017  Time:  09:00AM
Final Selection Posting Date   :  23FEB2017  Time:  1:00PM
1st Negotiations Meeting Date  :  27MAR2017  Time:  12:00PM



Meeting Location Notes:
  Negotiations meeting will be held at Midway Operations
  on March 27, 2017 at 12:00PM CST/1:00PM EST.


Rank  Consultant
  1      VIA CONSULTING SERVICES, INC.      
  2      AE ENGINEERING, INC.               
  3      NORTH FLORIDA PROFESSIONAL SERVICES


DISTRICT 3    
Advertisement Number          : 17332
Financial Management Number(s):
  41413236201
Project Description           :
  SR 30 (US 98) From CR 30F Airport Rd To Walton Co. Line
Shortlist Selection Date       :  03JAN2017  Time:  08:00AM
Shortlist Selection Posting    :  03JAN2017  Time:  10:39 A
Final Selection Meeting Date   :  20FEB2017  Time:  09:00AM
Final Selection Posting Date   :  20FEB2017  Time:  11:00AM




Rank  Consultant
  1      METRIC ENGINEERING INC.            
  2      PARSONS TRANSPORTATION GROUP INC.  
  3      STANTEC CONSULTING SERVICES INC.   


DISTRICT 3    
Advertisement Number          : 18331
Financial Management Number(s):
  42122522202
Project Description           :
  SR 390 from SR 77 to SR 75
Shortlist Selection Date       :  13MAR2017  Time:  08:00AM
Shortlist Selection Posting    :  13MAR2017  Time:  3:00 P
Final Selection Meeting Date   :  24APR2017  Time:  08:00AM





Shortlisted Firms:
  AMERICAN CONSULTING ENGINEERS OF FL
  RUMMEL, KLEPPER & KAHL, LLP D/B/A R
  STANTEC CONSULTING SERVICES INC.   


DISTRICT 3    
Advertisement Number          : 17364
Financial Management Number(s):
  42378117226
Project Description           :
  Ancilliary Structures Inspection
Shortlist Selection Date       :  27FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  11:00 A
Final Selection Meeting Date   :  24APR2017  Time:  09:00AM



Meeting Location Notes:
  Consultant Interviews will be held in the Production
  Conference Room



Shortlisted Firms:
  AYRES ASSOCIATES INC               
  KISINGER CAMPO & ASSOCIATES, CORP. 
  VOLKERT, INC.                      


DISTRICT 3    
Advertisement Number          : 17371
Financial Management Number(s):
  42378117228
Project Description           :
  D/W Maintenance Engineering In
Shortlist Selection Date       :  27FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  11:00 A
Final Selection Meeting Date   :  20MAR2017  Time:  09:00AM
Final Selection Posting Date   :  20MAR2017  Time:  11:00AM




Rank  Consultant
  1      JACOBS ENGINEERING GROUP INC.      
  2      GREENMAN-PEDERSEN, INC.            
  3      A & P CONSULTING TRANSPORTATION ENG


DISTRICT 3    
Advertisement Number          : 17341
Financial Management Number(s):
  42695016201
Project Description           :
  SR 30 From Dupont Bridge to Gulf Co.
Shortlist Selection Date       :  27MAR2017  Time:  09:00AM
Final Selection Meeting Date   :  10APR2017  Time:  09:00AM




DISTRICT 3    
Advertisement Number          : 17335
Financial Management Number(s):
  42884716201 43178516201 43178526201
Project Description           :
  CEI Group 17-B
Shortlist Selection Date       :  20FEB2017  Time:  09:00AM
Final Selection Meeting Date   :  20FEB2017  Time:  09:00AM
Final Selection Posting Date   :  20FEB2017  Time:  11:00AM
1st Negotiations Meeting Date  :  15MAR2017  Time:  02:00PM




Rank  Consultant
  1      VOLKERT, INC.                      
  2      MEHTA AND ASSOCIATES, INC.         
  3      DRMP, INC.                         
  4      ATKINS NORTH AMERICA, INC.         
  5      HDR CONSTRUCTION CONTROL CORPORATIO


DISTRICT 3    
Advertisement Number          : 17370
Financial Management Number(s):
  43661223201
Project Description           :
  D/W Traffic Safety Studies
Shortlist Selection Date       :  07MAR2017  Time:  08:00AM
Shortlist Selection Posting    :  07MAR2017  Time:  11:00 A
Final Selection Meeting Date   :  24APR2017  Time:  09:00AM





Shortlisted Firms:
  CARDNO, INC.                       
  GRESHAM, SMITH AND PARTNERS        
  JOHNSON, MIRMIRAN & THOMPSON, INC. 


DISTRICT 3    
Advertisement Number          : 17367
Financial Management Number(s):
  43890823201
Project Description           :
  SR 292 Bike Path/Trail
Shortlist Selection Date       :  03JAN2017  Time:  08:00AM
Shortlist Selection Posting    :  03JAN2017  Time:  10:39 A
Final Selection Meeting Date   :  15FEB2017  Time:  09:00AM
Final Selection Posting Date   :  15FEB2017  Time:  12:01PM




Rank  Consultant
  1      AMERICAN CONSULTING ENGINEERS OF FL
  2      KISINGER CAMPO & ASSOCIATES, CORP. 
  3      G-A-I CONSULTANTS, INC.            


DISTRICT 3    
Advertisement Number          : 18316
Financial Management Number(s):
  43937113201
Project Description           :
  CR 67 over Yellow Creek Bridge
Shortlist Selection Date       :  07MAR2017  Time:  8:00AM
Shortlist Selection Posting    :  07MAR2017  Time:  11:00 A
Scope Meeting Date             :  15MAR2017  Time:  01:00PM
Final Selection Meeting Date   :  24APR2017  Time:  09:00AM



Meeting Location Notes:
  Scope of Services Meeting will be held in the Procurement
  Conference Room



Shortlisted Firms:
  GRAEF-USA INC.                     
  PALMER ENGINEERING CO. CROSS REFERE
  SAI CONSULTING ENGINEERS, INC.     


DISTRICT 3    
Advertisement Number          : 18319
Financial Management Number(s):
  43938813201
Project Description           :
  Otter Creek Bridge
Shortlist Selection Date       :  03APR2017  Time:  09:00AM
Final Selection Meeting Date   :  22MAY2017  Time:  09:00AM




DISTRICT 3    
Advertisement Number          : 18322
Financial Management Number(s):
  43972413201
Project Description           :
  SR 273 from Washington Co. Line to SR 75
Shortlist Selection Date       :  27MAR2017  Time:  08:00AM
Scope Meeting Date             :  04APR2017  Time:  09:00AM
Final Selection Meeting Date   :  15MAY2017  Time:  08:00AM



Meeting Location Notes:
  Scope Meeting will be held in the Procurement Conference
  Room. Interviews will be held in the Production Conference
  Room.


DISTRICT 3    
Advertisement Number          : 18324
Financial Management Number(s):
  43972613201 44038313201
Project Description           :
  Design Group 18-01
Shortlist Selection Date       :  13MAR2017  Time:  08:00AM
Shortlist Selection Posting    :  13MAR2017  Time:  3:00 P
Final Selection Meeting Date   :  01MAY2017  Time:  08:00AM





Shortlisted Firms:
  CARDNO, INC.                       
  EISMAN & RUSSO, INC.               
  ICON CONSULTANT GROUP, INC.        


DISTRICT 3    
Advertisement Number          : 17366
Financial Management Number(s):
  43992613201 44055013201
Project Description           :
  Design Group 17-03
Shortlist Selection Date       :  19DEC2016  Time:  08:00AM
Shortlist Selection Posting    :  19DEC2016  Time:  10:00 A
Final Selection Meeting Date   :  15FEB2017  Time:  09:00AM
Final Selection Posting Date   :  15FEB2017  Time:  12:01PM




Rank  Consultant
  1      GORTEMOLLER ENGINEERING, INC.      
  2      KIMLEY-HORN AND ASSOCIATES, INC.   
  3      FALLER, DAVIS & ASSOCIATES, INC.   


DISTRICT 3    
Advertisement Number          : 17369
Financial Management Number(s):
  43993113201
Project Description           :
  Florida Highway Patrol Test Tr
Shortlist Selection Date       :  20FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  11:00 A
Final Selection Meeting Date   :  07MAR2017  Time:  08:00AM
Final Selection Posting Date   :  07MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  08MAR2017  Time:  09:00AM




Rank  Consultant
  1      GEORGE & ASSOCIATES, CONSULTING ENG
  2      MICHAEL BAKER INTERNATIONAL, INC. D
  3      POND & COMPANY CORPORATION         


DISTRICT 3    
Advertisement Number          : 17365
Financial Management Number(s):
  44066713201 VARIOUS
Project Description           :
  D/W Minor Design and Review
Shortlist Selection Date       :  12DEC2016  Time:  08:30AM
Shortlist Selection Posting    :  12DEC2016  Time:  10:01 A
Scope Meeting Date             :  04JAN2017  Time:  10:30AM
Final Selection Meeting Date   :  15FEB2017  Time:  09:00AM
Final Selection Posting Date   :  15FEB2017  Time:  12:01PM



Meeting Location Notes:
  Scope Meeting will be held in the Procurement Conference
  Room. Consultant Interviews will be held in the Personnel
  Conference Room.


Rank  Consultant
  1      HANSON PROFESSIONAL SERVICES INC.  
  2      JOHNSON, MIRMIRAN & THOMPSON, INC. 
  3      GRESHAM, SMITH AND PARTNERS        



DISTRICT 4    
Advertisement Number          : 18406
Financial Management Number(s):
  22976573201
Project Description           :
  D/W Traffic Ops. Transportation System ManagementSupport
Longlist(Tech. Rev. Cmte.) Date:  16FEB2017  Time:  3:00PM
Shortlist Selection Date       :  27FEB2017  Time:  9:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  12:00 P
Scope Meeting Date             :  09MAR2017  Time:  3:00PM
Tech. Rev. Cmte Meeting Date   :  06APR2017  Time:  2:00PM
Final Selection Meeting Date   :  17APR2017  Time:  9:00AM





Shortlisted Firms:
  ATKINS NORTH AMERICA, INC.         
  HDR ENGINEERING, INC.              
  KIMLEY-HORN AND ASSOCIATES, INC.   


DISTRICT 4    
Advertisement Number          : 18431
Financial Management Number(s):
  22994453201
Project Description           :
  Continuing Services contract for Traffic Operations
Longlist(Tech. Rev. Cmte.) Date:  07MAR2017  Time:  3:00PM
Shortlist Selection Date       :  20MAR2017  Time:  9:00AM
Shortlist Selection Posting    :  20MAR2017  Time:  11:00 A
Scope Meeting Date             :  29MAR2017  Time:  1:00PM
2nd Tech Rev. Cmte Meeting     :  27APR2017  Time:  10:30AM
Final Selection Meeting Date   :  08MAY2017  Time:  9:00AM
1st Negotiations Meeting Date  :  13JUN2017  Time:  9:00AM





Shortlisted Firms:
  A & P CONSULTING TRANSPORTATION ENG
  LANGAN ENGINEERING & ENVIRONMENTAL 
  MCMAHON ASSOCIATES, INC.           


DISTRICT 4    
Advertisement Number          : 18408
Financial Management Number(s):
  23037876201
Project Description           :
  D/W CEI Services for District Construction Office Support
Longlist(Tech. Rev. Cmte.) Date:  21MAR2017  Time:  3:00PM
Shortlist Selection Date       :  03APR2017  Time:  9:00AM
Tech. Rev. Cmte Meeting Date   :  23MAR2017  Time:  3:45PM
Final Selection Meeting Date   :  24APR2017  Time:  9:00AM




DISTRICT 4    
Advertisement Number          : 18402
Financial Management Number(s):
  40935426202 43310866202 43310946202 43310956202
  41242046203 43696416204
Project Description           :
  Geotechnical Testing Services
Longlist(Tech. Rev. Cmte.) Date:  15FEB2017  Time:  9:00AM
Shortlist Selection Date       :  27FEB2017  Time:  9:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  12:00 P
Scope Meeting Date             :  09MAR2017  Time:  9:00AM
Tech. Rev. Cmte Meeting Date   :  04APR2017  Time:  9:00AM
Final Selection Meeting Date   :  17APR2017  Time:  9:00AM





Shortlisted Firms:
  AMEC FOSTER WHEELER ENVIRONMENT & I
  FOUNDATION & GEOTECHNICAL ENGINEERI
  GEOSOL, INC.                       


DISTRICT 4    
Advertisement Number          : 18403
Financial Management Number(s):
  41304824201 43152114201
Project Description           :
  Acq. & Relo. Services for SR-9
Longlist(Tech. Rev. Cmte.) Date:  20MAR2017  Time:  9:30AM
Shortlist Selection Date       :  03APR2017  Time:  9:00AM
Scope Meeting Date             :  14APR2017  Time:  11:00AM
Tech. Rev. Cmte Meeting Date   :  08MAY2017  Time:  1:00PM
Final Selection Meeting Date   :  22MAY2017  Time:  9:00AM
1st Negotiations Meeting Date  :  27JUN2017  Time:  9:00AM




DISTRICT 4    
Advertisement Number          : 18461
Financial Management Number(s):
  41925224201
Project Description           :
  Right of Way Svcs for SR-710/Warfield Blvd in Martin County
Longlist(Tech. Rev. Cmte.) Date:  07FEB2017  Time:  10:00AM
Shortlist Selection Date       :  20FEB2017  Time:  9:00AM
Shortlist Selection Posting    :  20FEB2017  Time:  10:00 A
Scope Meeting Date             :  01MAR2017  Time:  1:30PM
Tech. Rev. Cmte Meeting Date   :  30MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  10APR2017  Time:  9:00AM





Shortlisted Firms:
  AECOM TECHNICAL SERVICES, INC.     
  FLORIDA ACQUISITION & APPRAISAL,INC
  THE URBAN GROUP, INC.              


DISTRICT 4    
Advertisement Number          : 17428
Financial Management Number(s):
  42139076201
Project Description           :
  CEI Services for WAVE Streetcar in Broward County
Shortlist Selection Date       :  17OCT2016  Time:  9:00AM
Shortlist Selection Posting    :  17OCT2016  Time:  12:00 P
Scope Meeting Date             :  24OCT2016  Time:  3:00PM
Tech. Rev. Cmte Meeting Date   :  21OCT2016  Time:  2:00PM
2nd Tech Rev. Cmte Meeting     :  03NOV2016  Time:  10:00AM
3rd Tech Rev. Cmte Meeting     :  14NOV2016  Time:  10:00AM
Final Selection Meeting Date   :  21NOV2016  Time:  9:00AM
Final Selection Posting Date   :  21NOV2016  Time:  10:00AM




Rank  Consultant
  1      GANNETT FLEMING, INC.              
  2      HNTB CORPORATION                   
  3      HAKS ENGINEERS, ARCHITECTS AND LAND


DISTRICT 4    
Advertisement Number          : 17466
Financial Management Number(s):
  42684016201 43436016201
Project Description           :
  CEI Services for SR-A1A Peter J. Cobb Memorial Bridge
Longlist(Tech. Rev. Cmte.) Date:  02FEB2017  Time:  10:00AM
Shortlist Selection Date       :  13FEB2017  Time:  9:00AM
Shortlist Selection Posting    :  13FEB2017  Time:  11:00 A
Final Selection Meeting Date   :  06MAR2017  Time:  9:00AM
Final Selection Posting Date   :  06MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  05APR2017  Time:  9:00AM




Rank  Consultant
  1      CARDNO, INC.                       
  2      JOHNSON, MIRMIRAN & THOMPSON, INC. 
  3      CREATIVE ENGINEERING GROUP, INC.   


DISTRICT 4    
Advertisement Number          : 17465
Financial Management Number(s):
  42793716201 42793726201 42793816201
Project Description           :
  CEI Services for SR-7 RRR projects in Broward and Palm Beach
Longlist(Tech. Rev. Cmte.) Date:  23JAN2017  Time:  10:00AM
Shortlist Selection Date       :  06FEB2017  Time:  9:00AM
Shortlist Selection Posting    :  06FEB2017  Time:  12:01 P
Tech. Rev. Cmte Meeting Date   :  13FEB2017  Time:  1:00PM
Final Selection Meeting Date   :  27FEB2017  Time:  9:00AM
Final Selection Posting Date   :  27FEB2017  Time:  12:00PM
1st Negotiations Meeting Date  :  04APR2017  Time:  9:00AM




Rank  Consultant
  1      EAC CONSULTING, INC.               
  2      AECOM TECHNICAL SERVICES, INC.     
  3      AIM ENGINEERING AND SURVEYING, INC.


DISTRICT 4    
Advertisement Number          : 17452
Financial Management Number(s):
  42840023201
Project Description           :
  SR-5/US-1 FEDERAL HIGHWAY FROM
Longlist(Tech. Rev. Cmte.) Date:  01DEC2016  Time:  11:00AM
Shortlist Selection Date       :  12DEC2016  Time:  9:00AM
Shortlist Selection Posting    :  12DEC2016  Time:  11:00 A
Scope Meeting Date             :  22DEC2016  Time:  1:00PM
Tech. Rev. Cmte Meeting Date   :  26JAN2017  Time:  10:00AM
Final Selection Meeting Date   :  06FEB2017  Time:  9:00AM
Final Selection Posting Date   :  06FEB2017  Time:  12:01PM
1st Negotiations Meeting Date  :  23MAR2017  Time:  9:00AM




Rank  Consultant
  1      HARDESTY & HANOVER, LLC            
  2      TRANSYSTEMS CORPORATION D/B/A TRANS
  3      NETWORK ENGINEERING SERVICES, INC. 


DISTRICT 4    
Advertisement Number          : 18479
Financial Management Number(s):
  42894241201 42894242201
Project Description           :
  D/W URBAN MODEL DEVELOPMENT, including Treasure Coast
Longlist(Tech. Rev. Cmte.) Date:  22MAR2017  Time:  11:00AM
Shortlist Selection Date       :  03APR2017  Time:  9:00AM
Scope Meeting Date             :  07APR2017  Time:  9:30AM
Tech. Rev. Cmte Meeting Date   :  27APR2017  Time:  9:30AM
Final Selection Meeting Date   :  15MAY2017  Time:  9:00AM
1st Negotiations Meeting Date  :  07JUN2017  Time:  9:00AM




DISTRICT 4    
Advertisement Number          : 17456
Financial Management Number(s):
  42957513201
Project Description           :
  Design Services for Transit Im
Longlist(Tech. Rev. Cmte.) Date:  07NOV2016  Time:  9:00AM
Shortlist Selection Date       :  14NOV2016  Time:  9:00AM
Shortlist Selection Posting    :  14NOV2016  Time:  11:00 A
Scope Meeting Date             :  17NOV2016  Time:  2:00PM
Tech. Rev. Cmte Meeting Date   :  12DEC2016  Time:  10:00AM
Final Selection Meeting Date   :  09JAN2017  Time:  9:00AM
Final Selection Posting Date   :  09JAN2017  Time:  12:00PM
1st Negotiations Meeting Date  :  09FEB2017  Time:  9:00AM




Rank  Consultant
  1      CALTRAN ENGINEERING GROUP, INC.    
  2      HBC ENGINEERING COMPANY            
  3      MARLIN ENGINEERING, INC.           


DISTRICT 4    
Advertisement Number          : 18417
Financial Management Number(s):
  42976831201
Project Description           :
  Districtwide Transit Corridor
Longlist(Tech. Rev. Cmte.) Date:  21MAR2017  Time:  9:30AM
Shortlist Selection Date       :  03APR2017  Time:  9:00AM
Scope Meeting Date             :  05APR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  25APR2017  Time:  9:00AM
Final Selection Meeting Date   :  14MAY2017  Time:  9:00AM
1st Negotiations Meeting Date  :  20JUN2017  Time:  9:00AM




DISTRICT 4    
Advertisement Number          : 18409
Financial Management Number(s):
  43266733201 43266743201 43266763201 43266773201
Project Description           :
  D/W Minor Project Design/Produ
Longlist(Tech. Rev. Cmte.) Date:  02MAR2017  Time:  10:00AM
Shortlist Selection Date       :  13MAR2017  Time:  9:00AM
Shortlist Selection Posting    :  13MAR2017  Time:  11:00 A
Scope Meeting Date             :  23MAR2017  Time:  3:30PM
Tech. Rev. Cmte Meeting Date   :  18APR2017  Time:  2:00PM
Final Selection Meeting Date   :  01MAY2017  Time:  9:00AM





Shortlisted Firms:
  AMERICAN CONSULTING ENGINEERS OF FL
  HNTB CORPORATION                   
  JOHNSON, MIRMIRAN & THOMPSON, INC. 
  NETWORK ENGINEERING SERVICES, INC. 
  STANTEC CONSULTING SERVICES INC.   
  THE BALMORAL GROUP, LLC            


DISTRICT 4    
Advertisement Number          : 17453
Financial Management Number(s):
  43373216201
Project Description           :
  Continuing Services for CEI Consultant Inspection Support
Longlist(Tech. Rev. Cmte.) Date:  16NOV2016  Time:  3.30PM
Shortlist Selection Date       :  28NOV2016  Time:  9:00AM
Shortlist Selection Posting    :  28NOV2016  Time:  12:00 P
Final Selection Meeting Date   :  20DEC2016  Time:  8:30AM
Final Selection Posting Date   :  20DEC2016  Time:  11:00AM
1st Negotiations Meeting Date  :  07FEB2017  Time:  11:00AM




Rank  Consultant
  1      JOHNSON, MIRMIRAN & THOMPSON, INC. 
  2      RUMMEL, KLEPPER & KAHL, LLP D/B/A R
  3      EISMAN & RUSSO, INC.               


DISTRICT 4    
Advertisement Number          : 17454
Financial Management Number(s):
  43427316201 43427326201 43804016201
Project Description           :
  CEI SERVICES FOR I-95/SR-9
Longlist(Tech. Rev. Cmte.) Date:  28NOV2016  Time:  1:00PM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  20DEC2016  Time:  8:30AM
Final Selection Posting Date   :  20DEC2016
1st Negotiations Meeting Date  :  01FEB2017  Time:  9:00AM




Rank  Consultant
  1      THE CORRADINO GROUP, INC.          
  2      A & P CONSULTING TRANSPORTATION ENG
  3      THOMPSON & ASSOCIATES, INC. CIVIL E


DISTRICT 4    
Advertisement Number          : 18413
Financial Management Number(s):
  43427333201 43427343201
Project Description           :
  Design Services for SR-9/I-95
Longlist(Tech. Rev. Cmte.) Date:  20MAR2017  Time:  1:30PM
Shortlist Selection Date       :  03APR2017  Time:  9:00AM
Scope Meeting Date             :  13APR2017  Time:  9:00AM
Tech. Rev. Cmte Meeting Date   :  08MAY2017  Time:  9:30AM
2nd Tech Rev. Cmte Meeting     :  27MAR2017  Time:  8:00AM
Final Selection Meeting Date   :  22MAY2017  Time:  9:00AM




DISTRICT 4    
Advertisement Number          : 17460
Financial Management Number(s):
  43551413202
Project Description           :
  Interchange Improvment for Sunrise Blvd
Longlist(Tech. Rev. Cmte.) Date:  16NOV2016  Time:  1:00PM
Shortlist Selection Date       :  28NOV2016  Time:  9:00AM
Shortlist Selection Posting    :  28NOV2016  Time:  12:00 P
Scope Meeting Date             :  08DEC2016  Time:  2:00PM
Tech. Rev. Cmte Meeting Date   :  23JAN2017  Time:  02:30PM
Final Selection Meeting Date   :  06FEB2017  Time:  9:00AM
Final Selection Posting Date   :  06FEB2017  Time:  12:01PM
1st Negotiations Meeting Date  :  27FEB2017  Time:  9:00AM




Rank  Consultant
  1      H.W. LOCHNER INC                   
  2      PEVIDA HIGHWAY DESIGNERS, PLLC     
  3      VOLKERT, INC.                      


DISTRICT 4    
Advertisement Number          : 18418
Financial Management Number(s):
  43630813201 42154813201 42154823201
Project Description           :
  Design Services for Eastbound
Longlist(Tech. Rev. Cmte.) Date:  27MAR2017  Time:  11:00AM
Shortlist Selection Date       :  10APR2017  Time:  9:00AM
Scope Meeting Date             :  20APR2017  Time:  3:30PM
Tech. Rev. Cmte Meeting Date   :  17MAY2017  Time:  1:00PM
Final Selection Meeting Date   :  29MAY2017  Time:  9:00AM
1st Negotiations Meeting Date  :  05JUL2017  Time:  9:00AM




DISTRICT 4    
Advertisement Number          : 18416
Financial Management Number(s):
  43656413201
Project Description           :
  Loxahatchee Rd. from Arthur Ma
Longlist(Tech. Rev. Cmte.) Date:  15MAR2017  Time:  3:00PM
Shortlist Selection Date       :  27MAR2017  Time:  9:00AM
Scope Meeting Date             :  07APR2017  Time:  4:00PM
Tech. Rev. Cmte Meeting Date   :  17MAR2017  Time:  9:30AM
2nd Tech Rev. Cmte Meeting     :  25APR2017  Time:  10:30AM
Final Selection Meeting Date   :  15MAY2017  Time:  9:00AM
1st Negotiations Meeting Date  :  21JUN2017  Time:  9:00AM




DISTRICT 4    
Advertisement Number          : 17462
Financial Management Number(s):
  43657712201
Project Description           :
  SR-9/I-95, FROM PBC/MARTIN CO.
Longlist(Tech. Rev. Cmte.) Date:  28NOV2016  Time:  3:00PM
Shortlist Selection Date       :  12DEC2016  Time:  9:00AM
Shortlist Selection Posting    :  12DEC2016  Time:  11:00 A
Scope Meeting Date             :  09JAN2017  Time:  02:30PM
Tech. Rev. Cmte Meeting Date   :  23JAN2017  Time:  03:30PM
Final Selection Meeting Date   :  06FEB2017  Time:  9:00AM
Final Selection Posting Date   :  06FEB2017  Time:  12:01PM
1st Negotiations Meeting Date  :  08MAR2017  Time:  9:00AM
2nd Negotiations Meeting Date  :  03APR2017  Time:  9:00AM




Rank  Consultant
  1      RS&H, INC.                         
  2      KIMLEY-HORN AND ASSOCIATES, INC.   
  3      HANSON PROFESSIONAL SERVICES INC.  


DISTRICT 4    
Advertisement Number          : 17459
Financial Management Number(s):
  43661716201
Project Description           :
  I-95 Deck Replacement at CR-709/FEC & Ten Mile Creek
Longlist(Tech. Rev. Cmte.) Date:  20DEC2016  Time:  1:00PM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  09JAN2017  Time:  9:00AM
Final Selection Posting Date   :  09JAN2017  Time:  10:00AM
1st Negotiations Meeting Date  :  15FEB2017  Time:  2:00PM




Rank  Consultant
  1      CARDNO, INC.                       
  2      AE ENGINEERING, INC.               
  3      JOHNSON, MIRMIRAN & THOMPSON, INC. 
  4      CREATIVE ENGINEERING GROUP, INC.   
  5      A & P CONSULTING TRANSPORTATION ENG


DISTRICT 4    
Advertisement Number          : 17444
Financial Management Number(s):
  43689313201
Project Description           :
  Congress Ave Lighting Improvements.
Longlist(Tech. Rev. Cmte.) Date:  19AUG2016  Time:  9:00AM
Shortlist Selection Date       :  06SEP2016  Time:  9:00AM
Shortlist Selection Posting    :  06SEP2016  Time:  11:00 A
Scope Meeting Date             :  15SEP2016  Time:  3:30PM
Tech. Rev. Cmte Meeting Date   :  14OCT2016  Time:  9:00AM
Final Selection Meeting Date   :  24OCT2016  Time:  9:00AM
Final Selection Posting Date   :  24OCT2016  Time:  2:00PM
1st Negotiations Meeting Date  :  13DEC2016  Time:  9:00AM




Rank  Consultant
  1      GOAL ASSOCIATES, INC.              
  2      CTS ENGINEERING, INC.              
  3      CARNAHAN, PROCTOR AND CROSS, INC.  


DISTRICT 4    
Advertisement Number          : 17461
Financial Management Number(s):
  43696213201
Project Description           :
  SR-9/I-95 @COPANS RD FR S OF S
Longlist(Tech. Rev. Cmte.) Date:  16NOV2016  Time:  08:00AM
Shortlist Selection Date       :  28NOV2016  Time:  9:00AM
Shortlist Selection Posting    :  28NOV2016  Time:  12:00 P
Scope Meeting Date             :  08DEC2016  Time:  4:00PM
Tech. Rev. Cmte Meeting Date   :  24JAN2017  Time:  09:00AM
Final Selection Meeting Date   :  06FEB2017  Time:  9:OOAM
Final Selection Posting Date   :  06FEB2017  Time:  12:01PM
1st Negotiations Meeting Date  :  06MAR2017  Time:  9:00AM




Rank  Consultant
  1      BCC ENGINEERING, INC.              
  2      JACOBS ENGINEERING GROUP INC.      
  3      AECOM TECHNICAL SERVICES, INC.     


DISTRICT 4    
Advertisement Number          : 17464
Financial Management Number(s):
  43770113201
Project Description           :
  SR-9/I-95 FROM SOUTH OF REST A
Longlist(Tech. Rev. Cmte.) Date:  15SEP2016  Time:  11:00AM
Shortlist Selection Date       :  03OCT2016  Time:  9:00AM
Shortlist Selection Posting    :  03OCT2016  Time:  11:00 A
Scope Meeting Date             :  13OCT2016  Time:  2:30PM
Tech. Rev. Cmte Meeting Date   :  07NOV2016  Time:  2:00PM
Final Selection Meeting Date   :  21NOV2016  Time:  9:00AM
Final Selection Date Not Posted
1st Negotiations Meeting Date  :  12JAN2017  Time:  9:00AM




Rank  Consultant
  1      DRMP, INC.                         
  2      PROTEAN DESIGN GROUP, INC.         
  3      F.R. ALEMAN & ASSOCIATES, INC.     


DISTRICT 4    
Advertisement Number          : 17430
Financial Management Number(s):
  43783213201
Project Description           :
  SR-93/I-75 FROM MIAMI DADE COU
Longlist(Tech. Rev. Cmte.) Date:  08DEC2016  Time:  10:00AM
Shortlist Selection Date       :  20DEC2016  Time:  8:30AM
Shortlist Selection Posting    :  20DEC2016
Scope Meeting Date             :  03JAN2017  Time:  1:00PM
Tech. Rev. Cmte Meeting Date   :  18JAN2017  Time:  1:00PM
Final Selection Meeting Date   :  30JAN2017  Time:  9:00AM
Final Selection Posting Date   :  30JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  16MAR2017  Time:  09:00AM




Rank  Consultant
  1      WANTMAN GROUP, INC.                
  2      RS&H, INC.                         
  3      T.Y. LIN INTERNATIONAL             


DISTRICT 4    
Advertisement Number          : 17450
Financial Management Number(s):
  43783413201
Project Description           :
  US-1/N. of George Bush Blvd to
Longlist(Tech. Rev. Cmte.) Date:  19SEP2016  Time:  10:0AM
Shortlist Selection Date       :  03OCT2016  Time:  9:00AM
Shortlist Selection Posting    :  03OCT2016  Time:  11:00 A
Scope Meeting Date             :  13OCT2016  Time:  3:30PM
Tech. Rev. Cmte Meeting Date   :  07NOV2016  Time:  3:30PM
Final Selection Meeting Date   :  21NOV2016  Time:  9:00AM
Final Selection Posting Date   :  21NOV2016  Time:  11:00AM
1st Negotiations Meeting Date  :  12JAN2017  Time:  9:00AM




Rank  Consultant
  1      JOHNSON, MIRMIRAN & THOMPSON, INC. 
  2      EAC CONSULTING, INC.               
  3      R. J. BEHAR & COMPANY, INC.        


DISTRICT 4    
Advertisement Number          : 17469
Financial Management Number(s):
  43917023201
Project Description           :
  SR-9/I-95 @ SR-848/Stirling Road Interim Improvements
Longlist(Tech. Rev. Cmte.) Date:  27OCT2016  Time:  9:00AM
Shortlist Selection Date       :  07NOV2016  Time:  9:00AM
Shortlist Selection Posting    :  07NOV2016  Time:  10:00 A
Scope Meeting Date             :  17NOV2016  Time:  1:00PM
Tech. Rev. Cmte Meeting Date   :  08DEC2016  Time:  2:30PM
Final Selection Meeting Date   :  20DEC2016  Time:  8:30AM
Final Selection Posting Date   :  20DEC2016  Time:  11:00AM
1st Negotiations Meeting Date  :  25JAN2017  Time:  9:00AM




Rank  Consultant
  1      THE CORRADINO GROUP, INC.          
  2      ATKINS NORTH AMERICA, INC.         
  3      PROPEL ENGINEERING, INC.           


DISTRICT 4    
Advertisement Number          : 17472
Financial Management Number(s):
  43971413201
Project Description           :
  Design Services for SR-5/US-1
Longlist(Tech. Rev. Cmte.) Date:  08DEC2016  Time:  11:30AM
Shortlist Selection Date       :  20DEC2016  Time:  8:30AM
Shortlist Selection Posting    :  20DEC2016  Time:  11:00 A
Scope Meeting Date             :  09JAN2017  Time:  1:00PM
Tech. Rev. Cmte Meeting Date   :  02FEB2017  Time:  10:00AM
Final Selection Meeting Date   :  13FEB2017  Time:  9:00AM
Final Selection Posting Date   :  13FEB2017  Time:  10:40AM
1st Negotiations Meeting Date  :  22MAR2017  Time:  9:00AM




Rank  Consultant
  1      GANNETT FLEMING, INC.              
  2      HDR ENGINEERING, INC.              
  3      AECOM TECHNICAL SERVICES, INC.     


DISTRICT 4    
Advertisement Number          : 18401
Financial Management Number(s):
  43989112202
Project Description           :
  PD&E for SR-869/SW10th Street
Longlist(Tech. Rev. Cmte.) Date:  12JAN2017  Time:  01:30PM
Shortlist Selection Date       :  23JAN2017  Time:  9:00AM
Shortlist Selection Posting    :  23JAN2017  Time:  11:00 A
Scope Meeting Date             :  15FEB2017  Time:  1:00PM
Tech. Rev. Cmte Meeting Date   :  13MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  03APR2017  Time:  9:00AM





Shortlisted Firms:
  KEITH AND SCHNARS, P.A.            
  PARSONS TRANSPORTATION GROUP INC.  
  RS&H, INC.                         


DISTRICT 4    
Advertisement Number          : 17473
Financial Management Number(s):
  43990412201 43990411201
Project Description           :
  Districtwide Congestion Assess
Longlist(Tech. Rev. Cmte.) Date:  16NOV2016  Time:  3:00PM
Shortlist Selection Date       :  28NOV2016  Time:  9:00AM
Shortlist Selection Posting    :  28NOV2016  Time:  12:00 P
Scope Meeting Date             :  09DEC2016  Time:  2:00PM
Tech. Rev. Cmte Meeting Date   :  11JAN2017  Time:  1:00PM
Final Selection Meeting Date   :  23JAN2017  Time:  9:00AM
Final Selection Posting Date   :  23JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  07MAR2017  Time:  9:00AM




Rank  Consultant
  1      CAMBRIDGE SYSTEMATICS, INC.        
  2      KEITH AND SCHNARS, P.A.            
  3      THE CORRADINO GROUP, INC.          


DISTRICT 4    
Advertisement Number          : 18405
Financial Management Number(s):
  44007213201 44007313201 44007413201
Project Description           :
  Broward Intersection Lighting Improvements
Longlist(Tech. Rev. Cmte.) Date:  23FEB2017  Time:  11:00AM
Shortlist Selection Date       :  06MAR2017  Time:  9:00AM
Shortlist Selection Posting    :  06MAR2017  Time:  11:00 A
Scope Meeting Date             :  16MAR2017  Time:  4:00PM
Tech. Rev. Cmte Meeting Date   :  13APR2017  Time:  10:00AM
Final Selection Meeting Date   :  24APR2017  Time:  9:00AM
1st Negotiations Meeting Date  :  31MAY2017  Time:  9:00AM





Shortlisted Firms:
  F.R. ALEMAN & ASSOCIATES, INC.     
  FLORIDA TRANSPORTATION ENGINEERING,
  PE CONSULTING ENGINEERING D/B/A PE 


DISTRICT 4    
Advertisement Number          : 17475
Financial Management Number(s):
  44055423201
Project Description           :
  Restoration of SR-A1A South of
Longlist(Tech. Rev. Cmte.) Date:  30JAN2017  Time:  10:00AM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  13FEB2017  Time:  9:00AM
Final Selection Posting Date   :  14FEB2017  Time:  11:21AM
1st Negotiations Meeting Date  :  07APR2017  Time:  9:00AM




Rank  Consultant
  1      LAKES ENGINEERING, INC.            
  2      RS&H, INC.                         
  3      HSQ GROUP, INC.                    


DISTRICT 4    
Advertisement Number          : 18404
Financial Management Number(s):
  44074613201 44074623201 44074633201 44074643201
  44074653201
Project Description           :
  Broward MPO Regional Complete Streets Initiative Projects
Longlist(Tech. Rev. Cmte.) Date:  20FEB2017  Time:  11:00AM
Shortlist Selection Date       :  27FEB2017  Time:  9:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  12:00 P
Scope Meeting Date             :  08MAR2017  Time:  3:00PM
Tech. Rev. Cmte Meeting Date   :  06APR2017  Time:  3:00PM
Final Selection Meeting Date   :  17APR2017  Time:  9:00AM





Shortlisted Firms:
  A & P CONSULTING TRANSPORTATION ENG
  KIMLEY-HORN AND ASSOCIATES, INC.   
  T.Y. LIN INTERNATIONAL             



DISTRICT 5    
Advertisement Number          : 17558
Financial Management Number(s):
  TBD
Project Description           :
  CSC for Roadway Design
Shortlist Selection Date       :  07NOV2016  Time:  09:00AM
Shortlist Selection Posting    :  07NOV2016  Time:  12:00 P
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  27JAN2017  Time:  12:00PM




Rank  Consultant
  1      DEWBERRY ENGINEERS INC.            
  2      HORIZON ENGINEERING GROUP, INC.    
  3      FALLER, DAVIS & ASSOCIATES, INC.   
  4      JACOBS ENGINEERING GROUP INC.      
  5      BURGESS & NIPLE, INC.              


DISTRICT 5    
Advertisement Number          : 17559
Financial Management Number(s):
  TBD
Project Description           :
  CSC for Roadway Design
Shortlist Selection Date       :  07NOV2016  Time:  09:00AM
Shortlist Selection Posting    :  07NOV2016  Time:  12:00 P
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  19DEC2016  Time:  12:00PM
1st Negotiations Meeting Date  :  23JAN2017  Time:  02:00PM




Rank  Consultant
  1      HORIZON ENGINEERING GROUP, INC.    
  2      DEWBERRY ENGINEERS INC.            
  3      FALLER, DAVIS & ASSOCIATES, INC.   
  4      JACOBS ENGINEERING GROUP INC.      
  5      BURGESS & NIPLE, INC.              


DISTRICT 5    
Advertisement Number          : 17560
Financial Management Number(s):
  TBD
Project Description           :
  CSC for Roadway Design #003
Longlist(Tech. Rev. Cmte.) Date:  30JAN2017  Time:  21:30PM
Shortlist Selection Date       :  06FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  06FEB2017  Time:  12:01 P
Scope Meeting Date             :  09FEB2017  Time:  09:30AM
Tech. Rev. Cmte Meeting Date   :  28FEB2017  Time:  9:30AM
2nd Tech Rev. Cmte Meeting     :  28FEB2017  Time:  10:30AM
3rd Tech Rev. Cmte Meeting     :  28FEB2017  Time:  2:30AM
Final Selection Meeting Date   :  13MAR2017  Time:  09:00AM
Final Selection Posting Date   :  13MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  13APR2017  Time:  09:00AM




Rank  Consultant
  1      SRD, INC.                          
  2      CONNELLY & WICKER INC.             
  3      KELLY, COLLINS & GENTRY, INC.      


DISTRICT 5    
Advertisement Number          : 17530
Financial Management Number(s):
  23827526201 23827536201
Project Description           :
  CEI Group 157
Longlist(Tech. Rev. Cmte.) Date:  08FEB2017  Time:  02:30PM
Shortlist Selection Date       :  13FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  13FEB2017  Time:  10:40 A
Final Selection Meeting Date   :  27FEB2017  Time:  09:00AM
Final Selection Posting Date   :  27FEB2017  Time:  11:00AM




Rank  Consultant
  1      RUMMEL, KLEPPER & KAHL, LLP D/B/A R
  2      CDM SMITH INC.                     
  3      G-A-I CONSULTANTS, INC.            


DISTRICT 5    
Advertisement Number          : 17528
Financial Management Number(s):
  23831926201
Project Description           :
  CEI Group 155
Longlist(Tech. Rev. Cmte.) Date:  18JAN2017  Time:  09:30AM
Shortlist Selection Date       :  23JAN2017  Time:  09:00AM
Shortlist Selection Posting    :  23JAN2017  Time:  11:00 A
Final Selection Meeting Date   :  06FEB2017  Time:  09:00AM
Final Selection Posting Date   :  06FEB2017  Time:  12:01PM
1st Negotiations Meeting Date  :  17MAR2017  Time:  09:00AM




Rank  Consultant
  1      METRIC ENGINEERING INC.            
  2      RUMMEL, KLEPPER & KAHL, LLP D/B/A R
  3      PARSONS BRINCKERHOFF, INC.         


DISTRICT 5    
Advertisement Number          : 17543
Financial Management Number(s):
  24106814203 24106814204
Project Description           :
  CSC for Right of Way Consultant Services
Longlist(Tech. Rev. Cmte.) Date:  15AUG2016  Time:  09:00AM
Shortlist Selection Date       :  22AUG2016  Time:  09:00AM
Scope Meeting Date             :  29AUG2016  Time:  10:00AM
Final Selection Meeting Date   :  26SEP2016  Time:  09:00AM
Final Selection Date Not Posted




DISTRICT 5    
Advertisement Number          : 17557
Financial Management Number(s):
  24106814203 24106814204
Project Description           :
  CSC for ROW Consultant Service
Longlist(Tech. Rev. Cmte.) Date:  07NOV2016  Time:  02:30PM
Shortlist Selection Date       :  14NOV2016  Time:  09:00AM
Shortlist Selection Posting    :  14NOV2016  Time:  11:00 A
Scope Meeting Date             :  21NOV2016  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  29NOV2016  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  29NOV2016  Time:  11:00AM
3rd Tech Rev. Cmte Meeting     :  29NOV2016  Time:  02:00PM
4th Tech Rev. Cmte Meeting     :  29NOV2016  Time:  03:30PM
5th Tech Rev. Cmte Meeting     :  30NOV2016  Time:  09:15AM
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  19DEC2016  Time:  11:00AM
1st Negotiations Meeting Date  :  24APR2017  Time:  09:30AM




Rank  Consultant
  1      AECOM TECHNICAL SERVICES, INC.     
  2      AMERICAN ACQUISITION GROUP, LLC    
  3      GLASS LAND ACQUISITION SERVICE SPEC
  4      FLORIDA ACQUISITION & APPRAISAL,INC
  5      INDEPENDENCE ACQUISITION & APPRAISA
  6      G-A-I CONSULTANTS, INC.            


DISTRICT 5    
Advertisement Number          : 17569
Financial Management Number(s):
  24106814203 24106814204
Project Description           :
  CSC for ROW Consultant Service
Longlist(Tech. Rev. Cmte.) Date:  07NOV2016  Time:  02:30PM
Shortlist Selection Date       :  14NOV2016  Time:  09:00AM
Shortlist Selection Posting    :  14NOV2016  Time:  11:00 A
Scope Meeting Date             :  21NOV2016  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  29NOV2016  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  29NOV2016  Time:  11:00AM
3rd Tech Rev. Cmte Meeting     :  29NOV2016  Time:  02:00PM
4th Tech Rev. Cmte Meeting     :  29NOV2016  Time:  03:30PM
5th Tech Rev. Cmte Meeting     :  30NOV2016  Time:  09:15AM
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  19DEC2016  Time:  11:00AM




Rank  Consultant
  1      G-A-I CONSULTANTS, INC.            
  2      AMERICAN ACQUISITION GROUP, LLC    
  3      GLASS LAND ACQUISITION SERVICE SPEC
  4      FLORIDA ACQUISITION & APPRAISAL,INC
  5      INDEPENDENCE ACQUISITION & APPRAISA
  6      AECOM TECHNICAL SERVICES, INC.     


DISTRICT 5    
Advertisement Number          : 17561
Financial Management Number(s):
  24108423213 24108426213 24108423214 24108426214
Project Description           :
  CSC for Geotechnical & Materia
Longlist(Tech. Rev. Cmte.) Date:  10NOV2016  Time:  01:30PM
Shortlist Selection Date       :  14NOV2016  Time:  09:00AM
Shortlist Selection Posting    :  14NOV2016  Time:  11:00 A
Scope Meeting Date             :  18NOV2016  Time:  09:00AM
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  19DEC2016  Time:  4:19PM
1st Negotiations Meeting Date  :  03FEB2017  Time:  08:30AM
2nd Negotiations Meeting Date  :  10FEB2017  Time:  08:30AM




Rank  Consultant
  1      ARDAMAN & ASSOCIATES, INC.         
  2      ELLIS & ASSOCIATES, INC.           
  3      PAGE ONE CONSULTANTS, INC.         
  4      PROFESSIONAL SERVICE INDUSTRIES, IN
  5      TERRACON CONSULTANTS, INC.         


DISTRICT 5    
Advertisement Number          : 17570
Financial Management Number(s):
  24108423213 24108426213 24108423214 24108426214
Project Description           :
  CSC for Geotechnical & Materia
Longlist(Tech. Rev. Cmte.) Date:  10NOV2016  Time:  01:30PM
Shortlist Selection Date       :  14NOV2016  Time:  09:00AM
Shortlist Selection Posting    :  14NOV2016  Time:  11:00 A
Scope Meeting Date             :  18NOV2016  Time:  09:00AM
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  19DEC2016  Time:  4:19PM




Rank  Consultant
  1      TERRACON CONSULTANTS, INC.         
  2      ELLIS & ASSOCIATES, INC.           
  3      PAGE ONE CONSULTANTS, INC.         
  4      PROFESSIONAL SERVICE INDUSTRIES, IN
  5      ARDAMAN & ASSOCIATES, INC.         


DISTRICT 5    
Advertisement Number          : 17556
Financial Management Number(s):
  41245617208
Project Description           :
  DW Sign Inspection
Longlist(Tech. Rev. Cmte.) Date:  25JAN2017  Time:  09:30AM
Shortlist Selection Date       :  06FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  06FEB2017  Time:  1:00 P
Scope Meeting Date             :  10FEB2017  Time:  10:30AM
Final Selection Meeting Date   :  06MAR2017  Time:  09:00AM
Final Selection Posting Date   :  06MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  11APR2017  Time:  01:30PM




Rank  Consultant
  1      AYRES ASSOCIATES INC               
  2      KISINGER CAMPO & ASSOCIATES, CORP. 
  3      INFRASTRUCTURE ENGINEERS, INC.     
  4      BURGESS & NIPLE, INC.              
  5      VOLKERT, INC.                      


DISTRICT 5    
Advertisement Number          : 17564
Financial Management Number(s):
  43013213203
Project Description           :
  SR 35 / US-301 Advanced Survey
Longlist(Tech. Rev. Cmte.) Date:  10JAN2017  Time:  01:00PM
Shortlist Selection Date       :  17JAN2017  Time:  09:00AM
Shortlist Selection Posting    :  17JAN2017  Time:  11:00 A
Scope Meeting Date             :  24JAN2017  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  27JAN2017  Time:  9:30AM
2nd Tech Rev. Cmte Meeting     :  27JAN2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  27JAN2017  Time:  2:30PM
4th Tech Rev. Cmte Meeting     :  27JAN2017  Time:  4:30PM
Final Selection Meeting Date   :  06FEB2017  Time:  09:00AM
Final Selection Posting Date   :  08FEB2017  Time:  11:00AM
2nd Negotiations Meeting Date  :  06MAR2017  Time:  10:00AM
3rd Negotiations Meeting Date  :  21MAR2017  Time:  10:00AM




Rank  Consultant
  1      McKim & Creed, Inc.                
  2      DRMP, INC.                         
  3      VOLKERT, INC.                      


DISTRICT 5    
Advertisement Number          : 13506
Financial Management Number(s):
  43180712201
Project Description           :
  SANFORD AMTRAK GATEWAY IMPROV
Shortlist Selection Date Not Available
Final Selection Date Not Posted




DISTRICT 5    
Advertisement Number          : 17503
Financial Management Number(s):
  43193513201
Project Description           :
  SR 40 Corridor from US 441
Longlist(Tech. Rev. Cmte.) Date:  12OCT2016  Time:  01:30PM
Shortlist Selection Date       :  24OCT2016  Time:  09:00AM
Shortlist Selection Posting    :  24OCT2016  Time:  2:00 P
Scope Meeting Date             :  31OCT2016  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  30NOV2016  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  30NOV2016  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  30NOV2016  Time:  02:30PM
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  19DEC2016  Time:  11:00AM
1st Negotiations Meeting Date  :  13JAN2017  Time:  09:00AM
2nd Negotiations Meeting Date  :  30JAN2017  Time:  10:00AM




Rank  Consultant
  1      HSQ GROUP, INC.                    
  2      METRIC ENGINEERING INC.            
  3      FALLER, DAVIS & ASSOCIATES, INC.   


DISTRICT 5    
Advertisement Number          : 17531
Financial Management Number(s):
  43505616201 43505316201 43505916201 43632516201
  43632316201
Project Description           :
  CEI Group 158
Shortlist Selection Date       :  27MAR2017  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  13MAR2017  Time:  11:00AM
Final Selection Meeting Date   :  27MAR2017  Time:  09:00AM




DISTRICT 5    
Advertisement Number          : 18505
Financial Management Number(s):
  43544348201 43544358201
Project Description           :
  Integrated Corridor Management
Shortlist Selection Date       :  27MAR2017  Time:  09:00AM
Final Selection Meeting Date   :  24APR2017  Time:  09:00AM




DISTRICT 5    
Advertisement Number          : 17535
Financial Management Number(s):
  43547112201
Project Description           :
  South Sumter Connector Trail
Longlist(Tech. Rev. Cmte.) Date:  31AUG2016  Time:  10:00AM
Shortlist Selection Date       :  06SEP2016  Time:  09:00AM
Shortlist Selection Posting    :  06SEP2016  Time:  12:00 P
Scope Meeting Date             :  12SEP2016  Time:  11:00AM
Tech. Rev. Cmte Meeting Date   :  04OCT2016  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  04OCT2016  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  04OCT2016  Time:  02:30PM
Final Selection Meeting Date   :  31OCT2016  Time:  09:00AM
Final Selection Posting Date   :  31OCT2016  Time:  11:00AM




Rank  Consultant
  1      TRANSYSTEMS CORPORATION D/B/A TRANS
  2      SPRINKLE CONSULTING INC.           
  3      KISINGER CAMPO & ASSOCIATES, CORP. 


DISTRICT 5    
Advertisement Number          : 17536
Financial Management Number(s):
  43547612201
Project Description           :
  I-75 Interchange at CR 514
Shortlist Selection Date       :  27DEC2016  Time:  09:00AM
Shortlist Selection Posting    :  27DEC2016  Time:  11:00 A
Final Selection Meeting Date   :  27FEB2017  Time:  09:00AM
Final Selection Date Not Posted





Shortlisted Firms:
  AECOM TECHNICAL SERVICES, INC.     
  ARCADIS U.S., INC.                 
  RUMMEL, KLEPPER & KAHL, LLP D/B/A R


DISTRICT 5    
Advertisement Number          : 17572
Financial Management Number(s):
  43547612201
Project Description           :
  I-75 at CR 514
Longlist(Tech. Rev. Cmte.) Date:  22MAR2017  Time:  01:00PM
Shortlist Selection Date       :  27MAR2017  Time:  09:00AM
Final Selection Meeting Date   :  10APR2017  Time:  09:00AM




DISTRICT 5    
Advertisement Number          : 17567
Financial Management Number(s):
  43585913201
Project Description           :
  West SR 50 Advanced Survey
Longlist(Tech. Rev. Cmte.) Date:  31JAN2017  Time:  01:00PM
Shortlist Selection Date       :  06FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  06FEB2017  Time:  12:01 P
Scope Meeting Date             :  10FEB2017  Time:  01:30PM
Tech. Rev. Cmte Meeting Date   :  24FEB2017  Time:  9:30AM
2nd Tech Rev. Cmte Meeting     :  24FEB2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  24FEB2017  Time:  2:30PM
Final Selection Meeting Date   :  06MAR2017  Time:  09:00AM
Final Selection Posting Date   :  06MAR2017  Time:  12:00PM




Rank  Consultant
  1      GEODATA CONSULTANTS, INC.          
  2      DRMP, INC.                         
  3      JONES, WOOD & GENTRY, INC.         


DISTRICT 5    
Advertisement Number          : 17506
Financial Management Number(s):
  43612213201 43612213202 43612213203
Project Description           :
  SR 405 Spaceport Connector SIS
Longlist(Tech. Rev. Cmte.) Date:  15DEC2016  Time:  01:00PM
Shortlist Selection Date       :  03JAN2017  Time:  09:00AM
Shortlist Selection Posting    :  03JAN2017  Time:  1:54 P
Scope Meeting Date             :  09JAN2017  Time:  01:00PM
Tech. Rev. Cmte Meeting Date   :  09FEB2017  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  09FEB2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  09FEB2017  Time:  02:30PM
Final Selection Meeting Date   :  27FEB2017  Time:  09:00AM
Final Selection Posting Date   :  27FEB2017  Time:  3:01PM
1st Negotiations Meeting Date  :  27MAR2017  Time:  01:00PM




Rank  Consultant
  1      TETRA TECH, INC.                   
  2      DRMP, INC.                         
  3      CDM SMITH INC.                     


DISTRICT 5    
Advertisement Number          : 17563
Financial Management Number(s):
  43643313201
Project Description           :
  Coast to Coast Trail, Seg. 2
Longlist(Tech. Rev. Cmte.) Date:  09JAN2017  Time:  09:00AM
Shortlist Selection Date       :  17JAN2017  Time:  09:00AM
Shortlist Selection Posting    :  17JAN2017  Time:  11:39 A
Scope Meeting Date             :  23JAN2017  Time:  11:00AM
Tech. Rev. Cmte Meeting Date   :  13FEB2017  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  13FEB2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  13FEB2017  Time:  02:30PM
Final Selection Meeting Date   :  13MAR2017  Time:  09:00AM
Final Selection Posting Date   :  13MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  18APR2017  Time:  09:00AM




Rank  Consultant
  1      MOFFATT & NICHOL, INC.             
  2      POND & COMPANY CORPORATION         
  3      TETRA TECH, INC.                   


DISTRICT 5    
Advertisement Number          : 17529
Financial Management Number(s):
  43710016201
Project Description           :
  CEI Group 156
Longlist(Tech. Rev. Cmte.) Date:  07DEC2016  Time:  01:30PM
Shortlist Selection Date       :  19DEC2016  Time:  09:00AM
Final Selection Meeting Date   :  19DEC2016  Time:  09:00AM
Final Selection Posting Date   :  19DEC2016  Time:  12:00PM




Rank  Consultant
  1      HILL INTERNATIONAL, INC.           
  2      DRMP, INC.                         
  3      MICHAEL BAKER INTERNATIONAL, INC. D


DISTRICT 5    
Advertisement Number          : 17568
Financial Management Number(s):
  43711312201
Project Description           :
  Study of Route & Mode Choice
Longlist(Tech. Rev. Cmte.) Date:  25JAN2017  Time:  04:00PM
Shortlist Selection Date       :  30JAN2017  Time:  09:00AM
Scope Meeting Date             :  03FEB2017  Time:  11:00AM
Final Selection Meeting Date   :  06MAR2017  Time:  09:00AM
Final Selection Date Not Posted




DISTRICT 5    
Advertisement Number          : 17571
Financial Management Number(s):
  43711312201
Project Description           :
  Study of Route & Mode Choice
Longlist(Tech. Rev. Cmte.) Date:  20FEB2017  Time:  01:30PM
Shortlist Selection Date       :  06MAR2017  Time:  09:00AM
Shortlist Selection Posting    :  06MAR2017  Time:  11:00 A
Scope Meeting Date             :  10MAR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  27MAR2017  Time:  11:30AM
2nd Tech Rev. Cmte Meeting     :  27MAR2017  Time:  02:15PM
3rd Tech Rev. Cmte Meeting     :  27MAR2017  Time:  04:15PM
Final Selection Meeting Date   :  10APR2017  Time:  09:00AM





Shortlisted Firms:
  ATKINS NORTH AMERICA, INC.         
  KAPSCH TRAFFICCOM TRANSPORTATION NA
  RESOURCE SYSTEMS GROUP, INC.       


DISTRICT 5    
Advertisement Number          : 18501
Financial Management Number(s):
  43720412201
Project Description           :
  Babcock from S of Micco PD&E
Longlist(Tech. Rev. Cmte.) Date:  16FEB2017  Time:  09:30AM
Shortlist Selection Date       :  27FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  27FEB2017  Time:  3:01 P
Scope Meeting Date             :  09MAR2017  Time:  10:30AM
Tech. Rev. Cmte Meeting Date   :  21MAR2017  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  21MAR2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  21MAR2017  Time:  02:30PM
Final Selection Meeting Date   :  10APR2017  Time:  09:00AM





Shortlisted Firms:
  GREENMAN-PEDERSEN, INC.            
  INWOOD CONSULTING ENGINEERS, INC.  
  SCALAR CONSULTING GROUP INC.       


DISTRICT 5    
Advertisement Number          : 17516
Financial Management Number(s):
  43734513201
Project Description           :
  SR 50/ Cheney Highway
Longlist(Tech. Rev. Cmte.) Date:  06SEP2016  Time:  01:00PM
Shortlist Selection Date       :  12SEP2016  Time:  09:00AM
Shortlist Selection Posting    :  12SEP2016  Time:  12:00 P
Scope Meeting Date             :  19SEP2016  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  19OCT2016  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  19OCT2016  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  19OCT2016  Time:  02:30PM
Final Selection Meeting Date   :  07NOV2016  Time:  09:00AM
Final Selection Posting Date   :  07NOV2016  Time:  11:00AM
1st Negotiations Meeting Date  :  13DEC2016  Time:  12:30PM
2nd Negotiations Meeting Date  :  14DEC2016  Time:  08:30AM




Rank  Consultant
  1      COMPREHENSIVE ENGINEERING SERVICES,
  2      CDM SMITH INC.                     
  3      LANDMARK ENGINEERING INC.          


DISTRICT 5    
Advertisement Number          : 17518
Financial Management Number(s):
  43734813201
Project Description           :
  SR 44 from 1900' W of CR 437
Longlist(Tech. Rev. Cmte.) Date:  04OCT2016  Time:  01:00PM
Shortlist Selection Date       :  10OCT2016  Time:  09:00AM
Shortlist Selection Posting    :  10OCT2016  Time:  3:00 P
Scope Meeting Date             :  24OCT2016  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  16NOV2016  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  16NOV2016  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  16NOV2016  Time:  02:30PM
Final Selection Meeting Date   :  05DEC2016  Time:  09:00AM
Final Selection Posting Date   :  05DEC2016  Time:  2:00PM
1st Negotiations Meeting Date  :  12JAN2017  Time:  09:00AM
2nd Negotiations Meeting Date  :  08FEB2017  Time:  09:00AM
3rd Negotiations Meeting Date  :  13JAN2017  Time:  01:30PM




Rank  Consultant
  1      PROPEL ENGINEERING, INC.           
  2      LANDMARK ENGINEERING INC.          
  3      BENTLEY ARCHITECTS AND ENGINEERS, I


DISTRICT 5    
Advertisement Number          : 18521
Financial Management Number(s):
  43898213201
Project Description           :
  US 1/ SR 5 from 6th St
Shortlist Selection Date       :  03APR2017  Time:  09:00AM
Final Selection Meeting Date   :  15MAY2017  Time:  09:00AM




DISTRICT 5    
Advertisement Number          : 17562
Financial Management Number(s):
  43922013201
Project Description           :
  I-95 Interchange at LPGA Blvd.
Longlist(Tech. Rev. Cmte.) Date:  05DEC2016  Time:  10:00AM
Shortlist Selection Date       :  12DEC2016  Time:  09:00AM
Shortlist Selection Posting    :  12DEC2016  Time:  11:00 A
Scope Meeting Date             :  16DEC2016  Time:  09:30AM
Tech. Rev. Cmte Meeting Date   :  12JAN2017  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  12JAN2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  12JAN2017  Time:  04:30PM
Final Selection Meeting Date   :  06FEB2017  Time:  09:00AM
Final Selection Posting Date   :  06FEB2017  Time:  12:01PM
1st Negotiations Meeting Date  :  15MAR2017  Time:  09:00AM




Rank  Consultant
  1      PARSONS TRANSPORTATION GROUP INC.  
  2      STV INCORPORATED                   
  3      H.W. LOCHNER INC                   


DISTRICT 5    
Advertisement Number          : 17566
Financial Management Number(s):
  43986512201
Project Description           :
  US 1 from Canal St to Beville
Longlist(Tech. Rev. Cmte.) Date:  19JAN2017  Time:  09:30AM
Shortlist Selection Date       :  30JAN2017  Time:  09:00AM
Scope Meeting Date             :  03FEB2017  Time:  09:30AM
Tech. Rev. Cmte Meeting Date   :  27FEB2017  Time:  11:30AM
2nd Tech Rev. Cmte Meeting     :  27FEB2017  Time:  02:15PM
3rd Tech Rev. Cmte Meeting     :  27FEB2017  Time:  04:15PM
Final Selection Meeting Date   :  13MAR2017  Time:  09:00AM
Final Selection Posting Date   :  13MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  28APR2017  Time:  09:00AM




Rank  Consultant
  1      SCALAR CONSULTING GROUP INC.       
  2      SPRINKLE CONSULTING INC.           
  3      BMA CONSULTING ENGINEERING, INC.   


DISTRICT 5    
Advertisement Number          : 17565
Financial Management Number(s):
  44041213201 44041213202
Project Description           :
  TSM&O Continuing Services
Longlist(Tech. Rev. Cmte.) Date:  26JAN2017  Time:  11:00AM
Shortlist Selection Date       :  06FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  06FEB2017  Time:  12:01 P
Scope Meeting Date             :  10FEB2017  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  22FEB2017  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  22FEB2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  22FEB2017  Time:  02:30PM
Final Selection Meeting Date   :  20MAR2017  Time:  09:00AM
Final Selection Posting Date   :  20MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  25APR2017  Time:  09:00AM




Rank  Consultant
  1      ATKINS NORTH AMERICA, INC.         
  2      HDR ENGINEERING, INC.              
  3      METRIC ENGINEERING INC.            
  4      ARCADIS U.S., INC.                 


DISTRICT 5    
Advertisement Number          : 17573
Financial Management Number(s):
  44041213201 44041213202
Project Description           :
  TSM&O Continuing Services
Longlist(Tech. Rev. Cmte.) Date:  26JAN2017  Time:  11:00AM
Shortlist Selection Date       :  06FEB2017  Time:  09:00AM
Shortlist Selection Posting    :  06FEB2017  Time:  12:01 P
Scope Meeting Date             :  10FEB2017  Time:  09:00AM
Tech. Rev. Cmte Meeting Date   :  22FEB2017  Time:  09:30AM
2nd Tech Rev. Cmte Meeting     :  22FEB2017  Time:  11:30AM
3rd Tech Rev. Cmte Meeting     :  22FEB2017  Time:  02:30PM
Final Selection Meeting Date   :  20MAR2017  Time:  09:00AM
Final Selection Posting Date   :  20MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  26APR2017  Time:  09:00AM




Rank  Consultant
  1      HDR ENGINEERING, INC.              
  2      ATKINS NORTH AMERICA, INC.         
  3      METRIC ENGINEERING INC.            
  4      ARCADIS U.S., INC.                 



DISTRICT 6    
Advertisement Number          : 17666
Financial Management Number(s):
  TBA
Project Description           :
  D/W ROW Acquisition & Relocati
Longlist(Tech. Rev. Cmte.) Date:  19JUL2016  Time:  11:00AM
Shortlist Selection Date       :  08AUG2016  Time:  10:00AM
Shortlist Selection Posting    :  08AUG2016  Time:  12:00 P
Final Selection Meeting Date   :  26SEP2016  Time:  10:00AM
Final Selection Posting Date   :  26SEP2016  Time:  2:00PM
1st Negotiations Meeting Date  :  21OCT2016  Time:  02:00PM




Rank  Consultant
  1      GLASS LAND ACQUISITION SERVICE SPEC
  2      AECOM TECHNICAL SERVICES, INC.     
  3      INDEPENDENCE ACQUISITION & APPRAISA


DISTRICT 6    
Advertisement Number          : 17671
Financial Management Number(s):
  TBA
Project Description           :
  Pre-event Natural Disaster Mon
Longlist(Tech. Rev. Cmte.) Date:  09SEP2016  Time:  10:00AM
Shortlist Selection Date       :  26SEP2016  Time:  10:00AM
Shortlist Selection Posting    :  26SEP2016  Time:  2:00 P
Final Selection Meeting Date   :  10OCT2016  Time:  10:00AM
Final Selection Posting Date   :  10OCT2016  Time:  1:00PM
1st Negotiations Meeting Date  :  07NOV2016  Time:  01:00PM




Rank  Consultant
  1      TARGET ENGINEERING GROUP, LLC      
  2      HDR CONSTRUCTION CONTROL CORPORATIO
  3      RS&H, INC.                         
  4      THE LOUIS BERGER GROUP, INC.       


DISTRICT 6    
Advertisement Number          : 18603
Financial Management Number(s):
  TBA
Project Description           :
  017 CEI Support
Longlist(Tech. Rev. Cmte.) Date:  29MAR2017  Time:  11:00AM
Shortlist Selection Date       :  10APR2017  Time:  10:00AM
Final Selection Meeting Date   :  10APR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  01MAY2017  Time:  10:00AM




DISTRICT 6    
Advertisement Number          : 17654
Financial Management Number(s):
  24972663201
Project Description           :
  D/W Misc Studies & RCI Data Co
Longlist(Tech. Rev. Cmte.) Date:  15DEC2016  Time:  10:00AM
Shortlist Selection Date       :  09JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  09JAN2017  Time:  3:00 P
Final Selection Meeting Date   :  23FEB2017  Time:  10:00AM
Final Selection Posting Date   :  23FEB2017  Time:  8:00AM
1st Negotiations Meeting Date  :  20MAR2017  Time:  10:00AM




Rank  Consultant
  1      CALTRAN ENGINEERING GROUP, INC.    
  2      F.R. ALEMAN & ASSOCIATES, INC.     
  3      C.H. PEREZ & ASSOCIATES CONSULTING 


DISTRICT 6    
Advertisement Number          : 17638
Financial Management Number(s):
  25060523208
Project Description           :
  D/W Misc. PE Design Consultant
Longlist(Tech. Rev. Cmte.) Date:  09SEP2016  Time:  10:00AM
Shortlist Selection Date       :  26SEP2016  Time:  10:00AM
Shortlist Selection Posting    :  26SEP2016  Time:  2:00 P
Final Selection Meeting Date   :  14NOV2016  Time:  10:00AM
Final Selection Posting Date   :  14NOV2016  Time:  2:00PM




Rank  Consultant
  1      ASA CONSULTANTS, INC.              
  2      SCALAR CONSULTING GROUP INC.       
  3      Civil Works, Inc.                  


DISTRICT 6    
Advertisement Number          : 17650
Financial Management Number(s):
  25062242202
Project Description           :
  D/W PD&E Consultant Support
Longlist(Tech. Rev. Cmte.) Date:  02DEC2016  Time:  10:00AM
Shortlist Selection Date       :  09JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  09JAN2017  Time:  3:00 P
Final Selection Meeting Date   :  20FEB2017  Time:  10:00AM
Final Selection Posting Date   :  21FEB2017  Time:  11:02AM




Rank  Consultant
  0      ATKINS NORTH AMERICA, INC.         
  0      GANNETT FLEMING, INC.              
  0      STANTEC CONSULTING SERVICES INC.   
  1      JACOBS ENGINEERING GROUP INC.      


DISTRICT 6    
Advertisement Number          : 17674
Financial Management Number(s):
  25062943201
Project Description           :
  Districtwide Traffic Operation
Longlist(Tech. Rev. Cmte.) Date:  21NOV2016  Time:  10:00PM
Shortlist Selection Date       :  05DEC2016  Time:  10:00PM
Shortlist Selection Posting    :  06DEC2016  Time:  9:00 A
Final Selection Meeting Date   :  09JAN2017  Time:  10:00PM
Final Selection Posting Date   :  09JAN2017  Time:  3:00PM




Rank  Consultant
  1      AES ENGINEERING, INC.              
  2      CTS ENGINEERING, INC.              
  3      CHOICE ENGINEERING CONSULTANTS, INC


DISTRICT 6    
Advertisement Number          : 17656
Financial Management Number(s):
  25064723205
Project Description           :
  Districtwide Repair/Rehab Plan
Longlist(Tech. Rev. Cmte.) Date:  05JAN2017  Time:  10:00AM
Shortlist Selection Date       :  23JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  23JAN2017  Time:  3:00 P
Final Selection Meeting Date   :  06MAR2017  Time:  10:00AM
Final Selection Posting Date   :  07MAR2017  Time:  10:00AM




Rank  Consultant
  1      NETWORK ENGINEERING SERVICES, INC. 
  2      BCC ENGINEERING, INC.              
  3      TRANSYSTEMS CORPORATION D/B/A TRANS


DISTRICT 6    
Advertisement Number          : 17655
Financial Management Number(s):
  25064922202
Project Description           :
  Districtwide Permits Consultan
Longlist(Tech. Rev. Cmte.) Date:  12JAN2017  Time:  10:00AM
Shortlist Selection Date       :  06FEB2017  Time:  10:00AM
Shortlist Selection Posting    :  06FEB2017  Time:  12:01 P
Final Selection Meeting Date   :  20MAR2017  Time:  10:00AM
Final Selection Posting Date   :  21MAR2017  Time:  4:00PM




Rank  Consultant
  1      WANTMAN GROUP, INC.                
  2      RS&H, INC.                         
  3      GREENMAN-PEDERSEN, INC.            


DISTRICT 6    
Advertisement Number          : 17677
Financial Management Number(s):
  25071186201
Project Description           :
  017 Districtwide CEI Contract
Longlist(Tech. Rev. Cmte.) Date:  19OCT2016  Time:  10:00AM
Shortlist Selection Date       :  14NOV2016  Time:  10:00AM
Shortlist Selection Posting    :  14NOV2016  Time:  2:00 P
Final Selection Meeting Date   :  05DEC2016  Time:  10:00AM
Final Selection Posting Date   :  06DEC2016  Time:  12:00PM
1st Negotiations Meeting Date  :  03JAN2017  Time:  10:00AM




Rank  Consultant
  1      F&J ENGINEERING GROUP, INC.        
  2      CARNAHAN, PROCTOR AND CROSS, INC.  
  3      AE ENGINEERING, INC.               


DISTRICT 6    
Advertisement Number          : 17652
Financial Management Number(s):
  25075932202
Project Description           :
  D/W Resurfacing Scoping Report
Longlist(Tech. Rev. Cmte.) Date:  03NOV2016  Time:  10:00AM
Shortlist Selection Date       :  05DEC2016  Time:  10:00PM
Shortlist Selection Posting    :  05DEC2016  Time:  5:00 P
Final Selection Meeting Date   :  23JAN2017  Time:  10:00AM
Final Selection Posting Date   :  23JAN2017  Time:  2:01PM




Rank  Consultant
  1      HDR ENGINEERING, INC.              
  2      HBC ENGINEERING COMPANY            
  3      AMMANN & WHITNEY, INC.             


DISTRICT 6    
Advertisement Number          : 17631
Financial Management Number(s):
  40561536201 40561546201
Project Description           :
  NW 87th Avenue from NW 74th St
Longlist(Tech. Rev. Cmte.) Date:  10NOV2016  Time:  10:00AM
Shortlist Selection Date       :  05DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  05DEC2016  Time:  5:00 P
Final Selection Meeting Date   :  09JAN2017  Time:  10:00AM
Final Selection Posting Date   :  09JAN2017  Time:  1:00PM
1st Negotiations Meeting Date  :  06FEB2017  Time:  01:30PM




Rank  Consultant
  1      RUMMEL, KLEPPER & KAHL, LLP D/B/A R
  2      PINNACLE CONSULTING ENTERPRISES, IN
  3      H.RODRIGUEZ CONSULTING ENGINEERING,


DISTRICT 6    
Advertisement Number          : 17653
Financial Management Number(s):
  41026526202
Project Description           :
  D/W Asbestos & Lead Abatement
Longlist(Tech. Rev. Cmte.) Date:  24OCT2016  Time:  10:00AM
Shortlist Selection Date       :  14NOV2016  Time:  10:00AM
Shortlist Selection Posting    :  14NOV2016  Time:  2:00 P
Final Selection Meeting Date   :  05DEC2016  Time:  10:00AM
Final Selection Posting Date   :  05DEC2016
1st Negotiations Meeting Date  :  30DEC2016  Time:  10:00AM




Rank  Consultant
  1      GREENMAN-PEDERSEN, INC.            
  2      NETWORK ENGINEERING SERVICES, INC. 
  3      AMEC FOSTER WHEELER ENVIRONMENT & I


DISTRICT 6    
Advertisement Number          : 18639
Financial Management Number(s):
  41056817206
Project Description           :
  Districtwide Sign Inspections
Longlist(Tech. Rev. Cmte.) Date:  03MAR2017  Time:  10:00AM
Shortlist Selection Date       :  20MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  05MAY2017  Time:  10:00AM
1st Negotiations Meeting Date  :  19JUN2017  Time:  01:00PM




DISTRICT 6    
Advertisement Number          : 17675
Financial Management Number(s):
  41064642101
Project Description           :
  SR 934/NE/NW 79 St from West o
Longlist(Tech. Rev. Cmte.) Date:  22NOV2016  Time:  10:00AM
Shortlist Selection Date       :  05DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  06DEC2016  Time:  9:00 A
Scope Meeting Date             :  19DEC2016  Time:  02:00PM
Final Selection Meeting Date   :  06FEB2017  Time:  10:00AM
Final Selection Posting Date   :  07FEB2017  Time:  8:00AM
1st Negotiations Meeting Date  :  09MAR2017  Time:  01:00PM




Rank  Consultant
  1      STANTEC CONSULTING SERVICES INC.   
  2      BMA CONSULTING ENGINEERING, INC.   
  3      ATKINS NORTH AMERICA, INC.         


DISTRICT 6    
Advertisement Number          : 17614
Financial Management Number(s):
  41405233201
Project Description           :
  D/W Traf. Ops. Safety Studies
Longlist(Tech. Rev. Cmte.) Date:  03NOV2016  Time:  10:00AM
Shortlist Selection Date       :  05DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  05DEC2016  Time:  5:00 P
Final Selection Meeting Date   :  23JAN2017  Time:  10:00AM
Final Selection Posting Date   :  23JAN2017  Time:  2:01PM




Rank  Consultant
  1      MCMAHON ASSOCIATES, INC.           
  2      CALTRAN ENGINEERING GROUP, INC.    
  3      VIA PLANNING, INC.                 


DISTRICT 6    
Advertisement Number          : 17625
Financial Management Number(s):
  42563723201
Project Description           :
  SR 7/US 441 SB from NW 2 Ave t
Longlist(Tech. Rev. Cmte.) Date:  14JUL2016  Time:  10:00AM
Shortlist Selection Date       :  08AUG2016  Time:  10:00AM
Shortlist Selection Posting    :  08AUG2016  Time:  12:00 P
Scope Meeting Date             :  22AUG2016  Time:  03:00PM
Final Selection Meeting Date   :  26SEP2016  Time:  10:00AM
Final Selection Posting Date   :  26SEP2016  Time:  1:00PM
1st Negotiations Meeting Date  :  17OCT2016  Time:  09:00AM




Rank  Consultant
  1      RIBBECK ENGINEERING, INC.          
  2      ASA CONSULTANTS, INC.              
  3      BASLEE ENGINEERING SOLUTIONS (BES),


DISTRICT 6    
Advertisement Number          : 17640
Financial Management Number(s):
  42930043201
Project Description           :
  SR 925/NW 3 Ct & NW 3 Ave
Longlist(Tech. Rev. Cmte.) Date:  29AUG2016  Time:  02:00PM
Shortlist Selection Date       :  12SEP2016  Time:  10:00AM
Shortlist Selection Posting    :  12SEP2016
Scope Meeting Date             :  26SEP2016  Time:  09:00AM
Final Selection Meeting Date   :  14NOV2016  Time:  10:00AM
Final Selection Posting Date   :  14NOV2016  Time:  2:00PM
1st Negotiations Meeting Date  :  12DEC2016  Time:  10:00AM




Rank  Consultant
  1      RIBBECK ENGINEERING, INC.          
  2      GOAL ASSOCIATES, INC.              
  3      AES ENGINEERING, INC.              


DISTRICT 6    
Advertisement Number          : 17645
Financial Management Number(s):
  43245111201 43305713201
Project Description           :
  D/W Public Transportation Cons
Longlist(Tech. Rev. Cmte.) Date:  06OCT2016  Time:  10:00AM
Shortlist Selection Date       :  24OCT2016  Time:  10:00AM
Shortlist Selection Posting    :  24OCT2016  Time:  1:00 P
Final Selection Meeting Date   :  05DEC2016  Time:  10:00AM
Final Selection Posting Date   :  05DEC2016




Rank  Consultant
  1      JACOBS ENGINEERING GROUP INC.      
  2      ATKINS NORTH AMERICA, INC.         
  3      TINDALE-OLIVER & ASSOCIATES,INC.   
  4      T.Y. LIN INTERNATIONAL             


DISTRICT 6    
Advertisement Number          : 17662
Financial Management Number(s):
  43263912202
Project Description           :
  Sr 826/Palmetto Expy from US-1
Longlist(Tech. Rev. Cmte.) Date:  12DEC2016  Time:  01:00PM
Shortlist Selection Date       :  09JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  09JAN2017
Final Selection Meeting Date   :  06MAR2017  Time:  10:00AM
Final Selection Posting Date   :  07MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  26APR2017  Time:  10:00AM




Rank  Consultant
  1      THE CORRADINO GROUP, INC.          
  2      METRIC ENGINEERING INC.            
  3      KEITH AND SCHNARS, P.A.            


DISTRICT 6    
Advertisement Number          : 17642
Financial Management Number(s):
  43305721201
Project Description           :
  D/W Public Transportation Cons
Longlist(Tech. Rev. Cmte.) Date:  03NOV2016  Time:  10:00AM
Shortlist Selection Date       :  05DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  05DEC2016  Time:  5:00 P
Final Selection Meeting Date   :  23JAN2017  Time:  10:00AM
Final Selection Posting Date   :  23JAN2017  Time:  2:01PM




Rank  Consultant
  1      C.H. PEREZ & ASSOCIATES CONSULTING 
  2      CALTRAN ENGINEERING GROUP, INC.    
  3      MARLIN ENGINEERING, INC.           


DISTRICT 6    
Advertisement Number          : 17647
Financial Management Number(s):
  43345543201 43345533201
Project Description           :
  SR 5/US-1/S. Dixie Hwy from E
Longlist(Tech. Rev. Cmte.) Date:  07OCT2016  Time:  10:00AM
Shortlist Selection Date       :  24OCT2016  Time:  10:00AM
Shortlist Selection Posting    :  24OCT2016  Time:  1:00 P
Scope Meeting Date             :  08NOV2016  Time:  02:00PM
Final Selection Meeting Date   :  09JAN2017  Time:  10:00AM
Final Selection Posting Date   :  09JAN2017  Time:  1:00PM
1st Negotiations Meeting Date  :  13FEB2017  Time:  10:00AM




Rank  Consultant
  1      CALTRAN ENGINEERING GROUP, INC.    
  2      METRIC ENGINEERING INC.            
  3      THE CORRADINO GROUP, INC.          
  4      LAKES ENGINEERING, INC.            


DISTRICT 6    
Advertisement Number          : 18601
Financial Management Number(s):
  43466413201
Project Description           :
  Districtwide Traffic Operation
Longlist(Tech. Rev. Cmte.) Date:  22MAR2017  Time:  10:00AM
Shortlist Selection Date       :  10APR2017  Time:  10:00AM
Final Selection Meeting Date   :  22MAY2017  Time:  10:00AM
1st Negotiations Meeting Date  :  26JUN2017  Time:  01:00PM




DISTRICT 6    
Advertisement Number          : 17659
Financial Management Number(s):
  43576043201
Project Description           :
  SR 826/Palmetto Expy from E of
Longlist(Tech. Rev. Cmte.) Date:  03NOV2016  Time:  10:00AM
Shortlist Selection Date       :  05DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  05DEC2016  Time:  6:00 P
Scope Meeting Date             :  09DEC2016  Time:  11:00AM
Final Selection Meeting Date   :  06FEB2017  Time:  10:00AM
Final Selection Posting Date   :  07FEB2017  Time:  8:00AM
1st Negotiations Meeting Date  :  10APR2017  Time:  01:00PM




Rank  Consultant
  1      GANNETT FLEMING, INC.              
  2      WANTMAN GROUP, INC.                
  3      KIMLEY-HORN AND ASSOCIATES, INC.   


DISTRICT 6    
Advertisement Number          : 17661
Financial Management Number(s):
  43576053201
Project Description           :
  SR 826/Palmetto Expy from E. o
Longlist(Tech. Rev. Cmte.) Date:  25OCT2016  Time:  10:00AM
Shortlist Selection Date       :  05DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  05DEC2016  Time:  6:00 P
Scope Meeting Date             :  07DEC2016  Time:  11:00AM
Final Selection Meeting Date   :  23JAN2017  Time:  10:00AM
Final Selection Posting Date   :  23JAN2017  Time:  2:01PM
1st Negotiations Meeting Date  :  13APR2017  Time:  10:00AM




Rank  Consultant
  1      T.Y. LIN INTERNATIONAL             
  2      KEITH AND SCHNARS, P.A.            
  3      RS&H, INC.                         


DISTRICT 6    
Advertisement Number          : 17668
Financial Management Number(s):
  43803443201
Project Description           :
  SR 997/Krome Avenue from SW 13
Longlist(Tech. Rev. Cmte.) Date:  09JAN2017  Time:  10:00AM
Shortlist Selection Date       :  23JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  23JAN2017  Time:  3:00 P
Scope Meeting Date             :  30JAN2017  Time:  10:00AM
Final Selection Meeting Date   :  06MAR2017  Time:  10:00AM
Final Selection Posting Date   :  07MAR2017  Time:  10:00AM
1st Negotiations Meeting Date  :  03APR2017  Time:  10:00AM




Rank  Consultant
  1      FERNANDEZ-BERAUD, INC.             
  2      MILLER, LEGG & ASSOCIATES,INC.     
  3      LANDSCAPE DE, LLC                  


DISTRICT 6    
Advertisement Number          : 17649
Financial Management Number(s):
  43884212201
Project Description           :
  Port og Miami Tunnel Freight M
Longlist(Tech. Rev. Cmte.) Date:  05JAN2017  Time:  02:00PM
Shortlist Selection Date       :  23JAN2017  Time:  10:00AM
Shortlist Selection Posting    :  23JAN2017  Time:  2:01 P
Scope Meeting Date             :  31JAN2017  Time:  02:00PM
Final Selection Meeting Date   :  20MAR2017  Time:  10:00AM
Final Selection Posting Date   :  21MAR2017  Time:  4:00PM
1st Negotiations Meeting Date  :  08MAY2017  Time:  02:00PM




Rank  Consultant
  1      CTS ENGINEERING, INC.              
  2      T.Y. LIN INTERNATIONAL             
  3      CAMBRIDGE SYSTEMATICS, INC.        


DISTRICT 6    
Advertisement Number          : 18607
Financial Management Number(s):
  44022812201
Project Description           :
  I-195 from I-95/NW 12th Avenue
Longlist(Tech. Rev. Cmte.) Date:  08MAR2017  Time:  03:00PM
Shortlist Selection Date       :  20MAR2017  Time:  10:00AM
Shortlist Selection Posting    :  23MAR2017  Time:  3:00 P
Scope Meeting Date             :  03APR2017  Time:  09:00AM
Final Selection Meeting Date   :  08MAY2017  Time:  10:00AM
1st Negotiations Meeting Date  :  06JUL2017  Time:  09:00AM





Shortlisted Firms:
  A & P CONSULTING TRANSPORTATION ENG



DISTRICT 7    
Advertisement Number          : 17737
Financial Management Number(s):
  TBD
Project Description           :
  CEI Hybrid - continuing
Longlist(Tech. Rev. Cmte.) Date:  31AUG2016  Time:  9:00 AM
Shortlist Selection Date       :  13SEP2016  Time:  1:30 PM
Shortlist Selection Posting    :  14SEP2016
Tech. Rev. Cmte Meeting Date   :  28SEP2016  Time:  9:00 AM
2nd Tech Rev. Cmte Meeting     :  28SEP2016  Time:  9:00 AM
Final Selection Meeting Date   :  11OCT2016  Time:  1:30 PM
Final Selection Posting Date   :  11OCT2016  Time:  5:00PM
1st Negotiations Meeting Date  :  25OCT2016  Time:  9:00 AM




Rank  Consultant
  1      KEYSTONE CIVIL, INC.               
  2      JACOBS ENGINEERING GROUP INC.      
  3      CALVIN, GIORDANO & ASSOCIATES,INC. 


DISTRICT 7    
Advertisement Number          : 17738
Financial Management Number(s):
  TBD
Project Description           :
  CEI Hybrid - Continuing
Longlist(Tech. Rev. Cmte.) Date:  17JAN2017  Time:  9:00 AM
Shortlist Selection Date       :  31JAN2017  Time:  1:30 PM
Shortlist Selection Posting    :  01FEB2017  Time:  10:01 A
Tech. Rev. Cmte Meeting Date   :  15FEB2017  Time:  10:00AM
Final Selection Meeting Date   :  28FEB2017  Time:  1:30 PM
Final Selection Posting Date   :  01MAR2017  Time:  9:01AM
1st Negotiations Meeting Date  :  14MAR2017  Time:  9:00 AM




Rank  Consultant
  1      JACOBS ENGINEERING GROUP INC.      
  2      HDR CONSTRUCTION CONTROL CORPORATIO
  3      AECOM TECHNICAL SERVICES, INC.     


DISTRICT 7    
Advertisement Number          : 18727
Financial Management Number(s):
  TBD
Project Description           :
  Emerg Resp Bridge Eval
Longlist(Tech. Rev. Cmte.) Date:  01FEB2017  Time:  3:00 PM
Shortlist Selection Date       :  14FEB2017  Time:  1:30 PM
Shortlist Selection Posting    :  14FEB2017  Time:  4:00 P
Scope Meeting Date             :  22FEB2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  23MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  11APR2017  Time:  1:30 PM
1st Negotiations Meeting Date  :  25APR2017  Time:  10:00AM





Shortlisted Firms:
  KISINGER CAMPO & ASSOCIATES, CORP. 
  MOFFATT & NICHOL, INC.             


DISTRICT 7    
Advertisement Number          : 18728
Financial Management Number(s):
  25455323202
Project Description           :
  Safety Studies and Minor Desig
Longlist(Tech. Rev. Cmte.) Date:  02MAR2017  Time:  1:30 PM
Shortlist Selection Date       :  14MAR2017  Time:  1:30 PM
Shortlist Selection Posting    :  15MAR2017  Time:  11:00 A
Scope Meeting Date             :  23MAR2017  Time:  1:30 PM
Tech. Rev. Cmte Meeting Date   :  07MAR2017  Time:  1:00 PM
2nd Tech Rev. Cmte Meeting     :  27APR2017  Time:  9:00 AM
Final Selection Meeting Date   :  09MAY2017  Time:  1:30 PM
1st Negotiations Meeting Date  :  23MAY2017  Time:  8:00 AM





Shortlisted Firms:
  ELEMENT ENGINEERING GROUP, LLC     
  ICON CONSULTANT GROUP, INC.        
  JOHNSON, MIRMIRAN & THOMPSON, INC. 


DISTRICT 7    
Advertisement Number          : 17740
Financial Management Number(s):
  25467716233 25467726233
Project Description           :
  CEI for Design Build Push Button & Lighting - continuing
Longlist(Tech. Rev. Cmte.) Date:  17JAN2017  Time:  2:00 PM
Shortlist Selection Date       :  31JAN2017  Time:  1:30 PM
Shortlist Selection Posting    :  01FEB2017  Time:  11:00 A
Tech. Rev. Cmte Meeting Date   :  21FEB2017  Time:  3:00 PM
2nd Tech Rev. Cmte Meeting     :  21FEB2017  Time:  9:00 AM
Final Selection Meeting Date   :  14MAR2017  Time:  1:30 PM
Final Selection Posting Date   :  15MAR2017  Time:  11:00AM
1st Negotiations Meeting Date  :  28MAR2017  Time:  9:00 AM




Rank  Consultant
  1      H.W. LOCHNER INC                   
  2      AECOM TECHNICAL SERVICES, INC.     
  3      KCI TECHNOLOGIES, INC.             


DISTRICT 7    
Advertisement Number          : 17745
Financial Management Number(s):
  25837213207
Project Description           :
  Intelligent Trans Sys (ITS) - continuing
Longlist(Tech. Rev. Cmte.) Date:  07DEC2016  Time:  8:30 AM
Shortlist Selection Date       :  13DEC2016  Time:  1:30 PM
Shortlist Selection Posting    :  14DEC2016  Time:  10:00 A
Scope Meeting Date             :  12JAN2017  Time:  1:00 PM
Tech. Rev. Cmte Meeting Date   :  14FEB2017  Time:  12:00PM
Final Selection Meeting Date   :  28FEB2017  Time:  1:30 PM
Final Selection Posting Date   :  01MAR2017  Time:  9:01AM
1st Negotiations Meeting Date  :  16MAR2017  Time:  1:00 PM




Rank  Consultant
  1      TRANSCORE ITS, LLC                 
  2      ATKINS NORTH AMERICA, INC.         
  3      GRESHAM, SMITH AND PARTNERS        


DISTRICT 7    
Advertisement Number          : 17704
Financial Management Number(s):
  25911711226
Project Description           :
  DW Highway Statistics Data
Longlist(Tech. Rev. Cmte.) Date:  07DEC2016  Time:  10:00AM
Shortlist Selection Date       :  13DEC2016  Time:  1:30 PM
Shortlist Selection Posting    :  14DEC2016  Time:  10:00 A
Scope Meeting Date             :  12JAN2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  16FEB2017  Time:  9:00 AM
Final Selection Meeting Date   :  28FEB2017  Time:  1:30 PM
Final Selection Posting Date   :  01MAR2017  Time:  9:01AM
1st Negotiations Meeting Date  :  16MAR2017  Time:  2:00 PM




Rank  Consultant
  1      FLORIDA TRANSPORTATION ENGINEERING,
  2      CALTRAN ENGINEERING GROUP, INC.    


DISTRICT 7    
Advertisement Number          : 17703
Financial Management Number(s):
  25912211214
Project Description           :
  Strategic Intermodal Sys (SIS) Continue
Longlist(Tech. Rev. Cmte.) Date:  06DEC2016  Time:  9:00 AM
Shortlist Selection Date       :  13DEC2016  Time:  1:30 PM
Shortlist Selection Posting    :  14DEC2016  Time:  10:00 A
Scope Meeting Date             :  11JAN2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  15FEB2017  Time:  12:00AM
Final Selection Meeting Date   :  28FEB2017  Time:  1:30 PM
Final Selection Posting Date   :  01MAR2017  Time:  9:01AM
1st Negotiations Meeting Date  :  29MAR2017  Time:  10:00AM




Rank  Consultant
  1      H.W. LOCHNER INC                   
  2      RENAISSANCE PLANNING GROUP, INC.   
  3      AECOM TECHNICAL SERVICES, INC.     


DISTRICT 7    
Advertisement Number          : 18733
Financial Management Number(s):
  40456913213
Project Description           :
  Miscellaneous Design - Continu
Longlist(Tech. Rev. Cmte.) Date:  08MAR2017  Time:  1:30PM
Shortlist Selection Date       :  14MAR2017  Time:  1:30 PM
Shortlist Selection Posting    :  15MAR2017  Time:  11:00 A
Scope Meeting Date             :  21MAR2017  Time:  11:00AM
Tech. Rev. Cmte Meeting Date   :  27APR2017  Time:  1:00PM
Final Selection Meeting Date   :  09MAY2017  Time:  1:30 PM
1st Negotiations Meeting Date  :  23MAY2017  Time:  1:00PM





Shortlisted Firms:
  AYRES ASSOCIATES INC               
  COMPREHENSIVE ENGINEERING SERVICES,
  GARRETT ENGINEERING GROUP, INC.    


DISTRICT 7    
Advertisement Number          : 17722
Financial Management Number(s):
  43033813201
Project Description           :
  I-4 (SR 400) EB from W of Orie
Longlist(Tech. Rev. Cmte.) Date:  19JAN2017  Time:  10:00AM
Shortlist Selection Date       :  31JAN2017  Time:  1:30 PM
Shortlist Selection Posting    :  31JAN2017
Scope Meeting Date             :  09FEB2017  Time:  2:00 PM
Final Selection Meeting Date   :  28MAR2017  Time:  1:30 PM
1st Negotiations Meeting Date  :  13APR2017  Time:  9:00 AM





Shortlisted Firms:
  JACOBS ENGINEERING GROUP INC.      
  PARSONS BRINCKERHOFF, INC.         
  RS&H, INC.                         


DISTRICT 7    
Advertisement Number          : 17746
Financial Management Number(s):
  43159313201 43159316202
Project Description           :
  Asphalt Plant Insp Serv...CONTINUING
Longlist(Tech. Rev. Cmte.) Date:  06DEC2016  Time:  10:00AM
Shortlist Selection Date       :  13DEC2016  Time:  1:30 PM
Shortlist Selection Posting    :  14DEC2016  Time:  10:00 A
Tech. Rev. Cmte Meeting Date   :  21FEB2017  Time:  9:30 AM
Final Selection Meeting Date   :  28FEB2017  Time:  1:30 PM
Final Selection Posting Date   :  01MAR2017  Time:  9:01AM




Rank  Consultant
  1      PAGE ONE CONSULTANTS, INC.         
  2      TIERRA, INC.                       
  3      RADISE INTERNATIONAL, L.C.         


DISTRICT 7    
Advertisement Number          : 17718
Financial Management Number(s):
  43379913201
Project Description           :
  US 19 (SR 55) from N of CR 95
Longlist(Tech. Rev. Cmte.) Date:  27OCT2016  Time:  9:00 AM
Shortlist Selection Date       :  08NOV2016  Time:  1:30 PM
Shortlist Selection Posting    :  09NOV2016  Time:  9:00 A
Scope Meeting Date             :  16NOV2016  Time:  11:00AM
Tech. Rev. Cmte Meeting Date   :  10JAN2017  Time:  1:00 PM
Final Selection Meeting Date   :  31JAN2017  Time:  1:30 PM
Final Selection Posting Date   :  01FEB2017  Time:  10:01AM
1st Negotiations Meeting Date  :  15FEB2017  Time:  9:00 AM




Rank  Consultant
  1      HDR ENGINEERING, INC.              
  2      KISINGER CAMPO & ASSOCIATES, CORP. 
  3      T.Y. LIN INTERNATIONAL             


DISTRICT 7    
Advertisement Number          : 17714
Financial Management Number(s):
  43590812201 43590823201 43753013201
Project Description           :
  SR 580 PD&E and Design (SWAT)
Longlist(Tech. Rev. Cmte.) Date:  08SEP2016  Time:  10:00AM
Shortlist Selection Date       :  13SEP2016  Time:  1:30 PM
Shortlist Selection Posting    :  14SEP2016
Scope Meeting Date             :  20SEP2016  Time:  3:00 PM
Tech. Rev. Cmte Meeting Date   :  27OCT2016  Time:  12:00PM
Final Selection Meeting Date   :  08NOV2016  Time:  1:30 PM
Final Selection Posting Date   :  09NOV2016  Time:  9:00AM
1st Negotiations Meeting Date  :  29NOV2016  Time:  9:00 AM




Rank  Consultant
  1      CH2M HILL, INC.                    
  2      KISINGER CAMPO & ASSOCIATES, CORP. 
  3      ICON CONSULTANT GROUP, INC.        


DISTRICT 7    
Advertisement Number          : 17721
Financial Management Number(s):
  43591123201
Project Description           :
  SR 574 from N 40th St to I-4
Longlist(Tech. Rev. Cmte.) Date:  28SEP2016  Time:  9:00 AM
Shortlist Selection Date       :  11OCT2016  Time:  1:30 PM
Shortlist Selection Posting    :  11OCT2016  Time:  5:00 P
Scope Meeting Date             :  19OCT2016  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  01DEC2016  Time:  1:00 PM
Final Selection Meeting Date   :  13DEC2016  Time:  1:30 PM
Final Selection Posting Date   :  13DEC2016  Time:  6:00PM
1st Negotiations Meeting Date  :  05JAN2017  Time:  9:00 AM




Rank  Consultant
  1      INFRASTRUCTURE ENGINEERS, INC.     
  2      DRMP, INC.                         
  3      STANTEC CONSULTING SERVICES INC.   


DISTRICT 7    
Advertisement Number          : 18701
Financial Management Number(s):
  43751413201
Project Description           :
  US 19/US 98/SR 55/S SUNCOAST B
Longlist(Tech. Rev. Cmte.) Date:  07MAR2017  Time:  02:00PM
Shortlist Selection Date       :  14MAR2017  Time:  01:30PM
Shortlist Selection Posting    :  15MAR2017  Time:  11:00 A
Scope Meeting Date             :  22MAR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  26APR2017  Time:  01:00PM
Final Selection Meeting Date   :  09MAY2017  Time:  01:30PM
1st Negotiations Meeting Date  :  24MAY2017  Time:  09:00AM





Shortlisted Firms:
  ATKINS NORTH AMERICA, INC.         
  FALLER, DAVIS & ASSOCIATES, INC.   
  HORIZON ENGINEERING GROUP, INC.    


DISTRICT 7    
Advertisement Number          : 18702
Financial Management Number(s):
  43762413201
Project Description           :
  US 19A/SR 595/Seminole Blvd
Longlist(Tech. Rev. Cmte.) Date:  29MAR2017  Time:  09:00AM
Shortlist Selection Date       :  11APR2017  Time:  01:30PM
Scope Meeting Date             :  19APR2017  Time:  11:00AM
Tech. Rev. Cmte Meeting Date   :  18MAY2017  Time:  12:00PM
Final Selection Meeting Date   :  13JUN2017  Time:  01:30PM
1st Negotiations Meeting Date  :  28JUN2017  Time:  09:00AM





TURNPIKE      
Advertisement Number          : 18810
Project Description           :
  DIST-WIDE SPECIALTY CONTRACT
Longlist(Tech. Rev. Cmte.) Date:  24JAN2017  Time:  01:00PM
Shortlist Selection Date       :  08FEB2017  Time:  10:30AM
Shortlist Selection Posting    :  08FEB2017  Time:  12:00 P
Scope Meeting Date             :  20FEB2017  Time:  01:30PM
Final Selection Meeting Date   :  02MAY2017  Time:  10:00AM





Shortlisted Firms:
  CALTRAN ENGINEERING GROUP, INC.    
  PROTEAN DESIGN GROUP, INC.         
  TRAFFIC ENGINEERING DATA SOLUTIONS,


TURNPIKE      
Advertisement Number          : 18811
Project Description           :
  DISTRICT WIDE SPECIALTY CONTRA
Longlist(Tech. Rev. Cmte.) Date:  14MAR2017  Time:  01:30PM
Shortlist Selection Date       :  21MAR2017  Time:  03:00PM
Scope Meeting Date             :  17APR2017  Time:  01:00PM
Tech. Rev. Cmte Meeting Date   :  09MAY2017  Time:  02:30PM
Final Selection Meeting Date   :  08JUN2017  Time:  09:30AM




TURNPIKE      
Advertisement Number          : 18812
Project Description           :
  CONT. SVCS CONTRACT PD&E
Longlist(Tech. Rev. Cmte.) Date:  15MAR2017  Time:  08:00AM
Shortlist Selection Date       :  23MAR2017  Time:  11:30AM
Shortlist Selection Posting    :  23MAR2017  Time:  3:00 P
Scope Meeting Date             :  04APR2017  Time:  11:00AM
Final Selection Meeting Date   :  19JUN2017  Time:  11:00AM





Shortlisted Firms:
  GREENMAN-PEDERSEN, INC.            
  PARSONS BRINCKERHOFF, INC.         
  STANTEC CONSULTING SERVICES INC.   


TURNPIKE      
Advertisement Number          : 17813
Financial Management Number(s):
  TBD
Project Description           :
  DW Materials & Geotech Svcs.
Longlist(Tech. Rev. Cmte.) Date:  29SEP2016  Time:  03:00PM
Shortlist Selection Date       :  27OCT2016  Time:  11:00AM
Shortlist Selection Posting    :  27OCT2016  Time:  1:00 P
Scope Meeting Date             :  09NOV2016  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  10OCT2016  Time:  03:30PM
2nd Tech Rev. Cmte Meeting     :  14DEC2016  Time:  09:00AM
Final Selection Meeting Date   :  04JAN2017  Time:  01:00PM
Final Selection Posting Date   :  04JAN2017  Time:  2:55PM




Rank  Consultant
  1      ARDAMAN & ASSOCIATES, INC.         
  2      UNIVERSAL ENGINEERING SCIENCES, INC
  3      TERRACON CONSULTANTS, INC.         


TURNPIKE      
Advertisement Number          : 18823
Financial Management Number(s):
  TBD
Project Description           :
  TPK-Wide Misc Design Svcs BDI
Longlist(Tech. Rev. Cmte.) Date:  28MAR2017  Time:  02:00PM
Shortlist Selection Date       :  10APR2017  Time:  11:30AM
Scope Meeting Date             :  24APR2017  Time:  10:00AM
Final Selection Meeting Date   :  26JUN2017  Time:  01:00PM




TURNPIKE      
Advertisement Number          : 18825
Financial Management Number(s):
  19235717201
Project Description           :
  Structure Inspection - South
Longlist(Tech. Rev. Cmte.) Date:  29MAR2017  Time:  01:00PM
Shortlist Selection Date       :  07APR2017  Time:  02:00PM
Scope Meeting Date             :  17APR2017  Time:  02:00PM
Final Selection Meeting Date   :  26MAY2017  Time:  01:00PM




TURNPIKE      
Advertisement Number          : 18824
Financial Management Number(s):
  19269317201
Project Description           :
  Structure Inspection - North
Longlist(Tech. Rev. Cmte.) Date:  29MAR2017  Time:  01:00PM
Shortlist Selection Date       :  07APR2017  Time:  02:00PM
Scope Meeting Date             :  17APR2017  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  10MAY2017  Time:  01:30PM
Final Selection Meeting Date   :  26MAY2017  Time:  01:00PM




TURNPIKE      
Advertisement Number          : 17809
Financial Management Number(s):
  41574813201 43652133201 43652113201
Project Description           :
  WDN TPK-SR710 (MP 106.1) - MP
Longlist(Tech. Rev. Cmte.) Date:  19SEP2016  Time:  03:00PM
Shortlist Selection Date       :  27SEP2016  Time:  01:30PM
Shortlist Selection Posting    :  27SEP2016  Time:  4:00 P
Scope Meeting Date             :  10OCT2016  Time:  09:00AM
Final Selection Meeting Date   :  02DEC2016  Time:  02:00PM
Final Selection Posting Date   :  02DEC2016  Time:  4:00PM
1st Negotiations Meeting Date  :  04JAN2017  Time:  01:00PM
2nd Negotiations Meeting Date  :  26JAN2017  Time:  08:00AM
3rd Negotiations Meeting Date  :  17FEB2017  Time:  08:00AM




Rank  Consultant
  1      HDR ENGINEERING, INC.              
  2      WBQ DESIGN & ENGINEERING, INC.     
  3      KISINGER CAMPO & ASSOCIATES, CORP. 


TURNPIKE      
Advertisement Number          : 17827
Financial Management Number(s):
  42933916201
Project Description           :
  AET 5A
Longlist(Tech. Rev. Cmte.) Date:  09MAR2017  Time:  01:00PM
Shortlist Selection Date       :  16MAR2017  Time:  01:30PM
Shortlist Selection Posting    :  16MAR2017  Time:  4:00 P
Final Selection Meeting Date   :  31MAR2017  Time:  10:00AM





Shortlisted Firms:
  H.RODRIGUEZ CONSULTING ENGINEERING,
  NEW MILLENNIUM ENGINEERING, INC.   
  RS&H, INC.                         


TURNPIKE      
Advertisement Number          : 18802
Financial Management Number(s):
  43173713201
Project Description           :
  AET Phase 8 Ticket System
Longlist(Tech. Rev. Cmte.) Date:  17JAN2017  Time:  03:00PM
Shortlist Selection Date       :  24JAN2017  Time:  03:00PM
Shortlist Selection Posting    :  24JAN2017  Time:  5:00 P
Scope Meeting Date             :  08FEB2016  Time:  08:30AM
Final Selection Meeting Date   :  17APR2017  Time:  01:30PM





Shortlisted Firms:
  KIMLEY-HORN AND ASSOCIATES, INC.   
  RS&H, INC.                         
  WANTMAN GROUP, INC.                


TURNPIKE      
Advertisement Number          : 17824
Financial Management Number(s):
  43516516201 43516536201 43516716201 43516736201
  43516616201 43516636201 43516816201 43516836201
Project Description           :
  CEI-Resurf/Roadside Imp-MP178-190
Longlist(Tech. Rev. Cmte.) Date:  05DEC2016  Time:  10:30AM
Shortlist Selection Date Not Available
Tech. Rev. Cmte Meeting Date   :  16DEC2016  Time:  10:00AM
Final Selection Meeting Date   :  12JAN2017  Time:  09:30AM
Final Selection Posting Date   :  12JAN2017  Time:  11:00AM
1st Negotiations Meeting Date  :  14FEB2017  Time:  10:00AM




Rank  Consultant
  1      CARNAHAN, PROCTOR AND CROSS, INC.  
  2      CREATIVE ENGINEERING GROUP, INC.   
  3      JOHNSON, MIRMIRAN & THOMPSON, INC. 


TURNPIKE      
Advertisement Number          : 17828
Financial Management Number(s):
  43517116201 43517136201 43517216201 43517236201
  43652116201 43652136201
Project Description           :
  CEI Resurf. & Roadside Improvement
Longlist(Tech. Rev. Cmte.) Date:  13MAR2017  Time:  10:00AM
Shortlist Selection Date       :  23MAR2017  Time:  11:00AM
Shortlist Selection Posting    :  23MAR2017  Time:  3:00 P
Final Selection Meeting Date   :  07APR2017  Time:  01:30PM





Shortlisted Firms:
  AE ENGINEERING, INC.               
  JOHNSON, MIRMIRAN & THOMPSON, INC. 
  NEW MILLENNIUM ENGINEERING, INC.   


TURNPIKE      
Advertisement Number          : 17830
Financial Management Number(s):
  43546113201
Project Description           :
  Wdn Sawgrass-Coral Ridge
Longlist(Tech. Rev. Cmte.) Date:  30SEP2016  Time:  01:00PM
Shortlist Selection Date       :  10OCT2016  Time:  11:30AM
Shortlist Selection Posting    :  10OCT2016  Time:  3:00 P
Scope Meeting Date             :  24OCT2016  Time:  03:00PM
Final Selection Meeting Date   :  15DEC2016  Time:  01:30PM
Final Selection Posting Date   :  15DEC2016  Time:  3:00PM
1st Negotiations Meeting Date  :  01FEB2017  Time:  02:00PM
2nd Negotiations Meeting Date  :  27FEB2017  Time:  08:00AM
3rd Negotiations Meeting Date  :  23MAR2017  Time:  08:00AM
4th Negotiations Meeting Date  :  16MAR2017  Time:  11:00AM




Rank  Consultant
  1      JACOBS ENGINEERING GROUP INC.      
  2      KIMLEY-HORN AND ASSOCIATES, INC.   
  3      DEWBERRY ENGINEERS INC.            


TURNPIKE      
Advertisement Number          : 17825
Financial Management Number(s):
  43560816201 43842016201 43842116201 43841916201
Project Description           :
  Polk Pkwy/Suncoast Sign Replac
Longlist(Tech. Rev. Cmte.) Date:  09JAN2017  Time:  09:00AM
Shortlist Selection Date Not Available
Final Selection Meeting Date   :  06FEB2017  Time:  10:00AM
Final Selection Posting Date   :  06FEB2017  Time:  12:01PM




Rank  Consultant
  1      KINARD-STONE, INC.                 
  2      MEHTA AND ASSOCIATES, INC.         
  3      CARNAHAN, PROCTOR AND CROSS, INC.  


TURNPIKE      
Advertisement Number          : 17823
Financial Management Number(s):
  43730016201
Project Description           :
  CEI Svcs. for Suntrax Test Facility
Longlist(Tech. Rev. Cmte.) Date:  18NOV2016  Time:  01:00PM
Shortlist Selection Date       :  07DEC2016  Time:  09:30AM
Shortlist Selection Posting    :  07DEC2016  Time:  11:00 A
Final Selection Meeting Date   :  11JAN2017  Time:  01:30PM
Final Selection Posting Date   :  11JAN2017  Time:  4:00PM
1st Negotiations Meeting Date  :  23FEB2017  Time:  01:00PM
2nd Negotiations Meeting Date  :  01MAR2017  Time:  10:00AM




Rank  Consultant
  1      METRIC ENGINEERING INC.            
  2      MEHTA AND ASSOCIATES, INC.         
  3      KCI TECHNOLOGIES, INC.             
  4      AECOM TECHNICAL SERVICES, INC.     
  5      DRMP, INC.                         


TURNPIKE      
Advertisement Number          : 17812
Financial Management Number(s):
  43799213201 43799233201
Project Description           :
  RESRF TPK MP 117.8 TO 138.10
Longlist(Tech. Rev. Cmte.) Date:  06SEP2016  Time:  08:00AM
Shortlist Selection Date       :  13SEP2016  Time:  10:30AM
Shortlist Selection Posting    :  13SEP2016  Time:  12:00 P
Scope Meeting Date             :  29SEP2016  Time:  10:30AM
Tech. Rev. Cmte Meeting Date   :  16NOV2016  Time:  10:30AM
Final Selection Meeting Date   :  08DEC2016  Time:  11:00AM
Final Selection Posting Date   :  08DEC2016  Time:  12:00PM
1st Negotiations Meeting Date  :  18JAN2017  Time:  08:30AM
2nd Negotiations Meeting Date  :  09FEB2017  Time:  08:30AM




Rank  Consultant
  1      LOCHRANE ENGINEERING INCORPORATED  
  2      JOHNSON, MIRMIRAN & THOMPSON, INC. 
  3      GOAL ASSOCIATES, INC.              


TURNPIKE      
Advertisement Number          : 17802
Financial Management Number(s):
  43854712201
Project Description           :
  Orlando So. Ultimate Interch.
Longlist(Tech. Rev. Cmte.) Date:  12OCT2016  Time:  08:00AM
Shortlist Selection Date       :  17OCT2016  Time:  02:30PM
Shortlist Selection Posting    :  17OCT2016  Time:  4:00 P
Scope Meeting Date             :  31OCT2016  Time:  02:00PM
Final Selection Meeting Date   :  06JAN2017  Time:  01:30PM
Final Selection Posting Date   :  06JAN2017  Time:  3:00PM
1st Negotiations Meeting Date  :  14MAR2017  Time:  07:30AM
2nd Negotiations Meeting Date  :  15MAR2017  Time:  10:00AM
3rd Negotiations Meeting Date  :  09MAR2017  Time:  10:00AM
4th Negotiations Meeting Date  :  16MAR2017  Time:  08:00AM
5th Negotiations Meeting Date  :  22MAR2017  Time:  03:00PM
6th Negotiations Meeting Date  :  28FEB2017  Time:  08:00AM




Rank  Consultant
  1      HARDESTY & HANOVER, LLC            
  2      KIMLEY-HORN AND ASSOCIATES, INC.   
  3      WANTMAN GROUP, INC.                


TURNPIKE      
Advertisement Number          : 18803
Financial Management Number(s):
  43954512201 43720612201
Project Description           :
  WDN HEFT US1 PALM DR TO CAMPBE
Longlist(Tech. Rev. Cmte.) Date:  16DEC2016  Time:  10:00AM
Shortlist Selection Date       :  21DEC2016  Time:  10:00AM
Shortlist Selection Posting    :  21DEC2016  Time:  12:00 P
Scope Meeting Date             :  13JAN2017  Time:  01:00PM
Tech. Rev. Cmte Meeting Date   :  15FEB2017  Time:  03:00PM
Final Selection Meeting Date   :  03MAR2017  Time:  02:30PM
Final Selection Posting Date   :  03MAR2017  Time:  4:00PM




Rank  Consultant
  1      STANLEY CONSULTANTS, INC.          
  2      PARSONS TRANSPORTATION GROUP INC.  
  3      H.W. LOCHNER INC                   


TURNPIKE      
Advertisement Number          : 18804
Financial Management Number(s):
  44031412201
Project Description           :
  COLONIAL PARKWAY - WOODBUR ROA
Longlist(Tech. Rev. Cmte.) Date:  13FEB2017  Time:  10:30AM
Shortlist Selection Date       :  20FEB2017  Time:  02:00PM
Shortlist Selection Posting    :  20FEB2017  Time:  5:00PM
Scope Meeting Date             :  06MAR2017  Time:  10:00AM
Final Selection Meeting Date   :  01MAY2017  Time:  02:00PM
1st Negotiations Meeting Date  :  07JUN2017  Time:  11:00AM
2nd Negotiations Meeting Date  :  13JUL2017  Time:  08:30AM
3rd Negotiations Meeting Date  :  04AUG2017  Time:  08:30AM





Shortlisted Firms:
  CH2M HILL, INC.                    
  KIMLEY-HORN AND ASSOCIATES, INC.   
  RS&H, INC.                         



CENTRAL OFFICE
Advertisement Number          : 17904
Project Description           :
  Motor Carrier Size and Weight
Longlist(Tech. Rev. Cmte.) Date:  07NOV2016  Time:  11:00AM
Shortlist Selection Date       :  28NOV2016  Time:  3:00PM
Shortlist Selection Posting    :  29NOV2016  Time:  9:00 A
Scope Meeting Date             :  13DEC2016  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  09JAN2017  Time:  2:30PM
Final Selection Meeting Date   :  24JAN2017  Time:  2:00 PM
Final Selection Posting Date   :  24JAN2017  Time:  3:24PM




Rank  Consultant
  1      HNTB CORPORATION                   
  2      MICHAEL BAKER INTERNATIONAL, INC. D
  3      GRESHAM, SMITH AND PARTNERS        


CENTRAL OFFICE
Advertisement Number          : 17908
Project Description           :
  ITS Communications Consultant
Longlist(Tech. Rev. Cmte.) Date:  17NOV2016  Time:  10:00AM
Shortlist Selection Date       :  01DEC2016  Time:  2:00PM
Shortlist Selection Posting    :  01DEC2016  Time:  3:00 P
Scope Meeting Date             :  13DEC2016  Time:  1:30PM
Tech. Rev. Cmte Meeting Date   :  06JAN2017  Time:  1:30PM
Final Selection Meeting Date   :  17JAN2017  Time:  10:30AM
Final Selection Posting Date   :  17JAN2017  Time:  11:39AM
1st Negotiations Meeting Date  :  15FEB2017  Time:  5:00PM




Rank  Consultant
  1      ATKINS NORTH AMERICA, INC.         
  2      KAPSCH TRAFFICCOM TRANSPORTATION NA


CENTRAL OFFICE
Advertisement Number          : 17910
Project Description           :
  ARCHITECTURAL SERVICES CONSULT
Longlist(Tech. Rev. Cmte.) Date:  21SEP2016  Time:  2:00 PM
Shortlist Selection Date       :  04OCT2016  Time:  2:00 PM
Shortlist Selection Posting    :  04OCT2016
Scope Meeting Date             :  12OCT2016  Time:  10:30AM
Tech. Rev. Cmte Meeting Date   :  03NOV2016  Time:  3:00 PM
Final Selection Meeting Date   :  16DEC2016  Time:  1:00 PM
Final Selection Posting Date   :  16DEC2016  Time:  2:00PM
1st Negotiations Meeting Date  :  04JAN2017  Time:  11:00AM




Rank  Consultant
  1      WANTMAN GROUP, INC.                
  2      BENTLEY ARCHITECTS AND ENGINEERS, I
  3      POND & COMPANY CORPORATION         


CENTRAL OFFICE
Advertisement Number          : 17914
Project Description           :
  Traffic Operations Consultant
Longlist(Tech. Rev. Cmte.) Date:  03FEB2017  Time:  01:00PM
Shortlist Selection Date       :  14FEB2017  Time:  12:00PM
Shortlist Selection Posting    :  14FEB2017  Time:  5:27 P
Scope Meeting Date             :  21FEB2017  Time:  01:00PM
Tech. Rev. Cmte Meeting Date   :  15MAR2017  Time:  3:00PM
Final Selection Meeting Date   :  24MAR2017  Time:  2:00 PM
Final Selection Posting Date   :  24MAR2017  Time:  3:29PM
1st Negotiations Meeting Date  :  10APR2017  Time:  5:00PM




Rank  Consultant
  1      CAMBRIDGE SYSTEMATICS, INC.        
  2      HDR ENGINEERING, INC.              
  3      RS&H, INC.                         


CENTRAL OFFICE
Advertisement Number          : 17912
Financial Management Number(s):
  07
Project Description           :
  Materials Testing
Longlist(Tech. Rev. Cmte.) Date:  02AUG2016  Time:  10:30AM
Shortlist Selection Date       :  10AUG2016  Time:  4:00 PM
Shortlist Selection Posting    :  11AUG2016  Time:  11:20 A
Scope Meeting Date             :  22AUG2016  Time:  1:00 PM
Tech. Rev. Cmte Meeting Date   :  16AUG2016  Time:  9:30 AM
2nd Tech Rev. Cmte Meeting     :  14SEP2016  Time:  1:00 PM
Final Selection Meeting Date   :  28SEP2016  Time:  10:00AM
Final Selection Posting Date   :  28SEP2016  Time:  2:25PM
1st Negotiations Meeting Date  :  14OCT2016  Time:  1:00 PM




Rank  Consultant
  1      KTA-TATOR, INC.                    
  2      BUREAU VERITAS NORTH AMERICA,INC.  
  3      PENNONI ASSOCIATES INC.            
  4      TRC ENGINEERS, INC.                
  5      HRV CONFORMANCE VERIFICATION ASSOCI


CENTRAL OFFICE
Advertisement Number          : 17913
Financial Management Number(s):
  07
Project Description           :
  Materials Testing
Longlist(Tech. Rev. Cmte.) Date:  02AUG2016  Time:  10:30AM
Shortlist Selection Date       :  10AUG2016  Time:  4:00 PM
Shortlist Selection Posting    :  11AUG2016  Time:  11:20 A
Scope Meeting Date             :  22AUG2016  Time:  1:00 PM
Tech. Rev. Cmte Meeting Date   :  16AUG2016  Time:  9:30 AM
2nd Tech Rev. Cmte Meeting     :  14SEP2016  Time:  1:00 PM
Final Selection Meeting Date   :  28SEP2016  Time:  10:00AM
Final Selection Posting Date   :  28SEP2016  Time:  2:25PM
1st Negotiations Meeting Date  :  14OCT2016  Time:  1:00 PM




Rank  Consultant
  1      KTA-TATOR, INC.                    
  2      BUREAU VERITAS NORTH AMERICA,INC.  
  3      PENNONI ASSOCIATES INC.            
  4      TRC ENGINEERS, INC.                
  5      HRV CONFORMANCE VERIFICATION ASSOCI


            
 
 
  Back to Top