Planned Professional Services Advertisements
 
Click Here to go to myFlorida.com   Link to the Florida Department of Transportation home page
 
 
 
PROCUREMENT OFFICE
Planned Professional Services Advertisements

Procurement Office Home Page

 

Planned Consultant Projects:
This web page provides detailed information, including public meeting schedules on planned professional services contracts.
 

 
 
 
Professional Services Advertisements
 
District: 1 2 3 4 5 6 7 Turnpike Central Office
 
Updated: Monday March 02 2015  
 
Notice to Professional Consultants
State Of Florida Department Of Transportation


Notice: All Letters of Response are required to be submitted via E-mail. The size limit for Letters of Response has been increased to 1MB. Please read the Response Procedure carefully!


The Department reserves the right to reject all Proposals and/or to waive minor irregularities.
The Department of Transportation anticipates seeking professional consultant services on the projects listed in this advertisement. Consideration will be given to only those firms that are qualified pursuant to law and that have been prequalified by the Department to perform the indicated MAJOR Type(s) of Work. Prime Consultants must be prequalified in at least one or more of the MAJOR Types of Work specified in the advertisement. A prequalified subconsultant(s) may be used to meet the other Types of Work specified in the advertisement. Persons and firms used whether prime consultant or subconsultant, can only perform the work for which they are prequalified with the Department, in accordance with Rule Chapter 14-75, Florida Administrative Code. Consultants technically prequalified without unlimited overhead status, will only be considered as primes for projects identified as "Minor Projects" (projects less than $500,000). Any firm not prequalified by the Department and desiring consideration for these projects must submit a complete Request for Qualification Application to co.profserv@dot.state.fl.us by the advertised Letter of Response Deadline Date and Time. Please call 850-414-4597 if you have any questions on the prequalification process. A Department approved overhead audit is required for projects $500,000 or more. The technical work type(s) and audit must be approved by the shortlist date referenced in the advertisement in order for the responding firm to be considered responsive for shortlisting.
CONSULTANT ELIGIBILITY: It is a basic tenet of the Department's contracting program that contracts are procured in a fair, open and competitive manner. The Department requires that Consultants representing the Department must be free of conflicting professional or personal interests. In order to prevent potential conflicts of interest, the Department has established guidelines to be followed by professional services Consultants. Please familiarize yourself with the requirements of Procedure No. 375-030-006, also known as: "Restriction on Consultants' Eligibility to Compete for Department Contracts". By submitting a Letter of Response, the Consultant certifies that they are in compliance with Procedure No. 375-030-006. This procedure is available at the following link: Professional Services Publications Menu. In addition to the restrictions identified in Procedure No. 375-030-006, please be advised of the following prohibition: A consultant firm or its affiliate who was the Designer or Engineer of Record is precluded from bidding on the same project as the Construction contractor, or as a member of the construction team(subcontractor).
TITLE VI OF THE CIVIL RIGHTS ACT OF 1964: The Department in accordance with Title VI of the Civil Rights Act of 1964, 42 USC 2000d- 2000d-4, Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in federally-assisted programs of the Department issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract/agreement entered into pursuant to this advertisement, minority and disadvantaged business enterprises will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated on the basis of race, color, national origin, or sex in consideration for an award.  
FEDERAL DEBARMENT: By submitting a Letter of Response, the consultant certifies that no principal (which includes officers, directors, or executives) is presently suspended, proposed for debarment, declared ineligible or voluntarily excluded from participation on this transaction by any Federal Department or Agency.
PUBLIC ENTITY CRIMES: A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO($35,000) for a period of 36 months following the date of being placed on the convicted vendor list.
E-VERIFY: The Vendor/Contractor shall utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the Vendor/Contractor during the term of the contract and shall expressly require any subcontractors performing work or providing services pursuant to the state contract to likewise utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employees hired by the subcontractor during the contract term.
SCRUTINIZED COMPANIES: Section 287.135, Florida Statutes, prohibits agencies from contracting with companies for goods or services of $1 million or more, that are on either the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List created pursuant to section 215.473, Florida Statutes. A company that is on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List may not bid on, submit a proposal for, or enter into a contract with an agency or local governmental entity for goods or services of $1 million or more.
SELECTION PROCEDURE: The listed projects are covered by the selection process detailed in the Rule Chapter 14-75, Florida Administrative Code. Some or all of the responding firms may be requested to provide Written Technical Proposals, Oral Presentations, Interviews, or Expanded Letters of Response, for the ranking process. After ranking of the consultants the contract fee will be negotiated in accordance with Section 287.055 Florida Statutes. Funding on all projects is subject to legislative approval. Registration in MyFloridaMarketPlace is required prior to contracting. Note: The shortlist and final selection meeting dates and times are provided within the advertisement. All public meetings will be held in District headquarters unless otherwise noted. Changes to meeting dates and times will be updated under the All Advertisements link. The agenda for each public meeting is as follows: a) Opening Remarks (approx. 3 minutes); b) Public Input (15 minutes); c) Department business; d) Closing. For more information, contact the designated responsible office. In order to ensure a fair, competitive and open process, once a project is advertised under Current Advertisements, all communications between interested firms and the Department must be directed to the appropriate Professional Services Office. Respondents to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee or officer of the executive or legislative branch concerning any aspect of this solicitation, except in writing to the procurement officer or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.
RESPONSE PROCEDURE: Qualified consultants are encouraged to submit a Letter of Response, for each project in which they are interested, to the indicated requesting unit by 5:00 PM Eastern time on the date indicated as the Response Deadline. Letters of Response will be submitted as an attachment to an E-mail, submitted electronically to the indicated response address. The Standard FDOT Professional Services Letter of Response form must be completed and submitted to the indicated response e-mail address. Consultants, be advised that you are responsible for downloading the latest version of the Letter of Response Form when responding to the advertisement.  The 11/14 version must be used when responding to the advertisement.  The form will be a single file not to exceed 1MB in size in Adobe PDF format (unzipped), and the form completed in its entirety will not exceed the six 8 ½ x 11 pages provided in the form unless otherwise indicated in the advertisement.  The content of the Letter cannot go beyond Page 3 of the form.  Pages 4, 5, and 6 of the form are reserved for the tables listing prime and subconsultants by work type.  Consultants must not add additional pages to the form.  Formatting requirements consist of a font size of 11, with ½ inch margins. Please be aware that all font (including graphics, tables, and captions on photos) must be standard arial narrow, 11 point font, single line spacing with no modification of font or spacing allowed. Please retain the source document as it may be requested at a later date within the procurement process, for audit purposes. The Department reserves the right to periodically sample letters of response to ensure compliance with format submittal requirements. All other advertisement submittal requirements will be verified with each Letter submittal. Failure to comply with the submittal requirements may cause the Letter of Response to be considered non-responsive. Consultants should receive an e-mailed Return Receipt acknowledgement within 2 hours of submittal to the indicated response address. If a Return Receipt acknowledgement is not received by the Consultant within 2 hours, or by the time and date due, please call the advertisement contact (within normal business hours) to verify the Department's receipt of your e-mailed Letter of Response. Letters of Response should not contain links to other web pages and will, at a minimum, include the following information:
  1. Project Name/DOT Financial Management Number
  2. Consultant's name and address
  3. Proposed responsible office for consultant
  4. Contact person, phone number and Internet Email Address
  5. Statement regarding prequalification of consultant or proposed subconsultants in advertised type(s) of work
  6. Proposed key personnel and their proposed roles (do not include resumes)
  7. Subconsultant(s) that may be used for the project
  8. Indication as to whether the prime firm and/or subconsultants are disadvantaged business enterprises (DBE) or Small Businesses
  9. Project Approach and Understanding of Critical Issues
  10. Relevant project experience - Similar type of work experience
  11. A Bid Opportunity List should be submitted through the Equal Opportunity Compliance system which is available at the Equal Opportunity Office Website. Prime Consultants can obtain access to the new EOC system by filling out the Contractors and Consultants New Users Access Form. Please complete the form and submit it to EOOHelp@dot.state.fl.us.

Important Update: Pursuant to the Federal Brooks Act, and Section 287.055, Florida Statutes, price may not be an evaluation criterion during the advertisement and selection phase for professional services procurements. Consultants are prohibited from including references to their proposed professional services fees or indirect rates in Letters of Response, Written Technical Proposals, Oral Presentations, or Interviews. It is permissible to address cost savings specifically related to the construction project. Inclusion of prohibited professional services cost data in a Letter of Response or Technical Proposal may cause the Letter of Response or Technical Proposal to be considered non-responsive.

STANDARD NOTES: (Applicable to following projects where indicated)
1. This project does not fall within the FDOT Professional Services Types of Work, therefore technical prequalification of responding consultants is not mandatory. However, prime must be currently licensed as a Professional Engineering firm in the State of Florida.  The Standard FDOT Letter of Qualification form must be completed and submitted to the indicated response e-mail. Consultants, be advised that you are responsible for downloading the latest version of the Letter of Qualification Form when responding to the advertisement.  The 11/14 version must be used when responding to this ad.  Consultants must include the following as an attachment to the Standard FDOT Letter of Qualification form:

  1. Proof of professional liability insurance (include a copy of professional liability insurance certificate with the Letter of Qualification)
  2. For projects $500,000 or above, a recent overhead audit (within 6 months of the fiscal year end), prepared by an independent Certified Public Accountant or governmental agency and in conformance with the Department's current Reimbursement Rate Guidelines should be on file with the Department or a completed Request for Qualification Package, including the recent overhead audit must be submitted to the Prequalification Administrator via email to co.profserv@dot.state.fl.us, prior to the response deadline of the Letter as indicated in the advertisement. Consultants must address all items within the Standard FDOT Letter of Qualification.
The Standard FDOT Letter of Qualification form completed in its entirety will not exceed the six 8  x 11 pages provided in the form unless otherwise indicated in the advertisement. The content of the Letter cannot go beyond Page 3 of the form.  Pages 4, 5, and 6 of the form are reserved for the tables listing prime and subconsultants by work type.  Consultants must not add additional pages to the form.  The Letter of Qualification will be a single file not to exceed 1MB in size in Adobe PDF format (unzipped). Page size requirement is a font size of 11, with ½ inch margins. Failure to comply with the submittal requirements may cause the Letter of Qualification to be considered non-responsive.

2. Reserved.  (Standard note not used).

3. Reserved.  (Standard note not used).

4. Selection will be made directly from the Standard FDOT Expanded Letters of Response form. Consultants, be advised that you are responsible for downloading the latest version of the Expanded Letter of Response Form when responding to the advertisement.  The 11/14 version must be used when responding to this ad.  The completed Standard FDOT Expanded Letters of Response form completed in its entirety will not exceed the nine 8  x 11 pages provided in the form.  The content of the Letter cannot go beyond Page 6 of the form.  Pages 7, 8, and 9 of the form are reserved for the tables listing prime and subconsultants by work type.  Consultants must not add additional pages to the form.  Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or staffing chart (can be either 8-1/2x11 or 11x17, at the discretion of the Consultant).  Construction Training and Qualification Program (CTQP) printouts may also be submitted.  Staff hours on summary sheet (one sheet showing the hours of prime and all subs) will be submitted where applicable. All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, with inch margins. Failure to comply with the submittal requirements may cause the Letter of Response to be considered non-responsive. 

5. Reserved.  (Standard note not used).

6. Reserved.  (Standard note not used).

7. This project has been reserved for competition among only small businesses in accordance with the Department's Business Development Initiative (BDI) Program. Letters of Response for this project will only be accepted from firms who qualify as a small business as defined by the Department. The prime consultant submitting a Letter of Response must meet the small business eligibility criteria below.  All subconsultants utilized for the project must also be small businesses and meet the small business eligibility criteria.  Note: Any professional services consultant firm prequalified under Rule 14-75, F.A.C., that is shown as a Small Business on the Professional Services Prequalified Small Business Report is not required to supply the Small Business Affidavit Certification for Prequalified Professional Services Firms form with the Letter of Response.

SMALL BUSINESS ELIGIBILITY CRITERIA:
  1. The prime firm and subconsultants proposed for this project must meet the small business definition provided by the Department.  They are also required to submit a notarized copy of the Small Business Affidavit Certification Form with the Letter of Response.  Firms who have previously submitted the Small Business Affidavit Certification Form, and appear in the Department’s Small Business listings are not required to resubmit the form.  Please refer to the advertisement for other submittal requirements
  2. Submitting firms that are small businesses must completely comply with the professional services prequalification process as described in the Florida Administrative Code Chapter 14-75. Additional instructions can be found in the BDI Program Guidelines.

8. Under-Utilization Goal for DBEs and Small Businesses - The goal of the Department’s Under-utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-utilized Work Groups are identified in the advertisement.  Consultants are strongly encouraged to propose a DBE or Small Business to perform services for each under-utilized work group identified in the advertisement.  DBEs or Small Businesses can be proposed at either the Prime or Sub-level for the Under-utilized Work Group(s).  Use of under-utilized DBEs or Small Businesses for Consultant teaming is a shortlist consideration factor for projects referencing this Standard Note.  Consultants are requested to submit the Proposed Consultants for DBE and Small Business Under-Utilized Work Groups Form, FDOT form 375-030-28 indicating your firm's proposed use of DBEs and/or Small Business primes or subconsultants to meet under-utilization goals.  The signed Proposed Consultants for DBE and Small Business Under-Utilized Work Groups Form shall be submitted with the Letter of Response. Please refer to the advertisement for other submittal directions. Reports are available at the following locations to validate status of firms as Small Businesses and DBEs:

DBE listing for Professional Services:
http://www2.dot.state.fl.us/procurement/ProfessionalServices/lppc/dbevend.htm

Small Business listing for Professional Services:
http://www2.dot.state.fl.us/procurement/ProfessionalServices/lppc/sbevend.htm

Additionally, firms will submit the Professional Services DBE or Small Business Commitment form as required by the advertisement when selecting from Expanded Letters of Response, otherwise it will be required with the Request for Proposal.

9. It is the policy of FDOT to encourage the participation of small businesses and disadvantaged business enterprises ("DBE") in all facets of the business activities of FDOT, consistent with applicable laws and regulations. FDOT has established an aspiration goal of 10% DBE usage and an additional 3% non-DBE Small Business usage for the subject Project. Firms proposing for this Project shall aspire to have ten percent (10%) or more of the total contract costs performed by DBEs, and an additional three percent (3%) or more of the total contract costs performed by non-DBE small businesses. Although not a contract requirement, FDOT believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. FDOT further believes that the 13% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, FDOT has adopted rules to provide certified DBEs opportunities to participate in the business activities of FDOT as vendors, contractors, subcontractors, and consultants. FDOT has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: http://www3b.dot.state.fl.us/EqualOpportunityOfficeBusinessDirectory/CustomSearch.aspx Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: http://www.dot.state.fl.us/EqualOpportunityOffice/sizeStandards.shtm Firms will submit the Professional Services DBE or Small Business Commitment form as required by the advertisement when selecting from Expanded Letters of Response, otherwise it will be required with the Request for Proposal.

10. This contract will require field office personnel; therefore the CEI Team must utilize CEI field office rates.

 

 
 
 
 
************************************************************

               DISTRICT 1    
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
Minor Work   :
  3.1    - Minor Highway Design
  3.2    - Major Highway Design
  4.1.2  - Minor Bridge Design
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
  9.4.1  - Standard Foundation Studies
Under-Utilized Work Groups:
  GROUP3  - Highway Design - Roadway
  GROUP4  - Highway Design - Bridge
Contract     : 16133
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  19823113210

  Environmental Permit Design
Project Manager: setchell, brent
Maximum Contract Amount: $1,500,000
See Standard Notes Above: 8

Special Notes:              
  Support for Environmental Permitting including;
  jurisdictional determinations, threatened and endangered
  species surveys, environmental permitting support,
  mitigation design, nutrient loading calculations, water
  quality sampling and testing, wildlife crossing design,
  engineering, surveying, geotechnical services, roadway
  design and agency coordination.
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  Direct all questions to the Department by emailing
  D1.profserv@dot.state.fl.us. Questions posed 72 hours
  Prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site location
  At: FTP directory /LTS/D1/PROFSERV/Fiscal%20Year%202015-2016
  /16133%20-%20198231%201%2032%2010/ at ftp.dot.state.fl.us
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2444.


Advertisement Date             :  20MAR2015
Longlist(Tech. Rev. Cmte.) Date:  15APR2015  Time:  02:00PM
Shortlst Selection Date        :  05MAY2015  Time:  10:00AM
Scope Meeting Date             :  15MAY2015  Time:  02:30PM
Tech. Rev. Cmte Meeting        :  08JUN2015  Time:  02:45PM
Final Selection Meeting Date   :  02JUL2015  Time:  10:00AM



Response Deadline              :  03APR2015
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Elizabeth Leopold
  Phone: (863)519-2901


               DISTRICT 1    
Major Work   :
  13.7   - Transportation Statistics
Contract     : 16118
Selection Procedure: LOR and Abbreviated Technical Proposal     
Financial Management Number(s):
  20201511208

Project Description:
  202015 1 12 08; DISTRICT WIDE STATISTICS - DATA COLLECTION
  AND ANALYSIS
Project Manager: GRUVER, RON W
Maximum Contract Amount: $1,500,000
See Standard Notes Above: 9

Special Notes:              
  Financial Management Number: 202015 1 12 08
  Work Program Description: D/W Statistics-Data Colllection
  and Analysis
  Major Type(s) of Work: 13.7
  Page Number Limitation: 5 Page Written Technical Proposal
  FDOT Project Manager: Ronald Gruver - (863) 519-2547
  Technical Review Committee Members: Ron Gruver, Howard
  Summers, Amarilys Perez, P.E.
  Technical Plan (0-50)
  A. Understanding Scope (0-10)
  B. Approach to Project (0-20)
  C. Approach to Quality Control (0-20)
  Subtotal Technical:
  Management Plan (0-25)
  A. Staffing Quantity Available (0-10)
  B. Staffing quality (experience etc.) (0-15)
  Subtotal Management
  Other (0-25)
  A. Proximity to Project (0-3)
  B. Team's Past Performance on Similar Projects (0-4)
  C. Use of Specialized Equipment (0-8)
  D. Team Commitment to Satisfy DOT Needs (0-10)
  Subtotal Other:
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  Direct all questions to the Department by emailing
  D1.profserv@dot.state.fl.us. Questions posed 72 hours
  Prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site location
  At: FTP directory /LTS/D1/PROFSERV/FiscalYear2015-2016
  /16118-20201511208/ at ftp.dot.state.fl.us
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2444.


Advertisement Date             :  20MAR2015
Longlist(Tech. Rev. Cmte.) Date:  15APR2015  Time:  02:00PM
Shortlst Selection Date        :  30APR2015  Time:  10:00AM
Scope Meeting Date             :  15MAY2015  Time:  11:00AM
Tech. Rev. Cmte Meeting        :  08JUN2015  Time:  02:45PM
Final Selection Meeting Date   :  02JUL2015  Time:  10:00AM



Response Deadline              :  03APR2015
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Elizabeth Leopold
  Phone: (863)519-2901


               DISTRICT 1    
Major Work   :
  3.1    - Minor Highway Design
  4.2.1  - Major Bridge Design - Concrete
  4.2.2  - Major Bridge Design - Steel
Minor Work   :
  4.1.1  - Miscellaneous Structures
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping
Under-Utilized Work Groups:
  GROUP3  - Highway Design - Roadway
  GROUP4  - Highway Design - Bridge
Contract     : 16117
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43534913201 43650913201 43354713201

Project Description:
  435349-1-32-01 US 41 Green Bridge Multi-Use Path;
  436509-1-32-01 US 41 Business (9th Street West) from 3rd Ave
  to Manatee Ave (SR 64)
  433547-1-32-01 US 41 Business at 3rd Ave
Project Manager: Breuggeman, Walter
Maximum Contract Amount: $800,000
See Standard Notes Above: 7

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  Direct all questions to the Department by emailing
  D1.profserv@dot.state.fl.us. Questions posed 72 hours
  Prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site location
  At: FTP directory /LTS/D1/PROFSERV/Fiscal%20Year%202015-2016
  /16117%20-%20435349%201%2032%2001,%20436509%201%2032%2001,%2
  0433547%201%2032%2001/Q%26A/ at ftp.dot.state.fl.us
  If the Department's website cannot be accessed, please
  act the Professional Services Office at 863-519-2444.


Advertisement Date             :  20MAR2015
Longlist(Tech. Rev. Cmte.) Date:  16APR2015  Time:  08:30AM
Shortlst Selection Date        :  30APR2015  Time:  10:00AM
Scope Meeting Date             :  14MAY2015  Time:  08:15AM
Tech. Rev. Cmte Meeting        :  09JUN2015  Time:  02:45PM
Final Selection Meeting Date   :  02JUL2015  Time:  10:00AM



Response Deadline              :  03APR2015
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Elizabeth Leopold
  Phone: (863)519-2901


               DISTRICT 1    
Major Work   :
  21.0   - Acquisition, Negot, Closing & Order of Taking
  24.0   - Acquisition Relocation Assistance
Minor Work   :
  13.6   - Land Planning/Engineering
  14.0   - Architect
  22.0   - Acquisition Bus. Damage Estimating & Review
  25.0   - Right of Way Clearing and Leasing
Contract     : 16119
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43649714201

Project Description:
  436497-1-42-01 & 436497-1-42-02; RIGHT OF WAY CONSULTANT
  SERVICES - ACQUISITION
Project Manager: RiChard, Jennie
Estimated Contract Amt: $5,000,000
See Standard Notes Above: 9
Multiple contracts may be awarded from this advertisement.
Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. Direct all questions to the Department by emailing D1.profserv@dot.state.fl.us. Questions posed 72 hours Prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site location At: FTP directory /LTS/D1/PROFSERV/FiscalYear2015-2016 16119.16135-43649714201.02/ at ftp.dot.state.fl.us If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. Advertisement Date :  20MAR2015 Longlist(Tech. Rev. Cmte.) Date:  17APR2015 Time:  01:00PM Shortlst Selection Date :  05MAY2015 Time:  10:00AM Scope Meeting Date :  15MAY2015 Time:  09:30AM Tech. Rev. Cmte Meeting :  11JUN2015 Time:  02:45PM Final Selection Meeting Date :  02JUL2015 Time:  10:00AM Response Deadline : 03APR2015 Respond To: d1.profserv@dot.state.fl.us Attn.: Elizabeth Leopold Phone: (863)519-2901 DISTRICT 1 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.3 - Controlled Access Highway Design 14.0 - Architect Minor Work : 6.1 - Traffic Engineering Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16116 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43660212201 Project Description: ____________________________________________________________ Project Manager: Andrews, Steven A Maximum Contract Amount: $1,200,000 See Standard Notes Above: 8 Special Notes: Construct Rest area buildings, parking areas, access roads, recreational areas, and other amenities as necessary. Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds Direct all questions to the Department by emailing D1.profserv@dot.state.fl.us. Questions posed 72 hours Prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site location At: FTP directory /LTS/D1/PROFSERV/Fiscal%20Year%202015-2016 /16116%20-%20436602%201%2022%2001/ at ftp.dot.state.fl.us If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. Advertisement Date :  20MAR2015 Longlist(Tech. Rev. Cmte.) Date:  16APR2015 Time:  10:00AM Shortlst Selection Date :  30APR2015 Time:  10:00AM Scope Meeting Date :  14MAY2015 Time:  01:15PM Tech. Rev. Cmte Meeting :  04JUN2015 Time:  02:45PM Final Selection Meeting Date :  02JUL2015 Time:  10:00AM Response Deadline : 03APR2015 Respond To: d1.profserv@dot.state.fl.us Attn.: Elizabeth Leopold Phone: (863)519-2901 DISTRICT 1 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16132 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 43719813201 Project Description: Continuous Service Contract: Utility Coordination Support Project Manager: Phillips, Tim Maximum Contract Amount: $3,250,000 See Standard Notes Above: 8 Special Notes: Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posted before 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: . in the Fiscal Year 2015-2016; 16132 Q&A folder. If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2722. Advertisement Date :  20MAR2015 Longlist(Tech. Rev. Cmte.) Date:  22APR2015 Time:  08:30AM Shortlst Selection Date :  05MAY2015 Time:  10:00AM Scope Meeting Date :  15MAY2015 Time:  08:30AM Final Selection Meeting Date :  02JUL2015 Time:  10:00AM Response Deadline : 03APR2015 Respond To: d1.profserv@dot.state.fl.us Attn.: Elizabeth Leopold Phone: (863)519-2901 DISTRICT 2 Major Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design Contract : 16204 Selection Procedure: Letter of Response and Interview Project Description: DISTRICT-WIDE BRIDGE DESIGN Project Manager: Morgan, Melissa D Estimated Contract Amt: $1,500,000 Advertisement Date :  09MAR2015 Shortlst Selection Date :  07APR2015 Time:  10:00AM Final Selection Meeting Date :  08JUN2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Contract : 16217 Selection Procedure: LOR and Abbreviated Technical Proposal Project Description: DISTRICT WIDE MISCELLANEOUS SURVEY - TWO CONTRACTS FROM ONE ADVERTISEMENT Project Manager: DRIGGERS, CLAY Estimated Contract Amt: $1,500,000 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  13APR2015 Shortlst Selection Date :  12MAY2015 Time:  10:00AM Final Selection Meeting Date :  14JUL2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16223 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 20800146201 Project Description: SR 200 (US 301) FROM SR 200 TO SR 100 (STARKE BYPASS) Project Manager: Olivella, Joaquin Est. Construction Cost: $43,365,000 Advertisement Date :  01FEB2016 Shortlst Selection Date :  15MAR2016 Time:  10:00AM Final Selection Meeting Date :  15MAR2016 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16225 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 20800156201 20800166201 Project Description: SR 200 (US 301) FROM SR 100 TO SR 16 (BYPASS) SR 200 (US 301) FROM SR 16 TO SR 200 (US 301) BYPASS Project Manager: SUAREZ, FRANK Est. Construction Cost: $46,833,000 Advertisement Date :  30NOV2015 Shortlst Selection Date :  12JAN2016 Time:  10:00AM Final Selection Meeting Date :  12JAN2016 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16237 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 20967416201 43122436201 43122446201 Project Description: DUVAL COUNTY DRAINAGE - VARIOUS SR 111 (EDGEWOOD AVE) FROM INA STREET TO EDGEWOOD DRIVE SR 111 (EDGEWOOD AVE)@ NORFOLK & CSXRR RAILWAY BRIDGE #720125 Project Manager: Mendez, Guelmary Est. Construction Cost: $3,123,000 Advertisement Date :  17AUG2015 Shortlst Selection Date :  29SEP2015 Time:  10:00AM Final Selection Meeting Date :  29SEP2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16229 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 21071246201 Project Description: SR 200 FROM WEST OF RUBIN ROAD TO E. OF CR 107/SCOTT ROAD Project Manager: Shaw, Michael Est. Construction Cost: $43,525,000 Advertisement Date :  15JUN2015 Shortlst Selection Date :  28JUL2015 Time:  10:00AM Final Selection Meeting Date :  28JUL2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16230 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 21332316201 Project Description: I-95 (SR 9) AT NORTH I-295 INTERCHANGE Project Manager: BENTON, BRIAN Est. Construction Cost: $146,989,000 Advertisement Date :  26OCT2015 Shortlst Selection Date :  08DEC2015 Time:  10:00AM Final Selection Meeting Date :  08DEC2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 DISTRICT 2 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Contract : 16201 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 21332922201 21332622201 Project Description: I-10 (SR 8) FROM I 295 TO I 95 EXPRESS LANES Project Manager: Wortner, Bill Estimated Contract Amt: $2,000,000 Advertisement Date :  30NOV2015 Shortlst Selection Date :  29DEC2015 Time:  10:00AM Final Selection Meeting Date :  01MAR2016 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 DISTRICT 2 Major Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16233 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 41525116201 43226716201 Project Description: DILLON RD/TRIBUARY OF BRADY BRANCH - BR#724049 SR 10 (US90/BEAVER STREET) FROM US 301 TO JONES ROAD RESURFACING Project Manager: TIPPETT, JESSICA Est. Construction Cost: $6,684,000 Advertisement Date :  22JUN2015 Shortlst Selection Date :  04AUG2015 Time:  10:00AM Final Selection Meeting Date :  04AUG2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16226 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42880516201 42880416201 Project Description: I-75 (SR 93) FROM MARION C/L TO S. OF SR 121 I-75 (SR 93) FROM S. OF SR 121 TO S. OF SR 222 Project Manager: Rogers, Kevin Est. Construction Cost: $33,877,000 Advertisement Date :  18MAY2015 Shortlst Selection Date :  30JUN2015 Time:  10:00AM Final Selection Meeting Date :  30JUN2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16231 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42886516201 Project Description: I-10 (SR 8)/SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVE Project Manager: TIPPETT, JESSICA Est. Construction Cost: $79,198,000 Advertisement Date :  18MAY2015 Shortlst Selection Date :  30JUN2015 Time:  10:00AM Final Selection Meeting Date :  30JUN2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16234 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43015716201 43075616201 Project Description: I-295 (SR 9A) DAMES POINT GR AT ST. JOHNS RVR & MILL COVE MISCELLANEOUS I-95 INT@ I-295 MODULAR JOINT REPAIR Project Manager: Lahey, Daniel B Est. Construction Cost: $6,684,000 Advertisement Date :  27APR2015 Shortlst Selection Date :  09JUN2015 Time:  10:00AM Final Selection Meeting Date :  09JUN2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16224 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43035216201 Project Description: SR 200 (US 301) FROM BRADFORD C/L TO NORTH OF CR218 Project Manager: Olivella, Joaquin Est. Construction Cost: $12,234,000 Advertisement Date :  22FEB2016 Shortlst Selection Date :  05APR2016 Time:  10:00AM Final Selection Meeting Date :  05APR2016 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16239 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43044916201 43025816201 Project Description: SR 206 @ MOTANZAS RIVER ICWW CRESENT BEACH BR#780090 US 17 @ ORTEGA RIVER BRIDGE CATHODIC PROTECTION Project Manager: Spittle, Stephen Est. Construction Cost: $8,127,000 Advertisement Date :  13APR2015 Shortlst Selection Date :  26MAY2015 Time:  10:00AM Final Selection Meeting Date :  26MAY2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16221 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43051716201 43225816201 42869616201 Project Description: 430517-1-62-01 CR 361 FR:DARK ISLAND DRIVE TO LEATON BEACH DRIVE 432258-1-62-01 CR 361 TRAILHEAD 428696-1-62-01 SR 20(US 27) FROM SW SAN PEDRO AVE TO SUWANNEE COUNTY LINE Project Manager: Smith, Mark Est. Construction Cost: $10,174,000 Advertisement Date :  04MAY2015 Shortlst Selection Date :  16JUN2015 Time:  10:00AM Final Selection Meeting Date :  16JUN2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16235 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43056216201 43056316201 43056016201 Project Description: SR 222 (GOLFAIR BLVD) FROM I-95 TO MAIN STREET SR 117 (NORWOOD AVE) FROM I-95 TO GOLFAIR BLVD SR 15 (KING ROAD)FROM CLEVELAND STREET TO MARTIN LUTHER KING Project Manager: Butler, Thomas Est. Construction Cost: $6,684,000 Advertisement Date :  13APR2015 Shortlst Selection Date :  26MAY2015 Time:  10:00AM Final Selection Meeting Date :  26MAY2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16240 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43056416201 43265616201 43265626201 Project Description: SR 5 (US 1/PHILLIPS HWY) FROM ST. JOHNS C/L TO SR 9B I-95 (SR 9) FROM S OLD ST. AUG INTER TO N OLD ST. AUG INTER I-95 (SR 9) S/B AUX LANE FROM I-295 TO OLD ST. AUGUSTINE RD Project Manager: WILLIAMS, JEFF Est. Construction Cost: $6,366,000 Advertisement Date :  13JUL2015 Shortlst Selection Date :  25AUG2015 Time:  10:00AM Final Selection Meeting Date :  25AUG2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16236 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43091416201 43091016201 Project Description: SR 212 (BEACH BLVD) FROM F.O.P. WAY TO RYAR ROAD SR 152 FROM FREEDOM COMMERCE TO COUNTRY DAY SCHOOL DR Project Manager: Lahey, Daniel B Est. Construction Cost: $10,494,000 Advertisement Date :  07DEC2015 Shortlst Selection Date :  19JAN2016 Time:  10:00AM Final Selection Meeting Date :  19JAN2016 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16222 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43226116201 43055716201 Project Description: SR 51 FROM LAFAYETTE C/L TO ROUNDABOUT SR 249 (US 129) FROM: LIVE OAK CITY LIMIT TO : SR 10 (US 90) Project Manager: Lovelace, Joseph S Est. Construction Cost: $14,121,000 Advertisement Date :  08JUN2015 Shortlst Selection Date :  21JUL2015 Time:  10:00AM Final Selection Meeting Date :  21JUL2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16238 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43226516201 Project Description: SR 19 FROM MARION C/L TO BARGE CANAL BRIDGE RESURFACING Project Manager: Spittle, Stephen Est. Construction Cost: $5,778,000 Advertisement Date :  30NOV2015 Shortlst Selection Date :  12JAN2016 Time:  10:00AM Final Selection Meeting Date :  12JAN2016 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 DISTRICT 2 Major Work : 3.1 - Minor Highway Design 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16206 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43240313201 43240413201 Project Description: SR 212 (BEACH BLVD) FROM SAN MATEO ST TO MARION ROAD SR 212 (BEACH BLVD) FROM PARENTAL HOME ROAD TO CORTEZ ROAD Project Manager: BENNETT, LEIGH ANN Estimated Contract Amt: $620,000 Advertisement Date :  04JAN2016 Shortlst Selection Date :  02FEB2016 Time:  10:00AM Final Selection Meeting Date :  05APR2016 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 3.1 - Minor Highway Design 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP7 - Traffic Operations Design Contract : 16207 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43240613201 43616113201 Project Description: SR 5 (US 1) FROM LEWIS ROAD TO SR 207 SR 5A FROM KING STREET TO SR 16 Project Manager: BRINKLEY, RENEE Estimated Contract Amt: $575,000 Advertisement Date :  03AUG2015 Shortlst Selection Date :  01SEP2015 Time:  10:00AM Final Selection Meeting Date :  03NOV2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16232 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43303616201 Project Description: I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT Project Manager: GEISENDORFF, KENNY Est. Construction Cost: $79,198,000 Advertisement Date :  22JUN2015 Shortlst Selection Date :  04AUG2015 Time:  10:00AM Final Selection Meeting Date :  04AUG2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 DISTRICT 2 Major Work : 3.1 - Minor Highway Design 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP7 - Traffic Operations Design Contract : 16208 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43499613201 43499913201 43500113201 43500313201 43589013201 43595213201 Project Description: I-10 (SR 8) AT SR 255 INTERCHANGE I-10 (SR 8) AT US 41 INTERCHANGE I-10 (SR 8) AT US 90 INTERCHANGE EXIT 324 I-10 (SR 8) AT SR 125 INTERCHANGE RECONSTRUCT 5 TRAFFIC SIGNALS ON SR 331 IN ALACHUA COUNTY SR 109 AT ARLINGTON SERVICE ROAD INTERS SIGNAL REBUILDS Project Manager: CARTER, MICHAEL Estimated Contract Amt: $575,000 Advertisement Date :  03AUG2015 Shortlst Selection Date :  01SEP2015 Time:  10:00AM Final Selection Meeting Date :  03NOV2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 3.1 - Minor Highway Design 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16209 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43514713201 43520013201 43592913201 Project Description: LANDSCAPING SR 47 FROM SW HAPPPINESS TO BASCOM NORRIS I-75 (SR 93) AT SR 6 INTERCHANGE LANDSCAPING LANDSCAPING SR 24 FROM SW 78TH STREET TO SW 13TH STREET Project Manager: Bedenbaugh, Nelson Estimated Contract Amt: $425,000 Advertisement Date :  25MAY2015 Shortlst Selection Date :  23JUN2015 Time:  10:00AM Final Selection Meeting Date :  25AUG2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 3.1 - Minor Highway Design 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16210 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43526413201 43526713201 43526813201 Project Description: SR 500 (US27) FROM CR 318 TO CR 316 I-295 (SR 9A) AT ALTA DRIVE INTERCHANGE LANDSCAPING I-295 (SR 9A) AT SR 134 INTERCHANGE LANDSCAPING Project Manager: WILLIAMS, AMY Estimated Contract Amt: $975,000 Advertisement Date :  30MAR2015 Shortlst Selection Date :  28APR2015 Time:  10:00AM Final Selection Meeting Date :  30JUN2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Contract : 16203 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43557712201 Project Description: I-95(SR 9A) FROM I-295(SR 9A) TO SR 202(JT BUTLER BLVD) Project Manager: Beauchamp, Carlee Estimated Contract Amt: $1,500,000 Advertisement Date :  25MAY2015 Shortlst Selection Date :  23JUN2015 Time:  10:00AM Final Selection Meeting Date :  25AUG2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16211 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43601013201 43611813201 Project Description: US 1 FROM BIG OAK ROAD TO STOKES LANDING ROAD SR 15 (US17) @ SR 16 INTERS AND ACCESS MGMT IMPROVEMENTS Project Manager: WILLIAMS, AMY Estimated Contract Amt: $800,000 Advertisement Date :  27APR2015 Shortlst Selection Date :  26MAY2015 Time:  10:00AM Final Selection Meeting Date :  28JUL2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: DeLanna Tooker, MS 2016 Phone: 386-961-7597 DISTRICT 2 Major Work : 3.1 - Minor Highway Design 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16213 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43611413201 43615813201 43616313201 Project Description: 436114-1-32-01 : SR 15 (NEW KINGS ROAD) FROM EDGEWOOD AVE TO WAGNER ROAD 436158-1-32-01 : SR 5 FROM PHILLIPS HIGHWAY TO MAIN STREET 436163-1-32-01 : SR 15(US1) FROM EDGEWOOD AVE TO TROUT RIVER BLVD. Project Manager: Daugharty, Jeff Estimated Contract Amt: $1,450,000 Advertisement Date :  29JUN2015 Shortlst Selection Date :  28JUL2015 Time:  10:00AM Final Selection Meeting Date :  28SEP2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 DISTRICT 2 Major Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16215 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43616813201 43616913201 SR 5(US 1) FROM SR207 5P SR 16 Project Manager: SHIMER, ERIC Estimated Contract Amt: $1,200,000 Advertisement Date :  13APR2015 Shortlst Selection Date :  12MAY2015 Time:  10:00AM Final Selection Meeting Date :  14JUL2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 DISTRICT 2 Major Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16216 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43617413201 Project Description: SR 111 FROM BLANDING BLVD TO LENOX AVENUE Project Manager: BAILEY, JEFF H Estimated Contract Amt: $700,000 Advertisement Date :  27APR2015 Shortlst Selection Date :  26MAY2015 Time:  10:00AM Final Selection Meeting Date :  28JUL2015 Time:  10:00AM Response Deadline : Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 DISTRICT 3 Major Work : 13.4 - Systems Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.3 - Policy Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Contract : 16341 Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Project Description: Districtwide Systems Planning Consultant Project Manager: Bowen, Virgie Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  07DEC2015 Shortlst Selection Date :  14JAN2016 Time:  08:30AM Final Selection Meeting Date :  22FEB2016 Time:  08:30AM Response Deadline : 18DEC2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16344 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 21783822201 Project Description: State Road 30A (US 98) Panama City Beach Parkway from Mandy Lane to Thomas Drive Flyover in Bay County Project Manager: Alaghemand, Sherry Est. Construction Cost: $1,000,000 See Standard Notes Above: 8 Advertisement Date :  13JUL2015 Shortlst Selection Date :  10AUG2015 Time:  08:30AM Final Selection Meeting Date :  28SEP2015 Time:  08:30AM Response Deadline : 24JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16362 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 21860316201 Project Description: State Road 95 (US 29) from State Road 8 (I-10) to North of State Road 10 (US 90A) 9 Mile Road in Escambia County Project Manager: Benson, Eric Est. Construction Cost: $33,131,621 See Standard Notes Above: 8 Advertisement Date :  14MAR2016 Shortlst Selection Date :  04APR2016 Time:  08:30AM Final Selection Meeting Date :  25APR2016 Time:  08:30AM Response Deadline : 25MAR2016 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16363 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 21860536201 Project Description: State Road 10 (US 90A) 9 Mile Road from State Road 297 Pine Forest to State Road 95 (US 29) in Escambia County. Project Manager: Benson, Eric Est. Construction Cost: $11,944,293 See Standard Notes Above: 8 Advertisement Date :  21MAR2016 Shortlst Selection Date :  11APR2016 Time:  08:30AM Final Selection Meeting Date :  02MAY2016 Time:  08:30AM Response Deadline : 01APR2016 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16352 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 21860566201 21860576201 Project Description: CEI Group 16-A; State Road 10 (US 90A) 9 Mile Road from County Road 99 Beulah Road to State Road 8 (I-10) in Escambia County; State Road 10 (US 90A) 9 Mile Road from State Road 8 (I-10) to State Road 297 Pine Forest Road in Escambia County; Project Manager: Benson, Eric Est. Construction Cost: $26,789,230 See Standard Notes Above: 8 Advertisement Date :  13JUL2015 Shortlst Selection Date :  03AUG2015 Time:  08:30AM Final Selection Meeting Date :  24AUG2015 Time:  08:30AM Response Deadline : 24JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16343 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 21863022201 Project Description: State Road 30 (US 98) Navy from State Road 295 to Bayou Chico Bridge in Escambia County Project Manager: Williams, April Est. Construction Cost: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  09NOV2015 Shortlst Selection Date :  07DEC2015 Time:  08:30AM Final Selection Meeting Date :  25JAN2016 Time:  08:30AM Response Deadline : 20NOV2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16345 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 21894642202 21894652201 Project Description: Group 22-A; Quincy Loop North from State Road 12 to State Road 267 and Quincy Loop South from State Road 267 to State Road 10 (US 90) East in Gadsden County. Project Manager: Vann, Alan Est. Construction Cost: $1,250,000 See Standard Notes Above: 8 Advertisement Date :  07DEC2015 Shortlst Selection Date :  04JAN2016 Time:  08:30AM Final Selection Meeting Date :  22FEB2016 Time:  08:30AM Response Deadline : 18DEC2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16346 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 22019622201 22042622201 Project Description: Group 22-B; State Road 30 (US 98) from Santa Rosa County line to State Road 393 Mary Ester Boulevard in Okaloosa County. State Road 30 (US 98) Gulf Breeze Parkway from Portside Drive to Okaloosa County line in Santa Rosa County. Project Manager: Williams, April Est. Construction Cost: $4,000,000 See Standard Notes Above: 8 Advertisement Date :  12OCT2015 Shortlst Selection Date :  09NOV2015 Time:  08:30AM Final Selection Meeting Date :  21DEC2015 Time:  08:30AM Response Deadline : 23OCT2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16314 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22023623201 Project Description: State Road 30 (US 98) Harbor Boulevard from East Pass Bridge to Airport Road in Okaloosa County Project Manager: HOWELL, BILL Estimated Contract Amt: $746,908 See Standard Notes Above: 8 Advertisement Date :  23MAR2015 Shortlst Selection Date :  20APR2015 Time:  08:30AM Final Selection Meeting Date :  08JUN2015 Time:  08:30AM Response Deadline : 03APR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16347 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 22043622201 22043632201 Project Description: State Road 10 (US 90) from State Road 10A (US 90) Scenic to Santa Rosa County lin in Escambia County; State Road 10 (US 90) from Escambia County line to Glover Lane in Santa Rosa County; Project Manager: Kelley, Peggy Estimated Contract Amt: $2,500,000 Advertisement Date :  11MAY2015 Shortlst Selection Date :  08JUN2015 Time:  08:30AM Final Selection Meeting Date :  20JUL2015 Time:  08:30AM Response Deadline : 22MAY2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16353 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22044276201 Project Description: State Road 87 from 2 Miles South of Yellow River to County Road 184 in Santa Rosa County Project Manager: Benson, Eric Est. Construction Cost: $30,178,767 See Standard Notes Above: 8 Advertisement Date :  27JUL2015 Shortlst Selection Date :  17AUG2015 Time:  08:30AM Final Selection Meeting Date :  07SEP2015 Time:  08:30AM Response Deadline : 07AUG2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16358 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22049556201 Project Description: State Road 61 (US 319) from State Road 30 (US 98) to North of Alaska Way in Wakulla County Project Manager: Chatwood, Brannon Est. Construction Cost: $3,799,900 See Standard Notes Above: 8 Advertisement Date :  28DEC2015 Shortlst Selection Date :  18JAN2016 Time:  08:30AM Final Selection Meeting Date :  08FEB2016 Time:  08:30AM Response Deadline : 08JAN2016 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 11.0 - Eng Contract Admin and Management Contract : 16301 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 22081813206 Project Description: General Engineering Consultant Project Manager: Shores, Keith Maximum Contract Amount: $35,000,000 Advertisement Date :  09MAR2015 Shortlst Selection Date :  13APR2015 Time:  08:30AM Final Selection Meeting Date :  08JUN2015 Time:  08:30AM Response Deadline : 20MAR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Minor Work : 8.1 - Control Surveying 8.3 - Photogrammetric Mapping Contract : 16302 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 22086613211 22086613212 Project Description: Districtwide Survey and Right of Way Mapping Project Manager: Deal, Danny Maximum Contract Amount: $1,500,000 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  06APR2015 Shortlst Selection Date :  27APR2015 Time:  08:30AM Final Selection Meeting Date :  08JUN2015 Time:  08:30AM Response Deadline : 17APR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.2 - Major Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16349 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22088113206 Project Description: Districtwide Drainage Design Consultant Project Manager: Glass, Miranda Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  09NOV2015 Shortlst Selection Date :  07DEC2015 Time:  08:30AM Final Selection Meeting Date :  25JAN2016 Time:  08:30AM Response Deadline : 20NOV2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.3 - Signalization Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Contract : 16303 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22089813212 Project Description: Districtwide Traffic Operations Minor Design Project Manager: Pettis, Brian Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  29JUN2015 Shortlst Selection Date :  27JUL2015 Time:  08:30AM Final Selection Meeting Date :  14SEP2015 Time:  08:30AM Response Deadline : 10JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16367 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22247626201 Project Description: State Road 8 (I-10) at State Road 95 (US 29) Phase I Improvements in Escambia County Project Manager: Benson, Eric Est. Construction Cost: $6,640,633 See Standard Notes Above: 8 Advertisement Date :  26OCT2015 Shortlst Selection Date :  16NOV2015 Time:  08:30AM Final Selection Meeting Date :  07DEC2015 Time:  08:30AM Response Deadline : 06NOV2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design 9.1 - Soil Exploration Minor Work : 4.1.1 - Miscellaneous Structures 5.4 - Bridge Load Rating 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16335 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41413263201 Project Description: State Road 30 (US 98) from County Road 457 Mack Bayou Road to County Road 30A West in Walton County Project Manager: WARREN, NOELLE Estimated Contract Amt: $1,800,000 See Standard Notes Above: 8 Advertisement Date :  26OCT2015 Shortlst Selection Date :  23NOV2015 Time:  08:30AM Final Selection Meeting Date :  11JAN2016 Time:  08:30AM Response Deadline : 06NOV2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 13.3 - Policy Planning 13.4 - Systems Planning 13.7 - Transportation Statistics Minor Work : 13.5 - Subarea/Corridor Planning Contract : 16338 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42074591201 Project Description: Districtwide Mapping and Data Development Project Manager: Kirkland, Ray Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  14SEP2015 Shortlst Selection Date :  12OCT2015 Time:  08:30AM Final Selection Meeting Date :  30NOV2015 Time:  08:30AM Response Deadline : 25SEP2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16348 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42122522201 Project Description: County Road 390 East 14th Street from State Road 77 Ohio Avenue to State Road 75 (US 231) in Bay County Project Manager: Alaghemand, Sherry Est. Construction Cost: $1,000,000 See Standard Notes Above: 8 Advertisement Date :  09MAR2015 Shortlst Selection Date :  06APR2015 Time:  08:30AM Final Selection Meeting Date :  25MAY2015 Time:  08:30AM Response Deadline : 20MAR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design 9.1 - Soil Exploration Minor Work : 4.1.1 - Miscellaneous Structures 5.4 - Bridge Load Rating 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16337 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42446473201 Project Description: State Road 388 from East of Burnt Mill Creek to State Road 77 in Bay County Project Manager: Hodges, Ray Estimated Contract Amt: $5,200,000 See Standard Notes Above: 8 Advertisement Date :  29JUN2015 Shortlst Selection Date :  27JUL2015 Time:  08:30AM Final Selection Meeting Date :  14SEP2015 Time:  08:30AM Response Deadline : 10JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 13.3 - Policy Planning 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.7 - Transportation Statistics Contract : 16340 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42583221203 Project Description: Districtwide Growth Management Consultant Project Manager: Wilson, Tori Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  06JUL2015 Shortlst Selection Date :  03AUG2015 Time:  08:30AM Final Selection Meeting Date :  21SEP2015 Time:  08:30AM Response Deadline : 17JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16359 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42884816201 Project Description: State Road 12 from Yon Creek Bridge to West of State Road 10 (US 90) in Gadsden County Project Manager: Chatwood, Brannon Est. Construction Cost: $3,773,460 See Standard Notes Above: 8 Advertisement Date :  11JAN2016 Shortlst Selection Date :  01FEB2016 Time:  08:30AM Final Selection Meeting Date :  22FEB2016 Time:  08:30AM Response Deadline : 22JAN2016 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 15383 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43077716201 Project Description: SR 30A (US 98) from West of Jenks Avenue to SR 389 East Ave in Bay County Project Manager: Brust, Martin See Standard Notes Above: 4,9,10 Advertisement Date :  09MAR2015 Shortlst Selection Date :  30MAR2015 Time:  08:30AM Final Selection Meeting Date :  20APR2015 Time:  08:30AM Response Deadline : 20MAR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16366 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43078016201 43254816201 Project Description: CEI Group 16-D; State Road 77 from Washington County Line to South of Brown Street and State Road 2 from County Road 165 Basswood Road to the Georgia State Line in Jackson County Project Manager: Brust, Martin Est. Construction Cost: $5,748,132 See Standard Notes Above: 8 Advertisement Date :  03AUG2015 Shortlst Selection Date :  24AUG2015 Time:  08:30AM Final Selection Meeting Date :  14SEP2015 Time:  08:30AM Response Deadline : 14AUG2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16351 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43078416201 Project Description: State Road 20 (US 27) from State Road 61 (US 27) to East of State Road 261 (US 319) in Leon County Project Manager: Chatwood, Brannon Est. Construction Cost: $5,334,411 See Standard Notes Above: 8 Advertisement Date :  30NOV2015 Shortlst Selection Date :  21DEC2015 Time:  08:30AM Final Selection Meeting Date :  11JAN2016 Time:  08:30AM Response Deadline : 11DEC2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16316 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43078913201 Project Description: State Road 71 from White City Bridge to Pine Street in Gulf County. Project Manager: Golema, Jessica Estimated Contract Amt: $1,112,040 See Standard Notes Above: 8 Advertisement Date :  06APR2015 Shortlst Selection Date :  04MAY2015 Time:  08:30AM Final Selection Meeting Date :  22JUN2015 Time:  08:30AM Response Deadline : 17APR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16357 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43253716201 Project Description: State Road 81 from Walton County Line to Alabama State Line in Holmes County Project Manager: Riley, Josh Est. Construction Cost: $8,555,416 See Standard Notes Above: 8 Advertisement Date :  21DEC2015 Shortlst Selection Date :  11JAN2016 Time:  08:30AM Final Selection Meeting Date :  01FEB2016 Time:  08:30AM Response Deadline : 02JAN2016 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16321 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43255113201 Project Description: State Road 397 Eglin Boulevard from State Road 85 Eglin Parkway to Eglin Airforce Base Gate in Okaloosa County Project Manager: Golema, Jessica Estimated Contract Amt: $223,388 See Standard Notes Above: 8 Advertisement Date :  11MAY2015 Shortlst Selection Date :  08JUN2015 Time:  08:30AM Final Selection Meeting Date :  27JUL2015 Time:  08:30AM Response Deadline : 22MAY2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16330 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43255913201 Project Description: Design of State Road 63 (US 27) from John Knox Road to State Road 61 Thomasville Road in Leon County Project Manager: HUNTER, CLAY Estimated Contract Amt: $481,200 See Standard Notes Above: 8 Advertisement Date :  24AUG2015 Shortlst Selection Date :  21SEP2015 Time:  08:30AM Final Selection Meeting Date :  09NOV2015 Time:  08:30AM Response Deadline : 04SEP2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16354 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43257016201 Project Description: CEI Services for State Road 8 (I-10) from East of State Road 57 (US 19) to Madison County Line in Jefferson County Project Manager: Chatwood, Brannon Est. Construction Cost: $10,727,033 See Standard Notes Above: 8 Advertisement Date :  19OCT2015 Shortlst Selection Date :  09NOV2015 Time:  08:30AM Final Selection Meeting Date :  30NOV2015 Time:  08:30AM Response Deadline : 30OCT2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16356 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43257216201 Project Description: State Road 73 from Calhoun County Line to County Road 167 South Street in Jackson County Project Manager: Brust, Martin Est. Construction Cost: $6,376,146 See Standard Notes Above: 8 Advertisement Date :  14DEC2015 Shortlst Selection Date :  11JAN2016 Time:  08:30AM Final Selection Meeting Date :  01FEB2016 Time:  08:30AM Response Deadline : 28DEC2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16355 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43273616201 Project Description: State Road 8 (I-10) from East of State Road 87 to Okaloosa County Line in Santa Rosa County. Project Manager: Benson, Eric Est. Construction Cost: $11,647,494 See Standard Notes Above: 8 Advertisement Date :  23NOV2015 Shortlst Selection Date :  14DEC2015 Time:  08:30AM Final Selection Meeting Date :  04JAN2016 Time:  08:30AM Response Deadline : 04DEC2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16350 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43273716201 Project Description: State Road 8 (I-10) from Santa Rosa County Line to East of County Road 189 in Okaloosa County. Project Manager: Benson, Eric Est. Construction Cost: $5,590,087 See Standard Notes Above: 8 Advertisement Date :  18MAY2015 Shortlst Selection Date :  08JUN2015 Time:  08:30AM Final Selection Meeting Date :  29JUN2015 Time:  08:30AM Response Deadline : 29MAY2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16361 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43273816201 43273826201 Project Description: Group 16-B; State Road 8 (I-10) from Choctawhatchee River to Holmes County line in Washington County and State Road 8 (I-10) from Washington County Line to County Road 173 in Holmes County. Project Manager: Brust, Martin Est. Construction Cost: $10,223,990 See Standard Notes Above: 8 Advertisement Date :  18JAN2016 Shortlst Selection Date :  08FEB2016 Time:  08:30AM Final Selection Meeting Date :  29FEB2016 Time:  08:30AM Response Deadline : 29JAN2016 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16331 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43273833201 Project Description: Design of State Road 8 (I-10) from Holmes County Line to East of State Road 77 in Washington County Project Manager: STEPHENS, KIM Estimated Contract Amt: $629,880 See Standard Notes Above: 8 Advertisement Date :  21SEP2015 Shortlst Selection Date :  19OCT2015 Time:  08:30AM Final Selection Meeting Date :  07DEC2015 Time:  08:30AM Response Deadline : 02OCT2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16360 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43273916201 Project Description: State Road 8 (I-10) from Leon County Line to East of County Road 158 Old Lloyd in Jefferson County Project Manager: Chatwood, Brannon Est. Construction Cost: $5,663,470 See Standard Notes Above: 8 Advertisement Date :  15FEB2016 Shortlst Selection Date :  07MAR2016 Time:  08:30AM Final Selection Meeting Date :  28MAR2016 Time:  08:30AM Response Deadline : 26FEB2016 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16365 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43274116201 43274126201 Project Description: CEI Group 16-C; Stae Road 8 (I-10) from West of State Road 10 (US 90) to Leon County Line in Gadsden County and State Road 8 (I-10) from East end of Ochlockonee River Bridge to Begin of 6 lane in Tallahassee in Leon County Project Manager: Chatwood, Brannon Est. Construction Cost: $3,224,893 See Standard Notes Above: 8 Advertisement Date :  20JUL2015 Shortlst Selection Date :  10AUG2015 Time:  08:30AM Final Selection Meeting Date :  31AUG2015 Time:  08:30AM Response Deadline : 31JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16313 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43290923201 Project Description: State Raod 368A Collegiate Drive from West of Moody Avenue to State Road 368 23rd Street in Bay County. Project Manager: Mitchell, Dean Estimated Contract Amt: $200,800 See Standard Notes Above: 8 Advertisement Date :  30MAR2015 Shortlst Selection Date :  27APR2015 Time:  08:30AM Final Selection Meeting Date :  15JUN2015 Time:  08:30AM Response Deadline : 10APR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.4 - Right of Way Mapping Under-Utilized Work Groups: GROUP5 - Bridge Inspection GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Contract : 16329 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43578213201 Project Description: Curtis Mill Road over Buggs Creek (Bridge Number 544077) in Jefferson County Project Manager: Henry, Robert F Estimated Contract Amt: $540,000 Advertisement Date :  27JUL2015 Shortlst Selection Date :  24AUG2015 Time:  08:30AM Final Selection Meeting Date :  12OCT2015 Time:  08:30AM Response Deadline : 07AUG2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 8.2 - Design, Right of Way, & Const. Surveying 9.4.1 - Standard Foundation Studies Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.2 - Non-Redundant Bridge Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16334 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43580013201 Project Description: FH 356 (Lawhon Mill Road) over Unsigned Stream (Bridge No. 594005) in Wakulla County Project Manager: Johns, Tommy Estimated Contract Amt: $480,000 See Standard Notes Above: 8 Advertisement Date :  02NOV2015 Shortlst Selection Date :  30NOV2015 Time:  08:30AM Final Selection Meeting Date :  18JAN2016 Time:  08:30AM Response Deadline : 13NOV2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.4 - Right of Way Mapping Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16320 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43580113201 Project Description: Red Barrow Road over Panther Creek (Bridge Number 574043) in Okaloosa County. Project Manager: Henry, Robert F Estimated Contract Amt: $680,000 See Standard Notes Above: 8 Advertisement Date :  04MAY2015 Shortlst Selection Date :  01JUN2015 Time:  08:30AM Final Selection Meeting Date :  20JUL2015 Time:  08:30AM Response Deadline : 15MAY2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 8.2 - Design, Right of Way, & Const. Surveying 9.4.1 - Standard Foundation Studies Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.2 - Non-Redundant Bridge Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16324 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43580213201 Project Description: County Road 65A Juniper Creek Road over Juniper Creek (Bridge Number 504050) in Gadsden County. Project Manager: HOWELL, BILL Estimated Contract Amt: $640,000 See Standard Notes Above: 8 Advertisement Date :  08JUN2015 Shortlst Selection Date :  06JUL2015 Time:  08:30AM Final Selection Meeting Date :  24AUG2015 Time:  08:30AM Response Deadline : 19JUN2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16327 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43625713201 Project Description: State Road 10 (US 90) West Tennessee Street from Ocklockonee River Bridge to Poplar Road in Leon County Project Manager: Lamb, Sandra Estimated Contract Amt: $401,560 See Standard Notes Above: 8 Advertisement Date :  13JUL2015 Shortlst Selection Date :  10AUG2015 Time:  08:30AM Final Selection Meeting Date :  28SEP2015 Time:  08:30AM Response Deadline : 24JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16328 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626013201 Project Description: State Road 65 from Telogia Creek to State Road 20 in Liberty County Project Manager: Smith, Jimmy Estimated Contract Amt: $222,120 Advertisement Date :  10AUG2015 Shortlst Selection Date :  07SEP2015 Time:  08:30AM Final Selection Meeting Date :  26OCT2015 Time:  08:30AM Response Deadline : 21AUG2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16319 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626113201 Project Description: State Road 30/61 (US 98) Coastal Highway from Franklin County line to Boykin Road in Wakulla County. Project Manager: Johns, Tommy Estimated Contract Amt: $656,160 Advertisement Date :  27APR2015 Shortlst Selection Date :  25MAY2015 Time:  08:30AM Final Selection Meeting Date :  13JUL2015 Time:  08:30AM Response Deadline : 08MAY2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16318 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626213201 Project Description: State Road 20 from Apalachicola River Bridge to End of four lane in Bristol. Project Manager: Bell, Lisa Estimated Contract Amt: $174,720 See Standard Notes Above: 8 Advertisement Date :  29JUN2015 Shortlst Selection Date :  27JUL2015 Time:  08:30AM Final Selection Meeting Date :  14SEP2015 Time:  08:30AM Response Deadline : 10JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16315 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626413201 Project Description: State Road 10 (US 90) from Choctawhatchee River Bridge to Saint Mary's Road in Washington County. Project Manager: Hodge, Howard Estimated Contract Amt: $217,440 See Standard Notes Above: 8 Advertisement Date :  16MAR2015 Shortlst Selection Date :  13APR2015 Time:  08:30AM Final Selection Meeting Date :  01JUN2015 Time:  08:30AM Response Deadline : 27MAR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16311 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626513201 Project Description: State Road 4 from Santa Rosa County Line to 16th Street in Okaloosa County. Project Manager: HUNTER, CLAY Estimated Contract Amt: $690,240 See Standard Notes Above: 8 Advertisement Date :  25MAY2015 Shortlst Selection Date :  22JUN2015 Time:  08:30AM Final Selection Meeting Date :  10AUG2015 Time:  08:30AM Response Deadline : 05JUN2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16332 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626713201 Project Description: State Road 2 from State Road 81 to Choctawhatchee River Bridge in Holmes County Project Manager: Golema, Jessica Estimated Contract Amt: $652,480 See Standard Notes Above: 8 Advertisement Date :  22JUN2015 Shortlst Selection Date :  20JUL2015 Time:  08:30AM Final Selection Meeting Date :  07SEP2015 Time:  08:30AM Response Deadline : 03JUL2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16333 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626813201 Project Description: State Road 267 Pat Thomas Parkway South of State Road 8 (I-10) to State Road 10A (US 90) Jefferson Street in Gadsden County Project Manager: Hodge, Howard Estimated Contract Amt: $598,440 See Standard Notes Above: 8 Advertisement Date :  19OCT2015 Shortlst Selection Date :  16NOV2015 Time:  08:30AM Final Selection Meeting Date :  04JAN2016 Time:  08:30AM Response Deadline : 30OCT2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16322 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43626913201 Project Description: State Road 10 (US 90) from Washington County Line to Begin 4 lane East of Banfill Avenue in Holmes County Project Manager: WEBB, ALAINA Estimated Contract Amt: $303,240 Advertisement Date :  05OCT2015 Shortlst Selection Date :  02NOV2015 Time:  08:30AM Final Selection Meeting Date :  21DEC2015 Time:  08:30AM Response Deadline : 16OCT2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies 99.0 - Other Professional Services Minor Work : 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16305 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43661313201 Project Description: Districtwide Traffic Safety Design Project Manager: DiRusso, Amy Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  01JUN2015 Shortlst Selection Date :  29JUN2015 Time:  08:30AM Final Selection Meeting Date :  17AUG2015 Time:  08:30AM Response Deadline : 12JUN2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies 99.0 - Other Professional Services Minor Work : 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16306 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43661323201 Project Description: Districtwide Traffic Safety Design Project Manager: DiRusso, Amy Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  18MAY2015 Shortlst Selection Date :  15JUN2015 Time:  08:30AM Final Selection Meeting Date :  05OCT2015 Time:  08:30AM Response Deadline : 29MAY2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16325 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43666313201 Project Description: State Road 8 (I-10) from West of County Road 270A Flat Creek Road to West of State Road 267 Pat Thomas Parkway in Gadsden County Project Manager: STEPHENS, KIM Estimated Contract Amt: $901,800 See Standard Notes Above: 8 Advertisement Date :  18MAY2015 Shortlst Selection Date :  15JUN2015 Time:  08:30AM Final Selection Meeting Date :  03AUG2015 Time:  08:30AM Response Deadline : 29MAY2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 3 Major Work : 3.1 - Minor Highway Design 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16312 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43671913201 43672013201 Project Description: Design Group 16-04; State ROad 295 New Warrington Road at County Road 298A Jackson Sreet intersection and State Road 292 Gulf Beach Highway at State Road 727 Fairfield in Escambia County. Project Manager: Lamb, Sandra Estimated Contract Amt: $481,800 See Standard Notes Above: 8 Advertisement Date :  09MAR2015 Shortlst Selection Date :  06APR2015 Time:  08:30AM Final Selection Meeting Date :  25MAY2015 Time:  08:30AM Response Deadline : 20MAR2015 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16463 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22966446201 CEI SR-7 FRM SR-704 OKEECHOBEE Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $2,539,760 See Standard Notes Above: 4 Advertisement Date :  28DEC2015 Shortlst Selection Date :  10FEB2016 Time:  8:15AM Final Selection Meeting Date :  29FEB2016 Time:  8:15AM Response Deadline : 08JAN2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16412 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22989616201 Project Description: CEI SERVICES FOR SR-710/BEELINE HWY FROM W. OF AUSTRALIAN AVE TO OLD DIXIE HWY. Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $2,395,208 See Standard Notes Above: 4 Special Notes: SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Estimate of Work Effort (8 1/2x11 or 11x17, 1 page) - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small Business- Firms (Form # 375-030-62) - Disclosure of Lobbying Activities, (if applicable) (Form 375-030-34) - Truth In Negotiations Form (Form 375-030-30) - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. * EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Advertisement Date :  06APR2015 Shortlst Selection Date :  18MAY2015 Time:  8:15AM Final Selection Meeting Date :  08JUN2015 Time:  8:15AM Response Deadline : 17APR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16416 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 22996593201 D/W UTILITY COORD CONTRACT Project Manager: Brock, Tim Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  09MAR2015 Shortlst Selection Date :  13APR2015 Time:  8:15AM Final Selection Meeting Date :  01JUN2015 Time:  8:15AM Response Deadline : 20MAR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 6.2 - Traffic Signal Timing Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies Contract : 16434 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23001773201 D/W TRAFFIC OPS SIGNAL RETIMIN Project Manager: OVERTON, JONATHAN Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  15JUN2015 Shortlst Selection Date :  13JUL2015 Time:  8:15AM Final Selection Meeting Date :  31AUG2015 Time:  8:15AM Response Deadline : 26JUN2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.2.3 - Major Bridge Design - Segmental Minor Work : 3.1 - Minor Highway Design 4.4 - Movable Span Bridge Design 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Contract : 16439 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23006853201 D/W BRIDGE EMERGENCY MINOR Project Manager: OTERO, RAMON Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  29JUN2015 Shortlst Selection Date :  03AUG2015 Time:  8:15AM Final Selection Meeting Date :  21SEP2015 Time:  8:15AM Response Deadline : 10JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.2.3 - Major Bridge Design - Segmental 7.1 - Signing, Pavement Marking & Channelization Minor Work : 4.4 - Movable Span Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.2 - Lighting 7.3 - Signalization 14.0 - Architect 15.0 - Landscape Architect Contract : 16449 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23008893201 D/W IN-HOUSE CONSULT CONTRACT Project Manager: Rodrigues, Nadir Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  22SEP2015 Shortlst Selection Date :  19OCT2015 Time:  8:15AM Final Selection Meeting Date :  30NOV2015 Time:  8:15AM Response Deadline : 02OCT2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.4 - Movable Span Bridge Design Minor Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating 8.2 - Design, Right of Way, & Const. Surveying 9.3 - Highway Materials Testing 10.3 - Construction Materials Inspection Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16419 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23009243201 D/W BRIDGE CONSULT MISC SVCS Project Manager: REYNOLDS, THOMAS Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  23MAR2015 Shortlst Selection Date :  27APR2015 Time:  8:15AM Final Selection Meeting Date :  15JUN2015 Time:  8:15AM Response Deadline : 03APR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Contract : 16452 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23033846201 CEI SR-614/INDRIO RD Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $3,873,095 See Standard Notes Above: 9 Advertisement Date :  06OCT2015 Shortlst Selection Date :  02NOV2015 Time:  8:15AM Final Selection Meeting Date :  14DEC2015 Time:  8:15AM Response Deadline : 16OCT2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16421 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 23037866201 D/W CEI CONSULT GENERAL Project Manager: HARRIS, JEANNETTE Maximum Contract Amount: $1,500,000 See Standard Notes Above: 4 Special Notes: SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Estimate of Work Effort (8 1/2x11 or 11x17, 1 page) - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small _Business- Firms (Form # 375-030-62) - Disclosure of Lobbying Activities, (if applicable) (Form 375-030-34) - Truth In Negotiations Form (Form 375-030-30) - CEI Staffing Matrix with Availability (1 Page) - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Advertisement Date :  11MAY2015 Shortlst Selection Date :  22JUN2015 Time:  8:15AM Final Selection Meeting Date :  13JUL2015 Time:  8:15AM Response Deadline : 22MAY2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.3 - Controlled Access Highway Design Contract : 16447 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41326513201 SR-9/I-95@PGA BLVD/CENTRAL BLV Project Manager: WANG, BING Estimated Contract Amt: $2,500,000 Advertisement Date :  17AUG2015 Shortlst Selection Date :  21SEP2015 Time:  8:15AM Final Selection Meeting Date :  09NOV2015 Time:  8:15AM Response Deadline : 28AUG2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.5.1 - Major Bridge(CEI) - Concrete Contract : 16462 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41901316201 CEI SR-80/SOUTHERN BLVD BRIDGE Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $10,058,522 See Standard Notes Above: 9 Advertisement Date :  28DEC2015 Shortlst Selection Date :  10FEB2016 Time:  8:15AM Final Selection Meeting Date :  29FEB2016 Time:  8:15AM Response Deadline : 08JAN2016 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP3 - Highway Design - Roadway Contract : 16408 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42485523201 Project Description: D/W TRAFFIC OPERATIONS SAFETY STUDIES Project Manager: Xie, Yujing Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Special Notes: Project Manager is available to meet with interested firms as follows: 2/23 from 11 to 12 2/24 from 11 to 12 Please contract Tracey Xie at (954) 777-4355 to schedule a meeting. Advertisement Date :  09MAR2015 Shortlst Selection Date :  13APR2015 Time:  8:15AM Final Selection Meeting Date :  01JUN2015 Time:  8:15AM Response Deadline : 20MAR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 9.3 - Highway Materials Testing 10.3 - Construction Materials Inspection Contract : 16441 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 42490876201 D/W MATERIALS LAB TESTING CONS Project Manager: ARCALAS, RONALD Maximum Contract Amount: $1,500,000 Advertisement Date :  20JUL2015 Shortlst Selection Date :  24AUG2015 Time:  8:15AM Final Selection Meeting Date :  05OCT2015 Time:  8:15AM Response Deadline : 31JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 13.3 - Policy Planning 13.7 - Transportation Statistics Contract : 16465 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42598032201 D/W SUPPT TRAFFIC FORECASTING Project Manager: MARTINEZ, CESAR Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  12MAY2015 Shortlst Selection Date :  15JUN2015 Time:  8:15AM Final Selection Meeting Date :  03SEP2015 Time:  8:15AM Response Deadline : 23MAY2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16413 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42701216201 Project Description: CEI FOR SR-823/FLAMINGO RS FROM N. OF SR-818/GRIFFIN ROAD TO S. OF SR-84 Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $669,961 See Standard Notes Above: 4 Special Notes: SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Estimate of Work Effort (8 1/2x11 or 11x17, 1 page) - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small Business- Firms (Form # 375-030-62) Note 9 - Disclosure of Lobbying Activities, (if applicable) (Form 375-030-34) - Truth In Negotiations Form (Form 375-030-30) - CEI Staffing Matrix with Availability (1 Page) - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should addres the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Advertisement Date :  06APR2015 Shortlst Selection Date :  18MAY2015 Time:  8:15AM Final Selection Meeting Date :  08JUN2015 Time:  8:15AM Response Deadline : 17APR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.2 - Major Highway Design 4.4 - Movable Span Bridge Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 14.0 - Architect 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Contract : 16425 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42840022201 PD&E SR-5/US-1 FED HWY Project Manager: SAINI, VANITA Estimated Contract Amt: $2,000,000 Advertisement Date :  03APR2015 Longlist(Tech. Rev. Cmte.) Date:  30APR2015 Time:  10:00AM Shortlst Selection Date :  08MAY2015 Time:  8:15AM Tech. Rev. Cmte Meeting :  11JUN2015 Time:  10:00AM Final Selection Meeting Date :  19JUN2015 Time:  8:15AM Response Deadline : 14APR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16457 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42872416201 SR-842/BROWARD BLVD FRM 15 AVE Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $608,085 See Standard Notes Above: 7 Advertisement Date :  20OCT2015 Shortlst Selection Date :  30NOV2015 Time:  8:15AM Final Selection Meeting Date :  11JAN2016 Time:  8:15AM Response Deadline : 30OCT2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16436 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42925316201 CEI BROWARD OPS CONTINUTING CE Project Manager: HARRIS, JEANNETTE Maximum Contract Amount: $5,000,000 See Standard Notes Above: 9 Advertisement Date :  13JUL2015 Shortlst Selection Date :  17AUG2015 Time:  8:15AM Final Selection Meeting Date :  17AUG2015 Time:  8:15AM Response Deadline : 31JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 8.1 - Control Surveying 8.4 - Right of Way Mapping Contract : 16443 Selection Procedure: LOR and Written Technical Proposal Financial Management Number(s): 42925813201 D/W SURVEY & MAPPING SVCS Project Manager: Doll, Paul Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  20JUL2015 Shortlst Selection Date :  24AUG2015 Time:  8:15AM Final Selection Meeting Date :  12OCT2015 Time:  8:15AM Response Deadline : 31JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Contract : 16445 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42993623201 SR-A1A N. BRIDGE OVER ICWW Project Manager: PESSOA, DONOVAN Estimated Contract Amt: $5,000,000 See Standard Notes Above: 8 Advertisement Date :  20JUL2015 Shortlst Selection Date :  24AUG2015 Time:  8:15AM Final Selection Meeting Date :  12OCT2015 Time:  8:15AM Response Deadline : 31JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16458 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42995816201 SR-842/BROWARD BLVD FRM 18 AVE Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $699,844 See Standard Notes Above: 7 Advertisement Date :  27OCT2015 Shortlst Selection Date :  07DEC2015 Time:  8:15AM Final Selection Meeting Date :  18JAN2016 Time:  8:15AM Response Deadline : 06NOV2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Contract : 15456 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43019216201 Project Description: RAVENSWOOD RD. OVER DANIA CUT-OFF CANAL BRIDGE #864028 * SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Estimate of Work Effort (8 1/2x11 or 11x17, 1 page) - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small Business- Firms (Form # 375-030-62 - Disclosure of Lobbying Activities, (if applicable) (Form 375-030-34) - Truth In Negotiations Form (Form 375-030-30) - CEI Staffing Matrix with Availability (1 Page) - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $1,260,723 See Standard Notes Above: 4 View proposed scope (Adobe Acrobat® PDF file) Advertisement Date :  02MAR2015 Shortlst Selection Date :  30MAR2015 Time:  8:15AM Final Selection Meeting Date :  30MAR2015 Time:  8:15AM Response Deadline : 13MAR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Contract : 16440 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43060116201 SR-A1A FRM E OF MERCEDES RIVER Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $352,411 See Standard Notes Above: 7 Advertisement Date :  24AUG2015 Shortlst Selection Date :  07OCT2015 Time:  8:15AM Final Selection Meeting Date :  26OCT2015 Time:  8:15AM Response Deadline : 04SEP2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16450 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43060216201 CEI SR-810/HILLSBORO BLVD Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $322,574 See Standard Notes Above: 4 Advertisement Date :  26OCT2015 Shortlst Selection Date :  09DEC2015 Time:  8:15AM Final Selection Meeting Date :  28DEC2015 Time:  8:15AM Response Deadline : 06NOV2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 13.3 - Policy Planning Minor Work : 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Contract : 16422 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43101321201 D/W TRANSIT PLANNING Project Manager: Pietrowsky, Jayne Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  30MAR2015 Shortlst Selection Date :  04MAY2015 Time:  8:15AM Final Selection Meeting Date :  15JUN2015 Time:  8:15AM Response Deadline : 10APR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16430 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43119916201 CEI PALM BEACH GENERAL Project Manager: HARRIS, JEANNETTE Maximum Contract Amount: $1,500,000 See Standard Notes Above: 4 Special Notes: SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Estimate of Work Effort (8 1/2x11 or 11x17, 1 page) - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small Business- Firms (Form # 375-030-62) - Disclosure of Lobbying Activities, (if applicable) (Form 375-030-34) - Truth In Negotiations Form (Form 375-030-30) - CEI Staffing Matrix with Availability (1 Page) - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Advertisement Date :  29JUN2015 Shortlst Selection Date :  10AUG2015 Time:  8:15AM Final Selection Meeting Date :  31AUG2015 Time:  8:15AM Response Deadline : 10JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 13.7 - Transportation Statistics Contract : 16427 Selection Procedure: LOR and Written Technical Proposal Financial Management Number(s): 43151321201 D/W PLEM TRAN DATA MGMT Project Manager: Li, Min-Tang Maximum Contract Amount: $1,500,000 Advertisement Date :  22APR2015 Shortlst Selection Date :  25MAY2015 Time:  8:15AM Final Selection Meeting Date :  13JUL2015 Time:  8:15AM Response Deadline : 01MAY2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Contract : 16438 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43152113201 DESIGN OSLO ROAD FRM SR-9/I-95 Project Manager: AUBERY, SABRINA Estimated Contract Amt: $2,200,000 See Standard Notes Above: 9 Advertisement Date :  29JUN2015 Shortlst Selection Date :  20JUL2015 Time:  8:15AM Final Selection Meeting Date :  07SEP2015 Time:  8:15AM Response Deadline : 10JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Contract : 16444 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43167013201 SR-811/DIXIE HWY FRM N FORK Project Manager: WALLACE, RONALD Estimated Contract Amt: $300,000 See Standard Notes Above: 7 Advertisement Date :  13JUL2015 Shortlst Selection Date :  17AUG2015 Time:  8:15AM Final Selection Meeting Date :  05OCT2015 Time:  8:15AM Response Deadline : 24JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16418 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43373116201 Project Description: CEI FOR PALM BEACH OPERATIONS GENERAL CEI CONSULTANT INSPECTION SUPPORT Project Manager: HARRIS, JEANNETTE Maximum Contract Amount: $1,500,000 See Standard Notes Above: 4 Special Notes: SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Estimate of Work Effort (8 1/2x11 or 11x17, 1 page) - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small Business- Firms (Form # 375-030-62 - Disclosure of Lobbying Activities, (if applicable) (Form 375-030-34) - Truth In Negotiations Form (Form 375-030-30) - CEI Staffing Matrix with Availability (1 Page) - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Advertisement Date :  27APR2015 Shortlst Selection Date :  08JUN2015 Time:  8:15AM Final Selection Meeting Date :  29JUN2015 Time:  8:15AM Response Deadline : 08MAY2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16426 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43373226201 CEI TREASURE COAST GENERAL Project Manager: HARRIS, JEANNETTE Maximum Contract Amount: $1,500,000 See Standard Notes Above: 4 Special Notes: SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Estimate of Work Effort (8 1/2x11 or 11x17, 1 page) - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small Business- Firms (Form # 375-030-62) - Disclosure of Lobbying Activities, (if applicable) (Form 375-030-34) - Truth In Negotiations Form (Form 375-030-30) - CEI Staffing Matrix with Availability (1 Page) - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Advertisement Date :  08JUN2015 Shortlst Selection Date :  21JUL2015 Time:  8:15AM Final Selection Meeting Date :  10AUG2015 Time:  8:15AM Response Deadline : 18JUN2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Contract : 16428 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43466913201 PERIMETER RD FRM GRIFFIN RD Project Manager: WANG, BING Estimated Contract Amt: $269,100 Advertisement Date :  22APR2015 Shortlst Selection Date :  28MAY2015 Time:  8:15AM Final Selection Meeting Date :  18JUL2015 Time:  8:15AM Response Deadline : 02MAY2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Contract : 16459 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43551312201 PD&E SR-9/I-95@SR-842/BROW BLV Project Manager: AUBERY, SABRINA Estimated Contract Amt: $3,650,000 See Standard Notes Above: 9 Advertisement Date :  27OCT2015 Shortlst Selection Date :  30NOV2015 Time:  8:15AM Final Selection Meeting Date :  11JAN2016 Time:  8:15AM Response Deadline : 06NOV2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Contract : 16451 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43576713201 WEST PARK VARIOUS SYSTEM LOCAT Project Manager: WALLACE, RONALD Estimated Contract Amt: $608,038 Advertisement Date :  07SEP2015 Shortlst Selection Date :  12OCT2015 Time:  8:15AM Final Selection Meeting Date :  30NOV2015 Time:  8:15AM Response Deadline : 19SEP2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration Contract : 16435 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43580812201 PD&E SR-9/I-95 FRM S. SR-870/C Project Manager: Olson, John Estimated Contract Amt: $2,000,000 See Standard Notes Above: 9 Advertisement Date :  01JUN2015 Shortlst Selection Date :  06JUL2015 Time:  8:15AM Final Selection Meeting Date :  17AUG2015 Time:  8:15AM Response Deadline : 12JUN2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Contract : 16433 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43609513201 DESIGN FOR SR-60/OSCEOLA BLVD Project Manager: DORVIL, CARL H Estimated Contract Amt: $328,601 See Standard Notes Above: 7 Advertisement Date :  18MAY2015 Shortlst Selection Date :  22JUN2015 Time:  8:15AM Final Selection Meeting Date :  10AUG2015 Time:  8:15AM Response Deadline : 29MAY2019 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Contract : 16423 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43609613201 SR-5/US-1 FRM N. OF SALERNO Project Manager: MORALES, FERNANDO Estimated Contract Amt: $298,775 See Standard Notes Above: 7 Advertisement Date :  23MAR2015 Shortlst Selection Date :  27APR2015 Time:  8:15AM Final Selection Meeting Date :  15JUN2015 Time:  8:15AM Response Deadline : 03APR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.3 - Photogrammetric Mapping Contract : 16420 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43609713201 SR-5/US-1 FRM SR-816/OAKLAND P Project Manager: SONNETT, WILLIAM A Estimated Contract Amt: $400,035 Advertisement Date :  09MAR2015 Shortlst Selection Date :  13APR2015 Time:  8:15AM Final Selection Meeting Date :  01JUN2015 Time:  8:15AM Response Deadline : 20MAR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 3.2 - Major Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP7 - Traffic Operations Design Contract : 16454 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43630713201 Project Description: SR-80/SOUTHERN BLVD @ FOREST HILL BLVD Project Manager: Bulsara, Rita Estimated Contract Amt: $590,000 See Standard Notes Above: 9 Advertisement Date :  21SEP2015 Shortlst Selection Date :  26OCT2015 Time:  8:15AM Final Selection Meeting Date :  14DEC2015 Time:  8:15AM Response Deadline : 02OCT2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Contract : 16429 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43651912201 PD&E SR-9/I-95 FRM S. OF 45 ST Project Manager: Delgado, Julio C Estimated Contract Amt: $400,000 Advertisement Date :  04MAY2015 Shortlst Selection Date :  08JUN2015 Time:  8:15AM Final Selection Meeting Date :  20JUL2015 Time:  8:15AM Response Deadline : 15MAY2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.5 - Subarea/Corridor Planning Contract : 16453 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43657612201 SR-9/I95 FRM S. LINTON BLVD. Project Manager: DYKSTRA, LISA Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  01SEP2015 Shortlst Selection Date :  05OCT2015 Time:  8:15AM Final Selection Meeting Date :  16NOV2015 Time:  8:15AM Response Deadline : 11SEP2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Contract : 16456 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43664616201 SR-9/I-95 OVER GATLIN BLVD Project Manager: HARRIS, JEANNETTE Estimated Contract Amt: $902,816 See Standard Notes Above: 9 Advertisement Date :  29NOV2015 Shortlst Selection Date :  12JAN2016 Time:  8:15AM Final Selection Meeting Date :  01FEB2016 Time:  8:15AM Response Deadline : 10DEC2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design Contract : 16437 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43696312201 PD&E I-95/SR-9@6TH AVE SOUTH Project Manager: MORALES, FERNANDO Estimated Contract Amt: $750,000 Advertisement Date :  22JUN2015 Shortlst Selection Date :  27JUL2015 Time:  8:15AM Final Selection Meeting Date :  07SEP2015 Time:  8:15AM Response Deadline : 03JUL2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Contract : 16460 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43696412201 SR-9/I-95 FRM S. OF SW 10 ST Project Manager: WALLACE, RONALD Estimated Contract Amt: $2,000,000 Advertisement Date :  02NOV2015 Shortlst Selection Date :  07DEC2015 Time:  8:15AM Final Selection Meeting Date :  18JAN2016 Time:  8:15AM Response Deadline : 13NOV2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 4 Major Work : 13.4 - Systems Planning Contract : 16414 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43709511201 Project Description: Districtwide Consultant for OMD and PL&EM for Freight Studies. The objective of this contract is to provide professional engineering, planning, policy economic and other technical services and professional personnel on a task work order basis to supplement the Department's District Four office of Modal Development and the Planning & Environmental Management Office staff members in the development implementation and evaluation of transportation and freight related projects. The primary modal areas to be supported include but are not limited to theFreight & Logistics Passenger Operations and Rail Sections within the Office of Modal Development. Project Manager: UPCHURCH, JEREMY Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Special Notes: This contract will be executed up to the maximum amount of $1,500,000. The Department has budgeted $500,000 for the current fiscal year. View proposed scope (Adobe Acrobat® PDF file) Advertisement Date :  02MAR2015 Longlist(Tech. Rev. Cmte.) Date:  24MAR2015 Time:  2:00PM Shortlst Selection Date :  06APR2015 Time:  8:15AM Scope Meeting Date :  14APR2015 Time:  2:30PM Tech. Rev. Cmte Meeting :  15MAY2015 Time:  2:00PM Final Selection Meeting Date :  25MAY2015 Time:  8:15AM 1st Negotiations Meeting :  26JUN2015 Time:  9:00AM Response Deadline : 13MAR2015 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 DISTRICT 5 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Contract : 15536 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23797513208 Project Description: Districtwide Drainage Project Manager: ARTUZ, RAUL Advertisement Date :  09MAR2015 Shortlst Selection Date :  13APR2015 Time:  08:15AM Final Selection Meeting Date :  15JUN2015 Time:  08:15AM Response Deadline : 20MAR2015 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 DISTRICT 5 Major Work : Contract : 16507 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 23842216201 Project Description: CEI Group 153 Project Manager: Schmitt, Alida J Estimated Contract Amt: $3,966,524 Special Notes: DBE/SBE Underutilization may be added at a later date. Advertisement Date :  10AUG2015 Shortlst Selection Date :  07SEP2015 Time:  08:15AM Final Selection Meeting Date :  21SEP2015 Time:  08:15AM Response Deadline : 21AUG2015 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 DISTRICT 5 Major Work : 3.3 - Controlled Access Highway Design Contract : 16513 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 40740233201 Project Description: SR 528 from West of SR 524 (Industry Rd) to East of SR 3 Project Manager: Kazmierczak, Storm Estimated Contract Amt: $5,800,000 Special Notes: DBE/SBE Underutilization may be added at a later date. Advertisement Date :  12OCT2015 Shortlst Selection Date :  23NOV2015 Time:  08:15AM Final Selection Meeting Date :  18JAN2016 Time:  08:15AM Response Deadline : 23OCT2015 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 DISTRICT 5 Major Work : 3.1 - Minor Highway Design Contract : 16525 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43440713201 Project Description: SR 25 (US 27) from CR 561 to North of O'Brien Rd Project Manager: Moss, Kevin Estimated Contract Amt: $660,000 Special Notes: DBE/SBE Underutilization may be added at a later date. Advertisement Date :  01JUN2015 Shortlst Selection Date :  06JUL2015 Time:  08:15AM Final Selection Meeting Date :  25AUG2015 Time:  08:15AM Response Deadline : 12JUN2015 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 DISTRICT 5 Major Work : 7.2 - Lighting Contract : 16519 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43505913201 Project Description: I-95 (SR 9) Multiple locations Volusia and Flagler Counties Project Manager: Varano, Gene Estimated Contract Amt: $1,210,000 Special Notes: DBE/SBE Underutilization may be added at a later date. Advertisement Date :  27APR2015 Shortlst Selection Date :  01JUN2015 Time:  08:15AM Final Selection Meeting Date :  20JUL2015 Time:  08:15AM Response Deadline : 08MAY2015 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 DISTRICT 5 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Contract : 16538 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43547612201 Project Description: County Road 514 & Interstate I-75 Interchange PD&E Project Manager: HEYWOOD, JAZLYN Estimated Contract Amt: $2,000,000 Special Notes: DBE/SBE Underutilization may be added at a later date. Advertisement Date :  28DEC2015 Shortlst Selection Date :  25JAN2016 Time:  08:15AM Final Selection Meeting Date :  14MAR2016 Time:  08:15AM Response Deadline : 08JAN2016 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 DISTRICT 6 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Contract : 16616 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA 016 SW 107 Avenue Project Manager: DUBROVSKY, MIKHAIL Estimated Contract Amt: See Standard Notes Above: 4,9 Advertisement Date :  11MAY2015 Longlist(Tech. Rev. Cmte.) Date:  05JUN2015 Time:  10:00AM Shortlst Selection Date :  22JUN2015 Time:  10:00AM Final Selection Meeting Date :  06JUL2015 Time:  10:00AM 1st Negotiations Meeting :  04AUG2015 Time:  02:00PM Response Deadline : 22MAY2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16620 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA Project Description: Flagler/1st Street Project Manager: ESPINAL, ENMANUEL Maximum Contract Amount: $5,000,000 See Standard Notes Above: 4,9 Advertisement Date :  08JUN2015 Longlist(Tech. Rev. Cmte.) Date:  03JUL2015 Time:  10:00AM Shortlst Selection Date :  20JUL2015 Time:  10:00AM Final Selection Meeting Date :  10AUG2015 Time:  10:00AM 1st Negotiations Meeting :  08SEP2015 Time:  02:00PM Response Deadline : 19JUN2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16634 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA Project Description: Palmetto Resurfacing Project Manager: DUBROVSKY, MIKHAIL Estimated Contract Amt: $900,000 See Standard Notes Above: 4,9 Advertisement Date :  24AUG2015 Longlist(Tech. Rev. Cmte.) Date:  18SEP2015 Time:  10:00AM Shortlst Selection Date :  05OCT2015 Time:  10:00AM Final Selection Meeting Date :  19OCT2015 Time:  10:00AM 1st Negotiations Meeting :  02DEC2015 Time:  02:00PM Response Deadline : 04SEP2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16639 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA Project Description: Krome Avenue North #3 Project Manager: DUBROVSKY, MIKHAIL Estimated Contract Amt: $2,300,000 See Standard Notes Above: 4,9 Advertisement Date :  06JUL2015 Longlist(Tech. Rev. Cmte.) Date:  31JUL2015 Time:  10:00AM Shortlst Selection Date :  24AUG2015 Time:  10:00AM Final Selection Meeting Date :  14SEP2015 Time:  10:00AM 1st Negotiations Meeting :  15OCT2015 Time:  02:00PM Response Deadline : 17JUL2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 11.0 - Eng Contract Admin and Management Minor Work : 3.1 - Minor Highway Design Contract : 16607 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25064922201 Project Description: Districtwide Permits Consultant Project Manager: VEGA, MANUEL Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  09MAR2015 Longlist(Tech. Rev. Cmte.) Date:  06APR2015 Time:  02:30PM Shortlst Selection Date :  20APR2015 Time:  10:00AM Final Selection Meeting Date :  08JUN2015 Time:  10:00AM Response Deadline : 20MAR2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 8.4 - Right of Way Mapping Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Contract : 16612 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25069663202 Project Description: Districtwide ROW Mapping & Survey Project Manager: KINMAN, CRISTINA Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  06APR2015 Longlist(Tech. Rev. Cmte.) Date:  07MAY2015 Time:  11:00AM Shortlst Selection Date :  26MAY2015 Time:  02:00PM Final Selection Meeting Date :  06JUL2015 Time:  10:00AM Response Deadline : 17APR2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 10.1 - Rdwy Construction Engineering Inspection Contract : 16631 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 25071156204 Project Description: Districtwide Misc. Consultant Engineering Inspection Consultant Project Manager: DUBROVSKY, MIKHAIL Maximum Contract Amount: $1,500,000 See Standard Notes Above: 4,9 Advertisement Date :  03AUG2015 Longlist(Tech. Rev. Cmte.) Date:  28AUG2015 Time:  10:00AM Shortlst Selection Date :  14SEP2015 Time:  10:00AM Final Selection Meeting Date :  05OCT2015 Time:  10:00AM 1st Negotiations Meeting :  03NOV2015 Time:  02:00PM Response Deadline : 14AUG2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design Minor Work : 6.1 - Traffic Engineering Studies 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies Contract : 16606 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 40652153201 Project Description: Districtwide Traffic Operations Studies Consultant Project Manager: RODRIGUEZ, JAVIER X Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  23MAR2015 Longlist(Tech. Rev. Cmte.) Date:  23APR2015 Time:  10:30AM Shortlst Selection Date :  11MAY2015 Time:  10:00AM Final Selection Meeting Date :  22JUN2015 Time:  10:00AM Response Deadline : 03APR2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design Contract : 16618 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41806413203 Project Description: Districtwide (ADA) Compliance Consultant Project Manager: LATA, ZAKARY Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  27APR2015 Longlist(Tech. Rev. Cmte.) Date:  28MAY2015 Time:  10:00AM Shortlst Selection Date :  22JUN2015 Time:  10:00AM Final Selection Meeting Date :  10AUG2015 Time:  10:00AM Response Deadline : 08MAY2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Contract : 16623 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42105331203 Project Description: Districtwide Intermodal Systems Planning Project Manager: JEFFRIES, KENNETH Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  22JUN2015 Longlist(Tech. Rev. Cmte.) Date:  23JUL2015 Time:  10:00AM Shortlst Selection Date :  10AUG2015 Time:  10:00AM Final Selection Meeting Date :  14SEP2015 Time:  10:00AM Response Deadline : 03JUL2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 3.2 - Major Highway Design Contract : 16626 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42325153201 Project Description: SR 25/Okeechobee Rd from E of NW 107 Avenue to E of NW 116 Way (Cncrete) Project Manager: QUINTELA, RAUL Estimated Contract Amt: $5,200,000 See Standard Notes Above: 9 Advertisement Date :  26MAY2015 Longlist(Tech. Rev. Cmte.) Date:  26JUN2015 Time:  10:00AM Shortlst Selection Date :  20JUL2015 Time:  10:00AM Scope Meeting Date :  04AUG2015 Time:  02:00PM Final Selection Meeting Date :  14SEP2015 Time:  10:00AM 1st Negotiations Meeting :  09OCT2015 Time:  02:00PM Response Deadline : 08JUN2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 4.1.2 - Minor Bridge Design Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16633 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42611313201 Project Description: NW 34 Avenue Over Comfort Canal (City of Miami) Project Manager: PERDOMO, MARIA I Estimated Contract Amt: $200,000 See Standard Notes Above: 8 Advertisement Date :  10AUG2015 Longlist(Tech. Rev. Cmte.) Date:  10SEP2015 Time:  10:00AM Shortlst Selection Date :  05OCT2015 Time:  10:00AM Scope Meeting Date :  14OCT2015 Time:  02:00PM Final Selection Meeting Date :  23NOV2015 Time:  10:00AM 1st Negotiations Meeting :  04JAN2015 Time:  02:00PM Response Deadline : 21AUG2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 15.0 - Landscape Architect Contract : 16628 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42904733201 Project Description: SR 93/I-75 from NW 148 Street to NW 162 Street Project Manager: HOOSAC, KIRK Estimated Contract Amt: $125,000 See Standard Notes Above: 7 Advertisement Date :  29JUN2015 Longlist(Tech. Rev. Cmte.) Date:  30JUL2015 Time:  10:00AM Shortlst Selection Date :  24AUG2015 Time:  10:00AM Scope Meeting Date :  08SEP2015 Time:  02:00PM Final Selection Meeting Date :  19OCT2015 Time:  10:00AM 1st Negotiations Meeting :  16NOV2015 Time:  02:00PM Response Deadline : 10JUL2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection Contract : 16614 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 43290717201 43290817201 Project Description: Districtwide Local Government In-Depth Bridge Inspection Project Manager: Delgado, Gabriel Maximum Contract Amount: $5,000,000 See Standard Notes Above: 9 Advertisement Date :  13APR2015 Longlist(Tech. Rev. Cmte.) Date:  14MAY2015 Time:  10:00AM Shortlst Selection Date :  08JUN2015 Time:  10:00AM Final Selection Meeting Date :  20JUL2015 Time:  10:00AM 1st Negotiations Meeting :  13AUG2015 Time:  02:00PM Response Deadline : 24APR2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : 6.3.2 - Intelligent Trans Systems Implementation Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies Contract : 16630 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43484532201 Project Description: SR 94/Kendall Drive from SR 997/Krome Avenue to SR 5/South Dixie Hwy Project Manager: JEFFRIES, KENNETH Estimated Contract Amt: $600,000 See Standard Notes Above: 8 Advertisement Date :  06JUL2015 Longlist(Tech. Rev. Cmte.) Date:  06AUG2015 Time:  10:00AM Shortlst Selection Date :  24AUG2015 Time:  10:00AM Scope Meeting Date :  08SEP2015 Time:  02:00PM Final Selection Meeting Date :  19OCT2015 Time:  10:00AM 1st Negotiations Meeting :  23NOV2015 Time:  02:00PM Response Deadline : 17JUL2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies Contract : 16615 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43484552201 Project Description: SR 90/US 41/SW 8 St from SR 997/Krome Avenue to SW 122 Avenue Project Manager: Restrepo, Christopher Estimated Contract Amt: $245,000 See Standard Notes Above: 8 Advertisement Date :  06APR2015 Longlist(Tech. Rev. Cmte.) Date:  07MAY2015 Time:  02:00PM Shortlst Selection Date :  26MAY2015 Time:  02:00PM Scope Meeting Date :  09JUN2015 Time:  11:00AM Final Selection Meeting Date :  20JUL2015 Time:  10:00AM 1st Negotiations Meeting :  17AUG2015 Time:  02:00PM Response Deadline : 17APR2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 6.2 - Traffic Signal Timing Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies Contract : 16659 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43520113202 Project Description: District 6 Districtwide Traffic Signal Systems Retiming Project Project Manager: LEGCEVIC, EVELIN Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Advertisement Date :  01JUN2015 Longlist(Tech. Rev. Cmte.) Date:  02JUL2015 Time:  10:00AM Shortlst Selection Date :  20JUL2015 Time:  10:00AM Final Selection Meeting Date :  14SEP2015 Time:  10:00AM 1st Negotiations Meeting :  09OCT2015 Time:  09:00AM Response Deadline : 12JUN2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 3.3 - Controlled Access Highway Design 4.2.1 - Major Bridge Design - Concrete Minor Work : 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP6 - Traffic Engineering & Operations Studies Contract : 16619 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43576013201 Project Description: SR 826/Palmetto Expy from I-75 to N. Canal C-8 Brdg (Approx 162 St) Project Manager: HUYNH, DAT Estimated Contract Amt: $5,900,000 See Standard Notes Above: 9 Advertisement Date :  20APR2015 Longlist(Tech. Rev. Cmte.) Date:  21MAY2015 Time:  10:00AM Shortlst Selection Date :  08JUN2015 Time:  10:00AM Scope Meeting Date :  22JUN2015 Time:  02:00PM Final Selection Meeting Date :  10AUG2015 Time:  10:00AM 1st Negotiations Meeting :  14SEP2015 Time:  02:00PM Response Deadline : 01MAY2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Michelle Rapaport Phone: (305)470-5112 DISTRICT 6 Major Work : 3.1 - Minor Highway Design Contract : 16622 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43631013201 Project Description: SR 973/SW 87 Avenue from SW 16 Street to SW 4 Street Project Manager: ARVELO, ANA Estimated Contract Amt: $150,000 See Standard Notes Above: 7 Advertisement Date :  01JUN2015 Longlist(Tech. Rev. Cmte.) Date:  02JUL2015 Time:  10:00AM Shortlst Selection Date :  20JUL2015 Time:  10:00AM Scope Meeting Date :  04AUG2015 Time:  02:00PM Final Selection Meeting Date :  14SEP2015 Time:  10:00AM 1st Negotiations Meeting :  12OCT2015 Time:  02:00PM Response Deadline : 12JUN2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Contract : 16617 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43634313201 43634213201 Project Description: SR 90/Killian Parkway from West of Kendale Blvd to SW 97 Avenue SR 990/SW 112 Street from SW 97 Avenue to US 1/S Dixie Highway Project Manager: PULIDO, NATHANIAL Estimated Contract Amt: $600,000 See Standard Notes Above: 9 Advertisement Date :  04MAY2015 Longlist(Tech. Rev. Cmte.) Date:  04JUN2015 Time:  10:00AM Shortlst Selection Date :  22JUN2015 Time:  10:00AM Scope Meeting Date :  02JUL2015 Time:  02:00PM Final Selection Meeting Date :  10AUG2015 Time:  10:00AM 1st Negotiations Meeting :  08SEP2015 Time:  02:00PM Response Deadline : 15MAY2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 3.1 - Minor Highway Design Contract : 16610 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43638513201 Project Description: SR 9/NW 27 Avenue at NW 17th Street Project Manager: BARRERA, JOSE Estimated Contract Amt: $140,000 See Standard Notes Above: 7 Advertisement Date :  20APR2015 Longlist(Tech. Rev. Cmte.) Date:  21MAY2015 Time:  10:00AM Shortlst Selection Date :  08JUN2015 Time:  10:00AM Scope Meeting Date :  25JUN2015 Time:  02:00PM Final Selection Meeting Date :  10AUG2015 Time:  10:00AM 1st Negotiations Meeting :  14SEP2015 Time:  02:00PM Response Deadline : 01MAY2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16608 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43640413201 Project Description: SR 934/E. 25 St. from W. 4 Ave/NW 47 Ave to E 12 Ave/NW 37 Ave Project Manager: PERDOMO, MARIA I Estimated Contract Amt: $293,584 See Standard Notes Above: 8 Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202015-2016/16608%20-%20434404-1-32-01/Advertisem ent/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Additional documents may be found at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202015-2016/16608%20-%20434404-1-32-01/Advertisem ent/ . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Maria Perdomo View proposed scope (Adobe Acrobat® PDF file) Advertisement Date :  02MAR2015 Longlist(Tech. Rev. Cmte.) Date:  02APR2015 Time:  02:00PM Shortlst Selection Date :  20APR2015 Time:  10:00AM Scope Meeting Date :  30APR2015 Time:  11:00AM Final Selection Meeting Date :  08JUN2015 Time:  10:00AM 1st Negotiations Meeting :  06JUL2015 Time:  02:00PM Response Deadline : 13MAR2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 4.2.3 - Major Bridge Design - Segmental Minor Work : 5.1 - Conventional Bridge Inspection Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16611 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43652313201 Project Description: SR 5/Overseas Highway Over Channel 5 Bridge #900098 Project Manager: Delgado, Gabriel Estimated Contract Amt: $400,000 See Standard Notes Above: 8 Advertisement Date :  30MAR2015 Longlist(Tech. Rev. Cmte.) Date:  30APR2015 Time:  10:00AM Shortlst Selection Date :  26MAY2015 Time:  02:00PM Scope Meeting Date :  10JUN2015 Time:  02:00PM Final Selection Meeting Date :  20JUL2015 Time:  10:00AM 1st Negotiations Meeting :  14AUG2015 Time:  09:00AM Response Deadline : 10APR2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 6 Major Work : 4.4 - Movable Span Bridge Design Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16627 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43652513201 Project Description: SR 826/Palmetto Expwy over Intracoastal Canal Bridges 870, 592, 870593 Project Manager: NUNEZ, PEDRO Estimated Contract Amt: $384,000 See Standard Notes Above: 8 Advertisement Date :  11MAY2015 Longlist(Tech. Rev. Cmte.) Date:  11JUN2015 Time:  10:00AM Shortlst Selection Date :  06JUL2015 Time:  10:00AM Scope Meeting Date :  20JUL2015 Time:  02:00PM Final Selection Meeting Date :  24AUG2015 Time:  10:00AM 1st Negotiations Meeting :  23SEP2015 Time:  02:00PM Response Deadline : 22MAY2015 Respond To: d6.profserv@dot.state.fl.us Attn.: Tiondra Wright Phone: (305)470-5403 DISTRICT 7 Major Work : 8.1 - Control Surveying Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Contract : 16731 Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Project Description: 16731, TBD, Survey Support Services - Continuing Contract 1 16732, TBD, Survey Support Services - Continuing Contract2 Project Manager: Parnes, Alex Maximum Contract Amount: $5,000,000 See Standard Notes Above: 9 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  03AUG2015 Longlist(Tech. Rev. Cmte.) Date:  25AUG2015 Time:  9:00 AM Shortlst Selection Date :  08SEP2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  12OCT2015 Time:  3:00 PM Final Selection Meeting Date :  27OCT2015 Time:  1:30 PM Response Deadline : 14AUG2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Toni Loyd Phone: 813-975-6414 DISTRICT 7 Major Work : Contract : 16732 Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Project Description: Survey Support Services - Continuing Contract 2 Project Manager: Parnes, Alex Maximum Contract Amount: $5,000,000 See Standard Notes Above: 9 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  03AUG2015 Longlist(Tech. Rev. Cmte.) Date:  25AUG2015 Time:  9:00 AM Shortlst Selection Date :  08SEP2015 Time:  1:30 PM Final Selection Meeting Date :  27OCT2015 Time:  1:30 PM Response Deadline : 14AUG2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Toni Loyd Phone: 813-975-6414 DISTRICT 7 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16743 Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Project Description: Pre/Post Disaster Debri Monitor CEI - Continuing Project Manager: Hensley, Terry Maximum Contract Amount: $5,000,000 See Standard Notes Above: 8 Advertisement Date :  13APR2015 Longlist(Tech. Rev. Cmte.) Date:  29APR2015 Time:  10:30AM Shortlst Selection Date :  12MAY2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  17JUN2015 Time:  1:00 PM Final Selection Meeting Date :  30JUN2015 Time:  1:30 PM Response Deadline : 24APR2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Dave Bouffard Phone: 813-975-6628 DISTRICT 7 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Contract : 16740 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25455313294 Project Description: District Wide Safety and Minor Design Project Manager: Benson, Stephen L Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  13JUL2015 Longlist(Tech. Rev. Cmte.) Date:  11AUG2015 Time:  10:00AM Shortlst Selection Date :  25AUG2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  29SEP2015 Time:  10:00AM Final Selection Meeting Date :  13OCT2015 Time:  1:30 PM Response Deadline : 24JUL2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 99.0 - Other Professional Services Contract : 16736 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25458413209 Project Description: District Wide Consultant Support for Utility Systems Relocation. Project Manager: CORNWELL, KATASHA Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  03AUG2015 Longlist(Tech. Rev. Cmte.) Date:  25AUG2015 Time:  1:30 PM Shortlst Selection Date :  08SEP2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  20OCT2015 Time:  3:00 PM Final Selection Meeting Date :  27OCT2015 Time:  1:30 PM Response Deadline : 14AUG2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 8.1 - Control Surveying Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Contract : 16737 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25458433204 Project Description: DW Consultant Support for SUE Project Manager: CORNWELL, KATASHA Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  26OCT2015 Longlist(Tech. Rev. Cmte.) Date:  16NOV2015 Time:  8:30 AM Shortlst Selection Date :  08DEC2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  25JAN2016 Time:  2:00 PM Final Selection Meeting Date :  09FEB2016 Time:  1:30 PM Response Deadline : 06NOV2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16739 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25465313216 Project Description: District Wide Minor Traffic Engineering Design Project Manager: Parman, William Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform all major and minor work types. Also include the qualifications and locations of all key staff members. Indicate how many project teams could be assigned to support this contract and how many simultaneous tasks your firm(s) can manage. Include a brief description of recent, relevant past work experience in all major work types. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. All questions of any nature regarding this advertisement, including this project's scope of services, should be addressed to the Contract Administrator, Jose Vazquez at 813-975-6453. ************************************************************ The Technical Review Committee for this project will be: William Parman, Rochelle Garrett, and Mark Mathes. The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Date :  02MAR2015 Longlist(Tech. Rev. Cmte.) Date:  01APR2015 Time:  3:00 PM Shortlst Selection Date :  14APR2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  14MAY2015 Time:  1:00 PM Final Selection Meeting Date :  26MAY2015 Time:  1:30 PM Response Deadline : 13MAR2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16719 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 25624326201 Project Description: SR 52 (Schrader Hwy) from CR 581 (Bellamy Bro) to East of Old Pasco Rd. Project Manager: Hoover, Dave Est. Construction Cost: $1,350,000 See Standard Notes Above: 7 Advertisement Date :  04SEP2015 Longlist(Tech. Rev. Cmte.) Date:  29SEP2015 Time:  9:00AM Shortlst Selection Date :  13OCT2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  28OCT2015 Time:  2:00 PM Final Selection Meeting Date :  10NOV2015 Time:  1:30 PM 1st Negotiations Meeting :  01DEC2015 Time:  9:00 AM Response Deadline : 18SEP2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Dave Bouffard Phone: 813-975-6628 DISTRICT 7 Major Work : 13.3 - Policy Planning Minor Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP13 - Planning Contract : 16706 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25910911224 Project Description: Corridor, Subarea and Special Transportation Studies - Continuing Project Manager: LAMB, DANNY R Maximum Contract Amount: $3,000,000 See Standard Notes Above: 8 Advertisement Date :  30MAR2015 Longlist(Tech. Rev. Cmte.) Date:  28APR2015 Time:  9:00 AM Shortlst Selection Date :  12MAY2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  18JUN2015 Time:  1:00 PM Final Selection Meeting Date :  30JUN2015 Time:  1:30 PM Response Deadline : 10APR2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 13.7 - Transportation Statistics Contract : 16738 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25911711224 Project Description: District Seven Traffic Statistics Program - Continuing Project Manager: LAMB, DANNY R Maximum Contract Amount: $2,000,000 See Standard Notes Above: 9 Advertisement Date :  01JUN2015 Longlist(Tech. Rev. Cmte.) Date:  22JUN2015 Time:  9:00 AM Shortlst Selection Date :  30JUN2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  29JUL2015 Time:  1:00 PM Final Selection Meeting Date :  11AUG2015 Time:  1:30 PM Response Deadline : 12JUN2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Alundra Gibbs Phone: 813-975-6469 DISTRICT 7 Major Work : 4.2.1 - Major Bridge Design - Concrete Minor Work : 4.4 - Movable Span Bridge Design 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.4 - Bridge Load Rating Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16741 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41259313210 Project Description: 16741, FPN: 412593 1 32 10, DW Bridge Engineering Support - Contract 1. ************************************************************ 16744, FPN: 412593 1 32 11, DW Bridge Engineering Support - Contract 2. Project Manager: Pye, Bronoris Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Multiple contracts may be awarded from this advertisement.
Special Notes: *******MULTIPLE CONTRACTS WILL BE SELECTED****************** Advertisement Date :  27APR2015 Longlist(Tech. Rev. Cmte.) Date:  27MAY2015 Time:  3:00 PM Shortlst Selection Date :  09JUN2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  16JUL2015 Time:  1:00 PM Final Selection Meeting Date :  28JUL2015 Time:  1:30 PM Response Deadline : 08MAY2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 4.2.1 - Major Bridge Design - Concrete Minor Work : 4.4 - Movable Span Bridge Design 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.4 - Bridge Load Rating Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Contract : 16744 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41295313211 Project Description: 15741, FPN: 412593 1 32 10, DW Bridge Engineering Support - Contract 1. ************************************************************ 15744, FPN: 412593 1 32 11, DW Bridge Engineering Support - Contract 2. Project Manager: Pye, Bronoris Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Multiple contracts may be awarded from this advertisement.
Special Notes: *******MULTIPLE CONTRACTS WILL BE SELECTED****************** Advertisement Date :  27APR2015 Longlist(Tech. Rev. Cmte.) Date:  27MAY2015 Time:  3:00 PM Shortlst Selection Date :  09JUN2015 Time:  1:30 PM Scope Meeting Date :  16JUN2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  16JUL2015 Time:  1:00 PM Final Selection Meeting Date :  28JUL2015 Time:  1:30 PM Response Deadline : 08MAY2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 3.2 - Major Highway Design Contract : 16733 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41498113205 Project Description: 16733, FPN: 414981 1 32 05, Stormwater Program Management - Continuing Contract #1 16734, FPN: 414981 1 32 06, Stormwater Program Management - Continuing Contract #2 Project Manager: LAMB, DANNY R Maximum Contract Amount: $1,000,000 See Standard Notes Above: 9 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  05OCT2015 Longlist(Tech. Rev. Cmte.) Date:  28OCT2015 Time:  9:00 AM Shortlst Selection Date :  10NOV2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  28DEC2015 Time:  3:00 PM Final Selection Meeting Date :  12JAN2016 Time:  1:30 PM Response Deadline : 16OCT2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Toni Loyd Phone: 813-975-6414 DISTRICT 7 Major Work : 3.2 - Major Highway Design Contract : 16734 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41498113206 Project Description: Stormwater Program Management - Continuing Contract #2 Project Manager: LAMB, DANNY R Maximum Contract Amount: $1,000,000 See Standard Notes Above: 9 Multiple contracts may be awarded from this advertisement.
Advertisement Date :  05OCT2015 Longlist(Tech. Rev. Cmte.) Date:  28OCT2015 Time:  9:00 AM Shortlst Selection Date :  10NOV2015 Time:  1:30 PM Final Selection Meeting Date :  12JAN2016 Time:  1:30 PM Response Deadline : 16OCT2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Toni Loyd Phone: 813-975-6414 DISTRICT 7 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16729 Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 41548936201 Project Description: US 301 (SR 43) from SR 674/Sun City Ctr Bl to CR 672/Balm Rd Project Manager: Chin, Melissa Est. Construction Cost: $3,005,000 See Standard Notes Above: 8 Advertisement Date :  30NOV2015 Longlist(Tech. Rev. Cmte.) Date:  28JAN2016 Time:  9:00 AM Shortlst Selection Date :  09FEB2016 Time:  1:30 PM Tech. Rev. Cmte Meeting :  09MAR2016 Time:  9:00 AM Final Selection Meeting Date :  29MAR2016 Time:  1:30 PM 1st Negotiations Meeting :  12APR2016 Time:  8:00 AM Response Deadline : 18DEC2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Dave Bouffard Phone: 813-975-6628 DISTRICT 7 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Contract : 16725 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41656126201 Project Description: SR 54 from CR 577/Curley Rd to CR 579/Morris Bridge Rd Project Manager: Hoover, Dave Est. Construction Cost: $2,460,000 See Standard Notes Above: 8 Advertisement Date :  02NOV2015 Longlist(Tech. Rev. Cmte.) Date:  10DEC2015 Time:  9:00 AM Shortlst Selection Date :  12JAN2016 Time:  1:30 PM Tech. Rev. Cmte Meeting :  09FEB2016 Time:  9:00 AM Final Selection Meeting Date :  23FEB2016 Time:  1:30 PM Response Deadline : 13NOV2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Dave Bouffard Phone: 813-975-6628 DISTRICT 7 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16728 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42895513201 Project Description: I-75 (SR 93A) & SR 60 from S of SR 60 @ Slip Ramp to N of SR 60 at CSX Ramp Project Manager: Neidringhaus, Amy Estimated Contract Amt: $1,275,000 See Standard Notes Above: 8 Advertisement Date :  07DEC2015 Longlist(Tech. Rev. Cmte.) Date:  27JAN2016 Time:  3:00 PM Shortlst Selection Date :  09FEB2016 Time:  1:30 PM Tech. Rev. Cmte Meeting :  16MAR2016 Time:  1:00 PM Final Selection Meeting Date :  29MAR2016 Time:  1:30 PM 1st Negotiations Meeting :  14APR2016 Time:  9:00 AM Response Deadline : 18DEC2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Rayesha Cotton Phone: 813-975-6656 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16707 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43258413201 Project Description: SR 600/US 92/Hillsborough Ave from W of N Miami Ave to E of SR 583/N 56th St Project Manager: SANTOS, MANUEL Estimated Contract Amt: $1,240,000 See Standard Notes Above: 8 Advertisement Date :  09MAR2015 Longlist(Tech. Rev. Cmte.) Date:  07APR2015 Time:  11:00AM Shortlst Selection Date :  14APR2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  20MAY2015 Time:  1:00 PM Final Selection Meeting Date :  09JUN2015 Time:  1:30 PM 1st Negotiations Meeting :  23JUN2015 Time:  9:00 AM Response Deadline : 20MAR2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Dave Bouffard Phone: 813-975-6628 DISTRICT 7 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16716 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43379613201 Project Description: US 19 (SR 55) from S of Timberlake Rd to S of Lake St. Project Manager: SHEETS, MARY Estimated Contract Amt: $9,900,000 See Standard Notes Above: 8 Advertisement Date :  27JUL2015 Longlist(Tech. Rev. Cmte.) Date:  26AUG2015 Time:  10:00AM Shortlst Selection Date :  08SEP2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  13OCT2015 Time:  2:00 PM Final Selection Meeting Date :  27OCT2015 Time:  1:30 PM 1st Negotiations Meeting :  11NOV2015 Time:  9:00 AM Response Deadline : 07AUG2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Alundra Gibbs Phone: 813-975-6469 DISTRICT 7 Major Work : Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16721 Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43379713201 Project Description: US 19 (SR 55) from N of Nebraska Ave to S of Timberlane Rd. Project Manager: SHEETS, MARY Estimated Contract Amt: $7,283,000 See Standard Notes Above: 8 Advertisement Date :  19OCT2015 Longlist(Tech. Rev. Cmte.) Date:  12NOV2015 Time:  10:00AM Shortlst Selection Date :  24NOV2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  29DEC2015 Time:  2:00 PM Final Selection Meeting Date :  12JAN2016 Time:  1:30 PM 1st Negotiations Meeting :  27JAN2016 Time:  9:00 AM Response Deadline : 30OCT2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Rebecca L. Schwarz Phone: 813-975-6461 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16709 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43473013201 Project Description: USB 41/SR 685 from N of Linebaugh Ave to N of Fletcher Ave. Project Manager: SANTOS, MANUEL Estimated Contract Amt: $933,000 See Standard Notes Above: 7 Advertisement Date :  06APR2015 Longlist(Tech. Rev. Cmte.) Date:  05MAY2015 Time:  9:00 AM Shortlst Selection Date :  12MAY2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  16JUN2015 Time:  1:00 PM Final Selection Meeting Date :  30JUN2015 Time:  1:30 PM 1st Negotiations Meeting :  14JUL2015 Time:  9:00 AM Response Deadline : 17APR2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Alundra Gibbs Phone: 813-975-6469 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16708 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43480613201 Project Description: SR 693/S Pasadena Ave from SR 699/Blind Pass Rd to Park St. Project Manager: Lee, Kevin I Estimated Contract Amt: $774,000 See Standard Notes Above: 8 Advertisement Date :  09MAR2015 Longlist(Tech. Rev. Cmte.) Date:  01APR2015 Time:  10:00AM Shortlst Selection Date :  14APR2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  21MAY2015 Time:  1:00 PM Final Selection Meeting Date :  09JUN2015 Time:  1:30 PM 1st Negotiations Meeting :  24JUN2015 Time:  9:00 AM Response Deadline : 20MAR2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Rayesha Cotton Phone: 813-975-6656 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16711 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43483913201 Project Description: SR 682/54th Ave S from US 19 (SR 55) to 41st St S Project Manager: Ratnayake, Liyanage I Estimated Contract Amt: $380,000 See Standard Notes Above: 7 Advertisement Date :  27APR2015 Longlist(Tech. Rev. Cmte.) Date:  27MAY2015 Time:  2:00 PM Shortlst Selection Date :  09JUN2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  15JUL2015 Time:  1:00 PM Final Selection Meeting Date :  28JUL2015 Time:  1:30 PM 1st Negotiations Meeting :  12AUG2015 Time:  9:00 AM Response Deadline : 08MAY2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Michele Turosz Phone: 813-975-6417 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16730 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43484813201 Project Description: US 41/SR 45 from S of Bullfrog Creek to Denver Street Project Manager: Cormier, Pia M Estimated Contract Amt: $1,820,000 See Standard Notes Above: 8 Advertisement Date :  08JUN2015 Longlist(Tech. Rev. Cmte.) Date:  29JUN2015 Time:  9:00 AM Shortlst Selection Date :  14JUL2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  11AUG2015 Time:  1:00 PM Final Selection Meeting Date :  25AUG2015 Time:  1:30 PM 1st Negotiations Meeting :  10SEP2015 Time:  9:00 AM Response Deadline : 19JUN2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Rayesha Cotton Phone: 813-975-6656 DISTRICT 7 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Contract : 16713 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43591412201 Project Description: US 19 from 70th Ave to SR 590/118th Ave. Project Manager: Hall, Sara E Maximum Contract Amount: $1,000,000 See Standard Notes Above: 8 Advertisement Date :  29JUN2015 Longlist(Tech. Rev. Cmte.) Date:  29JUL2015 Time:  9:00 AM Shortlst Selection Date :  11AUG2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  14SEP2015 Time:  1:00 PM Final Selection Meeting Date :  29SEP2015 Time:  1:30 PM 1st Negotiations Meeting :  13OCT2015 Time:  9:00 AM Response Deadline : 10JUL2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Rayesha Cotton Phone: 813-975-6656 DISTRICT 7 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Contract : 16717 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43591812201 Project Description: US 41 PD&E Study from Manatee Co Line to US 674 Project Manager: Pierce, Stephanie Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Advertisement Date :  14SEP2015 Longlist(Tech. Rev. Cmte.) Date:  14OCT2015 Time:  9:00 AM Shortlst Selection Date :  27OCT2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  18NOV2015 Time:  1:00 PM Final Selection Meeting Date :  08DEC2015 Time:  1:30 PM 1st Negotiations Meeting :  17DEC2015 Time:  9:00 AM Response Deadline : 25SEP2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Rayesha Cotton Phone: 813-975-6656 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16726 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43642013201 Project Description: US 92/SR 39/SR 600 from W of N Mobley to N Howard St Project Manager: Schneider, Henry J Estimated Contract Amt: $506,000 See Standard Notes Above: 7 Advertisement Date :  21DEC2015 Longlist(Tech. Rev. Cmte.) Date:  25JAN2016 Time:  9:00 AM Shortlst Selection Date :  09FEB2016 Time:  1:30PM Tech. Rev. Cmte Meeting :  17MAR2016 Time:  1:00 PM Final Selection Meeting Date :  29MAR2016 Time:  1:30 PM 1st Negotiations Meeting :  12APR2016 Time:  9:00 AM Response Deadline : 08JAN2016 Respond To: d7.profserv@dot.state.fl.us Attn.: Alundra Gibbs Phone: 813-975-6469 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16727 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43648613201 Project Description: SR 586/Curlew Rd from E of Fisher Rd to W of Tally Dr/69th St Project Manager: Schneider, Henry J Estimated Contract Amt: $299,000 See Standard Notes Above: 7 Advertisement Date :  21DEC2015 Longlist(Tech. Rev. Cmte.) Date:  27JAN2016 Time:  2:00 PM Shortlst Selection Date :  09FEB2016 Time:  1:30 PM Tech. Rev. Cmte Meeting :  15MAR2016 Time:  1:00 PM Final Selection Meeting Date :  29MAR2016 Time:  1:30 PM 1st Negotiations Meeting :  13APR2016 Time:  9:00 AM Response Deadline : 08JAN2016 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16718 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43649113201 Project Description: SR 60/E Kennedy Blvd from N Nebraska Ave to N Ashley St. Project Manager: Ratnayake, Liyanage I Estimated Contract Amt: $322,000 See Standard Notes Above: 7 Advertisement Date :  14SEP2015 Longlist(Tech. Rev. Cmte.) Date:  19OCT2015 Time:  9:00 AM Shortlst Selection Date :  27OCT2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  19NOV2015 Time:  1:00 PM Final Selection Meeting Date :  08DEC2015 Time:  1:30 PM 1st Negotiations Meeting :  21DEC2015 Time:  9:00 AM Response Deadline : 25SEP2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Alundra Gibbs Phone: 813-975-6469 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16720 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43649413201 Project Description: US 92/SR 600/Dale Mabry from S of McKay Ave. Project Manager: Xie, Charlie I Estimated Contract Amt: $539,000 See Standard Notes Above: 8 Advertisement Date :  19OCT2015 Longlist(Tech. Rev. Cmte.) Date:  12NOV2015 Time:  9:00 AM Shortlst Selection Date :  24NOV2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  29DEC2015 Time:  1:00 PM Final Selection Meeting Date :  12JAN2016 Time:  1:30 PM 1st Negotiations Meeting :  26JAN2016 Time:  9:00 AM Response Deadline : 30OCT2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP10 - Rdwy Construction Engineering Inspection GROUP13 - Planning Contract : 16722 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43649513201 Project Description: SR 674/Sun City Center from E of Commercial Ctr Dr to E of US 301/SR 43 Project Manager: Boulnois, Christina F Estimated Contract Amt: $803,000 See Standard Notes Above: 8 Advertisement Date :  26OCT2015 Longlist(Tech. Rev. Cmte.) Date:  24NOV2015 Time:  10:00AM Shortlst Selection Date :  08DEC2015 Time:  1:30 PM Tech. Rev. Cmte Meeting :  13JAN2016 Time:  1:00 PM Final Selection Meeting Date :  26JAN2016 Time:  1:30 PM 1st Negotiations Meeting :  10FEB2016 Time:  9:00 AM Response Deadline : 06NOV2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Dave Bouffard Phone: 813-975-6628 DISTRICT 7 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Contract : 16723 Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43658813201 Project Description: I-4/SR 400 from E of 50th St to E of McIntosh Project Manager: Neidringhaus, Amy Estimated Contract Amt: $1,069,000 See Standard Notes Above: 8 Advertisement Date :  02NOV2015 Longlist(Tech. Rev. Cmte.) Date:  08DEC2015 Time:  9:00 AM Shortlst Selection Date :  12JAN2016 Time:  1:30 PM Tech. Rev. Cmte Meeting :  23FEB2016 Time:  1:00 PM Final Selection Meeting Date :  08MAR2016 Time:  1:30 PM 1st Negotiations Meeting :  22MAR2016 Time:  9:00 AM Response Deadline : 13NOV2015 Respond To: d7.profserv@dot.state.fl.us Attn.: Rayesha Cotton Phone: 813-975-6656 TURNPIKE Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design Minor Work : 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP6 - Traffic Engineering & Operations Studies GROUP9 - Soil Exploration, Materials Testing Contract : 15832 Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Project Description: District Wide Intelligent Transportation Systems (ITS) Design Services. Estimated Contract Amt: $5,000,000 See Standard Notes Above: 8 Special Notes: Contact: John Easterling, FTE Traffic Operations Engineer (954) 934-1620. ** The Turnpike will be holding a 2-hour Pre-advertisement Informational Meeting for firms interested in pursuing this contract. FTE's Technical Review Committee (TRC) will provide a brief description of the contract expectations and specifics (15 minutes); the remainder of time will allow firms to inquire about the contract, meet and ask questions of the Department's staff and members of the TRC (Kathy Alexander, John Easterling, Nick Bowman). The following date has been reserved for this meeting: Tuesday, March 3, 2015 from 9:00 A.M. to 11:00 A.M. Firms interested in attending should contact Brianna Miller at 407-264-3835 or email Brianna.miller@dot.state.fl.us. Attendance at Pre-advertisement Informational Meeting is not mandatory to submit a Letter of Response. Advertisement Date :  09MAR2015 Longlist(Tech. Rev. Cmte.) Date:  01APR2015 Time:  01:00PM Shortlst Selection Date :  13APR2015 Time:  11:30AM Scope Meeting Date :  21APR2015 Time:  08:00AM Final Selection Meeting Date :  27MAY2015 Time:  01:30PM Response Deadline : 20MAR2015 Respond To: tp.profserv@dot.state.fl.us Attn.: Deborah Goodness Phone: 407-264-3810 TURNPIKE Major Work : 5.1 - Conventional Bridge Inspection Minor Work : 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating Contract : 15829 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 19235717201 Project Description: Structures Inspection - South. *** **Special Notes** Project manager: Ademola Adelekan (954) 934-1224 *** Structure Inspection on Florida's Turnpike from Milepost (MP) Zero to 200 and MP 0X to 3.42X and the Sawgrass Expressway. Structures include bridges, overhead sign structures, high mast light poles and large non-qualifying culverts. The contract term is two (2) years. The firms interested in pursuing this project shall be required to submit a two-page Letter of Response. Project Manager: Adelekan, Ademola Estimated Contract Amt: $2,200,000 See Standard Notes Above: 9 Advertisement Date :  09MAR2015 Longlist(Tech. Rev. Cmte.) Date:  13APR2015 Time:  10:00AM Shortlst Selection Date :  20APR2015 Time:  10:00AM Scope Meeting Date :  29APR2015 Time:  02:00PM Final Selection Meeting Date :  05JUN2015 Time:  01:30PM Response Deadline : 23MAR2015 Respond To: tp.profserv@dot.state.fl.us Attn.: Deborah Goodness Phone: 407-264-3810 TURNPIKE Major Work : 5.1 - Conventional Bridge Inspection Minor Work : 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating Contract : 15828 Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 19269317201 Project Description: Structures Inspection - North. *** ** Special Notes** Project Manager: Ademola Adelekan (954) 934-1224 *** Structure Inspection on Florida's Turnpike from Milepost (MP) 200 to Northern Terminus, the Beachline, Seminole Expressway, Southern Connector, Western Beltway, Polk Parkway, Veteran's Expressway and Suncoast Parkway. Structures includes bridges, overhead sign structures, high mast light poles and large non-qualifying culverts. The contract term is two (2) years. The firms interested in pursuing this project shall be required to submit a two-page Letter of Response. Project Manager: Adelekan, Ademola Estimated Contract Amt: $1,800,000 See Standard Notes Above: 9 Advertisement Date :  09MAR2015 Longlist(Tech. Rev. Cmte.) Date:  13APR2015 Time:  11:00AM Shortlst Selection Date :  20APR2015 Time:  10:30AM Scope Meeting Date :  29APR2015 Time:  01:00PM Final Selection Meeting Date :  05JUN2015 Time:  01:00PM Response Deadline : 23MAR2015 Respond To: tp.profserv@dot.state.fl.us Attn.: Deborah Goodness Phone: 407-264-3810 CENTRAL OFFICE Major Work : 99.0 - Other Professional Services Minor Work : 13.4 - Systems Planning Under-Utilized Work Groups: GROUP13 - Planning Contract : 16903 Selection Procedure: LOR and Abbreviated Technical Proposal Project Description: Aviation General Consultant The Department requires the services of a consultant for a wide range of aviation related services to support the aviation and Spaceports Office. The consultant will be required to perform planning, environmental, emergency response, security, and technical analysis and services related to statewide aviation system, and airports. The consultant will also be required to have expertise in reviewing the financial portions of Airport Master Plans and Airport Feasibility Studies. The consultant will establish and conduct internal quality assurance and quality control practices for all projects. Project Manager: Keith, Andy Maximum Contract Amount: $5,000,000 See Standard Notes Above: 1,8 Multiple contracts may be awarded from this advertisement.
Special Notes: Please see standard notes 1 and 8 above. View proposed scope (Adobe Acrobat® PDF file) Advertisement Date :  02MAR2015 Longlist(Tech. Rev. Cmte.) Date:  26MAR2015 Time:  10:00AM Shortlst Selection Date :  01APR2015 Time:  10:00AM Scope Meeting Date :  09APR2015 Time:  10:00AM Tech. Rev. Cmte Meeting :  29APR2015 Time:  10:00AM Final Selection Meeting Date :  08MAY2015 Time:  1:00PM Response Deadline : 16MAR2015 Respond To: co.profserv@dot.state.fl.us Attn.: Laura Thomas Phone: (850) 414-4288
 
 
  Back to Top