All(Work Plan, Advertised, Results) Projects
 
Click Here to go to myFlorida.com   Link to the Florida Department of Transportation home page
 
 
 
PROCUREMENT OFFICE
All (Work Plan, Advertised, Results) Projects

Procurement Office Home Page
 
 

Pursuant to Section 120.57(3), Florida Statutes, and Rule Chapter 28-110, Florida Administrative Code, any person adversely affected by the agency decision or intended decision shall file with the agency both a notice of protest in writing and bond within 72 hours after the posting of the notice of decision or intended decision, or posting of the solicitation with respect to a protest of the terms, conditions, and specifications contained in a solicitation and will file a formal written protest within ten days after the filing of the notice of protest. The required notice of protest and bond, and formal written protest must each be timely filed with the Florida Department of Transportation, Clerk of Agency Proceedings, 605 Suwannee St, Mail Station 58, Tallahassee FL 32399-0458. Failure to file a notice of protest or formal written protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes.

 
 
All Professional Services and All Design/Build Advertisements:
This web page provides detailed information, including public meeting schedules on professional services and design/build projects in all stages in the acquisition process including planned, current(new), shortlist, and final selection results. Changes to meeting dates and times will be displayed on this page.
 
 
District: 1 2 3 4 5 6 7 Turnpike Central Office
 
Updated: Saturday July 21 2018  

 
 
 
DISTRICT 1    

************************************************************
Professional Services Consultant Projects

Contract Number         : 19114  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Oral Presentation   
Financial Management Number(s):
  44251211201 44251222201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  6.1    - Traffic Engineering Studies
  13.4   - Systems Planning
  13.5   - Subarea/Corridor Planning
Minor Work   :
Project Description:
  44251211201: I-4 (SR 400) FROM W OF SR 570 (POLK PARKWAY)
  TO W OF US 27 INTERCHANGE
  44251222201: I-4 (SR 400) FROM W OF SR 570 (POLK PARKWAY)
  TO W OF US 27 INTERCHANGE
Project Manager    : JESTER, JOSH
Contract Amount/Limit:   $7,000,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 9

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and
  availability of funds.
  ------------------------------------------------------------
  The major and minor types of work will be updated at a
  later time. Please be sure to check back for updates.
  ------------------------------------------------------------
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us. Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  Consultant questions and answers have been placed on the
  FTP and will be updated as necessary.
  ************************************************************
  TRC members are subject to change.
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2444.



Advertisement Status           : Planned
Date of Advertisement          :  14FEB2019
Longlist(Tech. Rev. Cmte.) Date:  14MAR2019  Time:  01:30PM
Shortlist Selection Date       :  21MAR2019  Time:  10:00AM
Scope Meeting Date             :  29MAR2019  Time:  09:15AM
Tech. Rev. Cmte Meeting Date   :  16APR2019  Time:  02:45PM
Final Selection Meeting Date   :  02MAY2019  Time:  10:00AM
1st Date Negotiations Meetings :  06JUN2019  Time:  09:00AM


                                                            
************************************************************

Contract Number         : 19123  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Oral Presentation   
Financial Management Number(s):
  43372623201
Major Work   :
  3.2    - Major Highway Design
Minor Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  4.1.1  - Miscellaneous Structures
  4.1.2  - Minor Bridge Design
  4.2.1  - Major Bridge Design - Concrete
  5.4    - Bridge Load Rating
  6.1    - Traffic Engineering Studies
  6.2    - Traffic Signal Timing
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
  15.0   - Landscape Architect
Under-Utilized Work Groups:
  GROUP3  - Highway Design - Roadway
  GROUP4  - Highway Design - Bridge
  GROUP7  - Traffic Operations Design
  GROUP9  - Soil Exploration, Materials Testing

Project Description:
  SR 865 (SAN CARLOS) FROM ESTERO BLVD TO CR 869
  (SUMMERLIN RD)
Project Manager    : Breuggeman, Walter
Contract Amount/Limit:   $3,500,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 8

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and
  availability of funds.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us. Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2444.
  ************************************************************
  TRC members are subject to change.



Advertisement Status           : Planned
Date of Advertisement          :  14JAN2019
Longlist(Tech. Rev. Cmte.) Date:  12FEB2019  Time:  9:00AM
Shortlist Selection Date       :  19FEB2019  Time:  10:00AM
Scope Meeting Date             :  28FEB2019  Time:  9:30AM
Tech. Rev. Cmte Meeting Date   :  19MAR2019  Time:  2:45PM
Final Selection Meeting Date   :  04APR2019  Time:  10:00AM
1st Date Negotiations Meetings :  29APR2019  Time:  9:00AM


                                                            
************************************************************

Contract Number         : 19144  Technically Prequalified & Unlimited Audit required
Selection Method   : Selection from Expanded Letter of Response 
Financial Management Number(s):
  43614616202
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
  10.3   - Construction Materials Inspection
  10.4   - Minor Bridge & Misc. Structures(CEI)
  10.5.1 - Major Bridge(CEI) - Concrete
  10.5.2 - Major Bridge(CEI) - Steel
  10.5.3 - Major Bridge(CEI) - Segmental
  10.6.1 - Complex Bridge(CEI) - Concrete
  10.6.2 - Complex Bridge(CEI) - Steel
  10.7   - Movable Span Bridge(CEI)
  11.0   - Eng Contract Admin and Management
Under-Utilized Work Groups:
  GROUP10  - Rdwy Construction Engineering Inspection

Project Description:
  DISTRICT MAINTENANCE AREA WIDE SUPPORT
Project Manager    : Perez, Amarilys
Contract Amount/Limit:   $5,000,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 4,8,10

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  **********************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us.  Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  **********************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2440.
  **********************************************************
  TRC members are subject to change.
  - Resumes for all proposed staff are required as an
  addendum to the Letter of Interest and must include
  TINS and CTQP printouts, project
  dates, and updated work references, including
  names and telephone numbers.
  - The Technical Review Committee (TRC) members
  for the project will be Amarylis Alfonso-Perez, Sharon
  Harris, and Melody Joyner.  TRC Members are subject
  to change, according to availability.
  Area being Evaluated:
  Awareness of/Approach to Project Issues (0-35)
  A. Understanding of the Scope of the Project (0-15)
  B. Identification of Unique Project Issues (0-15)
  C. Best or Value Added (0-5)
  Proposed Staffing (0-55)
  A. Quantity Proposed (0-10)
  B. Availability of Staff (0-10)
  C. Qualifications/Certifications of Staff (0-10)
  D. Quality/Experience on Similar Projects (0-12)
  E. Team's Past Performance on Similar Projects (0-13)
  Other Considerations (0-10)
  A. Communication Abilities (0-5)
  B. Commitment to Satisfy the Department's Needs (0-5)



Advertisement Status           : Planned
Date of Advertisement          :  07JAN2019
Longlist(Tech. Rev. Cmte.) Date:  11FEB2019  Time:  01:30PM
Shortlist Selection Date       :  19FEB2019  Time:  10:00AM
Final Selection Meeting Date   :  07MAR2019  Time:  10:00AM


                                                            
************************************************************

Contract Number         : 19120  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Oral Presentation   
Financial Management Number(s):
  41754053201
Major Work   :
  3.2    - Major Highway Design
Minor Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  4.1.1  - Miscellaneous Structures
  4.1.2  - Minor Bridge Design
  6.1    - Traffic Engineering Studies
  6.2    - Traffic Signal Timing
  6.3.1  - Intelligent Trans Sys. Analysis & Design
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
  9.3    - Highway Materials Testing
  9.5    - Geotechnical Speciality Lab Testing
Under-Utilized Work Groups:
  GROUP3  - Highway Design - Roadway
  GROUP4  - Highway Design - Bridge
  GROUP7  - Traffic Operations Design
  GROUP9  - Soil Exploration, Materials Testing

Project Description:
  SR 29 FROM CR 846 E TO N OF NEW MARKET ROAD N
Project Manager    : Blair, Amy
Contract Amount/Limit:   $6,000,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 8

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us.  Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  Consultant questions and answers have been placed on the
  FTP and will be updated as necessary.
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2440.
  ************************************************************
  TRC members are subject to change.



Advertisement Status           : Planned
Date of Advertisement          :  03DEC2018
Longlist(Tech. Rev. Cmte.) Date:  08JAN2019  Time:  08:30AM
Shortlist Selection Date       :  15JAN2019  Time:  10:00AM
Scope Meeting Date             :  24JAN2019  Time:  09:15AM
Tech. Rev. Cmte Meeting Date   :  12FEB2019  Time:  02:45PM
Final Selection Meeting Date   :  07MAR2019  Time:  10:00AM
1st Date Negotiations Meetings :  04APR2019  Time:  09:00AM


                                                            
************************************************************

Contract Number         : 19141  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Oral Presentation   
Financial Management Number(s):
  44027312201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
Minor Work   :
  3.1    - Minor Highway Design
  3.2    - Major Highway Design
  4.1.2  - Minor Bridge Design
  6.1    - Traffic Engineering Studies
Under-Utilized Work Groups:
  GROUP3  - Highway Design - Roadway
  GROUP4  - Highway Design - Bridge

Project Description:
  SR 544 (LUCERNE PARK RD) FROM AVE T NW TO US 27 (SR 25)
Project Manager    : Turley, David C
Contract Amount/Limit:   $1,200,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 8

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us.  Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2440.
  ************************************************************
  TRC members are subject to change.



Advertisement Status           : Planned
Date of Advertisement          :  03DEC2018
Longlist(Tech. Rev. Cmte.) Date:  07JAN2019  Time:  08:30AM
Shortlist Selection Date       :  15JAN2019  Time:  10:00AM
Scope Meeting Date             :  28JAN2019  Time:  08:30AM
Tech. Rev. Cmte Meeting Date   :  11FEB2019  Time:  02:45PM
Final Selection Meeting Date   :  07MAR2019  Time:  10:00AM
1st Date Negotiations Meetings :  10APR2019  Time:  09:00AM


                                                            
************************************************************

Contract Number         : 19129  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Oral Presentation   
Financial Management Number(s):
  44251811201 44251822201 44251832201 44251842201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  6.1    - Traffic Engineering Studies
  13.4   - Systems Planning
  13.5   - Subarea/Corridor Planning
Minor Work   :
Project Description:
  44251811201: I-75 (SR 93) FROM N RIVER RD (CR 777) TO
  MOCCASIN WALLOW RD
  44251822201: I-75 (SR 93) FROM N UNIVERSITY PKWY TO
  MOCCASIN WALLOW
  44251832201: I-75 (SR 93) FROM N RIVER RD TO SR 681
  44251842201: I-75 (SR 93) FROM SR 681 TO N OF UNIVERSITY
  PARKWAY
Project Manager    : JESTER, JOSH
Contract Amount/Limit:  $10,000,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 9

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and
  availability of funds.
  ************************************************************
  The major and minor types of work will be updated at a
  later time. Please be sure to check back for updates.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us. Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  ************************************************************
  TRC members are subject to change.
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2444.



Advertisement Status           : Planned
Date of Advertisement          :  18OCT2018
Longlist(Tech. Rev. Cmte.) Date:  19NOV2018  Time:  09:00AM
Shortlist Selection Date       :  29NOV2018  Time:  10:00AM
Scope Meeting Date             :  11DEC2018  Time:  10:45AM
Tech. Rev. Cmte Meeting Date   :  03JAN2019  Time:  02:45PM
Final Selection Meeting Date   :  31JAN2019  Time:  10:00AM
1st Date Negotiations Meetings :  05MAR2019  Time:  9:00AM


                                                            
************************************************************

Contract Number         : 19126  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Interview           
Financial Management Number(s):
  44151213201
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  4.1.1  - Miscellaneous Structures
  6.1    - Traffic Engineering Studies
  6.2    - Traffic Signal Timing
  6.3.1  - Intelligent Trans Sys. Analysis & Design
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
Under-Utilized Work Groups:
  GROUP3  - Highway Design - Roadway
  GROUP4  - Highway Design - Bridge
  GROUP7  - Traffic Operations Design
  GROUP9  - Soil Exploration, Materials Testing

Project Description:
  US 41 (SR 45) from S of Dunruss Creek to S of Gulf Park Dr.
Project Manager    : Johnson, Kaylene
Contract Amount/Limit:   $1,500,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 8

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and
  availability of funds.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us .  Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2722.
  ************************************************************
  The following dates have been reserved by the District for
  marketing:
  Monday 10/1/18 at 2pm: Marketing Meeting Webinar (link to be
  provided at a later date)
  ************************************************************
  Marketing Question Sessions:
  Tuesday 10/2/18 1:30pm-4:00pm
  Thursday 10/4/18 8:30am-4:00pm
  Monday 10/8/18 8:30am-11:30am
  Please check back regularly for updates.
  ************************************************************
  TRC members are subject to change.



Advertisement Status           : Planned
Date of Advertisement          :  15OCT2018
Longlist(Tech. Rev. Cmte.) Date:  13NOV2018  Time:  09:00AM
Shortlist Selection Date       :  29NOV2018  Time:  10:00AM
Scope Meeting Date             :  10DEC2018  Time:  08:30AM
Tech. Rev. Cmte Meeting Date   :  07JAN2019  Time:  02:45PM
Final Selection Meeting Date   :  31JAN2019  Time:  10:00AM
1st Date Negotiations Meetings :  27FEB2019  Time:  09:00AM


                                                            
************************************************************

Contract Number         : 19132  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Interview           
Professional Liability Insurance $:     $250,000
Financial Management Number(s):
  43509912201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
Minor Work   :
  3.1    - Minor Highway Design
  6.1    - Traffic Engineering Studies

Project Description:
  US 41 AT CARMELITA ST EXTENSION
Project Manager    : Bateman, Patrick
Contract Amount/Limit:     $700,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 7

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us.  Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2440.
  ************************************************************
  TRC members are subject to change.
  The TRC will conduct 30 minutes meetings for this project.
  Marketing meetings can be scheduled by contacting the
  Project Manager.
  No webinar will be held.



Advertisement Status           : Planned
Date of Advertisement          :  08OCT2018
Longlist(Tech. Rev. Cmte.) Date:  05NOV2018  Time:  08:30AM
Shortlist Selection Date       :  29NOV2018  Time:  10:00AM
Scope Meeting Date             :  11DEC2018  Time:  01:30PM
Tech. Rev. Cmte Meeting Date   :  09JAN2019  Time:  02:45PM
Final Selection Meeting Date   :  31JAN2019  Time:  10:00AM
1st Date Negotiations Meetings :  04MAR2019  Time:  09:00AM


                                                            
************************************************************

Contract Number         : 19111  Technically Prequalified & Unlimited Audit required
Selection Method   : Selection from Expanded Letter of Response 
Financial Management Number(s):
  43806016201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Under-Utilized Work Groups:
  GROUP10  - Rdwy Construction Engineering Inspection

Project Description:
  US 27 (SR 25) FROM 5TH STREET TO N OF SR 78
Project Manager    : Hindman, Susan
Contract Amount/Limit:   $1,130,800
See Descriptions of Standard Notes on Current 
Advertisements webpage: 4,8,10

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us.  Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at: FTP
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2440.
  ************************************************************
  TRC members are subject to change.
  -Follow the Evaluation Scoring Criteria closely
  when preparing your Expanded Letter of Response.
  -Resumes for all proposed staff are required as
  an addendum to the Letter of Interest and must
  include TINS and CTQP printouts, project dates,
  and updated work references, including names
  and telephone numbers.
  -A manhour staffing estimate must also be
  included.
  -The Technical Review Committee (TRC) members
  for the project will be Randall James, Susan Hindman,
  Jan Thompson/TBD.  TRC Members are subject to
  change, according to availability.
  Areas being Evaluated:
  Awareness of/Approach to Project Issues (0-35)
  A. Understanding of the Scope of the Project (0-15)
  B. Identification of Unique Project Issues (0-15)
  C. Best or Value Added (0-5)
  Proposed Staffing (0-55)
  A. Quantity Proposed (0-10)
  B. Availability of Staff (0-10)
  C. Qualifications/Certifications of Staff (0-10)
  D. Quality/Experience on Similar Projects (0-12)
  E. Team's Past Performance on Similar Projects (0-13)
  Other Considerations (0-10)
  A. Communication Abilities (0-5)
  B. Commitment to Satisfy the Department's Needs (0-5)



Advertisement Status           : Planned
Date of Advertisement          :  24SEP2018
Longlist(Tech. Rev. Cmte.) Date:  22OCT2018  Time:  10:00AM
Shortlist Selection Date       :  01NOV2018  Time:  10:00AM
Final Selection Meeting Date   :  29NOV2018  Time:  10:00AM
1st Date Negotiations Meetings :  03JAN2019  Time:  10:00AM


                                                            
************************************************************

Contract Number         : 19128  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Interview           
Financial Management Number(s):
  TBD
Major Work   :
  21.0   - Acquisition, Negot, Closing & Order of Taking
Minor Work   :
  8.2    - Design, Right of Way, & Const. Surveying
  13.6   - Land Planning/Engineering
  14.0   - Architect
  15.0   - Landscape Architect

Project Description:
  Right Of Way Consultant Services
Project Manager    : Clark, Robin A
Contract Amount/Limit:   $5,000,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 9

Special Notes:              
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and
  availability of funds.
  ************************************************************
  Direct all questions to the Department by emailing
  d1.profserv@dot.state.fl.us .  Questions posed 72 hours
  prior to the response deadline will be responded to by the
  Department on the File Transfer Protocol (FTP) site located
  at:FTP
  ************************************************************
  If the Department's website cannot be accessed, please
  contact the Professional Services Office at 863-519-2722.
  ************************************************************
  TRC members are subject to change.



Advertisement Status           : Planned
Date of Advertisement          :  24SEP2018
Longlist(Tech. Rev. Cmte.) Date:  22OCT2018  Time:  02:00PM
Shortlist Selection Date       :  01NOV2018  Time:  10:00AM
Tech. Rev. Cmte Meeting Date   :  10DEC2018  Time:  02:45PM
Final Selection Meeting Date   :  03JAN2019  Time:  10:00AM


                                                            
************************************************************

Contract Number         : 19147  Technically Prequalified & Unlimited Audit required
Selection Method   : Letter of Response and Interview           
Financial Management Number(s):
  TBD
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
  4.1.1  - Miscellaneous Structures
  6.1    - Traffic Engineering Studies
  6.2    - Traffic Signal Timing
  6.3.1  - Intelligent Trans Sys. Analysis & Design
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.4    - Right of Way Mapping
  15.0   - Landscape Architect
Under-Utilized Work Groups:
  GROUP3  - Highway Design - Roadway
  GROUP4  - Highway Design - Bridge
  GROUP7  - Traffic Operations Design

Project Description:
  Minor Design Continuing Services Contract.
Project Manager    : Blair, Amy
Contract Amount/Limit:   $5,000,000
See Descriptions of Standard Notes on Current 
Advertisements webpage: 8
Number of contracts that may be awarded from this advertisement:  2 
Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2722. ************************************************************ This is a continuing services contract. ************************************************************ TRC members are subject to change. Advertisement Status : Planned Date of Advertisement : 17SEP2018 Longlist(Tech. Rev. Cmte.) Date:  23OCT2018 Time:  08:00AM Shortlist Selection Date :  01NOV2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  05DEC2018 Time:  02:45PM Final Selection Meeting Date :  03JAN2019 Time:  10:00AM ************************************************************ Contract Number : 19134 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 19805013211 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Project Description: SURVEYING & MAPPING CONSULTANT Project Manager : Rutkosky, Dan Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ TRC members are subject to change. Advertisement Status : Planned Date of Advertisement : 04SEP2018 Longlist(Tech. Rev. Cmte.) Date:  09OCT2018 Time:  08:30AM Shortlist Selection Date :  18OCT2018 Time:  01:30PM Final Selection Meeting Date :  29NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19124 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43385623201 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP9 - Soil Exploration, Materials Testing Project Description: SR 60 FROM CR 630 TO GRAPE HAMMOCK RD Project Manager : LAKE, ROXANN Contract Amount/Limit: $7,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ TRC members are subject to change. Advertisement Status : Planned Date of Advertisement : 27AUG2018 Longlist(Tech. Rev. Cmte.) Date:  25SEP2018 Time:  09:00AM Shortlist Selection Date :  04OCT2018 Time:  10:00AM Scope Meeting Date :  15OCT2018 Time:  09:00AM Tech. Rev. Cmte Meeting Date :  05NOV2018 Time:  02:45PM Final Selection Meeting Date :  29NOV2018 Time:  10:00AM 1st Date Negotiations Meetings :  07JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19119 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 41754043201 Major Work : 3.2 - Major Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.5 - Geotechnical Speciality Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP9 - Soil Exploration, Materials Testing Project Description: SR 29 FROM S OF AGRICULTURE WAY TO CR 846 E Project Manager : Johnson, Kaylene Contract Amount/Limit: $3,825,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ The following dates have been reserved by the District for Marketing: Monday 8/6/18 at 2pm-Marketing Meeting Webinar (link to be provided at a later date). ************************************************************ Question Sessions: Tuesday 8/7/18 9:30am-12:00pm Thursday 8/9/18 1:30pm-4:00pm Monday 8/13/18 8:30am-4:00pm Please check back regularly for updates. ************************************************************ This contract is scheduled to executed in May 2019. TRC members are subject to change. Advertisement Status : Planned Date of Advertisement : 20AUG2018 Longlist(Tech. Rev. Cmte.) Date:  24SEP2018 Time:  9:30AM Shortlist Selection Date :  04OCT2018 Time:  10:00AM Scope Meeting Date :  16OCT2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  06NOV2018 Time:  02:45PM Final Selection Meeting Date :  29NOV2018 Time:  10:00AM 1st Date Negotiations Meetings :  10JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19146 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44198313201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP9 - Soil Exploration, Materials Testing GROUP7 - Traffic Operations Design Project Description: US 92 (SR 600) at Fish Hatchery Road Project Manager : Reck, Justin A Contract Amount/Limit: $1,200,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2722. ************************************************************ The following dates have been reserved by the District for marketing: Wednesday 8/9/18 10:15am-10:30am Marketing Meeting Webinar (link to be provided at a later date) ************************************************************ Marketing Meetings (please contact the Project Manager listed to reserve a slot): Wednesday 8/15/18 10:30am-12:00pm Thursday 8/16/18 9am-12pm & 1:15pm-2:30pm ************************************************************ TRC members are subject to change. ************************************************************ This contract is for the flexible pavement reconstruction of US 92 (State Road 600) at Fish Hatchery Road in Polk County. Advertisement Status : Planned Date of Advertisement : 20AUG2018 Longlist(Tech. Rev. Cmte.) Date:  18SEP2018 Time:  09:00AM Shortlist Selection Date :  04OCT2018 Time:  10:00AM Scope Meeting Date :  17OCT2018 Time:  02:45PM Tech. Rev. Cmte Meeting Date :  08NOV2018 Time:  02:45PM Final Selection Meeting Date :  29NOV2018 Time:  10:00AM 1st Date Negotiations Meetings :  10JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19110 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 43084916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 82 from Gator Slough Lane to SR 29. Project Manager : Elliott, Leighton Contract Amount/Limit: $3,927,599 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2722. ************************************************************ Follow the Evaluation Scoring Criteria closely when preparing your Expanded Letter of Response. Resumes for all proposed staff are required as an addendum to the Letter of Interest and must include TINS and CTQP printouts, project dates, and updated work references, including names and telephone numbers. A manhour staffing estimate must also be included. The Technical Review Committee (TRC) members for the project will be Leighton Elliot, Dennis Day and Jan Thompson / TBD. TRC Members are subject to change. ************************************************************ Areas being evaluated: Awareness of/Approach to Project Issues (0-35) A. Understanding of the Scope of the Project (0-15) B. Identification of Unique Project Issues (0-15) C. Best of Value Added (0-5) Proposed Staffing (0-55) A. Quantity Proposed (0-10) B. Availability of Staff (0-10) C. Qualifications/Certifications of Staff (0-10) D. Quality/Experience on Similar Projects (0-12) E. Team's past performance on similar Projects (0-13) Other Considerations (0-10) A. Communication Abilities (0-5) B. Commitment to Satisfy the Department's Needs (0-5) Advertisement Status : Planned Date of Advertisement : 13AUG2018 Longlist(Tech. Rev. Cmte.) Date:  18SEP2018 Time:  02:00PM Shortlist Selection Date :  04OCT2018 Time:  10:00AM Final Selection Meeting Date :  01NOV2018 Time:  10:00AM 1st Date Negotiations Meetings :  06DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19105 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 42584126201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 82 FROM SHAWNEE ROAD TO ALABAMA ROAD S Project Manager : Elliott, Leighton Contract Amount/Limit: $3,260,816 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ -Follow the Evaluation Scoring Criteria closely when preparing your Expanded Letter of Response. -Resumes for all proposed staff are required as an addendum to the Letter of Interest and must include TINS and CTQP printouts, project dates, and updated work references, including names and telephone numbers. -A manhour staffing estimate must also be included. -The Technical Review Committee (TRC) members for the project will be Leighton Elliott, Gerald Byrne, Jan Thompson/Anita Michael. TRC Members are subject to change. Areas being Evaluated: Awareness of/Approach to Project Issues (0-35) A. Understanding of the Scope of the Project (0-15) B. Identification of Unique Project Issues (0-15) C. Best or Value Added (0-5) Proposed Staffing (0-55) A. Quantity Proposed (0-10) B. Availability of Staff (0-10) C. Qualifications/Certifications of Staff (0-10) D. Quality/Experience on Similar Projects (0-12) E. Team's Past Performance on Similar Projects (0-13) Other Considerations (0-10) A. Communication Abilities (0-5) B. Commitment to Satisfy the Department's Needs (0-5) Advertisement Status : Planned Date of Advertisement : 06AUG2018 Longlist(Tech. Rev. Cmte.) Date:  06SEP2018 Time:  01:30PM Shortlist Selection Date :  13SEP2018 Time:  10:00AM Final Selection Meeting Date :  18OCT2018 Time:  01:30PM 1st Date Negotiations Meetings :  14NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19135 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43534712201 43511012201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: FPID #: 435347 1 22 01: CR 887 (Old US 41) from Collier County Line to Bonita Beach Rd.; FPID #: 435110 1 22 01: CR 887 (Old US 41) from US 41 to Lee County Line. PD&E Study for Widening and complete streets treatment to CR 887 in Lee and Collier Counties. Project Manager : Andrews, Steven A Contract Amount/Limit: $1,600,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP. You may email the Department at profserv@dot.state.fl.us. ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2722. ************************************************************ TRC members are subject to change. Advertisement Status : Planned Date of Advertisement : 06AUG2018 Longlist(Tech. Rev. Cmte.) Date:  04SEP2018 Time:  01:30PM Shortlist Selection Date :  13SEP2018 Time:  10:00AM Scope Meeting Date :  24SEP2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  15OCT2018 Time:  02:45PM Final Selection Meeting Date :  01NOV2018 Time:  10:00AM 1st Date Negotiations Meetings :  10DEC2018 Time:  09:00AM ************************************************************ Contract Number : 19143 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $300,000 Financial Management Number(s): TBD Major Work : 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Minor Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Subsurface Utility Designate, Locate and Coordination. Project Manager : GLORIOSO, JOSEPH Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ TRC members are subject to change. ************************************************************ Due to an internal flaw in the procurement, the Department is rejecting all prior submissions and restarting the procurement. All submissions for this procurement will be protected, but if you wish to be considered under the new procurement, you must resubmit. Advertisement Status : Planned Date of Advertisement : 30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  29AUG2018 Time:  02:30PM Shortlist Selection Date :  13SEP2018 Time:  10:00AM Scope Meeting Date :  24SEP2018 Time:  08:15AM Tech. Rev. Cmte Meeting Date :  11OCT2018 Time:  02:45PM Final Selection Meeting Date :  01NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19130 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Professional Liability Insurance $: $500,000 Financial Management Number(s): 44251911201 44251922201 44251932201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 6.1 - Traffic Engineering Studies 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 13.3 - Policy Planning 13.7 - Transportation Statistics 14.0 - Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: 442519 1 12 01: I-75 (SR 93) FROM E OF SR 951 TO SR 78 (BAYSHORE DR) 442519 2 22 01: I-75 (SR 93) FROM E OF SR 951 TO COLLIER/LEE COUNTY LINE 442519 3 22 01: I-75 (SR 93) FROM COLLIER/LEE COUNTY LINE TO SR 78 (BAYSHORE DR) Project Manager : JESTER, JOSH Contract Amount/Limit : $10,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP Consultant questions and answers have been placed on the FTP and will be updated as necessary. ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ TRC members are subject to change. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 26JUN2018 Response Deadline Date :  11JUL2018 Longlist(Tech. Rev. Cmte.) Date:  30JUL2018 Time:  09:00AM Shortlist Selection Date :  02AUG2018 Time:  10:00AM Scope Meeting Date :  13AUG2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  05SEP2018 Time:  02:45PM Final Selection Meeting Date :  04OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  06NOV2018 Time:  09:00AM Response Deadline : 11JUL2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19116 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 19835413214 40403213211 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: 198354 1 32 14 - RESURFACING DESIGN CONSULTANT CONTRACT 404032 1 32 11 - RESURFACING DESIGN CONTRACT Project Manager : Blair, Amy Contract Amount/Limit : $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Number of contracts that may be awarded from this advertisement: 2
Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ TRC members are subject to change. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 25JUN2018 Response Deadline Date :  10JUL2018 Longlist(Tech. Rev. Cmte.) Date:  24JUL2018 Time:  08:30AM Shortlist Selection Date :  02AUG2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  29AUG2018 Time:  02:45PM Final Selection Meeting Date :  04OCT2018 Time:  10:00AM Response Deadline : 10JUL2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19117 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Professional Liability Insurance $: $375,000 Financial Management Number(s): 41451123201 Major Work : 3.2 - Major Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP9 - Soil Exploration, Materials Testing Project Description: US 98 FROM US 27 TO AIRPORT ROAD Project Manager : Jones, David R Contract Amount/Limit : $6,300,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ TRC members are subject to change. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. ************************************************************ The scope has been uploaded to the FTP for viewing. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 25JUN2018 Response Deadline Date :  10JUL2018 Longlist(Tech. Rev. Cmte.) Date:  25JUL2018 Time:  01:30PM Shortlist Selection Date :  02AUG2018 Time:  10:00AM Scope Meeting Date :  14AUG2018 Time:  08:30AM Tech. Rev. Cmte Meeting Date :  11SEP2018 Time:  02:45PM Final Selection Meeting Date :  04OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  19NOV2018 Time:  09:00AM Response Deadline : 10JUL2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19102 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Professional Liability Insurance $: $250,000 Financial Management Number(s): 44194212201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.2.1 - Major Bridge Design - Concrete 4.4 - Movable Span Bridge Design Minor Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: SR 31 FROM SR 80 (PALM BEACH BLVD) TO SR 78 (BAYSHORE RD) Project Manager : Bateman, Patrick Contract Amount/Limit : $2,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ TRC members are subject to change. ************************************************************ Additional project information may be also found on the FTP website under the advertisement #. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 18JUN2018 Response Deadline Date :  02JUL2018 Longlist(Tech. Rev. Cmte.) Date:  17JUL2018 Time:  09:00AM Shortlist Selection Date :  24JUL2018 Time:  10:00AM Scope Meeting Date :  06AUG2018 Time:  02:30PM Tech. Rev. Cmte Meeting Date :  27AUG2018 Time:  02:45PM Final Selection Meeting Date :  13SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  24OCT2018 Time:  10:00AM Response Deadline : 02JUL2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19107 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 19801766201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Venice Bypass from Center Rd to Gulf Coast Blvd. Project Manager : Nichols, James Contract Amount/Limit : $2,264,343 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP. ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ -Follow the Evaluation Scoring Criteria closely when preparing your Expanded Letter of Response. -Resumes for all proposed staff are required as an addendum to the Letter of Interest and must include TINS and CTQP printouts, project dates, and updated work references, including names and telephone numbers. -A manhour staffing estimate must also be included. -The Technical Review Committee (TRC) members for the project will be Jim Nichols, Alex Adames, and Manan Patel/ Jan Thompson. TRC Members are subject to change. ************************************************************ Areas being Evaluated: Awareness of/Approach to Project Issues (0-35) A. Understanding of the Scope of the Project (0-15) B. Identification of Unique Project Issues (0-15) C. Best or Value Added (0-5) Proposed Staffing (0-55) A. Quantity Proposed (0-10) B. Availability of Staff (0-10) C. Qualifications/Certifications of Staff (0-10) D. Quality / Experience on Similar Projects (0-12) E. Team's Past Performance on Similar Projects(0-13) Other Considerations (0-10) A. Communication Abilities (0-5) B. Commitment to Satisfy the Department's Needs (0-5) _____________________________________________________ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 18JUN2018 Response Deadline Date :  02JUL2018 Longlist(Tech. Rev. Cmte.) Date:  23JUL2018 Time:  01:30PM Shortlist Selection Date :  02AUG2018 Time:  10:00AM Final Selection Meeting Date :  30AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  01OCT2018 Time:  10:00AM Response Deadline : 02JUL2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19127 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 44153513201 44155113201 Major Work : 3.1 - Minor Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: 441535 1 32 01 - SR 64 (6TH AVE) FROM 10TH ST WEST TO 10TH ST EAST 441551 1 32 01 - SR 64 (MANATEE AVE) FROM 43RD ST W TO 15TH ST W (SR 64) Project Manager : Vargas, Fidel Contract Amount/Limit : $1,250,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ TRC members are subject to change. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 18JUN2018 Response Deadline Date :  02JUL2018 Longlist(Tech. Rev. Cmte.) Date:  19JUL2018 Time:  08:30AM Shortlist Selection Date :  02AUG2018 Time:  10:00AM Scope Meeting Date :  13AUG2018 Time:  09:00AM Tech. Rev. Cmte Meeting Date :  05SEP2018 Time:  02:45PM Final Selection Meeting Date :  04OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  07NOV2018 Time:  09:00AM Response Deadline : 02JUL2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19137 Projects less than $500,000 (Technical Qualification only) Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 44022513201 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.4 - Intelligent Trans Sys. Software Development Project Description: ADAPTIVE SYSTEM ON US 27 FROM HIGHLANDS AVE TO SEBRING PKWY Project Manager : Chinault, Katherine Contract Amount/Limit : $400,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ This project will include a 3-page Abbreviated Technical to be submitted by shortlisted firms. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 11JUN2018 Response Deadline Date :  25JUN2018 Longlist(Tech. Rev. Cmte.) Date:  10JUL2018 Time:  08:30AM Shortlist Selection Date :  24JUL2018 Time:  10:00AM Scope Meeting Date :  02AUG2018 Time:  02:00PM Final Selection Meeting Date :  30AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  26SEP2018 Time:  09:00AM Response Deadline : 25JUN2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19118 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Professional Liability Insurance $: $250,000 Financial Management Number(s): 41754033201 Major Work : 3.2 - Major Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.5 - Geotechnical Speciality Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP9 - Soil Exploration, Materials Testing Project Description: SR 29 FROM SUNNILAND NURSERY ROAD TO S OF AGRICULTURE WAY Project Manager : Reck, Justin R Contract Amount/Limit : $3,375,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ TRC members are subject to change. ************************************************************ This contract is not scheduled to execute until May 2019. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 04JUN2018 Response Deadline Date :  18JUN2018 Longlist(Tech. Rev. Cmte.) Date:  23JUL2018 Time:  01:30PM Shortlist Selection Date :  02AUG2018 Time:  10:00AM Scope Meeting Date :  14AUG2018 Time:  01:15PM Tech. Rev. Cmte Meeting Date :  28AUG2018 Time:  02:45PM Final Selection Meeting Date :  13SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  16OCT2018 Time:  09:00AM Response Deadline : 18JUN2018 Respond To: d1.profserv@dot.state.fl.us Attn.: Jamie Reyes Phone: (863)519-2301 ************************************************************ Contract Number : 19150 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $300,000 Financial Management Number(s): 44353326201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: PRE-EVENT TS/HURRICANE CEI - DEBRIS MONITORING Project Manager : Perez-Alfonso, Amarilys Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ An Audit Package will be due from the Final Selected firm by close of business on 07/06/2018. Please send to Shannon.Thompson@dot.state.fl.us. ************************************************************ Evaluation Scoring Criteria: Awareness of/Approach to Project Issues (0-35) A. Understanding of the Scope of the Project (0-10) B. Identification of Unique Project Issues (0-10) C. Management and Quality Assurance (0-15) Proposed Staffing (0-55) A. Quantity Proposed (0-10) B. Availability of Staff (0-10) C. Qualifications/Certifications of Staff (0-10) D. Quality/Experience on Similar Projects (0-25) Other Considerations (0-10) A. Communication Abilities (0-5) B. Value Added/Innovative Ideas (0-5) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21MAY2018 Shortlist Selection Date :  12JUN2018 Time:  10:00AM Shortlist Selection Posting :  12JUN2018 Time:  12:15PM Final Selection Meeting Date :  28JUN2018 Time:  10:00AM Final Selection Posting Date :  28JUN2018 Time:  11:15AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 EXP U.S. SERVICES INC. 2 STANLEY CONSULTANTS, INC. Letters Received by the Department: EXP U.S. SERVICES INC. STANLEY CONSULTANTS, INC. ************************************************************ Contract Number : 19151 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $300,000 Financial Management Number(s): 44353316201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: PRE-EVENT TS/HURRICANE CEI Project Manager : Thompson, Evelyn J Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ Follow the Evaluation Scoring Criteria closely when preparing your Expanded Letter of Response. Resumes for all proposed staff are required as an addendum to the Letter of Interest and must include TINS and CTQP printouts, project dates, and updated work references, including names and telephone numbers. * The Technical Review Committee (TRC) members for the Project will be James Nichols, Lavenia Toole, and Jan Thompson. TRC Members are subject to change. Areas being Evaluated: Awareness of/Approach to Project Issues (0-35) A. Understanding of the Scope of the Project (0-10) B. Identification of Unique Project Issues (0-10) C. Management and Quality Assurance (0-15) Proposed Staffing (0-55) A. Quantity Proposed (0-10) B. Availability of Staff (0-10) C. Qualifications/Certifications of Staff (0-10) D. Quality/Experience on Similar Projects (0-25) Other Considerations (0-10) A. Communication Abilities (0-5) B. Value Added/Innovative Ideas (0-5) ************************************************************ Audit Package will be due from the Final Selected firm by 9:00am on 7/17/2018. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21MAY2018 Longlist(Tech. Rev. Cmte.) Date:  21JUN2018 Time:  02:30PM Shortlist Selection Date :  28JUN2018 Time:  10:00AM Shortlist Selection Posting :  28JUN2018 Time:  12:01PM Final Selection Meeting Date :  12JUL2018 Time:  10:00AM Final Selection Posting Date :  12JUL2018 Time:  10:45AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 AECOM TECHNICAL SERVICES, INC. 2 AIM ENGINEERING & SURVEYING, INC. 3 EISMAN & RUSSO, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AIM ENGINEERING & SURVEYING, INC. EISMAN & RUSSO, INC. STANLEY CONSULTANTS, INC. ************************************************************ Contract Number : 19104 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43264413204 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design Project Description: DISTRICT WIDE DRAINAGE SUPPORT CONSULTANT Project Manager : Della Sera, Karina Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ TRC members are subject to change. ************************************************************ Central Office has granted a waiver on the video inspection subs being small businesses. This only applies to video inspection subs. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  12JUN2018 Time:  01:30PM Shortlist Selection Date :  28JUN2018 Time:  10:00AM Shortlist Selection Posting :  28JUN2018 Time:  11:45AM Scope Meeting Date :  10JUL2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  30JUL2018 Time:  02:45PM Final Selection Meeting Date :  30AUG2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Shortlisted Firms: SCALAR CONSULTING GROUP INC. THE BALMORAL GROUP, LLC TLP ENGINEERING CONSULTANTS, INC. Letters Received by the Department: PATEL, GREENE AND ASSOCIATES, PLLC SCALAR CONSULTING GROUP INC. THE BALMORAL GROUP, LLC TLP ENGINEERING CONSULTANTS, INC. ************************************************************ Contract Number : 19140 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Professional Liability Insurance $: $300,000 Financial Management Number(s): 20207311206 Major Work : 6.1 - Traffic Engineering Studies 13.7 - Transportation Statistics Minor Work : Project Description: STATISTICS TRAFFIC DATA COLLECTION Project Manager : Ledford, Royce Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ TRC members are subject to change. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  11JUN2018 Time:  08:30AM Shortlist Selection Date :  28JUN2018 Time:  10:00AM Shortlist Selection Posting :  28JUN2018 Time:  12:01PM Scope Meeting Date :  11JUL2018 Time:  08:30AM Final Selection Meeting Date :  30AUG2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Shortlisted Firms: FLORIDA TRANSPORTATION ENGINEERING, SOUTHERN TRAFFIC SERVICES, INC. Letters Received by the Department: FLORIDA TRANSPORTATION ENGINEERING, SOUTHERN TRAFFIC SERVICES, INC. ************************************************************ Contract Number : 19122 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43355823201 Major Work : 3.2 - Major Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP9 - Soil Exploration, Materials Testing Project Description: US 92 FROM COUNTY LINE RD TO WABASH AVE Project Manager : LAKE, ROXANN Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ TRC members are subject to change. ************************************************************ More information about the project can be found at the following link: US92 ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. ************************************************************ Request for marketing meetings will be accepted up to the day before the advertisement goes on Current by contacting the Project Manager. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 30APR2018 Longlist(Tech. Rev. Cmte.) Date:  30MAY2018 Time:  01:30PM Shortlist Selection Date :  12JUN2018 Time:  10:00AM Shortlist Selection Posting :  12JUN2018 Time:  12:15PM Scope Meeting Date :  20JUN2018 Time:  08:30AM Tech. Rev. Cmte Meeting Date :  16JUL2018 Time:  02:45PM Final Selection Meeting Date :  02AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  27AUG2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: G-A-I CONSULTANTS, INC. RS&H, INC. WSP USA INC. Letters Received by the Department: AMERICAN CONSULTING ENGINEERS OF FL AMERICAN STRUCTUREPOINT, INC. ATKINS NORTH AMERICA, INC. DEWBERRY ENGINEERS INC. G-A-I CONSULTANTS, INC. INWOOD CONSULTING ENGINEERS, INC. KISINGER CAMPO & ASSOCIATES, CORP. PARSONS TRANSPORTATION GROUP INC. PATEL, GREENE AND ASSOCIATES, PLLC RS&H, INC. TETRA TECH, INC. VOLKERT, INC. WSP USA INC. ************************************************************ Contract Number : 19133 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43510512201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: TAYLOR RD FROM US 41 TO AIRPORT RD Project Manager : Bateman, Patrick Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ Important project information has been placed on the FTP. ************************************************************ TRC members are subject to change. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 26MAR2018 Longlist(Tech. Rev. Cmte.) Date:  23APR2018 Time:  08:30AM Shortlist Selection Date :  03MAY2018 Time:  10:00AM Shortlist Selection Posting :  03MAY2018 Time:  11:00AM Scope Meeting Date :  15MAY2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  13JUN2018 Time:  02:45PM Final Selection Meeting Date :  12JUL2018 Time:  10:00AM Final Selection Posting Date :  12JUL2018 Time:  10:45AM 1st Date Negotiations Meetings :  16AUG2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 WANTMAN GROUP, INC. 2 METRIC ENGINEERING INC. 3 HANSON PROFESSIONAL SERVICES INC. Letters Received by the Department: G-A-I CONSULTANTS, INC. HANSON PROFESSIONAL SERVICES INC. LANDIS, EVANS AND PARTNERS, INC. METRIC ENGINEERING INC. POND & COMPANY CORPORATION SCALAR CONSULTING GROUP INC. TETRA TECH, INC. VOLKERT, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19115 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 19602263201 19602273201 Major Work : 3.2 - Major Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP9 - Soil Exploration, Materials Testing Project Description: 196022 6 32 01 - SR 64 @ LORRAINE ROAD 196022 7 32 01 - SR 64 AT GREYHAWK BOULEVARD INTERSECTION IMPROVEMENTS Project Manager : Vargas, Fidel Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. ************************************************************ Consultants shall not contact any municipalities, agencies, or other stake holders other than FDOT regarding this project, prior to the execution of this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  18APR2018 Time:  01:30PM Shortlist Selection Date :  26APR2018 Time:  10:00AM Shortlist Selection Posting :  26APR2018 Time:  12:15PM Scope Meeting Date :  07MAY2018 Time:  08:30AM Tech. Rev. Cmte Meeting Date :  04JUN2018 Time:  02:45PM Final Selection Meeting Date :  28JUN2018 Time:  10:00AM Final Selection Posting Date :  28JUN2018 Time:  11:45AM 1st Date Negotiations Meetings :  03AUG2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 PATEL, GREENE AND ASSOCIATES, PLLC 2 HORIZON ENGINEERING GROUP, INC. 3 PROTEAN DESIGN GROUP, INC. Letters Received by the Department: AMERICAN CONSULTING ENGINEERS OF FL AMERICAN STRUCTUREPOINT, INC. BURGESS & NIPLE, INC. CDM SMITH INC. COMPREHENSIVE ENGINEERING SERVICES, FRANKLIN SURVEYING & MAPPING, INC. GRESHAM, SMITH AND PARTNERS HORIZON ENGINEERING GROUP, INC. PATEL, GREENE AND ASSOCIATES, PLLC POND & COMPANY CORPORATION PROTEAN DESIGN GROUP, INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R SAM SCHWARTZ ENGINEERING, DPC, PA TETRA TECH, INC. WADE TRIM, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19108 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 19828516206 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : Project Description: CONSTRUCTION CEI SURVEY SUPPORT Project Manager : Michael, Anita Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. *********************************************************** Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP *********************************************************** If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444 *********************************************************** View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  16APR2018 Time:  02:00PM Shortlist Selection Date :  26APR2018 Time:  10:00AM Shortlist Selection Posting :  26APR2018 Time:  11:45AM Final Selection Meeting Date :  31MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  11:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 10 Rank Consultant 1 AIM ENGINEERING & SURVEYING, INC. 2 McKim & Creed, Inc. 3 CIVILSURV DESIGN GROUP, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AIM ENGINEERING & SURVEYING, INC. CIVILSURV DESIGN GROUP, INC. DRMP, INC. KEITH AND SCHNARS, P.A. McKim & Creed, Inc. ************************************************************ Contract Number : 19136 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 15.0 - Landscape Architect Project Description: D/W MINOR DESIGN Project Manager : Blair, Amy Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  18APR2018 Time:  09:00AM Shortlist Selection Date :  26APR2018 Time:  10:00AM Shortlist Selection Posting :  26APR2018 Time:  12:00PM Tech. Rev. Cmte Meeting Date :  07JUN2018 Time:  02:45PM Final Selection Meeting Date :  28JUN2018 Time:  10:00AM Final Selection Posting Date :  28JUN2018 Time:  11:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Rank Consultant 1 GARRETT ENGINEERING GROUP, INC. 2 ELEMENT ENGINEERING GROUP, LLC 3 PEGASUS ENGINEERING LLC Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), CUMBEY AND FAIR, INC. ELEMENT ENGINEERING GROUP, LLC FLORIDA TRANSPORTATION ENGINEERING, FRANKLIN SURVEYING & MAPPING, INC. GARRETT ENGINEERING GROUP, INC. PE CONSULTING ENGINEERING D/B/A PE PEGASUS ENGINEERING LLC PROPEL ENGINEERING, INC. SCALAR CONSULTING GROUP INC. THE BALMORAL GROUP, LLC TRAFFIC ENGINEERING DATA SOLUTIONS, ************************************************************ Contract Number : 19138 Technically Prequalified & Unlimited Audit required Selection Method   : LOR, Technical Proposal & Oral Presentation Professional Liability Insurance $: $750,000 Financial Management Number(s): 44252112201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 6.1 - Traffic Engineering Studies 11.0 - Eng Contract Admin and Management 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 13.3 - Policy Planning 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Interstate Program Manager - GEC Project Manager : Morton, Keilia Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2722. ************************************************************ This project has been approved for 45 minute presentations followed by 45 minutes of questions and answers. ************************************************************ FDOT District One is seeking an Interstate Program Manager for the upcoming express lane improvements to the I-75 and I-4 corridors within District 1. This contract will provide management support for all interstate projects in Collier, Lee, Charlotte, Sarasota, Manatee, and Polk Counties. Consultants pursuing this contract are expected to have strong experience in NEPA; project scheduling; highway design, traffic operations/TSM&O and drainage (as related to interstates); concept of operations; express lanes; systems planning (including traffic modeling, O&D studies, SIMR-s, T & R sketch studies, and IAR-s); multimodal planning; preparing MLOU/MOA-s; and coordinating with Florida's Turnpike Enterprise, FDOT Central Office, and the Federal Highway Administration (FHWA). This consultant should also have comprehensive experience in public involvement, preparing RFP's and alternative construction delivery methods, including design-build, design-build finance, and design-build operate maintain. *********************************************************** Please note that the prime consultant selected for this contract will not be able to pursue any of the other interstate projects as a prime or a subconsultant. Subconsultants for this contract may pursue the other interstate projects. Depth of subs in technical areas is strongly recommended. ************************************************************ Being selected for this contract may preclude the prime consultant from pursuing design or design-build projects. The Interstate Program Manager-GEC will not be asked to prepare RFP's for potential design-build projects, but may be asked to review them. Please check the Department's Conflict of Interest Policy for guidance on CEI marketing opportunities. ************************************************************ Important project information has been placed on the FTP under the respective advertisement folder. Please be sure to visit the FTP periodically for additional information. ************************************************************ Please view the video on the procurement FTP site as it provides general project information. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  17APR2018 Time:  03:00PM Shortlist Selection Date :  26APR2018 Time:  10:00AM Shortlist Selection Posting :  26APR2018 Time:  11:45AM Scope Meeting Date :  07MAY2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  21MAY2018 Time:  01:30PM Final Selection Meeting Date :  12JUN2018 Time:  10:00AM Final Selection Posting Date :  12JUN2018 Time:  12:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 STANTEC CONSULTING SERVICES INC. 2 AECOM TECHNICAL SERVICES, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 19142 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 20207511206 Major Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 13.7 - Transportation Statistics Project Description: Systems Panning Travel Forecasting Modeling Project Manager : Simpron, Christopher Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us . Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ The purpose of this contract is to provide the Florida Department of Transportation (FDOT) with professional services in support of Intermodal Systems Development and Systems Planning. Major Tasks may involve, but is not limited to: Florida Standard Urban Transportation Modeling Structure(FSUTMS)/Travel Demand Modeling Activities and assignments that could require developing specialized procedures requiring open source scripting changes, or developing specialized networks; implementing and supporting transit functions in traffic models; dynamically maintaining traffic models as needed; project traffic development; traffic data collection; interchange access document development and review; corridor traffic analyses and alternative feasibility studies; congestion management analyses; travel time reliability analyses; origin- destination studies; enhancement program development; application of micro-simulation traffic models; analysis of demographic and travel behavior data for model estimation and enhancements; application of mesoscopic traffic models for performance measurements of alternatives; development and testing of alternative land use scenarios; collection, analysis, and expansion of survey data; providing an analytic tool to assess existing, emerging and future transportation policies and technologies and providing technical assistance to traffic model users. The contract may also provide support in minor tasks including, but not limited to: review of local government Comprehensive Plans, Development of Regional Impacts/Florida Quality Developments, Sector Plans, Geographic Information System Mapping, transit access and pedestrain safety reviews functional classification of roadways and jurisdicitonal transfers, developing and testing alternative land use scenarios, assistance to Metropolitan Planning Organization, conducting Planning Workshops, development of policy guidance, and public involvement activities as they relate to all the above efforts. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  12APR2018 Time:  01:30PM Shortlist Selection Date :  26APR2018 Time:  10:00AM Shortlist Selection Posting :  26APR2018 Time:  11:45AM Scope Meeting Date :  07MAY2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  29MAY2018 Time:  02:45PM Final Selection Meeting Date :  28JUN2018 Time:  10:00AM Final Selection Posting Date :  28JUN2018 Time:  11:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 RS&H, INC. 2 TRAF-O-DATA CORP. 3 GANNETT FLEMING, INC. Letters Received by the Department: GANNETT FLEMING, INC. RS&H, INC. TRAF-O-DATA CORP. WHITMAN, REQUARDT AND ASSOCIATES, L ************************************************************ Contract Number : 19103 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 19839116217 Major Work : 9.3 - Highway Materials Testing 10.3 - Construction Materials Inspection Minor Work : 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP9 - Soil Exploration, Materials Testing GROUP10 - Rdwy Construction Engineering Inspection Project Description: MATERIALS & TESTING CEI SUPPORT CONSULTANT CONTRACT Project Manager : Lee, Joseph W Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ This project is being readvertised with an updated scope. Firms who have previously submitted must resubmit to be considered. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  02APR2018 Time:  09:30AM Shortlist Selection Date :  10APR2018 Time:  10:00AM Shortlist Selection Posting :  10APR2018 Time:  11:30AM Tech. Rev. Cmte Meeting Date :  05MAR2018 Time:  11:30AM Final Selection Meeting Date :  31MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  11:15AM See Descriptions of Standard Notes on Current Advertisements webpage: 8,11 Rank Consultant 1 HIGHSPANS ENGINEERING, INC. 2 MADRID ENGINEERING GROUP, INC. 3 ROBERTS CONSULTING SERVICES, INC. Letters Received by the Department: HIGHSPANS ENGINEERING, INC. MADRID ENGINEERING GROUP, INC. ROBERTS CONSULTING SERVICES, INC. ************************************************************ Contract Number : 19125 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43510313201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: LOST TRAIL OVER HARNEY POND PEDESTRIAN BRIDGE Project Manager : Weeks, Ryan Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ The department has placed a recorded GotoMeeting on the FTP for interested firms to access. ************************************************************ In addition, the department will hold face-to-face meetings on 2/20/18 and 2/21/18. Please contact the Project Manager directly to reserve a time slot. ************************************************************ Important project information has been posted to the FTP under the respective advertisement folder (19125), with the following caveat: The information contained in the Scope Report should be used as a general guide for the project intent. DO NOT COPY THE VERBIAGE IN THIS DOCUMENT FOR YOUR LETTER OF INTEREST. Additionally, DO NOT CONTACT THE LOCAL GOVERNMENT, RESIDENTS, PERMITTING AGENCIES, ETC. UNTIL AFTER THE SHORTLIST IS ANNOUNCED. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  03APR2018 Time:  02:30PM Shortlist Selection Date :  10APR2018 Time:  10:00AM Shortlist Selection Posting :  10APR2018 Time:  12:30PM Scope Meeting Date :  19APR2018 Time:  02:15PM Tech. Rev. Cmte Meeting Date :  14MAY2018 Time:  02:45PM Final Selection Meeting Date :  31MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  11:16AM 1st Date Negotiations Meetings :  25JUN2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Rank Consultant 1 AGENOR & CAMPBELL STRUCTURAL ENGINE 2 PATEL, GREENE AND ASSOCIATES, PLLC 3 SCALAR CONSULTING GROUP INC. Letters Received by the Department: AGENOR & CAMPBELL STRUCTURAL ENGINE BASLEE ENGINEERING SOLUTIONS (BES), BENTLEY ARCHITECTS AND ENGINEERS, I FLORIDA BRIDGE AND TRANSPORTATION, MASTER CONSULTING ENGINEERS, INC. PATEL, GREENE AND ASSOCIATES, PLLC SCALAR CONSULTING GROUP INC. ************************************************************ Contract Number : 19131 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 19823012213 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: DEMO DISTRICTWIDE CONSULTANT CONTRACT Project Manager : Bateman, Patrick Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. ************************************************************ The TRC will conduct 30 minutes meetings for this project. Marketing meetings can be scheduled by contacting the Project Manager. No webinar will be held. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  02APR2018 Time:  01:30PM Shortlist Selection Date :  10APR2018 Time:  10:00AM Shortlist Selection Posting :  10APR2018 Time:  12:30PM Tech. Rev. Cmte Meeting Date :  07MAY2018 Time:  02:45PM Final Selection Meeting Date :  31MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  11:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 SCALAR CONSULTING GROUP INC. 2 DRMP, INC. 3 RUMMEL, KLEPPER & KAHL, LLP D/B/A R Letters Received by the Department: DRMP, INC. PARSONS TRANSPORTATION GROUP INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R SCALAR CONSULTING GROUP INC. VOLKERT, INC. ************************************************************ Contract Number : 19121 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 41754063201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design GROUP9 - Soil Exploration, Materials Testing Project Description: SR 29 FROM N OF NEW MARKET RD N ROAD TO SR 82 Project Manager : VILCE, JIMMY Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ The Marketing Webinar has been uploaded to the FTP site for viewing. You will not be able to view the webinar video directly from the FTP. Save the webinar video (right-click and select "Save Target As") on your local directory. ************************************************************ As part of this advertisement, Consultants are only allowed to contact FDOT D1 Project Management, FDOT D1 PD&E, and FDOT D1 Drainage. Do not contact any of the stakeholders (Public, Local Government, Water Management District, etc.) prior to contract execution. ************************************************************ Only the PD&E recommended concept plan is to be used for the basis of your letter. See the appropriate folder on the FTP to locate the concept plan. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 26FEB2018 Longlist(Tech. Rev. Cmte.) Date:  26MAR2018 Time:  09:00AM Shortlist Selection Date :  10APR2018 Time:  10:00AM Shortlist Selection Posting :  10APR2018 Time:  12:30PM Scope Meeting Date :  18APR2018 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  10MAY2018 Time:  02:45PM Final Selection Meeting Date :  31MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  11:15AM 1st Date Negotiations Meetings :  12JUL2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 FALLER, DAVIS & ASSOCIATES, INC. 2 WANTMAN GROUP, INC. 3 SCALAR CONSULTING GROUP INC. Letters Received by the Department: AMERICAN CONSULTING ENGINEERS OF FL COMPREHENSIVE ENGINEERING SERVICES, CONNELLY & WICKER INC. DEWBERRY ENGINEERS INC. FALLER, DAVIS & ASSOCIATES, INC. G-A-I CONSULTANTS, INC. HDR ENGINEERING, INC. INFRASTRUCTURE ENGINEERS, LLC INWOOD CONSULTING ENGINEERS, INC. KISINGER CAMPO & ASSOCIATES, CORP. PARSONS TRANSPORTATION GROUP INC. SCALAR CONSULTING GROUP INC. STANTEC CONSULTING SERVICES INC. TETRA TECH, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19145 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44258213201 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP7 - Traffic Operations Design Project Description: TRAFFIC STUDIES CONSULTANT DISTRICT WIDE Project Manager : Kautz, Michael Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ All final reports submitted shall be signed, sealed and dated by a Florida registered professional Engineer. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 26FEB2018 Longlist(Tech. Rev. Cmte.) Date:  02APR2018 Time:  08:30AM Shortlist Selection Date :  10APR2018 Time:  10:00AM Shortlist Selection Posting :  10APR2018 Time:  12:00PM Scope Meeting Date :  19APR2018 Time:  10:45AM Tech. Rev. Cmte Meeting Date :  08MAY2018 Time:  02:45PM Final Selection Meeting Date :  31MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  11:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 TRAFFIC ENGINEERING DATA SOLUTIONS, 2 POND & COMPANY CORPORATION 3 FLORIDA TRANSPORTATION ENGINEERING, Letters Received by the Department: ENGLAND, THIMS & MILLER, INC. FLORIDA TRANSPORTATION ENGINEERING, GANNETT FLEMING, INC. GRESHAM, SMITH AND PARTNERS KISINGER CAMPO & ASSOCIATES, CORP. LANDIS, EVANS AND PARTNERS, INC. POND & COMPANY CORPORATION TRAFFIC ENGINEERING DATA SOLUTIONS, VANASSE HANGEN BRUSTLIN, INC. VIBENGINEERING, INC. ************************************************************ Contract Number : 19112 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43806116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 80 FROM N OF BEE CREEK TO N OF FT THOMPSON AVE Project Manager : Baker, Keith Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ This is a Business Development Initiative (BDI) project. ********************************************************** - Follow the Evaluation Scoring Criteria closely when preparing your Expanded Letter of Response. - Resumes for all proposed staff are required as an addendum to the Letter of Interest and must include TINS and CTQP printouts, project dates, and updated work references, including names and telephone numbers. - A manhour staffing estimate must also be included. - The Technical Review Committee (TRC) members for the project will be Keith Baker, Stacy Hill, and Jan Thompson. TRC Members are subject to change, according to availability. Areas being Evaluated: Awareness of/Approach to Project Issues (0-35) A. Understanding of the Scope of the Project (0-15) B. Identification of Unique Project Issues (0-15) C. Best or Value Added (0-5) Proposed Staffing (0-55) A. Quantity Proposed (0-10) B. Availability of Staff (0-10) C. Qualifications/Certifications of Staff (0-10) D. Quality/Experience on Similar Projects (0-12) E. Team's Past Performance on Similar Projects (0-13) Other Considerations (0-10) A. Communication Abilities (0-5) B. Commitment to Satisfy the Department's Needs (0-5) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Longlist(Tech. Rev. Cmte.) Date:  20MAR2018 Time:  01:30PM Shortlist Selection Date :  29MAR2018 Time:  10:00AM Shortlist Selection Posting :  29MAR2018 Time:  11:02AM Final Selection Meeting Date :  26APR2018 Time:  10:00AM Final Selection Posting Date :  26APR2018 Time:  11:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Rank Consultant 1 KINARD - STONE, INC. 2 MEHTA AND ASSOCIATES, INC. 3 AE ENGINEERING, INC. Letters Received by the Department: AE ENGINEERING, INC. KINARD - STONE, INC. MEHTA AND ASSOCIATES, INC. SOLID CONSULTING ENGINEERS, INC. ************************************************************ Contract Number : 19101 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44208311201 Major Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering Minor Work : Project Description: SYSTEMS PLANNING CORRIDOR PLANNING COMPLETE STREETS Project Manager : Reina, Bessie Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2440. ************************************************************ The draft scope for this project has been placed on the FTP. ************************************************************ The purpose of this contract is to provide the Florida Department of Transportation (FDOT) with professional services in support of Intermodal Systems Development and Systems Planning. The consultant services will assist in cost feasible planning studies for arterial or collector road corridors that identify Complete Streets strategies and improvements to provide safety, mobility, and access, and quality of life for all users of the transportation system. In addition, the contract will plan for the design, construction or reconstruction, and operation of a context-sensitive, community oriented transportation network that works for all modes of travel and promotes economic development in Florida. The contract may also provide support in minor tasks including but not limited to: review of local government Comprehensive Plans, Development of Regional Impacts / Florida Quality Developments, Sector Plans, Geographic Information Systems mapping, transit access and pedestrian safety reviews, functional classification of roadways and jurisdictional transfers, developing and testing alternative land use scenarios, assistance to Metropolitan Planning Organization, conducting Planning Workshops, development of policy guidance, research on unmanned technology for air/water/land, and public involvement activities as they relate to all of the above efforts. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  06MAR2018 Time:  01:30PM Shortlist Selection Date :  15MAR2018 Time:  01:30PM Shortlist Selection Posting :  15MAR2018 Time:  4:30PM Scope Meeting Date :  26MAR2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  17APR2018 Time:  02:45PM Final Selection Meeting Date :  03MAY2018 Time:  10:00AM Final Selection Posting Date :  03MAY2018 Time:  10:45AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 S&ME, INC. 2 KIMLEY-HORN AND ASSOCIATES, INC. 3 TINDALE-OLIVER & ASSOCIATES,INC. Letters Received by the Department: KIMLEY-HORN AND ASSOCIATES, INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R S&ME, INC. TINDALE-OLIVER & ASSOCIATES,INC. VANASSE HANGEN BRUSTLIN, INC. VIBENGINEERING, INC. ************************************************************ Contract Number : 19106 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 19838213211 Major Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 5.1 - Conventional Bridge Inspection Minor Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Structures Design Consultant. Project Manager : Diggs, Andra Special Notes: Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at:FTP ************************************************************ If the Department's website cannot be accessed, please contact the Professional Services Office at 863-519-2444. Shortlisted firms: Total resume page count should not exceed 70 pages for the technical packages. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  07MAR2018 Time:  09:00AM Shortlist Selection Date :  15MAR2018 Time:  01:30PM Shortlist Selection Posting :  15MAR2018 Time:  4:30PM Scope Meeting Date :  26MAR2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  17APR2018 Time:  02:45PM Final Selection Meeting Date :  03MAY2018 Time:  10:00AM Final Selection Posting Date :  03MAY2018 Time:  10:45AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 BCC ENGINEERING, INC. 2 PARSONS TRANSPORTATION GROUP INC. 3 AECOM TECHNICAL SERVICES, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AMERICAN CONSULTING ENGINEERS OF FL BCC ENGINEERING, INC. FLORIDA BRIDGE AND TRANSPORTATION, GRAEF-USA INC. HDR ENGINEERING, INC. INFRASTRUCTURE ENGINEERS, LLC JOHNSON, MIRMIRAN & THOMPSON, INC. KISINGER CAMPO & ASSOCIATES, CORP. MARLIN ENGINEERING, INC. MASTER CONSULTING ENGINEERS, INC. OM ENGINEERING SERVICES, INC. PARSONS TRANSPORTATION GROUP INC. SIGMA INFRASTRUCTURE SOLUTIONS, LLC VOLKERT, INC. WSP USA INC. ************************************************************ Design/Build Projects Procurement Number : E1Q99 Financial Management Number(s): 44108815201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive Bids and Proposals from Proposers for the design and construction of a lighting system for the US 41 roadway and sidewalk from approximately 700 feet southeast of the SR 951 instersection to approximately 1000 feet southeast of the Greenway Road Intersection in Collier County, a distance approximately 3.40 miles. BUDGET AMOUNT: $ 3,247,450.00 STIPEND AMOUNT: Not applicable Estimated Contract Time: 370 days SPECIAL NOTES: In accordance with RESTRICTION ON CONSULTANTS ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this project and are restricted from partici- pation on a Design Build Firm without approval from the District One Secretary. The Firms identified below may not not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Aim Engineering & Surveying, Inc. C9L05 Atkins C9L05 Broadspectrum E1L59 HNTB Corp. C9L49 Intertek-PSI C9L05 TRC Members: Marshall Douberley, Jamie Heuer, Luella Pierce Project Manager : Burkhart, Douglas J Selection Method : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 8 - Electrical Work (includes roadway, bridge, & runway lighting) Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: Technical Questions should be addressed to: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/Propo sal.aspx/SearchProposal View RFP (Adobe Acrobat® PDF file) Low Bid Design-Build Qualification Validation Form Advertisement Status : Shortlisted Date of Advertisement : 05FEB2018 Pre-Bid Meeting Date :  12FEB2018 Time:  9:30AM Bids Due Date :  13APR2018 Time:  11:00AM Bid Opening Date :  13APR2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  20APR2018 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  26APR2018 Time:  10:00AM 3rd Tech Rev. Cmte Meeting :  03MAY2018 Time:  10:00AM 4th Tech Rev. Cmte Meeting :  03MAY2018 Time:  1:30PM 5th Tech Rev. Cmte Meeting :  10MAY2018 Time:  10:00AM Final Selection Meeting Date :  15MAY2018 Time:  10:00AM Final Selection Date Not Posted Award Committee Meeting Date :  15MAY2018 Time:  10:00AM Selection Notice Posted: 15MAY2018 Time: 4:02PM ALL BIDS ARE REJECTED AND WILL READVERTISE. ************************************************************ Procurement Number : E1R18 Financial Management Number(s): 44078915201 44079015201 44079115201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit Order driven Districtwide Design-Build Push-Button Contract. The Task Work Orders derived from this contract may contain Federal Highway Administration (FHWA) mandates that require Federal Highway Administration approval as well as State mandates that require State approval. The successful bidder will be responsible for the implementation of projects from concept to completion of construction. Typical projects will consist of intersection improvements, lighting upgrades, median revisions, signal installations, drainage improvements, ITS upgrades, signing, installations, safety improvements and structure projects. Estimated Contract Days: 1095 Budget Amount: FY18/19: $6,168,000 FY19/20: $6,330,000 Actual commitment and final execution of this contract is legislative budget and availability of funds. Special Notes: In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design -Build Firm without approval from the District One Secretary The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Atkins North America Please use the link below, then click "Design Build" to view the Reference Documents: Reference Documents Project Manager : Patel, Nikesh Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 7 - Drainage (includes all storm drains,pipe culverts, culverts, etc.) 10 - Flexible Paving 15 - Hot Plant-Mixed Bitum. Course (incl structural & surface courses) 11 - Grading (includes clearing & grubbing, excavation, embarkment) Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 3.2 - Major Highway Design 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.3 - Signalization 6.1 - Traffic Engineering Studies 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies View RFP (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 30OCT2017 Phase1 Selection Cmte. Meeting :  01FEB2018 Time:  10:00AM LOI Scores Notification Date :  01FEB2018 Time:  4:00PM Deadline for Election to Participate in Phase2 :  05FEB2018 Time:  2:00PM Posting of Shortlist :  05FEB2018 Time:  4:00PM Mand. Pre-Proposal Meeting Date:  26FEB2018 Time:  1:30PM Phase 2 Tech. Proposal Due Date:  23APR2018 Time:  5:00PM Price Proposal Due Date :  05SEP2018 Time:  11:00AM Proposal Opening Date :  05SEP2018 Time:  11:00AM Final Selection Meeting Date :  13SEP2018 Time:  10:00AM Shortlisted Firms Phase1 Score AJAX PAVING INDUSTRIES OF FL, LLC 18.3 WRIGHT CONSTRUCTION GROUP 15.3 ************************************************************ Procurement Number : E1Q23 Financial Management Number(s): 43665015201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design, procurement, installation, integration, and testing of Intelligent Transortation (ITS) to provide a Rail Bypass System in the City of Lakeland. The Design Build Firm shall provide an Intelligent highway-grade rail crossing bypass system to be activatedwhen the signalized intersections adjacent to the SR 37/Florida Avenue rail crossing enter into rail road preemption. This system shall provide information dissemination to motorists via vehicle diversion route messages on SR 37/ Florida Avenue to direct motorist direct motorist towards a grade seperated bypass route. The Design Build shall provide all necessary system integration with the City of Lakeland Traffic Management Center (TMC) facilty and shall verify compliance through performance measures and tests developed by the Design Build Firm and approved by the Department. The System shall provide automated signal timing adjustments along the bypass route to enhance traffic flow along the route while the bypass is activated. The Design Build Firm shall coordinate integration activities with the Department and the City of Lakeland Traffic Operations offices. The Design Build Firm shall provide new closed circuit television (CCTV) cameras for monitoring traffic along the bypass route. The Design Build Firm shall provide battery status monitoring and real time reporting of the bypass system components. The Design Build Firm shall provide all power and communication equipment/ infrastructure necessary to connect all bypass system equipment to the existing City of Lakeland TMC located at 834 E. Rose Street, Lakeland, FL. Estimated Contract Time: 340 days Budget Amount:$1,750,000.00 actual commitment and final execution of this contract is contingent upon an approved legislative budget and availabilty of funds. Stipends Amount: $25,000.00 Work Mix: Project will require Intelligent Transportations Systems SPECIAL NOTES: In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from on a Design-Build Firm without approval from the District One Secretary.The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. HNTB, C9L49 Metric, C9A34 Project Manager : Chinault, Katherine Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 16 - Intelligent Transportation Systems Contractor Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchProposal View RFP (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24JUL2017 Phase1 Selection Cmte. Meeting :  05OCT2017 Time:  10:00AM Deadline for Election to Participate in Phase2 :  05OCT2017 Time:  5:00PM Posting of Shortlist :  10OCT2017 Time:  9:30AM Mand. Pre-Proposal Meeting Date:  19OCT2017 Time:  2:30PM Phase 2 Tech. Proposal Due Date:  04DEC2017 Time:  2:00PM Price Proposal Due Date :  13FEB2018 Time:  11:00AM Proposal Opening Date :  13FEB2018 Time:  11:00AM Final Selection Meeting Date :  01MAR2018 Time:  10:00AM Posting of Award :  01MAR2018 Time:  12:13PM Phase1 Phase2 Prop Bid Price Adjusted Rank Consultant Score Score Time Proposal Score 1 FLORIDA SAFETY CONTRACTORS,INC 15.7 67.0 $918,123 11106.3 2 SICE, inc. 17.3 68.7 $1,087,000 12639.4 3 TRAFFIC CONTROL DEVICES,INC. 16.0 57.7 $1,153,153 15653.5 ************************************************************ Procurement Number : E1R03 Financial Management Number(s): 44021215201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the of a Design-Build Firm to design, procure, install, integ- rate, and test and Intelligent Transportation System (ITS) to monitor and provide a Truck Parking Availability System (TPAS) at public facilities located along SR 93 (I-75) in Collier, Lee and Charlotte counties and along SR 400 (I-4) in Polk county. The specific locations of the public facil- ties and Regional Transportation Management Centers (RTMCs) which all devices associated with these facilities shall connect to are identified in "Table 1 - Truck Parking Availability System (TPAS) Location Description". Budget Amount: $1,693,389.00 *Actual commitment and final execution of this contract is contingent upon an approved legislative budget and avail- ability of funds.* Contract Time: 500 days Stipend Amount: $25,000.00 Work Mix: Project will require Intelligent Transportation System In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District One Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. HNTB Contract No. C9I98 Project Manager : Roberts, Mark A Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/Propo View RFP (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 22MAY2017 Phase1 Selection Cmte. Meeting :  20JUL2017 Time:  1:30PM LOI Scores Notification Date :  20JUL2017 Time:  4:00PM Deadline for Election to Participate in Phase2 :  24JUL2017 Time:  2:00PM Posting of Shortlist :  24JUL2017 Time:  4:00PM Mand. Pre-Proposal Meeting Date:  10AUG2017 Time:  8:30AM Phase 2 Tech. Proposal Due Date:  07NOV2017 Time:  2:00PM Price Proposal Due Date :  03JAN2018 Time:  11:00AM Proposal Opening Date :  03JAN2018 Time:  11:00AM Final Selection Meeting Date :  18JAN2018 Time:  01:30PM Posting of Award :  18JAN2018 Time:  3:30PM Phase1 Phase2 Prop Bid Price Adjusted Rank Consultant Score Score Time Proposal Score 1 FLORIDA SAFETY CONTRACTORS,INC 16.3 69.3 $1,441,171 16823.0 2 SICE, inc. 17.7 73.0 $1,667,000 18386.0 3 Contact Network,LLC DBA Inline 15.7 72.7 $1,940,767 21970.8 Firms not participating in Phase 2 Phase1 Score HORSEPOWER ELECTRIC INC. 15.7 TRANSCORE ITS, LLC 16.0 ************************************************************ DISTRICT 2 ************************************************************ Professional Services Consultant Projects Contract Number : 19250 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42845516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for Jacksonville National Cemetery Access Road Project Manager : Salter, James Contract Amount/Limit: $1,219,326 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Advertisement Status : Planned Date of Advertisement : 03DEC2018 Shortlist Selection Date :  14JAN2019 Time:  10:00AM Final Selection Meeting Date :  04FEB2019 Time:  10:00AM ************************************************************ Contract Number : 19211 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 21152213201 43427613201 Major Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: MULTI PROJECT ADVERTISEMENT The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 211522-1-32-01 PALATKA TO LAKE BUTLER TRAIL FROM HAMPTON TO CR 227. Estimated contract amount is $900,000.00. The project manager is Eric Shimer. 434276-1-32-01 PALATKA TO LAKE BUTLER TRAIL FROM CR 235 TO CR 237. Estimated contract amount is $875,000.00. The project manager is Clint McCraw. Project Manager : Shimer, Eric Contract Amount/Limit: $900,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Number of contracts that may be awarded from this advertisement: 2
Advertisement Status : Planned Date of Advertisement : 26NOV2018 Shortlist Selection Date :  26DEC2018 Time:  10:00AM Final Selection Meeting Date :  26FEB2019 Time:  10:00AM ************************************************************ Contract Number : 19233 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 44106013201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: MULTI PROJECT ADVERTISEMENT: The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 441060-1-32-01 - SR 500 (US 27A) FROM CR 124 TO SR 24. Estimated Contract amount is $900,000.00. Project Manager is Aaron Kaster. 442581-1-32-01 - SR 93 (I-75) FROM SR 47 TO US 90. Estimated Contract amount is $750,000.00. ProjectManager is Aaron Kaster. Project Manager : Kaster, Aaron Contract Amount/Limit: $900,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Advertisement Status : Planned Date of Advertisement : 26NOV2018 Shortlist Selection Date :  26DEC2018 Time:  10:00AM Final Selection Meeting Date :  26FEB2019 Time:  10:00AM ************************************************************ Contract Number : 19246 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 41142316201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI: C STREET CEDAR KEY CHANNEL BRIDGE NO340014 Project Manager : Suarez, Frank Contract Amount/Limit: $954,592 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 26NOV2018 Shortlist Selection Date :  07JAN2019 Time:  10:00AM Final Selection Meeting Date :  11FEB2019 Time:  10:00AM ************************************************************ Contract Number : 19256 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43934616201 44129816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 15 (US 17) from Black Creek Trail to Water Oak Lane SR 10 (Beaver Street) from East of Tyler Street to East of Eaverson Street Project Manager : Lahey, Daniel B Contract Amount/Limit: $1,012,908 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Advertisement Status : Planned Date of Advertisement : 26NOV2018 Shortlist Selection Date :  07JAN2019 Time:  10:00AM Final Selection Meeting Date :  28JAN2019 Time:  10:00AM ************************************************************ Contract Number : 19244 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 21002446201 21002456201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR20 from Aluchua C/L to SW 56th Avenue. SR20 from SW 56th Avenue to CR315 in Interlachen. Project Manager : Devenny, Donald Contract Amount/Limit: $7,099,445 See Descriptions of Standard Notes on Current Advertisements webpage: 8,4,10 Advertisement Status : Planned Date of Advertisement : 05NOV2018 Shortlist Selection Date :  17DEC2018 Time:  10:00AM Final Selection Meeting Date :  07JAN2019 Time:  10:00AM ************************************************************ Contract Number : 19253 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43761716201 43762016201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI for SR 5 (US1) from Flagler CL to SR 206 Project Manager : Byrd, Taylor Contract Amount/Limit: $809,180 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Advertisement Status : Planned Date of Advertisement : 15OCT2018 Shortlist Selection Date :  26NOV2018 Time:  10:00AM Final Selection Meeting Date :  17DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19205 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42469652201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : Project Description: US 17 North of Pomona park CR 309 (Satsuma) Project Manager : Brock, Michael Contract Amount/Limit: $500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Advertisement Status : Planned Date of Advertisement : 01OCT2018 Shortlist Selection Date :  30OCT2018 Time:  10:00AM Final Selection Meeting Date :  01JAN2019 Time:  10:00AM ************************************************************ Contract Number : 19252 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43743716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI for SR 115 over Trout River Bridge No. 720033 Project Manager : Kirts, Brian Contract Amount/Limit: $1,070,539 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 01OCT2018 Shortlist Selection Date :  12NOV2018 Time:  10:00AM Final Selection Meeting Date :  03DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19215 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43427713201 43427813201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Project Description: MULTI PROJECT ADVERTISEMENT The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 434277-1-32-01 PALATKA TO LAKE BUTLER TRAIL FROM CR 225 (SW 101 AVE) TO CR 235 (TRAIL) G-10. ESTIMATED CONTRACT AMOUNT IS $596,000.00. THE PROJECT MANAGER IS WILL LYONS 434278-1-32-01 PALATKA TO LAKE BUTLER TRAIL FROM CR 227 TO CR 225 (TRAIL) G-10. ESTIMATED CONTRACT AMOUNT IS $500,000.00. THE PROJECT MANAGER IS WILL LYONS. Project Manager : Lyons, Will Contract Amount/Limit: $596,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Number of contracts that may be awarded from this advertisement: 2
Advertisement Status : Planned Date of Advertisement : 24SEP2018 Shortlist Selection Date :  23OCT2018 Time:  10:00AM Final Selection Meeting Date :  26DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19217 Projects less than $500,000 (Technical Qualification only) Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43439813201 43737513201 44120813201 Major Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: DESIGN OF SR10 (ATLANTIC BLVD) AT CR 101A (SAN PABLO) (TRAFFIC SIGNAL) SR13 (SAN JOSE) FROM ST. AUGUSTINE RD. TO VIA DE LA REINA ST (SCHOOL ZONE UPDATE) SR212 (BEACH BLVD) FROM SAN MATEO/WALTON ST TO LINDEN AVE SCHUMACER AVE Project Manager : Carter, Michael Contract Amount/Limit: $453,342 See Descriptions of Standard Notes on Current Advertisements webpage: 8,4 Advertisement Status : Planned Date of Advertisement : 24SEP2018 Shortlist Selection Date :  23OCT2018 Time:  10:00AM Final Selection Meeting Date :  26DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19227 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43935813201 44112913201 44132113201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: MULTI PROJECT ADVERTISEMENT THE FOLLOWING THREE PROJECTS WILL BE ADVERTISED TOGETHER AND FIVE FIRMS WILL BE SHORTLISTED. THE TOP THREE RANKED FIRMS WILL EACH RECEIVE A CONTRACT FOR ONE OF THE PROJECTS. 439358-1-32-01 SR 103 FROM SR 208 TO SR 228 (RESURFACING) ESTIMATED CONTRACT AMOUNT IS $600,000.00 THE PROJECT MANAGER IS ERIC SHIMER 441129-1-32-01 SR 21 FROM SR 16 TO CR215 (RESURFACING) ESTIMATED CONTRACT AMOUNT IS $650,000.00 THE PROJECT MANAGER IS DOUG DYCUS 441321-1-32-01 SR 105 FROM I-95 TO BUSCH DRIVE (RESURFACING) ESTIMATED CONTRACT AMOUNT IS $650,000.00 THE PROJECT MANAGER IS DOUG DYCUS Project Manager : Shimer, Eric Contract Amount/Limit: $600,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Number of contracts that may be awarded from this advertisement: 3
Advertisement Status : Planned Date of Advertisement : 24SEP2018 Shortlist Selection Date :  23OCT2018 Time:  10:00AM Final Selection Meeting Date :  25DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19236 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44126113201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: Design Services for Resurfacing State Road (SR) 134 (103rd Street) from Firestone Road to Wesconnett Boulevard. Project Manager : Rhude, Chris Contract Amount/Limit: $550,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Advertisement Status : Planned Date of Advertisement : 24SEP2018 Shortlist Selection Date :  22OCT2018 Time:  10:00AM Final Selection Meeting Date :  17DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19237 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44129013201 44129113201 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: MULTI PROJECT ADVERTISEMENT The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 441290-1-32-01 SR 200 from W of Rubin Davis Lane to E of CR 107. Estimated contract amount is $400,00.00. The project manager is Brandi Vittur 441291-1-32-01 SR 200 from I-95 DDI to W of Still Quarters Rd. Estimated contract amount is $350,000.00. The project manager is Brandi Vittur Project Manager : Dycus, Doug Contract Amount/Limit: $400,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Number of contracts that may be awarded from this advertisement: 2
Advertisement Status : Planned Date of Advertisement : 24SEP2018 Shortlist Selection Date :  23OCT2018 Time:  10:00AM Final Selection Meeting Date :  25DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19261 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 21099513221 Major Work : 9.2 - Geotechnical Classification Lab Testing Minor Work : 9.1 - Soil Exploration 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: Preliminary Coring Continuing Services Project Manager : Morgan, Sally Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Advertisement Status : Planned Date of Advertisement : 20AUG2018 Shortlist Selection Date :  17SEP2018 Time:  10:00AM Final Selection Meeting Date :  12NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19249 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $500,000 Financial Management Number(s): 42307146201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for I-75 (SR 93) at SR 24 (Archer Rd.) Project Manager : Ruiz, Alex Contract Amount/Limit: $551,439 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 06AUG2018 Shortlist Selection Date :  17SEP2018 Time:  10:00AM Final Selection Meeting Date :  08OCT2018 Time:  10:00AM ************************************************************ Contract Number : 19207 Projects less than $500,000 (Technical Qualification only) Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 44032512201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : Project Description: PD&E: NATURE COAST TRAIL FROM TRENTON DEPOT TO ALACHUA COUNTY LINE; Gilchrist County Project Manager : Brooker, Brian Contract Amount/Limit: $350,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: When submitting LOR, include Financial Management (FM) Number 440325-1-22-01 and firm name on the subject line. Construction Training and Qualification Program (CTQP) printouts DO NOT need to be submitted Resumes- a two-page resume or work history sheet for key personnel. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of Project Issues (30) -Understanding of scope -Project Issues 2. Approach to Project (30) -Unique Concepts & Savings -Quality Control -Schedule 3. Project Staff (30) -Project Manager -Staff Quality -Availability 4. Other (10) -Prime/Sub Relationship -Quality of Proposal During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has Occurred. The project manager will participate as a member of the Technical Review Committee for this contract. Advertisement Status : Planned Date of Advertisement : 23JUL2018 Shortlist Selection Date :  20AUG2018 Time:  10:00AM Final Selection Meeting Date :  22OCT2018 Time:  10:00AM ************************************************************ Contract Number : 19245 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 21284436201 41524816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI: CR361 (KEATON BEACH RD) @ CYPRESS LAKE BRIDGE NO380038 CR361 @ FISH CREEK BRIDGE NO. 380068 Project Manager : Smith, Mark See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Special Notes: When submitting LOR, include Financial Management (FM) Number 212844-3-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUL2018 Response Deadline Date :  30JUL2018 Shortlist Selection Date :  27AUG2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  13AUG2018 Time:  01:00PM Final Selection Meeting Date :  17SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  20SEP2018 Time:  01:30PM Response Deadline : 30JUL2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Lynne Crawford, MS 2016 Phone: 386-961-7835 ************************************************************ Contract Number : 19247 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $3,000,000 Financial Management Number(s): 42293856201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI for SR 23 from East of CR 209 to North of SR 16 Project Manager : Byrd, Taylor Contract Amount/Limit : $15,110,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: When submitting LOR, only include Financial Management (FM) Number 422938-5-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Palatka Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUL2018 Response Deadline Date :  30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  14AUG2018 Time:  03:00PM Shortlist Selection Date :  27AUG2018 Time:  10:00AM Final Selection Meeting Date :  17SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  20SEP2018 Time:  01:00PM Last Date Negotiations Meetings:  12NOV2018 Time:  05:00PM Response Deadline : 30JUL2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Lindsey Ballance MS-2016 Phone: 386-961-7362 ************************************************************ Contract Number : 19260 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Project Description: District Wide Landscaping Design Project Manager : Owens, Allen Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: When submitting Letters of Response, include TCN 19260 and firm name on the subject line. The TRC meetings will be held at the District Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUL2018 Response Deadline Date :  30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  06AUG2018 Time:  11:00AM Shortlist Selection Date :  13AUG2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  17SEP2018 Time:  02:00PM 2nd Tech Rev. Cmte Meeting :  18SEP2018 Time:  11:30AM Final Selection Meeting Date :  08OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  10OCT2018 Time:  09:00AM Last Date Negotiations Meetings:  26NOV2018 Time:  05:00PM Response Deadline : 30JUL2018 Respond To: d2.propserv@dot.state.fl.us Attn.: Mandy Eadie Phone: 386-961-7596 ************************************************************ Contract Number : 19213 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 42879633201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: DESIGN OF STATE ROAD 116 (WONDERWOOD) EXPRESS WAY TO JANE STREET TO SAND CASTLE LANE Project Manager : Bailey, Jeff H Contract Amount/Limit : $1,400,056 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: When submitting LOR, include Financial Management (FM) Number 428796-3-32-01 and firm name on the subject line. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held in the Jacksonville Urban Office. This advertisement has been extended through July 23, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  06AUG2018 Time:  11:00AM Shortlist Selection Date :  13AUG2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  27AUG2018 Time:  01:30PM 2nd Tech Rev. Cmte Meeting :  05SEP2018 Time:  11:45AM Final Selection Meeting Date :  24SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  26SEP2018 Time:  03:00PM Response Deadline : 23JUL2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Kathy Jenkins, MS-2016 Phone: 386-961-7523 ************************************************************ Contract Number : 19219 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43595213201 Major Work : 7.3 - Signalization Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Project Description: SR 109 (University Blvd) at Arlington Service Road Intersections Project Manager : Carter, Michael Contract Amount/Limit : $590,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: When submitting Letters of Response, include Financial Management (FM) number 435952-1-32-01 and firm name on the subject line. The TRC meetings will be held at the District Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  31JUL2018 Time:  10:00AM Shortlist Selection Date :  06AUG2018 Time:  10:00AM Scope Meeting Date :  14AUG2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  04SEP2018 Time:  02:00PM 2nd Tech Rev. Cmte Meeting :  11SEP2018 Time:  11:30AM Final Selection Meeting Date :  01OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  04OCT2018 Time:  10:00AM Last Date Negotiations Meetings:  23NOV2018 Time:  05:00PM Response Deadline : 23JUL2018 Respond To: d2.propserv@dot.state.fl.us Attn.: Mandy Eadie Phone: 386-961-7596 ************************************************************ Contract Number : 19224 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 43765113201 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 8.2 - Design, Right of Way, & Const. Surveying Project Description: I-95 AT NORTH I-295 INTERCHANGE (LANDSCAPING) Project Manager : Vittur, Brandi Contract Amount/Limit : $400,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: When submitting Letters of Response, include Financial Management (FM) number 437651-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  14AUG2018 Time:  11:00AM Shortlist Selection Date :  20AUG2018 Time:  10:00AM Scope Meeting Date :  21AUG2018 Time:  03:00PM Tech. Rev. Cmte Meeting Date :  10SEP2018 Time:  02:00PM 2nd Tech Rev. Cmte Meeting :  20SEP2018 Time:  11:15AM Final Selection Meeting Date :  08OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  10OCT2018 Time:  01:30PM Response Deadline : 23JUL2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Kathy Jenkins, MS-2016 Phone: 386-961-7523 ************************************************************ Contract Number : 19239 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Professional Liability Insurance $: $250,000 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Lake City District Wide Minor Design. Project Manager : Dycus, Doug Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: When submitting Letters of Response, include Temporary Contract Number (TCN) 19239 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  31JUL2018 Time:  01:30PM Shortlist Selection Date :  13AUG2018 Time:  10:00AM Final Selection Meeting Date :  08OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  11OCT2018 Time:  01:30PM Response Deadline : 23JUL2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 ************************************************************ Contract Number : 19259 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43477913201 Major Work : 6.1 - Traffic Engineering Studies Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies Project Description: CONTINUING SERVICES SAFETY STUDIES Project Manager : Dipola, Mario Contract Amount/Limit : $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: When submitting Letters of Response, include Firm Name and Financial Management (FM) number 43477913201 on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Shortlist Selection Date :  13AUG2018 Time:  10:00AM Scope Meeting Date :  14AUG2018 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  02AUG2018 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  13SEP2018 Time:  10:00AM 3rd Tech Rev. Cmte Meeting :  18SEP2018 Time:  12:00PM Final Selection Meeting Date :  15OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  22OCT2018 Time:  01:00PM Last Date Negotiations Meetings:  26NOV2018 Time:  12:00PM Response Deadline : 23JUL2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Lynne Crawford, MS 2016 Phone: 386-961-7835 ************************************************************ Contract Number : 19220 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $750,000 Financial Management Number(s): 43615713201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: SR 25 (US441) from Marion County Line to SR 331 Project Manager : Teal, Craig Contract Amount/Limit : $1,450,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: When submitting Letters of Response, include Financial Management (FM) number 436157-1-32-01 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. The TRC meetings will be held at the District Office. This advertisement has been extended through July 23, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 02JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  31JUL2018 Time:  03:00PM Shortlist Selection Date :  06AUG2018 Time:  10:00AM Scope Meeting Date :  08AUG2018 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  04SEP2018 Time:  03:00PM 2nd Tech Rev. Cmte Meeting :  05SEP2018 Time:  11:30AM Final Selection Meeting Date :  24SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  26SEP2018 Time:  10:00AM Last Date Negotiations Meetings:  16NOV2018 Time:  05:00PM Response Deadline : 23JUL2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Lindsey Ballance MS-2016 Phone: 386-961-7362 ************************************************************ Contract Number : 19243 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $1,500,000 Financial Management Number(s): 20821186201 20821156201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 21 (Blanding Boulevard from CR 220 (Long Bay Road) to Allie Murray Road. SR 21 / Blanding Boulevard add lanes and reconstruct (CR 218 to Black Creek). Project Manager : Olivella, Joaquin Contract Amount/Limit : $4,951,848 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: When submitting LOR, include Financial Management (FM) Number 208211-8-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 11JUN2018 Response Deadline Date :  25JUN2018 Longlist(Tech. Rev. Cmte.) Date:  07JUL2018 Time:  01:30PM Shortlist Selection Date :  23JUL2018 Time:  10:00AM Final Selection Meeting Date :  13AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  16AUG2018 Time:  09:30AM Response Deadline : 25JUN2018 Respond To: d2.propserv@dot.state.fl.us Attn.: Mandy Eadie Phone: 386-961-7596 ************************************************************ Contract Number : 18269 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Pre-Event Disaster/Construction Engineering & Inspection - East/West Debris Management (Cut and Toss and Debris Montoring Oversight) Project Manager : Keen, William Special Notes: When submitting LOR, include TCN 18269 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Contract/Project Issues (50) -Approach to Project -Understanding of Scope/Potential Project Types -Management and Quality Assurance 2.Proposed Staffing (50) -Proposed Staff Qualifications -Availability of Staff and Geographic Coverage -Qualifications/Certifications/Experience of Staff During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. Two contracts will be awarded from this advertisement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05JUN2018 Longlist(Tech. Rev. Cmte.) Date:  21JUN2018 Time:  01:30PM Shortlist Selection Date :  02JUL2018 Time:  10:00AM Final Selection Meeting Date :  02JUL2018 Time:  10:00AM Final Selection Posting Date :  02JUL2018 Time:  10:46AM 1st Date Negotiations Meetings :  03JUL2018 Time:  02:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 EISMAN & RUSSO, INC. 2 EXP U.S. SERVICES INC. Letters Received by the Department: EISMAN & RUSSO, INC. EXP U.S. SERVICES INC. ************************************************************ Contract Number : 18272 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Pre-Event Disaster/Construction Engineering & Inspection - East/West Debris Management (Cut and Toss and Debris Montoring Oversight) Project Manager : Keen, William Special Notes: When submitting LOR, include TCN 18269 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Contract/Project Issues (50) -Approach to Project -Understanding of Scope/Potential Project Types -Management and Quality Assurance 2.Proposed Staffing (50) -Proposed Staff Qualifications -Availability of Staff and Geographic Coverage -Qualifications/Certifications/Experience of Staff During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. Two contracts will be awarded from this advertisement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05JUN2018 Longlist(Tech. Rev. Cmte.) Date:  21JUN2018 Time:  01:30PM Shortlist Selection Date :  02JUL2018 Time:  10:00AM Final Selection Meeting Date :  02JUL2018 Time:  10:00AM Final Selection Posting Date :  02JUL2018 Time:  10:46AM 1st Date Negotiations Meetings :  03JUL2018 Time:  02:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 EISMAN & RUSSO, INC. 2 EXP U.S. SERVICES INC. Letters Received by the Department: EISMAN & RUSSO, INC. EXP U.S. SERVICES INC. ************************************************************ Contract Number : 19254 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $500,000 Financial Management Number(s): 43761916201 43762016201 43762116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI for SR 55 (US19) from Cross City to Old Town CEI for SR 49 (US129) from Levy C/L to End C&G CEI for SR 49 (US129) from SR 55 (US19) to Gilchrist C/L Project Manager : Chitwood, Sandra Special Notes: When submitting LOR, only include Financial Management (FM) Number 437619-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the District Two Gainesville Office View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 04JUN2018 Longlist(Tech. Rev. Cmte.) Date:  27JUN2018 Time:  02:00PM Shortlist Selection Date :  09JUL2018 Time:  10:00AM Shortlist Selection Posting :  10JUL2018 Time:  8:00AM Final Selection Meeting Date :  30JUL2018 Time:  10:00AM 1st Date Negotiations Meetings :  02AUG2018 Time:  02:00PM Last Date Negotiations Meetings:  31OCT2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Shortlisted Firms: BASLEE ENGINEERING SOLUTIONS (BES), KCCS, INC. TARGET ENGINEERING GROUP, LLC Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), KCCS, INC. KEVILLE ENTERPRISES, INC. NORTH FLORIDA PROFESSIONAL SERVICES SAI CONSULTING ENGINEERS, INC. TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19262 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Professional Liability Insurance $: $250,000 Financial Management Number(s): 42293866221 42293856221 42845516221 42835916221 43910016221 Major Work : 9.3 - Highway Materials Testing Minor Work : 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: SR23 from North of SR16 to North of SR21 (Blanding Blvd.); SR23 from East of SR209 to North of SR16; Jacksonville National Cemetery Access Road; SR5 (US1/MainSt) @ St. Johns River Bridge No. 720022; 1-10 from 1-295 to I-95 (FY2020) Project Manager : Morgan, Sally Special Notes: Additional Financial Identification Numbers may be assigned after the contract is executed. Projects will be added and removed, as necessary, to accomodate the work program for the duration of the contract Teaming of the firms is encourage. Prime firm may be required to sub 50% of the Test Pile Program to a Qualified Subconsultant(s). The selected prime consultant will not be able to work for the Contractor, on any of the projects assigned within this contract, in any capacity. Consultant Construction Engineering Inspection personnel will perform field concrete and earthwork testing. This advertisement has been extended through June 11, 2018. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21MAY2018 Longlist(Tech. Rev. Cmte.) Date:  14JUN2018 Time:  01:00PM Shortlist Selection Date :  25JUN2018 Time:  10:00AM Shortlist Selection Posting :  25JUN2018 Time:  10:15AM Final Selection Meeting Date :  20AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  23AUG2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Shortlisted Firms: AMEC FOSTER WHEELER ENVIRONMENT & I ECS-FLORIDA, L.L.C. TERRACON CONSULTANTS, INC. Letters Received by the Department: AMEC FOSTER WHEELER ENVIRONMENT & I CSI GEO, INC. ECS-FLORIDA, L.L.C. NOVA ENGINEERING AND ENVIRONMENTAL, TERRACON CONSULTANTS, INC. ************************************************************ Contract Number : 19248 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42293866201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services SR 23 New Road Construction (North of SR 16 to North of SR 21). Project Manager : Olivella, Joaquin Special Notes: When submitting LOR, include Financial Management (FM) Number 422938-6-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. This advertisement has been extended through June 5, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14MAY2018 Longlist(Tech. Rev. Cmte.) Date:  06JUN2018 Time:  04:00PM Shortlist Selection Date :  09JUL2018 Time:  10:00AM Final Selection Meeting Date :  09JUL2018 Time:  10:00AM Final Selection Posting Date :  10JUL2018 Time:  8:00AM 1st Date Negotiations Meetings :  12JUL2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 HNTB CORPORATION 2 H.W. LOCHNER INC Letters Received by the Department: H.W. LOCHNER INC HNTB CORPORATION ************************************************************ Contract Number : 19255 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43763016201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Construction Engineering Inspection Services for SR 16 Lighting from CR 16A to Verona Way and from St. Augustine Premium Outlet to San Marco Avenue. Project Manager : Devenny, Donald Special Notes: When submitting LOR, include Financial Management (FM) Number 437630-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14MAY2018 Longlist(Tech. Rev. Cmte.) Date:  13JUN2018 Time:  01:00PM Shortlist Selection Date :  25JUN2018 Time:  10:00AM Shortlist Selection Posting :  25JUN2018 Time:  10:30AM Final Selection Meeting Date :  16JUL2018 Time:  10:00AM Final Selection Posting Date :  16JUL2018 Time:  10:30AM 1st Date Negotiations Meetings :  18JUL2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 G-A-I CONSULTANTS, INC. 2 CREATIVE ENGINEERING GROUP, INC. 3 KEITH AND SCHNARS, P.A. Letters Received by the Department: AE ENGINEERING, INC. CREATIVE ENGINEERING GROUP, INC. CSI GEO, INC. G-A-I CONSULTANTS, INC. KEITH AND SCHNARS, P.A. SAI CONSULTING ENGINEERS, INC. ************************************************************ Contract Number : 18270 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Pre-Event Disater Monitoring/ Construction Engineering & Inspection - Traffic Signal Repair/Generator Installation Project Manager : Benton, Brian Special Notes: When submitting LOR, include TCN 18270 and the firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Contract/Project Issues (50) -Approach to Project -Understanding of Scope/Potential Project Types -Management and Quality Assurance 2.Proposed Staffing (50) -Proposed Staff Qualifications -Availability of Staff and Geographic Coverage -Qualifications/Certifications/Experience of Staff During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract.ber of the Two contracts will be awarded from this one advertisement This advertisement has been extended through May 17, 2018 -Proposed Staff Qualifications -Availability of Staff and Geographic Coverage -Qualifications/Certifications/Experience of Staff During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 30APR2018 Longlist(Tech. Rev. Cmte.) Date:  22MAY2018 Time:  10:00AM Shortlist Selection Date :  04JUN2018 Time:  10:00AM Final Selection Meeting Date :  04JUN2018 Time:  10:00AM Final Selection Posting Date :  04JUN2018 Time:  11:15AM 1st Date Negotiations Meetings :  07JUN2018 Time:  10:00AM Last Date Negotiations Meetings:  30JUN2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 AE ENGINEERING, INC. Letters Received by the Department: AE ENGINEERING, INC. ************************************************************ Contract Number : 18271 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: PRE-EVENT DISASTER MONITORING/CONSTRUCTION ENGINEERING AND INSPECTION CONTRACT OVERSIGHT EAST/WEST Project Manager : Chitwood, Sandra Contract Amount/Limit : $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Number of contracts that may be awarded from this advertisement: 2
Special Notes: When submitting LOR, include TCN 18271 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Contract/project issues (50) -Approach to Project -Understanding of Scope/Potential Project Types -Management and Quality Assurance 2. Proposed Staffing (50) -Proposed Staff Qualifications -Availability of Staff and Geographic Coverage -Qualifications/Certifications/Experience of Staff During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the District Office, Gainesville Construction, and Jacksonville Urban Office. TWO CONTRACTS WILL BE AWARDED FROM THIS ONE ADVERTISEMENT This advertisement has been extended through May 17, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 30APR2018 Response Deadline Date :  17MAY2018 Longlist(Tech. Rev. Cmte.) Date:  16MAY2018 Time:  02:30PM Shortlist Selection Date :  29MAY2018 Time:  10:00AM Final Selection Meeting Date :  29MAY2018 Time:  10:00PM Final Selection Date Not Posted 1st Date Negotiations Meetings :  30MAY2018 Time:  02:00PM Response Deadline : 17MAY2018 Respond To: d2.profserv@dot.state.fl.us Attn.: Kathy Jenkins, MS-2016 Phone: 386-961-7523 ************************************************************ Contract Number : 19251 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43025916201 43391216201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 113 (Southside Extension) at SR 10A/ Arlington Bridge No. 720502 Southbound and No. 720503. CEI Services for SR 211 (St. Johns Ave) at Fishweir Creek Bridge No. 720006. Project Manager : Kirts, Brian Special Notes: When submitting LOR, include Financial Management (FM) Number 430259-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Project Manager will participate as a member of the Technical Review Committee for this contract. This advertisement has been extended through May 8, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 16APR2018 Longlist(Tech. Rev. Cmte.) Date:  18MAY2018 Time:  01:00PM Shortlist Selection Date :  18JUN2018 Time:  10:00AM Final Selection Meeting Date :  18JUN2018 Time:  10:00AM Final Selection Posting Date :  18JUN2018 Time:  10:30AM 1st Date Negotiations Meetings :  20JUN2018 Time:  03:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 GREENMAN-PEDERSEN, INC. 2 BASLEE ENGINEERING SOLUTIONS (BES), Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), GREENMAN-PEDERSEN, INC. ************************************************************ Contract Number : 19203 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43457811201 Major Work : 13.5 - Subarea/Corridor Planning Under-Utilized Work Groups: GROUP13 - Planning Project Description: US 301 from Marion County line to I-10 Project Manager : Browning, Stephen View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09APR2018 Longlist(Tech. Rev. Cmte.) Date:  03MAY2018 Time:  01:30PM Shortlist Selection Date :  14MAY2018 Time:  10:00AM Shortlist Selection Posting :  14MAY2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  12JUN2018 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  14JUN2018 Time:  11:30AM Final Selection Meeting Date :  09JUL2018 Time:  10:00AM Final Selection Posting Date :  10JUL2018 Time:  8:15AM 1st Date Negotiations Meetings :  11JUL2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 H.W. LOCHNER INC 2 OSIRIS 9 CONSULTING, LLC 3 VOLKERT, INC. Letters Received by the Department: ARCADIS U.S., INC. BASLEE ENGINEERING SOLUTIONS (BES), H.W. LOCHNER INC OSIRIS 9 CONSULTING, LLC VOLKERT, INC. ************************************************************ Contract Number : 19206 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43574512201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design Project Description: PD&E: I-10 (SR 8) @ SR 121 OPERATIONAL IMPROVEMENTS Project Manager : Tyler, David Special Notes: When submitting Letters of Response, include Firm Name and Financial Management (FM) number 435745-1-22-01 on the subject line The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 09APR2018 Shortlist Selection Date :  21MAY2018 Time:  10:00AM Shortlist Selection Posting :  21MAY2018 Time:  10:45AM Tech. Rev. Cmte Meeting Date :  08MAY2018 Time:  08:30AM 2nd Tech Rev. Cmte Meeting :  15JUN2018 Time:  03:00PM Final Selection Meeting Date :  23JUL2018 Time:  10:00AM 1st Date Negotiations Meetings :  26JUL2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Shortlisted Firms: DEWBERRY ENGINEERS INC. G-A-I CONSULTANTS, INC. WANTMAN GROUP, INC. Letters Received by the Department: ARCADIS U.S., INC. DEWBERRY ENGINEERS INC. G-A-I CONSULTANTS, INC. METRIC ENGINEERING INC. PARSONS TRANSPORTATION GROUP INC. STANTEC CONSULTING SERVICES INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19242 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43628916219 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Districtwide Constructability Review Project Manager : HUMPHRIES, TRAVIS Special Notes: When submitting LOR, include Financial Management (FM) Number 436289-1-62-19 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09APR2018 Longlist(Tech. Rev. Cmte.) Date:  14MAY2018 Time:  03:30PM Shortlist Selection Date :  18JUN2018 Time:  10:00AM Final Selection Meeting Date :  18JUN2018 Time:  10:00AM Final Selection Posting Date :  18JUN2018 Time:  10:30AM 1st Date Negotiations Meetings :  21JUN2018 Time:  02:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 KCCS, INC. 2 DRMP, INC. 3 EXP U.S. SERVICES INC. 4 JACOBS ENGINEERING GROUP INC. Letters Received by the Department: DRMP, INC. EXP U.S. SERVICES INC. JACOBS ENGINEERING GROUP INC. KCCS, INC. ************************************************************ Contract Number : 19241 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43381146219 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: GAINESVILLE OPERATIONS CONTINUING SERVICES CONSTRUCTION ENGINEERING INSPECTION CONTRACT Project Manager : Suarez, Frank Special Notes: Florida Department of Transportation (FDOT) Project Manager is Frank Suarez 352-381-4202. Final Selection will be . made from Letters of Response. All letters of response are . to be submitted as attachments to E-Mail in Portable Digital Format (PDF). Letters of Response (LOR) are limited to five pages, may include information to demonstrate the firms' qualifications, but cannot exceed 1 MB in size. When submitting LOR, include Financial Management (FM) number 433811-4-62-19 and firm name on the subject line. Also, firms are required to indicate their percentage of Disadvantaged Business Enterprise (DBE) commitment on this contract or to fill out the attached DBE Participation Statement and return it in PDF format along with the LOR. During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. This is a Continuing Services (for Construction Inspection Staff). This contract will require field office personnel, therefore all CEI Services must utilize CEI field office rates. It is the Department-s intent to achieve economic efficiency through shared use of CEI personnel, facilities, equipment and other resources across multiple projects. The Department encourages the utilization of sub-consultants to accomplish this work effort. Construction Engineering and Inspection (CEI) Services will be procured through the Optional Alternate Selection Process and selection made directly from Letters of Response (LOR). Focus of relevant experience and qualifications of the proposed firms and personnel is desired. The Technical Committee shall consider and weigh the following in their selection process (0-100): Awareness of and Approach to Contract/Project Issues (0-40) -Understanding the Scope of Services for this contract (0-10 -Identification of Unique Project Issues (0-10) -Management and Quality Assurance (0-20) Proposed Staffing (0-50) -Quantity Proposed (0-10) -Availability of Staff (0-10) -Qualifications/Certifications of Staff (0-10) -Quality/Experience on Similar Projects (0-20) Other Considerations (0-10) -Communication abilities (0-5) -Value Added/ Innovative ideas (0-5) To be provided in addition to the five-page LOR: Staffing chart- include all proposed personnel clearly identifying prime and sub-consultant staff not to exceed one page in length and 11x17 in size. Resumes- For key personnel to include the engineer and senior inspectors not to exceed two pages per staff member. In addition to the resumes, a Construction Training Qualification Program (CTQP) printout may be included. The meetings will be held at the Gainesville Office. During the acquisition phase of this project,Consultants are refrained from contacting District Staff to market their firms until Final Ranking has occurred. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Longlist(Tech. Rev. Cmte.) Date:  07MAY2018 Time:  02:00PM Shortlist Selection Date :  04JUN2018 Time:  10:00AM Final Selection Meeting Date :  04JUN2018 Time:  10:00AM Final Selection Posting Date :  04JUN2018 Time:  11:45AM 1st Date Negotiations Meetings :  12JUN2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 TARGET ENGINEERING GROUP, LLC 2 RS&H, INC. 3 AE ENGINEERING, INC. Letters Received by the Department: AE ENGINEERING, INC. RS&H, INC. TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19258 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 21099513220 Major Work : 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies Minor Work : 9.2 - Geotechnical Classification Lab Testing 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: Geotechnical Continuing Services Contract Project Manager : Morgan, Sally Special Notes: When submitting Letters of Response, include Financial Management (FM) number 210995-1-32-20 and firm name on the subject line. THIS CONTRACT WILL BE A COMBO CONTRACT AND WILL UTILIZE THE Project Cost Redistribution PROCESS. ADDITIONAL FINANCIAL IDENTIFICATION NUMBERS WILL BE ASSIGNED AFTER THE CONTRACT IS EXECUTED. PROJECTS WILL BE ADDED AND REMOVED, AS NECESSARY, TO ACCOMODATE THE WORK PROGRAM FOR THE DURATION OF THE CONTRACT TEAMING OF THE FIRMS IS ENCOURAGED. PRIME FIRM MAY BE REQUIRED TO SUB 50% OF THE TEST PILE PROGRAM TO A QUALIFIED SUB-CONSULTANT(S). THE SELECTED PRIME CONSULTANT WILL NOT BE ABLE TO WORK FOR THE CONTRACTOR, ON ANY OF THE PROJECTS ASSIGNED WITHIN THIS CONTRACT, IN ANY CAPACITY. CONSULTANT CONSTRUCTIONENGINEERING INSPECTION PERSONEL WILL PERFORM FIELD CONCRETE AND EARTHWORK TESTING. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  16APR2018 Time:  01:30PM Shortlist Selection Date :  23APR2018 Time:  10:00AM Shortlist Selection Posting :  23APR2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  14MAY2018 Time:  02:00PM Final Selection Meeting Date :  18JUN2018 Time:  10:00AM Final Selection Posting Date :  18JUN2018 Time:  10:45AM 1st Date Negotiations Meetings :  20JUN2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 ENVIRONMENTAL AND GEOTECHNICAL SPEC 2 TERRACON CONSULTANTS, INC. 3 AMEC FOSTER WHEELER ENVIRONMENT & I Letters Received by the Department: AMEC FOSTER WHEELER ENVIRONMENT & I CSI GEO, INC. ECS-FLORIDA, L.L.C. ENVIRONMENTAL AND GEOTECHNICAL SPEC GSE ENGINEERING & CONSULTING, INC. MESKEL & ASSOCIATES ENGINEERING, PL TERRACON CONSULTANTS, INC. ************************************************************ Contract Number : 19221 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43731913201 44105713201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: MULTI PROJECT ADVERTISEMENT The following two projects will be advetised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 437319-1-32-01 DESIGN SERVICES FOR SR 10 (US 90) FROM EDGEWOOD STREET TO MCDUFF STREET. Estimated contract amount is $850,000.00. The project manager is Doug Dycus. 441057-1-32-01 DESIGN SERVICES FOR SR 13 FROM MILL CREEK TO DUVAL COUNTY LINE. Estimated contract amount is $830,000.00. The project manager is Clint McCraw. Project Manager : Dycus, Doug Special Notes: When submitting LOR, include Financial Management (FM) Number 437319-1-32-01 and firm name on the subject line. Construction Training and Qualification Program (CTQP) printouts DO NOT need to be submitted. Staff Hours, Org Charts, Resumes (if teams are different) and Schedules are to be submitted per project. Resumes- a two-page resume or work history sheet for key personnel. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of Project Issues (30) -Understanding of scope -Project Issues 2. Approach to Project (30) -Unique Concepts & Savings -Quality Control -Schedule 3. Project Staff (30) -Project Manager -Staff Quality -Availability 4. Other (10) -Prime/Sub Relationship -Quality of Proposal During the acquisition phase of this project, consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  12APR2018 Time:  03:00PM Shortlist Selection Date :  23APR2018 Time:  10:00AM Shortlist Selection Posting :  23APR2018 Time:  10:45AM Final Selection Meeting Date :  14MAY2018 Time:  10:00AM Final Selection Posting Date :  14MAY2018 Time:  11:45AM 1st Date Negotiations Meetings :  17MAY2018 Time:  09:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 GARRETT ENGINEERING GROUP, INC. 2 INWOOD CONSULTING ENGINEERS, INC. 3 POND & COMPANY CORPORATION 4 GRESHAM, SMITH AND PARTNERS Letters Received by the Department: ALFRED BENESCH & COMPANY AYRES ASSOCIATES INC BASLEE ENGINEERING SOLUTIONS (BES), FALLER, DAVIS & ASSOCIATES, INC. FISHER AND ARNOLD, INC. G-A-I CONSULTANTS, INC. GARRETT ENGINEERING GROUP, INC. GRAEF-USA INC. GRESHAM, SMITH AND PARTNERS HANSON PROFESSIONAL SERVICES INC. INWOOD CONSULTING ENGINEERS, INC. JOHN DAVENPORT ENGINEERING, INCORPO JOHNSON, MIRMIRAN & THOMPSON, INC. KEITH AND ASSOCIATES, INC. LASSITER TRANSPORTATION GROUP, INC. METRIC ENGINEERING INC. MOTT MACDONALD FLORIDA, LLC. NV5, INC. PALMER ENGINEERING CO. CROSS REFERE PATEL, GREENE AND ASSOCIATES, PLLC POND & COMPANY CORPORATION PROPEL ENGINEERING, INC. THE BALMORAL GROUP, LLC VOLKERT, INC. ************************************************************ Contract Number : 19235 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44120713201 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: DESIGN OF I-295 (SR9A) DAMES POINT BRIDGE (TRAFFIC OPS) Project Manager : Daugharty, Jeff Special Notes: When submitting LOR, include Financial Management (FM) Number 441207-1-32-01 and firm name on the subject line. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held in the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  02APR2018 Time:  01:00PM Shortlist Selection Date :  09APR2018 Time:  10:00AM Shortlist Selection Posting :  09APR2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  18APR2018 Time:  01:30PM 2nd Tech Rev. Cmte Meeting :  03MAY2018 Time:  03:00PM Final Selection Meeting Date :  04JUN2018 Time:  10:00AM Final Selection Posting Date :  04JUN2018 Time:  12:00PM 1st Date Negotiations Meetings :  06JUN2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 WSP USA INC. 2 POND & COMPANY CORPORATION 3 VANASSE HANGEN BRUSTLIN, INC. 4 FALLER, DAVIS & ASSOCIATES, INC. Letters Received by the Department: FALLER, DAVIS & ASSOCIATES, INC. POND & COMPANY CORPORATION VANASSE HANGEN BRUSTLIN, INC. WSP USA INC. ************************************************************ Contract Number : 19263 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 44105713201 43731913201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design Services for SR 13 from Mill Creek to Duval County Line. Project Manager : McCraw, Clint Special Notes: When submitting LOR, include Financial Management (FM) Number 437319-1-32-01 and firm name on the subject line. Construction Training and Qualification Program (CTQP) printouts DO NOT need to be submitted. Staff Hours, Org Charts, Resumes (if teams are different) and Schedules are to be submitted per project. Resumes- a two-page resume or work history sheet for key personnel. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of Project Issues (30) -Understanding of scope -Project Issues 2. Approach to Project (30) -Unique Concepts & Savings -Quality Control -Schedule 3. Project Staff (30) -Project Manager -Staff Quality -Availability 4. Other (10) -Prime/Sub Relationship -Quality of Proposal During the acquisition phase of this project, consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  12APR2018 Time:  03:00PM Shortlist Selection Date :  23APR2018 Time:  10:00AM Shortlist Selection Posting :  23APR2018 Time:  10:45AM Final Selection Meeting Date :  14MAY2018 Time:  10:00AM Final Selection Posting Date :  14MAY2018 Time:  11:45AM 1st Date Negotiations Meetings :  17MAY2018 Time:  03:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 GARRETT ENGINEERING GROUP, INC. 2 INWOOD CONSULTING ENGINEERS, INC. 3 POND & COMPANY CORPORATION 4 GRESHAM, SMITH AND PARTNERS Letters Received by the Department: ALFRED BENESCH & COMPANY AYRES ASSOCIATES INC BASLEE ENGINEERING SOLUTIONS (BES), FALLER, DAVIS & ASSOCIATES, INC. FISHER AND ARNOLD, INC. G-A-I CONSULTANTS, INC. GARRETT ENGINEERING GROUP, INC. GRAEF-USA INC. GRESHAM, SMITH AND PARTNERS HANSON PROFESSIONAL SERVICES INC. INWOOD CONSULTING ENGINEERS, INC. JOHN DAVENPORT ENGINEERING, INCORPO JOHNSON, MIRMIRAN & THOMPSON, INC. KEITH AND ASSOCIATES, INC. LASSITER TRANSPORTATION GROUP, INC. METRIC ENGINEERING INC. MOTT MACDONALD FLORIDA, LLC. NV5, INC. PALMER ENGINEERING CO. CROSS REFERE PATEL, GREENE AND ASSOCIATES, PLLC POND & COMPANY CORPORATION PROPEL ENGINEERING, INC. THE BALMORAL GROUP, LLC VOLKERT, INC. ************************************************************ Contract Number : 19208 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44186112201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : Project Description: A1A/SR116/Mt Pleasant Rd from Ft. Caroline National Memorial to Kingsley Plant Project Manager : Brooker, Brian Special Notes: When submitting Letters of Response, include Financial Management (FM) number 441861-1-22-01 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. The TRC meetings will be held at the District 2 Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 06MAR2018 Longlist(Tech. Rev. Cmte.) Date:  28MAR2018 Time:  02:00PM Shortlist Selection Date :  09APR2018 Time:  10:00AM Shortlist Selection Posting :  09APR2018 Time:  11:33AM Tech. Rev. Cmte Meeting Date :  26APR2018 Time:  02:00PM 2nd Tech Rev. Cmte Meeting :  03MAY2018 Time:  11:30AM Final Selection Meeting Date :  29MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  8:00AM 1st Date Negotiations Meetings :  31MAY2018 Time:  10:00AM Last Date Negotiations Meetings:  13AUG2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 INFRASTRUCTURE ENGINEERS, LLC 2 SCALAR CONSULTING GROUP INC. 3 H.W. LOCHNER INC Letters Received by the Department: G-A-I CONSULTANTS, INC. H.W. LOCHNER INC INFRASTRUCTURE ENGINEERS, LLC PROSSER, INC. D/B/A PROSSER HALLOCK SCALAR CONSULTING GROUP INC. ************************************************************ Contract Number : 19226 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 43808413201 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: US1/US17/SR211/CR211 (Talleyrand Avenue) Project Manager : Cordero, Orlando Special Notes: When submitting Letters of Response, include Financial Management (FM) number 438084-1-32-01 and firm name on the subject line. The TRC meetings will be held at the District Two Main Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  28MAR2018 Time:  02:00PM Shortlist Selection Date :  09APR2018 Time:  10:00AM Shortlist Selection Posting :  09APR2018 Time:  11:00AM Scope Meeting Date :  11APR2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  03MAY2018 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  15MAY2018 Time:  11:30AM Final Selection Meeting Date :  29MAY2018 Time:  10:00AM Final Selection Posting Date :  31MAY2018 Time:  8:00AM 1st Date Negotiations Meetings :  31MAY2018 Time:  03:00PM Last Date Negotiations Meetings:  13AUG2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 METRIC ENGINEERING INC. 2 VANASSE HANGEN BRUSTLIN, INC. 3 ARCADIS U.S., INC. Letters Received by the Department: ARCADIS U.S., INC. METRIC ENGINEERING INC. VANASSE HANGEN BRUSTLIN, INC. ************************************************************ Contract Number : 19209 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 20930143201 Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.2.1 - Major Bridge Design - Concrete Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: I-295 (SR9A) from Southside Connector (SR113) to SR202 JTB Project Manager : Shimer, Eric View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 26FEB2018 Longlist(Tech. Rev. Cmte.) Date:  03APR2018 Time:  01:30PM Shortlist Selection Date :  09APR2018 Time:  10:00AM Shortlist Selection Posting :  09APR2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  29MAY2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  29MAY2018 Time:  11:30AM Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  12JUN2018 Time:  8:00AM 1st Date Negotiations Meetings :  13JUN2018 Time:  9:300MM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 PARSONS TRANSPORTATION GROUP INC. 2 CH2M HILL, INC. 3 STV INCORPORATED Letters Received by the Department: CH2M HILL, INC. PARSONS TRANSPORTATION GROUP INC. STV INCORPORATED T.Y. LIN INTERNATIONAL ************************************************************ Contract Number : 19201 Technically Prequalified & Unlimited Audit required Selection Method   : LOR, Technical Proposal & Interview Financial Management Number(s): 21396131203 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.5 - Subarea/Corridor Planning Under-Utilized Work Groups: GROUP13 - Planning Project Description: GEC LAKE CITY PLANNING CONSULTANT Project Manager : Bennette, Barney Special Notes: When submitting Letters of Response, include Firm Name and Financial Management (FM) number 213961-3-12-03 on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Shortlist Selection Date :  19MAR2018 Time:  10:00AM Shortlist Selection Posting :  19MAR2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  13APR2018 Time:  03:00PM Final Selection Meeting Date :  21MAY2018 Time:  10:00AM Final Selection Posting Date :  21MAY2018 Time:  10:30AM 1st Date Negotiations Meetings :  23MAY2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 HANSON PROFESSIONAL SERVICES INC. 2 ATKINS NORTH AMERICA, INC. 3 AECOM TECHNICAL SERVICES, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. ALFRED BENESCH & COMPANY ATKINS NORTH AMERICA, INC. CRIBB PHILBECK WEAVER GROUP, INC. GANNETT FLEMING, INC. GRESHAM, SMITH AND PARTNERS HANSON PROFESSIONAL SERVICES INC. ************************************************************ Contract Number : 19202 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 21396161204 Major Work : 13.4 - Systems Planning Under-Utilized Work Groups: GROUP13 - Planning Project Description: Community impact assessment/environmental streamlining-ETDM Project Manager : Newman, Terri Special Notes: When submitting LOR, include Financial Management (FM) Number 21396161204 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. The TRC meetings will be held at the District Office in Lake City. This advertisement has been extended for 1 week. - - View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14FEB2018 Longlist(Tech. Rev. Cmte.) Date:  21FEB2018 Time:  02:30PM Shortlist Selection Date :  05MAR2018 Time:  10:00AM Shortlist Selection Posting :  19MAR2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  28MAR2018 Time:  02:30PM Final Selection Meeting Date :  30APR2018 Time:  10:00AM Final Selection Posting Date :  30APR2018 Time:  8:00AM 1st Date Negotiations Meetings :  03MAY2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 ATKINS NORTH AMERICA, INC. Letters Received by the Department: ATKINS NORTH AMERICA, INC. ************************************************************ Contract Number : 19204 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 21334592201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.3 - Controlled Access Highway Design Minor Work : Project Description: PD&E for I-295 from State Road 13 (San Jose) to State Road 21 (Blanding Blvd.) Project Manager : Brock, Michael Special Notes: When submitting Letters of Response, include Firm Name and Financial Management (FM) number 213345-9-22-01 on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. The TRC meetings will be held at the District 2 District Office View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12FEB2018 Longlist(Tech. Rev. Cmte.) Date:  05MAR2018 Time:  10:00AM Shortlist Selection Date :  12MAR2018 Time:  10:00AM Shortlist Selection Posting :  12MAR2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  05APR2018 Time:  02:30PM 2nd Tech Rev. Cmte Meeting :  09APR2018 Time:  11:30AM Final Selection Meeting Date :  30APR2018 Time:  10:00AM Final Selection Posting Date :  02MAY2018 Time:  8:00AM 1st Date Negotiations Meetings :  03MAY2018 Time:  02:00PM Last Date Negotiations Meetings:  23JUL2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 ARCADIS U.S., INC. 2 PARSONS TRANSPORTATION GROUP INC. 3 RS&H, INC. Letters Received by the Department: ARCADIS U.S., INC. G-A-I CONSULTANTS, INC. PARSONS TRANSPORTATION GROUP INC. RS&H, INC. ************************************************************ Contract Number : 19210 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 20964873201 Major Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 9.1 - Soil Exploration Project Description: Design Services of Traffic Control Devices/Systems for State Road (SR) 228/Normandy Boulevard from New World Avenue to Cassat Avenue in Duval County. Project Manager : Brinkley, Renee Special Notes: When submitting Letters of Response, include Firm Name and Financial Management (FM) number 20964873201 on the subject line. The TRC meetings will be held at the District Office in Lake City. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  19FEB2018 Time:  09:30AM Shortlist Selection Date :  05MAR2018 Time:  10:00AM Shortlist Selection Posting :  05MAR2018 Time:  10:30AM Scope Meeting Date :  08MAR2018 Time:  03:30PM Tech. Rev. Cmte Meeting Date :  10APR2018 Time:  01:30PM 2nd Tech Rev. Cmte Meeting :  16APR2018 Time:  12:00PM Final Selection Meeting Date :  07MAY2018 Time:  10:00AM Final Selection Posting Date :  07MAY2018 Time:  12:45PM 1st Date Negotiations Meetings :  10MAY2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 PETERS AND YAFFEE, INC. 2 WAITZ & MOYE, INC. 3 PARSONS TRANSPORTATION GROUP INC. Letters Received by the Department: ARCADIS U.S., INC. BASLEE ENGINEERING SOLUTIONS (BES), COMPREHENSIVE ENGINEERING SERVICES, H.W. LOCHNER INC METRIC ENGINEERING INC. PARSONS TRANSPORTATION GROUP INC. PETERS AND YAFFEE, INC. WAITZ & MOYE, INC. ************************************************************ Contract Number : 19230 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43946813201 44137213201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: MULTI PROJECT ADVERTISEMENT The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 439468-1-32-01 SR 115 (SOUTHSIDE BLVD) AT DEERWOOD PARK. Estimated contract amount is $830,781.00, the project Manager is Chris Rhude. 441372-1-32-01 SR 115 (SOUTHSIDE BLVD) AT GATE PARKWAY. Estimated contract amount is $997,662.00, the project manager is Eric Shimer. Project Manager : Rhude, Chris Special Notes: When submitting Letters of Response, include Financial Management (FM) number 439468-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  05MAR2018 Time:  01:00PM Shortlist Selection Date :  12MAR2018 Time:  10:00AM Shortlist Selection Posting :  12MAR2018 Time:  11:30AM Scope Meeting Date :  26MAR2018 Time:  04:00PM Tech. Rev. Cmte Meeting Date :  19APR2018 Time:  03:00PM 2nd Tech Rev. Cmte Meeting :  24APR2018 Time:  03:15PM Final Selection Meeting Date :  14MAY2018 Time:  10:00AM Final Selection Posting Date :  14MAY2018 Time:  12:45PM 1st Date Negotiations Meetings :  17MAY2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 STANTEC CONSULTING SERVICES INC. 2 HANSON PROFESSIONAL SERVICES INC. 3 MICHAEL BAKER INTERNATIONAL, INC. D 4 CONNELLY & WICKER INC. Letters Received by the Department: ALFRED BENESCH & COMPANY BASLEE ENGINEERING SOLUTIONS (BES), CONNELLY & WICKER INC. GGI, LLC D/B/A GENESIS GROUP GRAEF-USA INC. H.W. LOCHNER INC HANSON PROFESSIONAL SERVICES INC. HDR ENGINEERING, INC. HORIZON ENGINEERING GROUP, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. KISINGER CAMPO & ASSOCIATES, CORP. METRIC ENGINEERING INC. MICHAEL BAKER INTERNATIONAL, INC. D MOTT MACDONALD FLORIDA, LLC. NV5, INC. POND & COMPANY CORPORATION STANTEC CONSULTING SERVICES INC. T.Y. LIN INTERNATIONAL VOLKERT, INC. ************************************************************ Contract Number : 19232 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44105013201 Major Work : 7.3 - Signalization Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: SR 134 (103rd Street) from Hillman Dr./McManus Dr. to Readstone Dr. Project Manager : Lyons, Will Special Notes: When submitting Letters of Response, include Financial Management (FM) number 441050-1-32-01 and firm name on the subject line. The TRC meetings will be held at the District Two Office View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  20FEB2018 Time:  10:00AM Shortlist Selection Date :  26FEB2018 Time:  10:00AM Shortlist Selection Posting :  26FEB2018 Time:  12:01PM Tech. Rev. Cmte Meeting Date :  20MAR2018 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  22MAR2018 Time:  11:30AM Final Selection Meeting Date :  30APR2018 Time:  10:00AM Final Selection Posting Date :  30APR2018 Time:  8:00AM 1st Date Negotiations Meetings :  18APR2018 Time:  02:00PM Last Date Negotiations Meetings:  11JUN2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 WAITZ & MOYE, INC. 2 POND & COMPANY CORPORATION 3 GRAEF-USA INC. Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), CONSOLIDATED DESIGN PROFESSIONALS, GRAEF-USA INC. LASSITER TRANSPORTATION GROUP, INC. PETERS AND YAFFEE, INC. POND & COMPANY CORPORATION WAITZ & MOYE, INC. ************************************************************ Contract Number : 19264 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44137213201 43946813201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design Services SR 115 (Southside Blvd.) at Gate Parkway. Project Manager : Shimer, Eric Special Notes: When submitting Letters of Response, include Financial Management (FM) number 439468-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  05MAR2018 Time:  01:00PM Shortlist Selection Date :  12MAR2018 Time:  10:00AM Shortlist Selection Posting :  12MAR2018 Time:  11:30AM Scope Meeting Date :  26MAR2018 Time:  04:00PM Tech. Rev. Cmte Meeting Date :  19APR2018 Time:  03:00PM 2nd Tech Rev. Cmte Meeting :  24APR2018 Time:  03:15PM Final Selection Meeting Date :  14MAY2018 Time:  10:00AM Final Selection Posting Date :  14MAY2018 Time:  12:45PM 1st Date Negotiations Meetings :  17MAY2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 STANTEC CONSULTING SERVICES INC. 2 HANSON PROFESSIONAL SERVICES INC. 3 MICHAEL BAKER INTERNATIONAL, INC. D 4 CONNELLY & WICKER INC. Letters Received by the Department: ALFRED BENESCH & COMPANY BASLEE ENGINEERING SOLUTIONS (BES), CONNELLY & WICKER INC. GGI, LLC D/B/A GENESIS GROUP GRAEF-USA INC. H.W. LOCHNER INC HANSON PROFESSIONAL SERVICES INC. HDR ENGINEERING, INC. HORIZON ENGINEERING GROUP, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. KISINGER CAMPO & ASSOCIATES, CORP. METRIC ENGINEERING INC. MICHAEL BAKER INTERNATIONAL, INC. D MOTT MACDONALD FLORIDA, LLC. NV5, INC. POND & COMPANY CORPORATION STANTEC CONSULTING SERVICES INC. T.Y. LIN INTERNATIONAL VOLKERT, INC. ************************************************************ Contract Number : 19218 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43461513201 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: DESIGN OF I-95 (SR9) FROM SR207 TO INTERNATIONAL GOLF PARKWAY (RESURFACING WITH DIVERGING DIAMOND INTERCHANGE AT SR16) Project Manager : McCraw, Clint Special Notes: WHEN SUBMITTING LOR, INCLUDE FINANCIAL MANAGEMENT (FM) NUMBER 434615-1-32-01 AND FIRM NAME ON THE SUBJECT LINE. THE TECHNICAL REVIEW COMMITTEE MEETING AND SCOPE CLARIFICATION MEETING/BEGIN NEGOTIATIONS MEETING WILL BE HELD AT THE JACKSONVILLE URBAN OFFICE. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 22JAN2018 Longlist(Tech. Rev. Cmte.) Date:  13FEB2018 Time:  10:30AM Shortlist Selection Date :  26FEB2018 Time:  10:00AM Shortlist Selection Posting :  26FEB2018 Time:  11:30AM Scope Meeting Date :  01MAR2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  03APR2018 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  05APR2018 Time:  02:30PM Final Selection Meeting Date :  23APR2018 Time:  10:00AM Final Selection Posting Date :  23APR2018 Time:  10:30AM 1st Date Negotiations Meetings :  25APR2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 TRANSYSTEMS CORPORATION D/B/A TRANS 2 HNTB CORPORATION 3 CONNELLY & WICKER INC. Letters Received by the Department: ARCADIS U.S., INC. CONNELLY & WICKER INC. FISHER AND ARNOLD, INC. HNTB CORPORATION HORIZON ENGINEERING GROUP, INC. KISINGER CAMPO & ASSOCIATES, CORP. STANTEC CONSULTING SERVICES INC. T.Y. LIN INTERNATIONAL TRANSYSTEMS CORPORATION D/B/A TRANS VOLKERT, INC. ************************************************************ Contract Number : 19223 Projects less than $500,000 (Technical Qualification only) Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43737713201 44117313201 44119413201 Major Work : 3.1 - Minor Highway Design 7.2 - Lighting 7.3 - Signalization Minor Work : 7.1 - Signing, Pavement Marking & Channelization 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: SR226 (SW 16TH AVE) AT SW 10TH TERRACE (PED MID BLOCK) SR117 (LEM TURNER RD) CROSSWALK EAST OF I-95 (PED XWAY) SR A1A/SR10/ATLANTIC BLVD/3RD ST FR: 2ND AVENUE NORTH TO BAY ST (PED XWAY) Project Manager : Kaster, Aaron Special Notes: This advertisement has been extended through 02/19/2018. When submitting LOR, include Financial Management (FM) Number 437377-1-32-01 and firm name on the subject line. Construction Training and Qualification Program (CTQP) printouts DO NOT need to be submitted Resumes- a two-page resume or work history sheet for key personnel. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Project Issues (50) -Understanding of Scope -Project Issues -Project Challenges 2. Technical Approach (30) -Key Personnel -Project Coordination -Schedule / Milestones 3. Cost Savings Strategies (20) -Production Saving Efficiencies -Construction Saving Strategies -Proposes strategies that can be delivered During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 22JAN2018 Shortlist Selection Date :  12MAR2018 Time:  10:00AM Final Selection Meeting Date :  02APR2018 Time:  10:00AM Final Selection Posting Date :  02APR2018 Time:  10:30AM 1st Date Negotiations Meetings :  04APR2018 Time:  01:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 PATEL, GREENE AND ASSOCIATES, PLLC 2 LASSITER TRANSPORTATION GROUP, INC. 3 GRAEF-USA INC. Letters Received by the Department: GRAEF-USA INC. LASSITER TRANSPORTATION GROUP, INC. PATEL, GREENE AND ASSOCIATES, PLLC ************************************************************ Contract Number : 19240 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 21118513214 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 3.1 - Minor Highway Design 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Under-Utilized Work Groups: GROUP6 - Traffic Engineering & Operations Studies Project Description: District Wide Traffic OPerations Studies Project Manager : Farnell, Amanda Special Notes: When submitting Letters of Response, include Financial Management (FM) number 211185-1-32-14 and firm name on the subject line. The Technical Review Committee meetings will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 22JAN2018 Longlist(Tech. Rev. Cmte.) Date:  26FEB2018 Time:  10:00AM Shortlist Selection Date :  05MAR2018 Time:  10:00AM Shortlist Selection Posting :  05MAR2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  02APR2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  03APR2018 Time:  11:45AM Final Selection Meeting Date :  30APR2018 Time:  10:00AM Final Selection Posting Date :  02MAY2018 Time:  8:00AM 1st Date Negotiations Meetings :  03MAY2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 KIMLEY-HORN AND ASSOCIATES, INC. 2 METRIC ENGINEERING INC. 3 CARDNO, INC. Letters Received by the Department: ALFRED BENESCH & COMPANY CARDNO, INC. ENGLAND, THIMS & MILLER, INC. KIMLEY-HORN AND ASSOCIATES, INC. LASSITER TRANSPORTATION GROUP, INC. METRIC ENGINEERING INC. ************************************************************ Contract Number : 19257 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 21481417219 21481427219 Major Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.3 - Complex Bridge Inspection Minor Work : 5.4 - Bridge Load Rating Under-Utilized Work Groups: GROUP5 - Bridge Inspection Project Description: Area Wide Bridge Inspection (Non-interstate) Atea Wide Bridge Inspection (Interstate) Project Manager : Morgan, Melissa D View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 22JAN2018 Longlist(Tech. Rev. Cmte.) Date:  14FEB2018 Time:  01:00PM Shortlist Selection Date :  26FEB2018 Time:  10:00AM Shortlist Selection Posting :  26FEB2018 Time:  11:30AM Final Selection Meeting Date :  16APR2018 Time:  10:00AM Final Selection Posting Date :  16APR2018 Time:  10:30AM 1st Date Negotiations Meetings :  19APR2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 INFRASTRUCTURE ENGINEERS, LLC 2 BURGESS & NIPLE, INC. 3 TRANSYSTEMS CORPORATION D/B/A TRANS Letters Received by the Department: BURGESS & NIPLE, INC. INFRASTRUCTURE ENGINEERS, LLC TRANSYSTEMS CORPORATION D/B/A TRANS VOLKERT, INC. ************************************************************ Design/Build Projects Procurement Number : E2Q65 Financial Management Number(s): 20820745201 Project Description: Landscaping, perimeter wall, drainage improvements, and other incidental construction on SR 15 (US 17) from Holly Point Road to East Elbow Road in Clay County Project Manager : Teal, Craig Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 5 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 15.0 - Landscape Architect DBE/MBE Requirements: DBE Availability is 8.6% CLICK HERE FOR ADDITIONAL INFORMATION Advertisement Status : Shortlisted Date of Advertisement : 17JAN2412 Phase1 Selection Cmte. Meeting :  24JAN2412 Time:  08:30AM LOI Scores Notification Date :  24JAN2412 Time:  08:30AM Deadline for Election to Participate in Phase2 :  30JAN2412 Time:  02:00PM Posting of Shortlist :  30JAN2412 Time:  02:00PM Mand. Pre-Proposal Meeting Date:  31JAN2412 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  29MAR2412 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  19JAN2012 Time:  10:00AM Price Proposal Due Date :  29MAR2412 Time:  02:00PM Proposal Opening Date :  29MAR2412 Time:  02:00PM Final Selection Meeting Date :  03APR2412 Time:  08:30AM Award Committee Meeting Date :  03APR2012 Time:  08:30AM ************************************************************ Procurement Number : E2N43 Financial Management Number(s): 42598615201 42598715201 Project Description: THIS PROJECT HAS BEEN PULLED FROM THE FEBRUARY 17, 2010 . The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids & proposals from Proposers for the upgrade of an addition to an existing ITS system along SR15 (US 17) from Creighton Road in Clay County to Collins Road in Duval County. DESCRIPTION OF WORK: The ITS project consist of installation of four (4) arterial dynamic message signs (ADMS), interconnection with the existing FDOT District 2 fiber optic network (FON), adjustments to existing closed-circuit television (CCTV) camera mounting equipment, and the installation of an ITS cabinet at the intersection of SR 15 and Kingsley Avenue. The project shall also include all ancillary components and device configuration needed to connect and operate a complete ITS. Where complete shall be defined as command and control of all ITS interconnected components required by the identified command and control agencies specified in these contract documents. Existing multi-mode (MM) fiber optic cable (FOC) shall be utilized as the FOC backbone for the Project. DESIGN BUILD TEAM REQUIREMENTS:The contractor and Design professionals cannot be on more than one team. The secondary member (i.e.,designer or contractor) of the design build team cannot change, after award, without the written approval of the District Secretary. . A professional firm shall not submit a proposal for CEI services, either as a Prime or a Sub, for a Design-Build contract for which the same firm or its affiliate is the Engineer of Record (EOR) or is Sub to the EOR. . A consultant firm, its affiliate, or sub consultant that is under contract with the Department to develop the Request for Proposal for a Design Team proposing on that contract cannot be a part of a Design Build Team proposing on that contract as a prime or a sub consultant. A consultant firm, its affiliate, or sub consultant, that is under contract with the Department to provide Construction Engineering and Inspection (CEI) services on the Design Build contract cannot be a part of a Design Build Team proposing on that contract as a prime or sub consultant. PREQUALIFIFCATION:Prequalification requirements for Design Build Advertisements for the contractor and design professional members of the Design Build team must be in
  1. Contractors submitting as a lead or primary party with the design build team must be qualified in the work classes, in accordance with the provisions of Rule Chapter 14-22. F.A.C. In this case, where the design professional is not the lead of the design-build team, the design professional will be utilized to meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C.
  2. Design Professionals submitting as lead of the design build team may utilize subcontractors to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22 F.A.C. In this case, the lead design professional will meet the professional consultant work type requirements, in accordance with provisions of Rule 14-45, F.A.C.
  3. When a joint venture party submits a Letter of Interest, one of the contractor members of the joint venture party must be assigned to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, the design professional member of the team will be utilized to meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C.
RESPONSE PROCEDURE:Prequalified firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting a Fax Order Form found at the District Two website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2 . SELECTION PROCEDURE: if it is responsive and responsible. If the proposal is proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor irregularities. . PROTEST RIGHTS: section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes." . ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. Project Manager : Williams, Amy Selection Method : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications Technical Questions Should Be Addressed To: DUE DATE FOR BID PROPOSALS WITH TECHNICAL PROPOSALS: Bid Proposals with technical proposals will be due to the District Contracts Office on February 17, 2010 on or before 2:00 p.m. deadline of the bid due date. . Prior to letting, direct questions through: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Bidders shall take responsibility to review and be familiar with all questions and responses posted on this website up through 2 business days prior to the bid opening and to make any necessary adjustments in the proposal accordingly. Bonding Requirements: BONDING REQUIREMENTS: Firms submitting bids will be required to provide a 5% bid bond for each bid in excess of $150,000.00. . The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid. The successful firm will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Florida. . The legal entity contracting with the Department must provide project specific Professional Liability Insurance covering errors and omissions in the amount of $1,000,000 unless each team member providing professional services carries and maintains blanket Professional Liability Insurance covering errors and omissions in the amount of $1,000,000. Project specific insurance is insurance covering only this project. Blanket insurance is insurance that covers all projects. The awarded contractor will be required to provide certificates of Insurance for General Liability, Auto's and Worker's Compensation. For GENERAL LIABILITY INSURANCE, the description area MUST state that the State of Florida Department of Transportation is endorsed as an additional insured. For GENERAL LIABILITY INSURANCE, THE DESIGN BUILD TEAM MUST PROVIDE an ENDORSEMENT PAGE OF THE INSURANCE POLICY THAT ACTUALLY STATES FDOT IS ENDORSED. . The Professional Liability Insurance must be provided by Liability Insurance must be provided by the Designer/ Consultant. ALL CERTIFICATES OF INSURANCE MUST HAVE ORIGINAL SIGNATURES. DBE/MBE Requirements: DBE REQUIREMENTS: The Florida Department of Transportation (hereinafter referred to as the "Department"),in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement,minority business enterprises and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan CLICK HERE FOR ADDITIONAL INFORMATION View RFP (Adobe Acrobat® PDF file) Low Bid Design-Build Qualification Validation Form Advertisement Status : Shortlisted Date of Advertisement : 14DEC2400 Pre-Bid Meeting Date :  27JAN2400 Time:  10:00AM Bid Opening Date :  17FEB2400 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  25FEB2400 Time:  08:30AM Final Selection Meeting Date :  01MAR2400 Time:  08:30AM ************************************************************ Procurement Number : E2L04 Financial Management Number(s): 4229381 SEE ADDEND6 Project Description: The First Coast Outer Beltway Project - The Florida Department of Transportation, an agency of the State of Florida requests sealed submittal of Statements of Qualification from Proposers desiring to Develop, Design, Construct, Finance, Maintain, Operate and Toll the project. - FDOT is seeking a private partner experienced in undertaking large transportation (road and bridge) infrastructure projects under a concession approach and who is willing to share risks. The successful Proposer must have proven ability to arrange and close financing on favorable terms. as well as a demonstrated skill in designing, building, managing and operating complex transportation (road and bridge) projects on behalf of public sector owners. - The Project is a minmum four-lane limited access toll the St. Johns River in the vicinity of the existing SR 16 crossing (Shands Bridge) of the St Johns River to Inter- state 10 in Duval County. The Project is comprised of the St. Johns River Crossing segment in St. Johns and Clay Counties and the Branen Field-Chaffee Road segment in Clay and Duval Counties. The total length of the Project is approximatgely 46.5 miles. - For a complete Request for Qualification package, the map, any addendums and the Project Information Memorandum go to: http://www.fdotfirstcoastouterbeltway.com - The Statement of Qualifications will be sent by mail to the address in the Requalification for Qualification. Project Manager : Jones-Redd, Jane E Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: ___ Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.2.3 - Major Bridge Design - Segmental 5.1 - Conventional Bridge Inspection 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing 10.1 - Rdwy Construction Engineering Inspection 10.3 - Construction Materials Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) 10.5.1 - Major Bridge(CEI) - Concrete Technical Questions Should Be Addressed To: email address: FCOBprocurement@dot.state.fl.us Special Notes: Please see the Request for Qualification package (Scope) for additional information. Note: An second addendum was added to the scope on February 8, 2008.  In addition, a Questions and Answers document has been added to the end of addendum two. (page 118)   Please download the revised document. CLICK HERE FOR ADDITIONAL INFORMATION View RFP (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 04DEC2400 Phase1 Selection Cmte. Meeting :  08APR2400 Time:  08:30AM Posting of Shortlist :  25SEP2400 Time:  Mand. Pre-Proposal Meeting Date:  23APR2400 Time:  02:00PM Phase 2 Tech. Proposal Due Date:  24SEP2400 Time:  Tech. Rev. Cmte Meeting Date :  19NOV2008 Time:  02:00PM Final Selection Meeting Date :  25NOV2400 Time:  08:30AM On Hold ************************************************************ Procurement Number : E2L32 Financial Management Number(s): 20820235201 Project Description: NOTICE OF WITHDRAWAL DUE TO CHANGES NECESSARY ON BID PACKAGE E2L32, WE HAVE DECIDED TO PULL THIS PROJECT FROM THE SEPTEMBER 25, 2008 LETTING. WE APOLOGIZE FOR ANY INCONVENIENCE THIS MAY HAVE CAUSED YOU. HOWEVER, SINCE WE DO ANTICIPATE RE-LETTING THIS PROJECT IN ITS REVISED FORM IN THE VERY NEAR FUTURE, WE WOULD RECOMMEND THAT YOU SAVE THE WORK YOU HAVE DONE THUS FAR AS MUCH OF IT SHOULD BE APPLICABLE TO THE NEXT PROJECT. The Florida Department of Transportation has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for landscape design and installation of median landscaping for SR 15 from Gum Street to Lamont Street (0.937 miles) and SR 21 from Halpren's Way to CR 220 (1.396 miles) in Clay County. DESCRIPTION OF WORK On Project 20820235201 - SR 15 (N. Orange Avenue) from Gum St. to Lamont St., Clay County, the work shall consist of removal of existing landscaping, design and implement a new landscape plan which includes cabbage palms, crape myrtles, shrubs, ornamental grass and perennial peanut sod as well as flower bed preparation on each median nose. Project includes design and construction of a permanent irrigation system per each median. Finally, maintenance including mowing of the medians will be required of the contractor during the contract and throughout the one (1) year establishment period. On Project 20821165201 - SR 21 (Blanding Blvd.) from Halpren's Way to CR 220, Clay County, the work shall consist of removal of existing landscaping, design and implement a new landscape design with crape myrtles planted throughout the center of the curbed medians at the appropriate spacing. Also, maintenance including mowing of the medians will be required of the contractor during the contract and throughout the one (1) year establishment period. . The Design-Build Firm shall be responsible for survey, geotechnical investigation, design, acquisition of all permits not acquired by the Department, any required modification of permits acquired by the Department, maintenance of traffic, demolition, and construction on or before the date indicated in their proposal. The Design- Build Firm will coordinate all utility relocations. The Design and Construction Criteria (Section VI) sets forth requirements regarding survey, design, construction, maintenance of traffic during construction, requirements relative to project management, scheduling and coordination with other agencies and entities such as state and local government, utilities, environmental permitting agencies and the public. The Design-Build Firm shall demonstrate good project management practices while working on this project. These include communication with the Department and the District Landscape Architect and others as necessary, documentation, management of time and resources. There will be a one (1) year establishment period following installation. During this time period the Design-Build Firm will be responsible for planting survival, project maintenance, and mowing as stated in FDOT Standard Specification Section 580. DESIGN-BUILD TEAM REQUIREMENTS: The Contractor and Design professionals cannot be on more than one team. The secondary member (i.e., designer or contractor) of the Design-Build team cannot change, after award, without the written approval of the District Secretary. A professional firm shall not submit a proposal for CEI services, either as a Prime or a Sub, for a Design-Build contract for which the same firm or its affiliate is the Engineer of Record (EOR) or is Sub to the EOR. a consultant firm, its affiliate, or subconsultant that is under contract with the Department to develop the Request for Proposal for a Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or a subconsultant. A consultant firm, its affiliate, or subconsultant, that is under contract with the Department to provide Construction Engineering and Inspection (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subconsultant. PREQUALIFICATION: Pre-qualification requirements for Design-Build Advertise- ments for the contractor and design professional members of the Design-Build team must be in accordance with the following (Rule Chapter 14-91, F.A.C.). (1) Contractors submitting as a lead or primary party with the Design-Build team must be qualified in the advertised construction contractor work classes, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, where the design professional is not the lead of the Design-Build team, the design professional will be utilized to meet the professional consultant work type requirements, in accordance with provision of Rule 14-75, F.A.C. (2) Design professionals submitting as lead of the Design- Build team may utilize subcontractors to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, the lead design professional will meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C. (3) When a joint venture party submits a Letter of Interest, one of the contractor members of the joint venture party must be assigned to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, the design professional member of the team will be utilized to meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C. RESPONSE PROCEDURE: Prequalified firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting the fax request form found on the District Two District Contracts website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2. SELECTION PROCEDURE: Firms shall submit a bid proposal and a technical proposal. All bids will be opened and the technical proposal of the lowest bidder shall be evaluated by the FDOT to determine if it is responsive and responsible. If the proposal of deemed non-responsive or non-responsible, the technical proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor proposal irregularities. PROTEST RIGHTS: "Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time frame allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes." ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. Project Manager : THRASHER, JOHN Selection Method : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 15.0 - Landscape Architect Technical Questions Should Be Addressed To: Prior to letting, direct questions through: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Bidders shall take responsibility to review and be familiar with all questions and responses posted on this website up through 2 business days prior to the bid opening and to make any necessary adjustments in the proposal accordingly. Bonding Requirements: Firms submitting bids will be required to provide a 5% bid bond for each bid in excess of $150,000.00. . The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid. The successful firm will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Florida. . The legal entity contracting with the Department must provide project specific Professional Liability Insurance covering errors and omissions in the amount of $1,000,000.00 unless each team member providing professional services carries and maintains blanket Professional Liability Insurance covering errors and omissions in the amount of $1,000,000.00. Project specific insurance is insurance covering only this project. Blanket insurance is insurance that covers all projects. All certificates of insurance shall name the Florida Department of Transportation as an additional insured and must have original signatures. DBE/MBE Requirements: The Florida Department of Transportation (hereinafter referred to as the "Department"), in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21 Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Further, the Department will not discriminate against bidders on the grounds of race, color, national origin, sex, age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan. View RFP (Adobe Acrobat® PDF file) Low Bid Design-Build Qualification Validation Form Advertisement Status : Shortlisted Date of Advertisement : 08JUL2400 Pre-Bid Meeting Date :  10SEP2400 Time:  10:00AM Bids Due Date :  25SEP2400 Time:  02:00PM Bid Opening Date :  25SEP2400 Time:  02:00PM Final Selection Meeting Date :  07OCT2400 Time:  08:30AM Project Withdrawn ************************************************************ Procurement Number : E2P15 Financial Management Number(s): 42930415201 42930425201 Project Description: SR 23 Frontage roads from old Jennings Road to Oakleaf Plantation Parkway, New Road Construction, Orange Park Project Manager : THOMAS, KATHY Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 5 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.3 - Controlled Access Highway Design 4.1.2 - Minor Bridge Design CLICK HERE FOR ADDITIONAL INFORMATION Advertisement Status : Shortlisted Date of Advertisement : 18APR2400 1st Pre-Longlist(TRC)Date :  22APR2011 Time:  10:00AM Phase1 Selection Cmte. Meeting :  26APR2400 Time:  08:30AM Posting of Shortlist :  28APR2400 Time:  Mand. Pre-Proposal Meeting Date:  03MAY2411 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  12JUL2411 Time:  Price Proposal Due Date :  11AUG2411 Time:  02:00PM Proposal Opening Date :  11AUG2411 Time:  02:00PM Final Selection Meeting Date :  16AUG2411 Time:  08:30AM Award Committee Meeting Date :  16AUG2011 Time:  08:30AM ************************************************************ Procurement Number : E2M00 Financial Management Number(s): 21149425201 Project Description: PROJECT NAME AND DESCRIPTION The Florida Department of Transportation (Department), District 2 has identified this Federal project for Design Build for Safe Sidewalk (5' wide by 4" thick) in Starke between the existing sidewalk and North Westmoreland Street in Starke, Florida. . Note: The RFP will contain Davis Bacon Wage Rate, FHWA 1273, Buy America and the monthly reporting information required by FHWA. . There will be no stipends for this project. . ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. . DESIGN BUILD TEAM REQUIREMENT LIMITATIONS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . RESPONSE PROCEDURE: Firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting the fax request form found on the District Two District Contracts website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2. Project packages will be e-mailed to those firms that have requested them. . Technical proposals with Bid packages must be submitted by 2:00 pm on the date indicated in the Calendar of Events. . Bid openings and public meetings will be held in district headquarters unless otherwise noted. . PREQUALIFICATION: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . PROTEST RIGHTS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . "Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes." . SELECTION PROCEDURE: Firms shall submit a bid proposal and a technical proposal. Bids will be opened and the technical proposal of the lowest bidder shall be evaluated by the FDOT to determine if it is responsive and responsible. If the proposal is deemed non-responsive or non responsible, the technical proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor proposal irregularities. . The Department shall determine the relative ability of the proposer to perform the services required for this project based on * 14-22 and 14-75 prequalification information, *Technical Proposal with other experience and other documentation of pertinent information requested. . The selection results will be posted on the Department's website (www.dot.state.fl.us/procurement) at the indicated date and time indicated in the advertisement. . A contractor must have a current certificate of qualification in accordance with Rule Chapter 14-22, F.A.C. on the due date of the Technical proposals and the sealed bid. In order for the Department to have the information required to determine a bidder's Current Capacity, it is necessary that the bidder enter his "Work Underway". This certification shall be accomplished electronically by submitting the Certification of Work Underway (Online Web Application) http://www.dot.state.fl.us/cc-admin/PreQual Info/prequalified.shtm to the Department concurrently with the bid submittal for the first letting in the calendar month that the bidder submits a bid. . proposer to perform the services required for this project based on *14-22 and 14-75 prequalification information, *Technical Proposal with other experience and other documentation of pertinent information requested. . ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. . NOTE: A contractor must have a current certificate of qualification in accordance with Rule Chapter 14-22, F.A.C. on the due date of the Technical proposals and the sealed bid. In order for the Department to have the information required to determine a bidder's Current Capacity, it is necessary that the bidder enter his "Work Underway". This certification shall be accomplished electronically by submitting the Certification of Work Underway (Online Web Application) http://www.dot.state.fl.us/cc-admin/PreQual Info/prequalified.shtm to the Department concurrently with the bid submittal for the first letting in the calendar month that the bidder submits a bid. . Project Manager : BRINKLEY, RENEE Selection Method : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design Technical Questions Should Be Addressed To: Direct questions to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Proposers are responsible for viewing the website and shall be familiar with all questions and responses posted on this website up to the due date of the Technical Proposal with the price package and are responsible for making necessary adjustments to the information to be presented. . Bonding Requirements: The Price Package shall contain the Bid Bond. . Bid Bond At bid time, a Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bankdraft of any national or state bank,or a Surety Bid Bond made payable to the Florida Departmentof Transportation must accompany each bid. A check or draft in an amount less than five percent (5%) of the actual bidwill invalidate the bid proposal. . Performance and Payment Bond At award time the following is applicable: The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid before execution of the contract. The successful proposer will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Florida. . INSURANCE REQUIREMENTS Workers' Compensation Insurance Provide in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefits of the Florida Workers' Compensation Law for all employees. If subletting any of the work, ensure employees of the subcontractors are covered by similar insurance. Ensure that any equipment rental agreements that include operators who are employees of independent contractors, sole proprietorships or partners are covered by similar insurance. The Engineer will accept equivalent approved protection in lieu of insurance. . Contractors' Public Liability and Property Damage Liability Insurance Furnish evidence to the Department that, with respect to the operations performed, regular Contractors' Public Liability Insurance providing for a limit of not less than $1,000,000 for all damages arising out of bodily injuries to, or death of, one person and, subject to that limit for each person, a total limit of $5,000,000 for all damages arising out of bodily injuries to, or death of, two or more persons in any one occurrence; and regular Contractors' Property Damage Liability Insurance providing for a limit of not less than $50,000 for all damages arising out of injury to, or destruction of, property in any one occurrence and, subject to that limit per occurrence, a total (or aggregate) limit of $100,000 for all damages arising out of injury to, or destruction of, property during the policy period is carried. . Cause the Department to be an additional insured party on the Contractor's Public Liability and Property Damages Liability Insurance policies that insure the Contractor for the described work that it performs under the Contract. . Contractors' Protective Public Liability and Property Damage Liability Insurance Furnish evidence to the Department that, with respect to the operations performed by subcontractors, regular Contractors' Protective Public Liability Insurance providing for a limit of not less than $1,000,000 for all damages arising out of bodily injuries to, or death of, one person and, subject to that limit for each person, a total limit of $5,000,000 for all damages arising out of bodily injuries to, or death of, two or more persons in any one occurrence; and regular Contractors' Protective Property Damage Liability Insurance providing for a limit of not less than $50,000 for all damages arising out of injury to, or destruction of, property in any one occurrence and, subject to that limit per occurrence, a total (or aggregate) limit of $100,000 for all damages arising out of injury to, or destruction of, property during the policy period is carried. . Cause the Department to be an additional insured party on the Contractor's Protective Public Liabilityand Property Damage Liability Insurance policies that insure the Contractor for the described work that it performs under the Contract. . Insurance for Protection of Utility Owners When work under the Contract involves work on or in the vicinity of utility-owned property or facilities, furnish the Department with evidence that, with respect to the operations performed, General Comprehensive Liability Insurance or its equivalent providing for a limit of not less than $1,000,000 for bodily injury or death to person(s) per occurrence and $300,000 property damage each occurrence is carried. . The Department and Utility Company are to be Additional Named Insured, and the policy will be primary to any coverage maintained by the Department or Company. Do not make any material change or cancellation to the policy without providing the Department with ten days prior written notice. . Submission and Approval of Policies; Termination Certificates of such insurance shall be filed at the time of Contract execution with the District Contracts Administrator. These certificates shall contain a provision that coverages afforded under the policies will not be canceled until at least thirty (30) days after the Department accepts the work. . Professional Liability The Design-Build Firm shall have and maintain during the period of this Contract, professional liability insurance policy or policies with a company or companies authorized to do business in the State of Florida, affording professional liability coverage for the professional services to be rendered in accordance with this Agreement in the following amounts: Total D-B Contract Price - Up to $30 Million Minimum Coverage Limits - Minimum Coverage Limits . DBE/MBE Requirements: * A DBE Affirmative Action Plan must be approved and on file prior to award of any contract. * The Federal DBE program requires states to maintain a database of all firms that are participating, or attempting to participate on DOT assisted contracts. This list must include both DBE and NON DBE companies. * The Bid Opportunity List form must be submitted with the RFP, (Note: The RFP and price are to be in separate packages.) * The Anticipated DBE Participation Statement shall be submitted with the price proposal. * The Design Build Firm is required to report monthly actual payments to subcontractors and suppliers. * DBEs are encouraged to utilize the DBE Supportive Services Provider. Contact Blackmon Roberts at 863-802-1280 for assistance. * The Department of Transportation has an overall eight point one eighteen percent (8.18%) race-neutral DBE goal. This means that the State-s goal is to spend at least 8.18% of the highway dollars with certified DBEs as prime Design Build Firms or as subcontractors or sub consultants. Race- neutral means that the Department believes that the 8.18% overall goal can be achieved through the normal competitive procurement process. The Department reviewed this project and the percentage will be given at RFP time. The Department believes that this percentage can be realistically achieved. * The Florida Department of Transportation (hereinafter referred to as the "Department"), in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Further, the Department will not discriminate against bidders on the grounds of race, color, national origin, sex, age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan. . Special Notes: . CLICK HERE FOR ADDITIONAL INFORMATION View RFP (Adobe Acrobat® PDF file) Low Bid Design-Build Qualification Validation Form Advertisement Status : Shortlisted Date of Advertisement : 29MAR2400 Bid Opening Date :  25MAY2400 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  01JUN2400 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  03JUN2400 Time:  09:00AM 3rd Tech Rev. Cmte Meeting :  15JUN2400 Time:  09:00AM 4th Tech Rev. Cmte Meeting :  17JUN2400 Time:  09:00AM Final Selection Meeting Date :  08JUN2400 Time:  08:30AM ************************************************************ Procurement Number : E2X05 Financial Management Number(s): 44030215201 Project Description: This project is for the installation of a Truck Parking Availability System at public parking facilities (rest areas welcome centers, weigh stations) located along I-10, in Madison and Baker Counties, I-75 in Alachua, Columbia and Hamilton Counties and I-95 in St. Johns and Nassau Counties. The TPAS installation portion in the rest areas and welcome centers of the Project work includes in-pavement Wireless Detection Sensors (WDS) in the truck parking stalls capable of detecting whether each space is occupied.The verification of truck parking occupancy shall be verified through complete Closed Circuit Television (CCTV) coverage of all truck parking stalls. The WDS shall be installed in the following locations: SR 8(I-10) Madison County Facility 20101 Eastbound Mile Marker 265 SR 8(I-10) Madison County Facility 20102 Westbound Mile Marker 265 SR 8(I-10) Baker County Facility 20121 Eastbound Mile Marker 318 SR 8(I-10) Baker County Facility 20122 Westbound Mile Marker 318 SR 93(I-75) Alachua County Facility 20171 Northbound Mile Marker 383 SR 93(I-75) Alachua County Facility 20172 Southbound Mile Marker 382 SR 93(I-75) Columbia County Facility 20161 Northbound Mile Marker 413 SR 93(I-75) Columbia County Facility 20162 Southbound Mile Marker 413 SR 93(I-75) Hamilton County Facility 20140 Southbound Mile Marker 470 SR 9(I-95) St. Johns County Facility 20331 Northbound Mile Marker 302 SR 9(I-95) St. Johns County Facility 20332 Southbound Mile Marker 303 SR 9(I-95) St. Johns County Facility 20321 Northbound Mile Marker 331 SR 9(I-95) St. Johns County Facility 30322 Southbound Mile Marker 331 SR 9(I-95) Nassau County Facility 20310 Southbound Mile Marker 378 The TPAS installation portion in the weigh station areas of the Project work includes microwave or radar vehicle detection system (MVDS) capable of monitoring the ingress and egress of vehicles into the parking location. The verification of truck parking occupancy shall be verified through complete Closed Circuit Television (CCTV) coverage of all truck parking stalls. The MVDS shall be installed in the following locations: SR 8(I-10) Madison County Facility 20631 Eastbound Mile Marker 264 SR 8(I-10) Madison County Facility 20632 Westbound Mile Marker 264 SR 93(I-75) Hamilton County Facility 20621 Northbound Mile Marker 449 SR 93(I-75) Hamilton County Facility 20622 Southbound Mile Marker 449 SR 9(I-95) Nassau County Facility 20611 Northbound Mile Marker 376 SR 9(I-95) Nassau County Facility 20612 Southbound Mile Marker 376 The TPAS installation shall include ground mounted static signs with color embedded dynamic message sign (DMS) before each location to display the available number of parking spaces. The TPAS installation shall be integrated, tested and operated from the FDOT District 2 SunGuide Regional Transportation Management Center (RTMC) located in in Jacksonville, Florida. The TPAS installation shall include installation of conduit and cabling infrastructure infrastructure for both power and communication and equipment and infrastructure necessary to connect the system to the existing RTMC. Communication shall be on the existing fiber optic network. The Request for Proposal and Attachments are available through the Contract Proposal Processing (CPP) Online Ordering system. CPP can be accessed at: https://fdotwp1.dot .state.fl.us/contractproposalprocessingonlineordering/ BUDGET AMOUNT: $5,759,709.00 Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. Estimated Contract Time: 485 SPECIAL NOTES: In accordance with RESTRICTION ON CONSULTANTS ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 2 2 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. C9I98 - HNTB Corporation C9U36 - Jacobs Engineering Group C9939 - STV, Inc. Project Manager : Vittur, Brandi Selection Method : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 16 - Intelligent Transportation Systems Contractor Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 3.1 - Minor Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/Propo sal DBE/MBE Requirements: See preamble. Low Bid Design-Build Qualification Validation Form Advertisement Status : Final Selection Date of Advertisement : 09OCT2017 Bids Due Date :  13DEC2017 Time:  11:00AM Bid Opening Date :  13DEC2017 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  09JAN2018 Time:  11:00AM 2nd Tech Rev. Cmte Meeting :  17JAN2018 Time:  11:00AM 3rd Tech Rev. Cmte Meeting :  22JAN2018 Time:  11:00AM Final Selection Meeting Date :  29JAN2018 Time:  10:00AM Final Selection Posting Date :  29JAN2018 Time:  12:31PM Meeting Location Notes: All public meetings will be held at the Florida Department of Transportation District Two Headquarters 1109 South Marion Avenue, Lake City, FL 32025 Rank Consultant Bid Amount 1 FLORIDA SAFETY CONTRACTORS,INC. $3,698,384 2 SICE, inc. $4,392,000 3 Contact Network,LLC DBA Inline $5,376,856 4 TRAFFIC CONTROL DEVICES,INC. $5,566,566 Selection Notice Posted: 17JUL2018 Time: 9:08 AM Focus Engineering LLC is non-responsive. Focus Engineering LLC did not submit the required Low-Bid Design-Build Qualification Validation form, as required by the advertisement, are not prequalified, and also did not submit the required bid bond. ************************************************************ DISTRICT 3 ************************************************************ Professional Services Consultant Projects Contract Number : 19308 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43627016201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: CEI Services for SR 20 from East of SR 65 to the Ochlockonee River Bridge in Liberty County Project Manager : Kerwin, Jeff Contract Amount/Limit: $4,575,909 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Special Notes: For the subject Business Development Initiative Set Aside pilot project only, the following exception has been granted: Certified Small Business firms responding to this solicitation are permitted to subcontract with firms that are not small businesses, for up to 15% of the total contract amount. The small business certified prime consultant is required to indicate in their letter of response, the total percentage of work anticipated for each proposed subconsultant that is not certified as as small business. All other requirements of Standard Note 7 are in effect. Advertisement Status : Planned Date of Advertisement : 28JAN2019 Shortlist Selection Date :  18FEB2019 Time:  09:00AM Final Selection Meeting Date :  11MAR2019 Time:  09:00AM ************************************************************ Contract Number : 19312 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43774616201 43774616202 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 95 (US 29) from South of CR 184 (Muscogee Road) to SR 97 (Atmore Highway) in Escambia County Project Manager : Benson, Eric Contract Amount/Limit: $10,694,185 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 14JAN2019 Shortlist Selection Date :  04FEB2019 Time:  09:00AM Final Selection Meeting Date :  25FEB2019 Time:  09:00AM ************************************************************ Contract Number : 19307 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43282816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 4 Blackwater River Bridge (Bridge No. 570033) in Okaloosa County Project Manager : Benson, Eric Contract Amount/Limit: $9,429,723 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 31DEC2018 Shortlist Selection Date :  21JAN2019 Time:  09:00AM Final Selection Meeting Date :  11FEB2019 Time:  09:00AM ************************************************************ Contract Number : 19351 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 22017122201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Project Development and Environmental Study of SR 85 S Ferdon Blvd from SR 123 Roger J Clary Hwy to SR 8 (I-10) in Okaloosa County Project Manager : ARRANT, NIKOLE Contract Amount/Limit: $1,850,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 31DEC2018 Shortlist Selection Date :  28JAN2019 Time:  09:00AM Final Selection Meeting Date :  11MAR2019 Time:  09:00AM ************************************************************ Contract Number : 19304 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 21787526201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 390 (St. Andrews) from SR 368 (23rd St.) to East of CR 2312 (Baldwin Rd.) in Bay County Project Manager : Toole, Kim Contract Amount/Limit: $35,256,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 24DEC2018 Shortlist Selection Date :  14JAN2019 Time:  09:00AM Final Selection Meeting Date :  04FEB2019 Time:  09:00AM ************************************************************ Contract Number : 19310 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43736716201 43775216201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Group 19-D in Holmes County: SR 79 (Waukesha Street) from North of SR 8 (I-10) to SR 10 (US 90) SR 79 from CR 177 to the Alabama State Line Project Manager : Riley, Josh Contract Amount/Limit: $6,921,627 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Special Notes: For the subject Business Development Initiative Set Aside pilot project only, the following exception has been granted: Certified Small Business firms responding to this solicitation are permitted to subcontract with firms that are not small businesses, for up to 15% of the total contract amount. The small business certified prime consultant is required to indicate in their letter of response, the total percentage of work anticipated for each proposed subconsultant that is not certified as as small business. All other requirements of Standard Note 7 are in effect. Advertisement Status : Planned Date of Advertisement : 17DEC2018 Shortlist Selection Date :  07JAN2019 Time:  09:00AM Final Selection Meeting Date :  28JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19315 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43775316201 43775416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Group 19-C in Walton County: SR 81 from SR 20 to the Holmes County Line SR 20 from SR 81 to the Choctawhatchee River Bridge Project Manager : Riley, Josh Contract Amount/Limit: $9,684,675 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 26NOV2018 Shortlist Selection Date :  17DEC2018 Time:  09:00AM Final Selection Meeting Date :  07JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19316 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43776516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Construction Engineering and Inspection services for SR 8 (I-10) from East of SR 77 to Jackson County Line in Washington County Project Manager : Riley, Josh Contract Amount/Limit: $7,546,481 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 29OCT2018 Shortlist Selection Date :  19NOV2018 Time:  09:00AM Final Selection Meeting Date :  10DEC2018 Time:  09:00AM ************************************************************ Contract Number : 19314 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43774816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 30 (US 98) Coastal Highway from St. Marks River to Jefferson County Line in Wakulla County Project Manager : Kerwin, Jeff Contract Amount/Limit: $6,681,137 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 22OCT2018 Shortlist Selection Date :  12NOV2018 Time:  09:00AM Final Selection Meeting Date :  03DEC2018 Time:  09:00AM ************************************************************ Contract Number : 19318 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 22485827202 Major Work : 5.1 - Conventional Bridge Inspection 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating Under-Utilized Work Groups: GROUP5 - Bridge Inspection Project Description: State Bridge Inspection Consultant Project Manager : Cushing, Jeremy Contract Amount/Limit: $2,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 15OCT2018 Shortlist Selection Date :  05NOV2018 Time:  09:00AM Final Selection Meeting Date :  17DEC2018 Time:  09:00AM ************************************************************ Contract Number : 19306 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43255416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 4 from Escambia River Bridge to CR 87A in Santa Rosa County. Project Manager : Benson, Eric Contract Amount/Limit: $4,175,122 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 17SEP2018 Shortlist Selection Date :  08OCT2018 Time:  09:00AM Final Selection Meeting Date :  29OCT2018 Time:  09:00AM ************************************************************ Contract Number : 19330 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43972813201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design of SR 61 (US 319) Thomasville Road from Tallahasse Drive to Timberwolf Crossing in Leon County. Project Manager : Barber, DJ Contract Amount/Limit: $925,045 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 04SEP2018 Shortlist Selection Date :  01OCT2018 Time:  09:00AM Final Selection Meeting Date :  19NOV2018 Time:  09:00AM ************************************************************ Contract Number : 19305 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 22023626201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 30 (US 98) Harbor Boulevard from East Pass Bridge to Airport Road in Okaloosa County Project Manager : Riley, Josh Contract Amount/Limit: $4,279,578 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Advertisement Status : Planned Date of Advertisement : 20AUG2018 Shortlist Selection Date :  10SEP2018 Time:  09:00AM Final Selection Meeting Date :  01OCT2018 Time:  09:00AM ************************************************************ Contract Number : 19333 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43974013201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Project Description: Design of SR 75 (US 231) from the Bay County Line to Pike Pond Road in Jackson County Project Manager : Bell, Lisa Contract Amount/Limit: $811,985 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Advertisement Status : Planned Date of Advertisement : 20AUG2018 Shortlist Selection Date :  17SEP2018 Time:  09:00AM Final Selection Meeting Date :  05NOV2018 Time:  09:00AM ************************************************************ Contract Number : 19329 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43776313201 44188113201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design Group 19-06 in Bay County: SR 79 from SR 30A (US 98) Back Beach Rd to West Bay Bridge and SR 391 Airport Rd @ 19th Street Intersection Project Manager : Hayes, Zeke Contract Amount/Limit: $1,018,580 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 13AUG2018 Shortlist Selection Date :  10SEP2018 Time:  09:00AM Final Selection Meeting Date :  29OCT2018 Time:  09:00AM ************************************************************ Contract Number : 19323 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 22089863202 Major Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing Minor Work : Project Description: Districtwide Traffic Studies/Signal Retiming Consultant Project Manager : Johnson, Cliff L Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Advertisement Status : Planned Date of Advertisement : 06AUG2018 Shortlist Selection Date :  03SEP2018 Time:  09:00AM Final Selection Meeting Date :  15OCT2018 Time:  09:00AM ************************************************************ Contract Number : 19340 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44154813201 44367213201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Project Description: Design Group 19-07 Design of SR 85 (South Ferdon Boulevard) from North of SR 123 (Roger J Clary) to North of SR 8 (I-10) and SR 85 SR 85 S Ferdon Blvd from Southcrest Drive to Hospital Drive. Award and execution of SR 85 S Ferdon Blvd from Southcrest Drive to Hospital Drive is contingent upon legislative funding approval. Project Manager : Burnett, Jordan Contract Amount/Limit: $1,807,771 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 06AUG2018 Shortlist Selection Date :  17SEP2018 Time:  09:00AM Final Selection Meeting Date :  05NOV2018 Time:  09:00AM ************************************************************ Contract Number : 19344 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44048713201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Project Description: SR 390 over Mill Bayou (Bridge No. 460020) in Bay County Project Manager : Hunter, Clay Contract Amount/Limit: $850,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 30JUL2018 Shortlist Selection Date :  10SEP2018 Time:  09:00AM Final Selection Meeting Date :  29OCT2018 Time:  09:00AM ************************************************************ Contract Number : 19309 Projects less than $500,000 (Technical Qualification only) Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43736516201 43814816201 43774516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Group 19-B in Leon and Gadsden Counties: SR 265 (Magnolia Dr.) from SR 20 (US 27) Apalachee Parkway to 7th Avenue in Leon County. SR 20 (US 27) Apalachee Parkway @ SR/CR 265 (Magnolia Dr.) Intersection in Leon County SR 63 (US 27) from CR 270 (Shady Rest Road) to the Ochlockonee River Bridge in Gadsden County Project Manager : Harris, Shannon Contract Amount/Limit: $3,658,605 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants. ... Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) ... Final Selection Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) ... Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) ... It is the Department's intent to group projects being let within the described geographical area of Gadsden, Liberty, Franklin, Leon, Wakulla and Jefferson counties to achieve economic efficiency through the shared use of CEI personnel, equiptment, facilities and other resources across multiple projects.The department may at its sole discretion add projects occuring within these limits or delete projects if warranted. ... Firms who are pursuing this CEI contract may obtain the construction plans dated June 25,2018 by submitting an email request. For records containing exempt information under Chapter 119, Florida Statutes, a completed exempt documents request form and copy of a photo ID are required. Please send all requests to Ranae Dodson at ranae.dodson@do .state.fl.us. Advertisement Status : Planned Date of Advertisement : 23JUL2018 Shortlist Selection Date :  13AUG2018 Time:  09:00AM Final Selection Meeting Date :  03SEP2018 Time:  09:00AM ************************************************************ Contract Number : 19342 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44188213201 44159313201 Major Work : 3.1 - Minor Highway Design 8.2 - Design, Right of Way, & Const. Surveying 9.4.1 - Standard Foundation Studies Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Design Group 19-05 in Escambia County: SR 292 (Sorrento Road) @ CR 293 (Bauer Road) Intersection Improvements SR 8 (I-10) Escambia County Welcome Center Resurfacing Project Manager : Howell, William Contract Amount/Limit: $858,555 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 23JUL2018 Shortlist Selection Date :  03SEP2018 Time:  09:00AM Final Selection Meeting Date :  22OCT2018 Time:  09:00AM ************************************************************ Contract Number : 19311 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $500,000 Financial Management Number(s): 43774416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Services for SR 57 (US 19) from SR 20 (US 27) to North of Martin/Fairchilds Roads in Jefferson County Project Manager : Walters, Anthony Contract Amount/Limit : $922,994 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants. ... Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) ... Final Selection Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) ... Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) ... It is the Department's intent to group projects being let within the described geographical area of Gadsden, Liberty, Franklin, Leon, Wakulla and Jefferson counties to achieve economic efficiency through the shared use of CEI personnel, equiptment, facilities and other resources across multiple projects.The department may at its sole discretion add projects occuring within these limits or delete projects if warranted. ... Firms who are pursuing this CEI contract may obtain the construction plans dated June 25,2018 by submitting an email request. For records containing exempt information under Chapter 119, Florida Statutes, a completed exempt documents request form and copy of a photo ID are required. Please send all requests to Ranae Dodson at ranae.dodson@do .state.fl.us. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Shortlist Selection Date :  30JUL2018 Time:  09:00AM Final Selection Meeting Date :  20AUG2018 Time:  09:00AM Response Deadline : 23JUL2018 Respond To: D3.profserv@dot.state.fl.us Attn.: Steve Thames Phone: (850)330-1366 ************************************************************ Contract Number : 19319 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 42378117238 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Maintenance Engineering Inspection Consultant Project Manager : Yates, Richard Contract Amount/Limit : $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants.The letters of response for this project will be evaluated based on the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2)The volume of work previously awarded to the Consultant as evidenced by new agreements and suppemental amedments executed between the Department and the Consultant within the past five years. 3)The distribution of work among the competing Consultants a and the utilization of new Consultants. 4)The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not has final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) ... Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope (0-15 points) 2) Quality Control (0-20 points) 3) Agreement/Task Management (0-20 points) Staffing/Technical Plan: 1) Proposed Staff Quality/Prime/Sub Relationship (0-20 points) 2) Proposed Staff Availability (0-10 points) 3) Quality of Proposal (0-15 points) The advertised types of work and scope of services for this project have been updated as of July 10, 2018. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Shortlist Selection Date :  30JUL2018 Time:  09:00AM Final Selection Meeting Date :  13AUG2018 Time:  09:00AM Response Deadline : 23JUL2018 Respond To: D3.profserv@dot.state.fl.us Attn.: Steve Thames Phone: (850)330-1366 ************************************************************ Contract Number : 19331 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43973113201 44066013201 Major Work : 3.1 - Minor Highway Design Minor Work : 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP5 - Bridge Inspection Project Description: Design Group 19-04 in Jackson and Washington Counties: Resurfacing of SR 75 (US 231) from South of SR 8 (I-10) to SR 10 (US 90) in Jackson County Paved Shoulders on CR 276 Alford Road from CR 273 (Orange Hill Road) to Macedonia Road in Washington County Project Manager : Whittington, John Contract Amount/Limit : $1,025,760 See Descriptions of Standard Notes on Current Advertisements webpage: 8 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Shortlist Selection Date :  06AUG2018 Time:  09:00AM Final Selection Meeting Date :  24SEP2018 Time:  09:00AM Response Deadline : 23JUL2018 Respond To: D3.profserv@dot.state.fl.us Attn.: Steve Thames Phone: (850)330-1366 ************************************************************ Contract Number : 19349 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42254141205 Major Work : 13.4 - Systems Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.3 - Policy Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: Systems Planning Consultant Services Project Manager : Harrell, Starsky Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Shortlist Selection Date :  06AUG2018 Time:  09:00AM Final Selection Meeting Date :  17SEP2018 Time:  09:00AM Response Deadline : 23JUL2018 Respond To: D3.profserv@dot.state.fl.us Attn.: Steve Thames Phone: (850)330-1366 ************************************************************ Contract Number : 19350 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 22049586203 Major Work : 9.4.1 - Standard Foundation Studies Minor Work : Project Description: Settlement Monitoring for SR 369 (US 319) from N of SR 267 to the Leon County Line in Wakulla County. Project Manager : Whittington, David Contract Amount/Limit : $1,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9 Special Notes: The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants.The letters of response for this project will be evaluated based on the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2)The volume of work previously awarded to the Consultant as evidenced by new agreements and suppemental amedments executed between the Department and the Consultant within the past five years. 3)The distribution of work among the competing Consultants and the utilization of new Consultants. 4)The workload of each Consultant, as evidenced by the number of similar projects the Consultabt is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) ... Final Selection Evaluation Criteria: Awareness of Project Issues: 1) Understanding of scope (0-20 points) 2) Understanding Issues Unique to this Contract (0-20) Project Staff: 1) Project Manager(0-5 points) 2) Staff Quality/Prime/Sub Relationship (0-20 points) 3) Availability (0-15 points) Other: 1) Communication (0-20 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Shortlist Selection Date :  13AUG2018 Time:  09:00AM Final Selection Meeting Date :  13AUG2018 Time:  09:00AM Response Deadline : 23JUL2018 Respond To: D3.profserv@dot.state.fl.us Attn.: Steve Thames Phone: (850)330-1366 ************************************************************ Contract Number : 19348 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 22083516223 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Districtwide Construction Engineering Inspection Services Project Manager : Croft, Peggy Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants.The letters of response for this project will be evaluated based upon the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope (0-15 points) 2) Quality Control (0-20 points) 3) Agreement/Task Management (0-20 points) Staffing/Technical Plan: 1) Proposed Staff Quality (0-20 points) 2) Proposed Staff Availability (0-10 points) 3) Quality of Proposal (0-15 points) _____________________________________________ uted between the Department and the Consultant within past five years. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 02JUL2018 Response Deadline Date :  17JUL2018 Shortlist Selection Date :  23JUL2018 Time:  09:00AM Final Selection Meeting Date :  13AUG2018 Time:  09:00AM Response Deadline : 17JUL2018 Respond To: D3.profserv@dot.state.fl.us Attn.: Steve Thames Phone: (850)330-1366 ************************************************************ Contract Number : 19328 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43776113201 Major Work : 3.1 - Minor Highway Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP5 - Bridge Inspection Project Description: Design of SR 267 from SR 10 (US 90) Jefferson Street to the Georgia State Line in Gadsden County. Project Manager : Bell, Lisa Contract Amount/Limit : $1,075,995 See Descriptions of Standard Notes on Current Advertisements webpage: 8 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 25JUN2018 Response Deadline Date :  09JUL2018 Shortlist Selection Date :  23JUL2018 Time:  09:00AM Final Selection Meeting Date :  10SEP2018 Time:  09:00AM Response Deadline : 09JUL2018 Respond To: D3.profserv@dot.state.fl.us Attn.: Steve Thames Phone: (850)330-1366 ************************************************************ Contract Number : 19327 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43775913201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design of SR 30 (US 98) from Walton Co. Line to Heather Dr. in Bay County Project Manager : Griffin, Hays View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 18JUN2018 Shortlist Selection Date :  16JUL2018 Time:  09:00AM Shortlist Selection Posting :  16JUL2018 Time:  10:30AM Scope Meeting Date :  31JUL2018 Time:  02:00PM Final Selection Meeting Date :  04SEP2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: CONNELLY & WICKER INC. HANSON PROFESSIONAL SERVICES INC. L & W ENGINEERING, INC. D/B/A INOVI Letters Received by the Department: CARDNO, INC. CONNELLY & WICKER INC. DAVID H. MELVIN, INC. FALLER, DAVIS & ASSOCIATES, INC. GRESHAM, SMITH AND PARTNERS HANSON PROFESSIONAL SERVICES INC. L & W ENGINEERING, INC. D/B/A INOVI PALMER ENGINEERING CO. CROSS REFERE PROSSER, INC. D/B/A PROSSER HALLOCK WANTMAN GROUP, INC. ************************************************************ Contract Number : 19347 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 44336013201 Major Work : 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design 9.4.1 - Standard Foundation Studies Minor Work : 3.1 - Minor Highway Design 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Project Description: SR 30 (US 98) at CR 30 East Inlet Beach Pedestrian Crossing in Walton County Project Manager : Fussell, Kevin Special Notes: The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exception: a schedule of a maximum of 2 pages (11" x 17") should also be submitted along with a one-page summary of staffhours for the project. The staffhour summary form is attached to the scope of services linked to the advertisement. ... Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) ... ... Final Selection Evaluation Criteria: I. Project Staff: A. Project Manager/Prime/Subconsultant Relationship and Ability (0-30) II. Awareness of Project Issues: A. Understanding of Scope (0-10) B. Project Issues (0-30) III. Approach to Project: A. Innovative Concepts (0-10) B. Schedule (0-5) IV. Other A. Communication (0-15) A staffhour summary form has been added to the scope of services linked to this advertisement as of June 5, 2018. A staffhour summary is now required as part of the submittal. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29MAY2018 Shortlist Selection Date :  25JUN2018 Time:  09:00AM Shortlist Selection Posting :  25JUN2018 Time:  12:30PM Final Selection Meeting Date :  09JUL2018 Time:  09:00AM Final Selection Posting Date :  09JUL2018 Time:  11:15AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 VOLKERT, INC. 2 INFRASTRUCTURE ENGINEERS, LLC 3 PATEL, GREENE AND ASSOCIATES, PLLC Letters Received by the Department: BENTLEY ARCHITECTS AND ENGINEERS, I BERGMANN ASSOCIATES, ARCHITECTS, EN CARDNO, INC. INFRASTRUCTURE ENGINEERS, LLC PARSONS TRANSPORTATION GROUP INC. PATEL, GREENE AND ASSOCIATES, PLLC POND & COMPANY CORPORATION REGISTE, SLIGER ENGINEERING, INC. STANTEC CONSULTING SERVICES INC. VOLKERT, INC. ************************************************************ Contract Number : 19313 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $500,000 Financial Management Number(s): 43774716201 43774916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Group 19-A in Jackson County: SR 75 (US 231) from North of CR 169 (Peanut Rd) to North of SR 73 SR 75 (US 231) from Pike Pond Road to Mill Road Project Manager : Mastro, Joe Special Notes: For the subject Business Development Initiative Set Aside pilot project only, the following exception has been granted: Certified Small Business firms responding to this solicitation are permitted to subcontract with firms that are not small businesses, for up to 15% of the total contract amount. The small business certified prime consultant is required to indicate in their letter of response, the total percentage of work anticipated for each proposed subconsultant that is not certified as as small business. All other requirements of Standard Note 7 are in effect. ... The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants. ... Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) ... Final Selection Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) ... Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) ... It is the Department's intent to group projects being let within the described geographical area of Bay,Gulf, Calhoun, and Jackson counties to achieve economic efficiency through the shared use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects if warranted. ... Firms who are pursuing this CEI contract may obtain the construction plans dated April 23 ,2018 by submitting an email request. For records containing exempt information under Chapter 119, Florida Statutes, a completed exempt documents request form and copy of a photo ID are required. Please send all requests to Ranae Dodson at ranae.dodson@dot .state.fl.us. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21MAY2018 Shortlist Selection Date :  11JUN2018 Time:  09:00AM Shortlist Selection Posting :  11JUN2018 Time:  11:00AM Final Selection Meeting Date :  02JUL2018 Time:  09:00AM Final Selection Posting Date :  02JUL2018 Time:  10:45AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Rank Consultant 1 AE ENGINEERING, INC. 2 SOUTHEASTERN CONSULTING ENGINEERS, 3 BASLEE ENGINEERING SOLUTIONS (BES), Letters Received by the Department: AE ENGINEERING, INC. BASLEE ENGINEERING SOLUTIONS (BES), SOUTHEASTERN CONSULTING ENGINEERS, ************************************************************ Contract Number : 19334 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 44091533201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Multilane Design of SR 10 (US 90) Caroline Street from CR 89 Ward Basin Road to SR 87 in Santa Rosa County. Project Manager : Lamb, Sandra View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21MAY2018 Shortlist Selection Date :  25JUN2018 Time:  09:00AM Shortlist Selection Posting :  25JUN2018 Time:  12:30PM Scope Meeting Date :  09JUL2018 Time:  01:30PM Final Selection Meeting Date :  13AUG2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: AECOM TECHNICAL SERVICES, INC. COMPREHENSIVE ENGINEERING SERVICES, HDR ENGINEERING, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. COMPREHENSIVE ENGINEERING SERVICES, H.W. LOCHNER INC HDR ENGINEERING, INC. STV INCORPORATED ************************************************************ Contract Number : 19398 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 22485817211 22485917211 22485817214 22485917214 Major Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating Minor Work : 4.1.2 - Minor Bridge Design 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Project Description: Local Government Bridge Inspection and Scour Analysis Services Project Manager : Cushing, Jeremy Special Notes: This is a re-advertisement of Ad 19301. Firms who submitted during the original advertisement MUST resubmit in order to be considered for this project. ... The consultants ranked first and second will be required to submit their price and audit package information 1 week after final selection in order to expedite execution of these agreements. ... The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions:The Consultant should submit a one (1) page summary of staffhours for each contract (east and west) that includes both the prime and subs, using the spreadsheets attached to the scope of services linked to this advertisement. DO NOT include price information in the staffhour spreadsheets. ... Final Selection Criteria: Awareness of Project Issues (0-50 points): 1) Understanding of Scope (0-25 points) 2) Project Issues (0-25 points) ... Approach to Project (0-10 points): 1) Innovative Concepts (0-5 points) 2) Quality Control (0-5 points) ... Project Staff (0-25 points): 1) Project Manager (0-5 points) 2) Staff Quality/Prime/Sub Relationship (0-15 points) 3) Availability (0-5 points) ... Other (0-15 points): 1) Commitment to the Department's needs (0-10 points) 2) Quality of Letter (0-5 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14MAY2018 Shortlist Selection Date :  04JUN2018 Time:  09:00AM Final Selection Meeting Date :  04JUN2018 Time:  09:00AM Final Selection Posting Date :  04JUN2018 Time:  11:15AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 INFRASTRUCTURE ENGINEERS, LLC 2 KISINGER CAMPO & ASSOCIATES, CORP. 3 STANTEC CONSULTING SERVICES INC. 4 VOLKERT, INC. 5 OM ENGINEERING SERVICES, INC. Letters Received by the Department: INFRASTRUCTURE ENGINEERS, LLC KISINGER CAMPO & ASSOCIATES, CORP. OM ENGINEERING SERVICES, INC. STANTEC CONSULTING SERVICES INC. VOLKERT, INC. ************************************************************ Contract Number : 19399 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 22485817211 22485917211 22485817214 22485917214 Major Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating Minor Work : 4.1.2 - Minor Bridge Design 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Project Description: Local Government Bridge Inspection and Scour Analysis Services Project Manager : Cushing, Jeremy Special Notes: This is a re-advertisement of Ad 19301. Firms who submitted during the original advertisement MUST resubmit in order to be considered for this project. ... The consultants ranked first and second will be required to submit their price and audit package information 1 week after final selection in order to expedite execution of these agreements. ... The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions:The Consultant should submit a one (1) page summary of staffhours for each contract (east and west) that includes both the prime and subs, using the spreadsheets attached to the scope of services linked to this advertisement. DO NOT include price information in the staffhour spreadsheets. ... Final Selection Criteria: Awareness of Project Issues (0-50 points): 1) Understanding of Scope (0-25 points) 2) Project Issues (0-25 points) ... Approach to Project (0-10 points): 1) Innovative Concepts (0-5 points) 2) Quality Control (0-5 points) ... Project Staff (0-25 points): 1) Project Manager (0-5 points) 2) Staff Quality/Prime/Sub Relationship (0-15 points) 3) Availability (0-5 points) ... Other (0-15 points): 1) Commitment to the Department's needs (0-10 points) 2) Quality of Letter (0-5 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14MAY2018 Shortlist Selection Date :  04JUN2018 Time:  09:00AM Final Selection Meeting Date :  04JUN2018 Time:  09:00AM Final Selection Posting Date :  04JUN2018 Time:  11:15AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 INFRASTRUCTURE ENGINEERS, LLC 2 KISINGER CAMPO & ASSOCIATES, CORP. 3 STANTEC CONSULTING SERVICES INC. 4 VOLKERT, INC. 5 OM ENGINEERING SERVICES, INC. Letters Received by the Department: INFRASTRUCTURE ENGINEERS, LLC KISINGER CAMPO & ASSOCIATES, CORP. OM ENGINEERING SERVICES, INC. STANTEC CONSULTING SERVICES INC. VOLKERT, INC. ************************************************************ Contract Number : 19338 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 44154413201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Project Description: Design of SR 55 (US 221) from the Madison County Line to the Georgia State Line in Jefferson County Project Manager : Barber, DJ Special Notes: Please do not include a survey team member in your letter for this project. All survey for this project will be performed under a seperate agreement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 07MAY2018 Shortlist Selection Date :  04JUN2018 Time:  09:00AM Shortlist Selection Posting :  04JUN2018 Time:  11:30AM Scope Meeting Date :  12JUN2018 Time:  08:00AM Final Selection Meeting Date :  23JUL2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Shortlisted Firms: BRINDLEY PIETERS AND ASSOCIATES, IN CIVIL SERVICES INC. KENNEDY ENGINEERING & ASSOCIATES GR Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BRINDLEY PIETERS AND ASSOCIATES, IN CAPITAL ENGINEERING AND CONSULTING CIVIL SERVICES INC. CRIBB PHILBECK WEAVER GROUP, INC. KENNEDY ENGINEERING & ASSOCIATES GR NORTH FLORIDA PROFESSIONAL SERVICES PATEL, GREENE AND ASSOCIATES, PLLC PHILLIPS PRECISION ENGINEERING, INC REGISTE, SLIGER ENGINEERING, INC. THE BALMORAL GROUP, LLC ************************************************************ Contract Number : 19335 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44154013201 44154513201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design Group 19-03: SR 30 (US 98) from East of CR 385 (Tilton Rd) to CR 384 (12th Street) in Franklin County SR 65 from South of Telogia Power to South of Telogia Creek in Liberty County Project Manager : Hayes, Zeke View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 30APR2018 Shortlist Selection Date :  29MAY2018 Time:  09:00AM Shortlist Selection Posting :  29MAY2018 Time:  11:15AM Scope Meeting Date :  12JUN2018 Time:  02:00PM Final Selection Meeting Date :  16JUL2018 Time:  09:00AM Final Selection Posting Date :  16JUL2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 GRESHAM, SMITH AND PARTNERS 2 EISMAN & RUSSO, INC. 3 DEWBERRY ENGINEERS INC. Letters Received by the Department: AYRES ASSOCIATES INC BASLEE ENGINEERING SOLUTIONS (BES), DEWBERRY ENGINEERS INC. EISMAN & RUSSO, INC. FALLER, DAVIS & ASSOCIATES, INC. GRESHAM, SMITH AND PARTNERS H.W. LOCHNER INC ICON CONSULTANT GROUP, INC. KIMLEY-HORN AND ASSOCIATES, INC. MOFFATT & NICHOL, INC. PALMER ENGINEERING CO. CROSS REFERE PETERS AND YAFFEE, INC. PROSSER, INC. D/B/A PROSSER HALLOCK PROTEAN DESIGN GROUP, INC. REGISTE, SLIGER ENGINEERING, INC. ************************************************************ Contract Number : 19346 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 22089833203 22089833204 Major Work : 6.1 - Traffic Engineering Studies Minor Work : Project Description: Traffic Operations Studies Consultant Project Manager : Boyd, Dallas Special Notes: In an effort to enhance competition, the due date for letters of response for this project has been extended. Please see the schedule below for the new due date for letters of response.Firms who submitted during the original advertisement period do NOT need to resubmit. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 23APR2018 Shortlist Selection Date :  04JUN2018 Time:  09:00AM Shortlist Selection Posting :  04JUN2018 Time:  11:30AM Scope Meeting Date :  13JUN2018 Time:  08:00AM Final Selection Meeting Date :  06AUG2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Shortlisted Firms: FLORIDA TRANSPORTATION ENGINEERING, HDR ENGINEERING, INC. HSA CONSULTING GROUP, INC. Letters Received by the Department: FLORIDA TRANSPORTATION ENGINEERING, HDR ENGINEERING, INC. HSA CONSULTING GROUP, INC. ************************************************************ Contract Number : 19332 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44154713201 43973913201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design Group 19-02 in Leon County: SR 363 (South Monroe Street) from Paul Russell Road to Perkins Street SR 63 (US 27) from the Gadsden County Line to SR 263 (Capital Circle) Project Manager : Whittington, John View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 16APR2018 Shortlist Selection Date :  14MAY2018 Time:  09:00AM Shortlist Selection Posting :  14MAY2018 Time:  11:45AM Scope Meeting Date :  23MAY2018 Time:  02:00PM Final Selection Meeting Date :  02JUL2018 Time:  09:00AM Final Selection Posting Date :  02JUL2018 Time:  10:45AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 H.W. LOCHNER INC 2 ICON CONSULTANT GROUP, INC. 3 MOFFATT & NICHOL, INC. Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BUCHART-HORN, INC. FALLER, DAVIS & ASSOCIATES, INC. H.W. LOCHNER INC HORIZON ENGINEERING GROUP, INC. ICON CONSULTANT GROUP, INC. KIMLEY-HORN AND ASSOCIATES, INC. MOFFATT & NICHOL, INC. PALMER ENGINEERING CO. CROSS REFERE PETERS AND YAFFEE, INC. PROSSER, INC. D/B/A PROSSER HALLOCK PROTEAN DESIGN GROUP, INC. STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 19302 Projects less than $500,000 (Technical Qualification only) Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): VARIOUS Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: District Three Hybrid CEI Consultant Services Project Manager : Croft, Peggy Special Notes: The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants.The letters of response for this project will be evaluated based on the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2)The volume of work previously awarded to the Consultant as evidenced by new agreements and suppemental amedments executed between the Department and the Consultant within the past five years. 3)The distribution of work among the competing Consultants a and the utilizztion of new Consultants. 4)The workload of each Consultant, as evidenced by the number of similar projects the Consultabt is shortlisted on that have not has final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) ... Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope (0-15 points) 2) Quality Control (0-20 points) 3) Agreement/Task Management (0-20 points) Staffing/Technical Plan: 1) Proposed Staff Quality/Prime/Sub Relationship (0-20 points) 2) Proposed Staff Availability (0-10 points) 3) Quality of Proposal (0-15 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09APR2018 Shortlist Selection Date :  07MAY2018 Time:  09:00AM Shortlist Selection Posting :  07MAY2018 Time:  2:30PM Final Selection Meeting Date :  21MAY2018 Time:  09:00AM Final Selection Posting Date :  21MAY2018 Time:  10:46AM 1st Date Negotiations Meetings :  09JUL2018 Time:  10:00AM Meeting Location Notes: Operations Conf Room See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 METRIC ENGINEERING INC. 2 GREENMAN-PEDERSEN, INC. 3 EXP U.S. SERVICES INC. Letters Received by the Department: EXP U.S. SERVICES INC. GREENMAN-PEDERSEN, INC. HDR CONSTRUCTION CONTROL CORPORATIO METRIC ENGINEERING INC. ************************************************************ Contract Number : 19336 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 44193213201 44154213201 44188413201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design Group 19-01 in Okaloosa County. Intersection improvements at the SR 188 (Racetrack Rd) and Denton Boulevard Intersection; Resurfacing of SR 10 (US 90) W James Lee Boulevard from Yellow River Bridge to Old Bethel Road; and Intersection improvements at the SR 188 (Racetrack Rd) and Mar Walt Drive Intersection. Project Manager : Hunter, Clay View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Shortlist Selection Date :  30APR2018 Time:  09:00AM Shortlist Selection Posting :  30APR2018 Time:  11:00AM Scope Meeting Date :  08MAY2018 Time:  09:00AM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Final Selection Posting Date :  25JUN2018 Time:  12:16PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 PETERS AND YAFFEE, INC. 2 POND & COMPANY CORPORATION 3 BUCHART-HORN, INC. Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BRINDLEY PIETERS AND ASSOCIATES, IN BUCHART-HORN, INC. PATEL, GREENE AND ASSOCIATES, PLLC PETERS AND YAFFEE, INC. POND & COMPANY CORPORATION PROSSER, INC. D/B/A PROSSER HALLOCK ************************************************************ Contract Number : 19345 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): VARIOUS 43661233201 Major Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 99.0 - Other Professional Services Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Traffic Operations Safety Consultant Services Project Manager : Lewis, Michael View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Shortlist Selection Date :  30APR2018 Time:  09:00AM Shortlist Selection Posting :  30APR2018 Time:  11:00AM Scope Meeting Date :  09MAY2018 Time:  01:00PM Final Selection Meeting Date :  11JUN2018 Time:  09:00AM Final Selection Posting Date :  11JUN2018 Time:  11:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 GREENMAN-PEDERSEN, INC. 2 GRESHAM, SMITH AND PARTNERS 3 ENGLAND, THIMS & MILLER, INC. Letters Received by the Department: CRIBB PHILBECK WEAVER GROUP, INC. ENGLAND, THIMS & MILLER, INC. GREENMAN-PEDERSEN, INC. GRESHAM, SMITH AND PARTNERS H.W. LOCHNER INC ************************************************************ Contract Number : 19325 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 41674883201 Major Work : 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design 9.4.1 - Standard Foundation Studies Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.2 - Non-Redundant Bridge Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Project Description: SR 87 New Connector from SR 10 (US 90) to CR 191 (Munson Highway) in Santa Rosa County Project Manager : Golema, Jessica View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 26MAR2018 Shortlist Selection Date :  23APR2018 Time:  09:00AM Shortlist Selection Posting :  23APR2018 Time:  11:15AM Scope Meeting Date :  07MAY2018 Time:  10:00AM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Final Selection Posting Date :  25JUN2018 Time:  12:16PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 MOTT MACDONALD FLORIDA, LLC. 2 STV INCORPORATED 3 T. Y. LIN INTERNATIONAL CONSTRUCTIO Letters Received by the Department: AMERICAN CONSULTING ENGINEERS OF FL COMPREHENSIVE ENGINEERING SERVICES, DRMP, INC. H.W. LOCHNER INC HORIZON ENGINEERING GROUP, INC. INFRASTRUCTURE ENGINEERS, LLC MOTT MACDONALD FLORIDA, LLC. STV INCORPORATED T. Y. LIN INTERNATIONAL CONSTRUCTIO ************************************************************ Contract Number : 19320 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43790212201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design 4.2.1 - Major Bridge Design - Concrete Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Project Development and Environmental Study for SR 373 (Orange Avenue) from SR 263 (Capital Circle) to SR 61 (S. Monroe Street) in Leon County. Project Manager : Waters, Iris Special Notes: The work types for this project have been updated as of March 29, 2018. As a result, the due date for letters of response has been extended. Please see the schedule for revised due date. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Shortlist Selection Date :  23APR2018 Time:  09:00AM Shortlist Selection Posting :  23APR2018 Time:  11:15AM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Final Selection Posting Date :  25JUN2018 Time:  12:45PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 DRMP, INC. 2 KIMLEY-HORN AND ASSOCIATES, INC. 3 SCALAR CONSULTING GROUP INC. Letters Received by the Department: DRMP, INC. G-A-I CONSULTANTS, INC. INFRASTRUCTURE ENGINEERS, LLC KIMLEY-HORN AND ASSOCIATES, INC. SCALAR CONSULTING GROUP INC. STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 19322 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42254141203 VARIOUS Major Work : 13.4 - Systems Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.3 - Policy Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: Systems Planning Consultant Services Project Manager : Kirkland, Ray View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Shortlist Selection Date :  16APR2018 Time:  09:00AM Shortlist Selection Posting :  16APR2018 Time:  10:57AM Scope Meeting Date :  24APR2018 Time:  09:00AM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Final Selection Posting Date :  25JUN2018 Time:  11:46AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 VANASSE HANGEN BRUSTLIN, INC. 2 CRIBB PHILBECK WEAVER GROUP, INC. 3 AECOM TECHNICAL SERVICES, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. CRIBB PHILBECK WEAVER GROUP, INC. VANASSE HANGEN BRUSTLIN, INC. ************************************************************ Contract Number : 19337 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44154313201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Project Description: Design of SR 20 (US 27) from Leon County Line to West of Chittling Street in Jefferson County Project Manager : Whittington, John View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Shortlist Selection Date :  16APR2018 Time:  09:00AM Shortlist Selection Posting :  16APR2018 Time:  12:00PM Scope Meeting Date :  24APR2018 Time:  09:00AM Final Selection Meeting Date :  04JUN2018 Time:  09:00AM Final Selection Posting Date :  04JUN2018 Time:  11:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Rank Consultant 1 CETERIS, INC. 2 THE BALMORAL GROUP, LLC 3 BRINDLEY PIETERS AND ASSOCIATES, IN Letters Received by the Department: BAKER KLEIN ENGINEERING, P.L. BASLEE ENGINEERING SOLUTIONS (BES), BRINDLEY PIETERS AND ASSOCIATES, IN CETERIS, INC. JOHN DAVENPORT ENGINEERING, INCORPO PATEL, GREENE AND ASSOCIATES, PLLC PETERS AND YAFFEE, INC. REGISTE, SLIGER ENGINEERING, INC. THE BALMORAL GROUP, LLC ************************************************************ Contract Number : 19303 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 22096836206 VARIOUS Major Work : 9.4.1 - Standard Foundation Studies Minor Work : Project Description: Districtwide High and Low Strain Testing/Reporting for Piles and Shafts Project Manager : Whittington, David View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Shortlist Selection Date :  02APR2018 Time:  09:00AM Shortlist Selection Posting :  02APR2018 Time:  11:38AM Final Selection Meeting Date :  21MAY2018 Time:  09:00AM Final Selection Posting Date :  21MAY2018 Time:  11:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9,11 Rank Consultant 1 APPLIED FOUNDATION TESTING, INC. 2 TERRACON CONSULTANTS, INC. 3 SOUTHERN EARTH SCIENCES, INC. Letters Received by the Department: APPLIED FOUNDATION TESTING, INC. RADISE INTERNATIONAL, L.C. SOUTHERN EARTH SCIENCES, INC. TERRACON CONSULTANTS, INC. ************************************************************ Contract Number : 19326 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43626613201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Design of SR 20 from SR 77 to SR 75 (US 231) in Bay County Project Manager : Bell, Lisa View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Shortlist Selection Date :  09APR2018 Time:  09:00AM Shortlist Selection Posting :  09APR2018 Time:  11:00AM Scope Meeting Date :  17APR2018 Time:  11:00AM Final Selection Meeting Date :  21MAY2018 Time:  09:00AM Final Selection Posting Date :  21MAY2018 Time:  11:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 GORTEMOLLER ENGINEERING, INC. 2 JOHNSON, MIRMIRAN & THOMPSON, INC. 3 CONNELLY & WICKER INC. Letters Received by the Department: BAKER KLEIN ENGINEERING, P.L. BASLEE ENGINEERING SOLUTIONS (BES), CONNELLY & WICKER INC. DAVID H. MELVIN, INC. EISMAN & RUSSO, INC. FALLER, DAVIS & ASSOCIATES, INC. GORTEMOLLER ENGINEERING, INC. GRESHAM, SMITH AND PARTNERS INFRASTRUCTURE ENGINEERS, LLC JOHNSON, MIRMIRAN & THOMPSON, INC. KIMLEY-HORN AND ASSOCIATES, INC. PALMER ENGINEERING CO. CROSS REFERE PETERS AND YAFFEE, INC. PROTEAN DESIGN GROUP, INC. PROVIDENCE ENGINEERING AND DESIGN, ************************************************************ Contract Number : 19321 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 42253441203 Major Work : 8.3 - Photogrammetric Mapping 13.7 - Transportation Statistics Minor Work : Project Description: Digital Data Extraction Consultant Project Manager : Hynes, Geoff View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Shortlist Selection Date :  02APR2018 Time:  09:00AM Shortlist Selection Posting :  02APR2018 Time:  11:38AM Scope Meeting Date :  17APR2018 Time:  10:00AM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Final Selection Posting Date :  25JUN2018 Time:  11:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 SOUTHEASTERN SURVEYING AND MAPPING 2 NOBLES CONSULTING GROUP, INC. 3 GPI GEOSPATIAL, INC. Letters Received by the Department: GPI GEOSPATIAL, INC. NOBLES CONSULTING GROUP, INC. SOUTHEASTERN SURVEYING AND MAPPING ************************************************************ Contract Number : 19324 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 21783833201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP15 - Landscape Architect SR 30A Multilaning Project Manager : Mitchell, Dean Special Notes: Design of SR 30A (US 98/PC Beach Pkwy) from Mandy Lane to East of Nautilus in Bay County. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Shortlist Selection Date :  26MAR2018 Time:  09:00AM Shortlist Selection Posting :  26MAR2018 Time:  12:00PM Scope Meeting Date :  03APR2018 Time:  09:00AM Final Selection Meeting Date :  21MAY2018 Time:  09:00AM Final Selection Posting Date :  21MAY2018 Time:  11:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 DRMP, INC. 2 HDR ENGINEERING, INC. 3 AECOM TECHNICAL SERVICES, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. DRMP, INC. GORTEMOLLER ENGINEERING, INC. H.W. LOCHNER INC HDR ENGINEERING, INC. INFRASTRUCTURE ENGINEERS, LLC SCALAR CONSULTING GROUP INC. STV INCORPORATED WANTMAN GROUP, INC. ************************************************************ Contract Number : 19343 Projects less than $500,000 (Technical Qualification only) Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 44154413201 43775913201 43776113201 44154813201 43974013201 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Minor Work : Project Description: Design Survey Services for: FPID 441544-1 SR 55 from Madison Co. Line to Georgia Line FPID 437759-1 SR 30A from Walton Co. Line to Heather Drive FPID 437761-1 SR 267 from SR 10 to Georgia State Line FPID 439740-1 SR 75 from Bay Co. Line to Pike Pond Road FPID 441548-1 SR 85 S Ferdon Blvd from N of SR 123 Roger J Clary to N of SR 8 (I-10) Project Manager : Davis, Craig View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Shortlist Selection Date :  26MAR2018 Time:  09:00AM Shortlist Selection Posting :  26MAR2018 Time:  12:00PM Final Selection Meeting Date :  07MAY2018 Time:  09:00AM Final Selection Posting Date :  07MAY2018 Time:  2:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 SNELGROVE SURVEYING & MAPPING, INC. 2 NOBLES CONSULTING GROUP, INC. 3 CARDNO, INC. Letters Received by the Department: CARDNO, INC. DRMP, INC. NOBLES CONSULTING GROUP, INC. SNELGROVE SURVEYING & MAPPING, INC. SOUTHEASTERN SURVEYING AND MAPPING WANTMAN GROUP, INC. ************************************************************ Contract Number : 19339 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44154613201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Resurfacing Design SR 63 (US 27/Main Street) from Fifth Street to CR 159A (Potter Woodberry Rd) in Gadsden Co. Project Manager : Whittington, John View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12FEB2018 Shortlist Selection Date :  12MAR2018 Time:  09:00AM Shortlist Selection Posting :  12MAR2018 Time:  12:30PM Scope Meeting Date :  20MAR2018 Time:  09:30AM Final Selection Meeting Date :  14MAY2018 Time:  09:00AM Final Selection Posting Date :  14MAY2018 Time:  11:30AM 1st Date Negotiations Meetings :  22JUN2018 Time:  08:00AM Last Date Negotiations Meetings:  29JUN2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 JACOBS ENGINEERING GROUP INC. 2 INWOOD CONSULTING ENGINEERS, INC. 3 CARDNO, INC. Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), CARDNO, INC. FALLER, DAVIS & ASSOCIATES, INC. H.W. LOCHNER INC HORIZON ENGINEERING GROUP, INC. ICON CONSULTANT GROUP, INC. INWOOD CONSULTING ENGINEERS, INC. JACOBS ENGINEERING GROUP INC. MICHAEL BAKER INTERNATIONAL, INC. D PALMER ENGINEERING CO. CROSS REFERE PETERS AND YAFFEE, INC. POND & COMPANY CORPORATION PROTEAN DESIGN GROUP, INC. THE BALMORAL GROUP, LLC ************************************************************ Contract Number : 19341 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44158813201 Major Work : 3.1 - Minor Highway Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP5 - Bridge Inspection Project Description: Design of SR 8 (I-10) from East of SR 281 (Avalon Blvd) to East of SR 87 in Santa Rosa County. Project Manager : Fussell, Kevin View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Shortlist Selection Date :  05MAR2018 Time:  09:00AM Shortlist Selection Posting :  05MAR2018 Time:  11:00AM Scope Meeting Date :  21MAR2018 Time:  01:00PM Final Selection Meeting Date :  07MAY2018 Time:  09:00AM Final Selection Posting Date :  07MAY2018 Time:  2:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 GREENMAN-PEDERSEN, INC. 2 HANSON PROFESSIONAL SERVICES INC. 3 SCALAR CONSULTING GROUP INC. Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BRINDLEY PIETERS AND ASSOCIATES, IN DAVID H. MELVIN, INC. GREENMAN-PEDERSEN, INC. GRESHAM, SMITH AND PARTNERS H.W. LOCHNER INC HANSON PROFESSIONAL SERVICES INC. ICON CONSULTANT GROUP, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. PALMER ENGINEERING CO. CROSS REFERE PETERS AND YAFFEE, INC. POND & COMPANY CORPORATION PROVIDENCE ENGINEERING AND DESIGN, SCALAR CONSULTING GROUP INC. ************************************************************ Design/Build Projects Procurement Number : E3Q67 Financial Management Number(s): 43168415201 Project Description: SR 30 (US 98) Elevated Roadway East to West of Tyndall AFB Entrance in Bay County ... Please do NOT contact Tyndall Air Force Base in regard to this project. All questions should be directed through the Department's Bid Question and Answer website or the District Procurement Office. ... The contract time for this project has been set at 630 calendar days. ... In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 3 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. HDR Engineering, Inc. (C-9916) Southeastern Surveying & Mapping Corp. (C-9916) Tierra, Inc. (C-9916) ... The stipend amount for this project is $74,100. ... The Request for Proposal document for this project contains exempt information. Firms pursuing this project may obtain the RFP document by submitting a completed Exempt Documents Request Form and a copy of a photo ID to Ranae Dodson of the Procurement Office at ranae.dodson@dot.state.fl.us. Project Manager : Fussell, Kevin Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 10 - Flexible Paving 11 - Grading (includes clearing & grubbing, excavation, embarkment) 15 - Hot Plant-Mixed Bitum. Course (incl structural & surface courses) 7 - Drainage (includes all storm drains,pipe culverts, culverts, etc.) 27 - Minor Bridge Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design Additional Bridge Design Work Types : Design Build Firms responding to this advertisement must submit a completed and signed Bridge Design Qualification Form (Form No. 375-030-55) along with the LOI by the date/ time deadline established for the LOI. Technical Questions Should Be Addressed To: All questions for this project should be submitted through the Department's Bid Question and Answers website: https://fdotwp1.dot.state.fl.us/BidQuestionsandAnswers/ Proposal.aspx/SearchProposal DBE/MBE Requirements: The Department has reviewed this project and established a 10% DBE Availability Goal. Advertisement Status : Final Selection Date of Advertisement : 25SEP2017 Phase1 Selection Cmte. Meeting :  13NOV2017 Time:  09:00AM LOI Scores Notification Date :  13NOV2017 Time:  11:00AM Deadline for Election to Participate in Phase2 :  15NOV2017 Time:  11:00AM Posting of Shortlist :  15NOV2017 Time:  12:00PM Mand. Pre-Proposal Meeting Date:  14DEC2017 Time:  01:30PM Phase 2 Tech. Proposal Due Date:  20APR2018 Time:  12:00PM Price Proposal Due Date :  07JUN2018 Time:  10:00AM Proposal Opening Date :  07JUN2018 Time:  10:30AM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Posting of Award :  25JUN2018 Time:  11:00AM Meeting Location Notes: A mandatory preproposal meeting will be held for this project on Thursday, December 14, 2017 at 1:30 p.m. (local time), Florida Department of Transportation, 1074 Highway 90 East, Chipley, Florida. Phase1 Phase2 Prop Bid Price Adjusted Rank Consultant Score Score Time Proposal Score 1 ANDERSON COLUMBIA CO. INC. 17.3 73.0 750 $19,950,000 220856 2 GLF Construction Corporation 16.0 69.0 750 $21,100,000 248235 3 SUPERIOR CONSTRUCTION COMPANY 17.7 71.0 750 $22,545,648 254273 Firms not participating in Phase 2 Phase1 Score PRINCE CONTRACTING, LLC. 15.7 ************************************************************ DISTRICT 4 ************************************************************ Professional Services Consultant Projects Contract Number : 19473 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43630716201 42922234201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-816/Oakland Park Blvd from Atrium West to SR-A1A.FM#43630716201 =========================================================== FM#42922234201: CEI for D/W Right of Way Services for Relocation/Acquisition/Property Mgmt. =========================================================== Reserved for BDI ============================================================ Project Manager : Sasala, Stacey Contract Amount/Limit: $575,843 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Advertisement Status : Planned Date of Advertisement : 07JAN2019 Shortlist Selection Date :  07FEB2019 Time:  9:00AM Final Selection Meeting Date :  28FEB2019 Time:  9:00AM 1st Date Negotiations Meetings :  27MAR2019 Time:  9:00AM Last Date Negotiations Meetings:  05MAY2019 Time:  9:00AM ************************************************************ Contract Number : 19417 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42922234201 Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Minor Work : Project Description: D/W Right of Way Services for Reloc/Acq/Property Mgmt Project Manager : Miller, Josh Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9 Advertisement Status : Planned Date of Advertisement : 31DEC2018 Shortlist Selection Date Not Available Final Selection Meeting Date :  11FEB2019 Time:  9:00AM 1st Date Negotiations Meetings :  21MAR2019 Time:  9:00AM Last Date Negotiations Meetings:  03JUN2019 Time:  5:00PM ************************************************************ Contract Number : 19472 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 44007216201 44007316201 44007416201 44007516201 44007616201 44007716201 44008616201 44008716201 44008816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for various projects in Broward County: FM44007216201 SR A1A/SE 17 St Seabreeze Blvd from Miami Rd to Harbor Rd FM44007316201 SR A1A from Sebastian St. to Southeast 13th St FM44007416201 SR-838/Sunrise Blvd from Motorola Entrance to Andrews Avenue FM44007516201 SR -817/University Drive from Riverside Drive to Sample Road FM44007616201 SR-834/Sample Rd from NW 85th Ave.to Holiday Spring Blvd. FM44007716201 SR-845/Powerline Rd from McNab Road to West Drive FM44008616201 SR-814/Atlantic Blvd from NW/SW 27th Avenue to SR-A1A FM4008716201 SR-870/Commercial Blvd from NW 70TH Avenue to SR-A1A FM4408816201 SR-816/Oakland Park Blvd from Atrium West to SR-A1A ============================================================ Project is reserved under the Small Business Initiative Project Manager : Sasala, Stacey Contract Amount/Limit: $1,365,225 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Special Notes: Reserved for BDI Advertisement Status : Planned Date of Advertisement : 24DEC2018 Shortlist Selection Date :  28JAN2019 Time:  9:00AM Final Selection Meeting Date :  18FEB2019 Time:  9:00AM ************************************************************ Contract Number : 19469 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 44029716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Continuing Services for Resident Compliance CEI Support Project Manager : Sasala, Stacey Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 17DEC2018 Shortlist Selection Date :  21JAN2019 Time:  9:00AM Final Selection Meeting Date :  11FEB2019 Time:  9:00AM ************************************************************ Contract Number : 19470 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43373516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Continuing Services for Treasure Coast Inspection Support Project Manager : Sasala, Stacey Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 17DEC2018 Shortlist Selection Date :  21JAN2019 Time:  9:00AM Final Selection Meeting Date :  11FEB2019 Time:  9:00AM 1st Date Negotiations Meetings :  20MAR2019 Time:  9:00AM Last Date Negotiations Meetings:  13MAY2019 Time:  9:00AM ************************************************************ Contract Number : 19466 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43270916201 43789216201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-93/I-95 FM43270916201 SR-93/I-75 Eastside Ramp Improvements at Griffin Road FM43783216201 SR-93/I-75 From Miami-Dade County line to Sheridan Street Project Manager : Sasala, Stacey Contract Amount/Limit: $2,766,083 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 03DEC2018 Shortlist Selection Date :  07JAN2019 Time:  9:00AM Final Selection Meeting Date :  28JAN2019 Time:  9:00AM 1st Date Negotiations Meetings :  27FEB2019 Time:  9:00AM Last Date Negotiations Meetings:  22APR2019 Time:  9:00AM ************************************************************ Contract Number : 19465 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43783416201 43783516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-5/US-1/Federal Hwy from N of George Bush Blvd to C-16 Canal FM#43783416201 ============================================================ CEI Services for SR-5/US1/Dixie Hwy From N of Hypoluxo Road to 300' S of Waterway Drive. FM#43783516201 ============================================================ Project Manager : Sasala, Stacey Contract Amount/Limit: $1,111,093 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 19NOV2018 Shortlist Selection Date :  24DEC2018 Time:  9:00AM1 Final Selection Meeting Date :  14JAN2019 Time:  9:00AM ************************************************************ Contract Number : 19464 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43206656201 43206666201 43773116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR 817/University Drive from S of Spring tree Drive to NW 45th Court FM#43206656201 =========================================================== CEI Services for SR 817/University Drive from NW 45th Court to North of NW 57th Street FM#43206666201 =========================================================== CEI Services for SR 817/University Drive fr SR-816/Oakland Park to SR-870 Commercial Blvd MFM#43773116201 =========================================================== Project Manager : Sasala, Stacey Contract Amount/Limit: $1,076,770 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Special Notes: This project is reserved for Business Development Initiative (BDI). Advertisement Status : Planned Date of Advertisement : 12NOV2018 Shortlist Selection Date :  17DEC2018 Time:  9:00AM Final Selection Meeting Date :  07JAN2019 Time:  9:00AM 1st Date Negotiations Meetings :  13FEB2019 Time:  9:00AM Last Date Negotiations Meetings:  08APR2019 Time:  9:00AM ************************************************************ Contract Number : 19460 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43388916201 43469516201 43668516201 43784716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-5/US-1 Bridge #860259 Over Hillsboro Canal FM#43388916201 ============================================================ CEI Services for SR-5/US1 from SR-834/Sample Road to BR/PB County Line FM#43469516201 ============================================================ CEI Services for NW 21st Avenue from Oakland Park Blvd to Commercial Blvd FM#43668516201 =========================================================== CEI Services for SR-A1A/Dania Beach Blvd from Ocean to Gulf Stream Rd FM#43784716201 ============================================================ Project Manager : Sasala, Stacey Contract Amount/Limit: $2,582,214 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 29OCT2018 Shortlist Selection Date :  03DEC2018 Time:  9:00AM Final Selection Meeting Date :  17DEC2018 Time:  9:00PM 1st Date Negotiations Meetings :  30JAN2019 Time:  9:00AM Last Date Negotiations Meetings:  25MAR2019 Time:  9:00AM ************************************************************ Contract Number : 19467 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42485253201 Major Work : 99.0 - Other Professional Services Minor Work : Project Description: Districtwide Value Engineering Contract Project Manager : Khashper, Eugene Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 1,9 Advertisement Status : Planned Date of Advertisement : 29OCT2018 Shortlist Selection Date :  03DEC2018 Time:  9:00AM Final Selection Meeting Date :  12JAN2019 Time:  9:00AM 1st Date Negotiations Meetings :  27FEB2019 Time:  9:00AM Last Date Negotiations Meetings:  29APR2019 Time:  5:00PM ************************************************************ Contract Number : 19459 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43804216201 44055426201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR A1A/Tides Road From North of SR-60 to North of CR-510 and Hurricane Matthew Restoration of SR-A1A south of Sebastian Inlet. Project Manager : Sasala, Stacey Contract Amount/Limit: $679,681 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 22OCT2018 Shortlist Selection Date :  26NOV2018 Time:  9:00AM Final Selection Meeting Date :  17DEC2018 Time:  9:00AM 1st Date Negotiations Meetings :  23JAN2019 Time:  9:00AM Last Date Negotiations Meetings:  18MAR2019 Time:  9:00AM ************************************************************ Contract Number : 19455 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43783816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SS-1/SR-5 from Southeast Heritage Blvd. to North of Salerno Road Project Manager : Sasala, Stacey Contract Amount/Limit: $717,315 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 15OCT2018 Shortlist Selection Date :  19NOV2018 Time:  9:00AM Final Selection Meeting Date :  10DEC2018 Time:  9:00AM ************************************************************ Contract Number : 19453 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43783616201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-7/US-441 South of SR-806/Atlantic Ave. to SR-804/Boynton Beach Blvd. Project Manager : Sasala, Stacey Contract Amount/Limit: $966,086 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 08OCT2018 Shortlist Selection Date :  13NOV2018 Time:  9:00AM Final Selection Meeting Date :  03DEC2018 Time:  9:00AM 1st Date Negotiations Meetings :  09JAN2019 Time:  9:00AM Last Date Negotiations Meetings:  04MAR2019 Time:  5:00PM ************************************************************ Contract Number : 19456 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 43789213201 43789223201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 14.0 - Architect 15.0 - Landscape Architect Project Description: Districtwide Minor Professional Design Services ========================================================== This project is reserved under the Business Development Initiative =========================================================== Two contracts may be selected from this advertisement: AD 19456 - FM 43789213201 - $1,500,000 AD 19457 - FM 43789223201 - $1,500,000 =========================================================== Selection from Expanded Letter of Response Project Manager : Hughes, James N Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7 Number of contracts that may be awarded from this advertisement: 2
Advertisement Status : Planned Date of Advertisement : 08OCT2018 Shortlist Selection Date :  13NOV2018 Time:  9:00AM Final Selection Meeting Date :  03DEC2018 Time:  9:00AM ************************************************************ Contract Number : 19451 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43467416201 43468613201 43469016201 43469716201 43469916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for Various Broward Mobility Projects FM43467416201 Pompano Beach Bikelanes FM43468616201 NE Broward- Pompano Beach/Deerfield Beach FM43469016201 Hollywood FM43469716201 Miramar/Hollywood FM43469916202 Pompano Beach Sidewalks Project Manager : Sasala, Stacey Contract Amount/Limit: $2,062,718 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 01OCT2018 Shortlist Selection Date :  05NOV2018 Time:  9:00AM Final Selection Meeting Date :  26NOV2018 Time:  9:00AM 1st Date Negotiations Meetings :  02JAN2019 Time:  9:00AM Last Date Negotiations Meetings:  25FEB2019 Time:  5:00PM ************************************************************ Contract Number : 19461 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 40560643201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: CR-510/85th St. from CR-512 to West of 82nd Ave. Project Manager : Formoso, Maria Contract Amount/Limit: $4,113,040 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: Maria Formoso, Project Manager has reserved the following times for marketing meetings. If you are interested, please contact her at (954)777-4677 to schedule a time. Available meeting dates are every Monday (all day) from August 20, 2018 through September 24, 2018. Advertisement Status : Planned Date of Advertisement : 24SEP2018 Shortlist Selection Date :  29NOV2018 Time:  9:00AM Final Selection Meeting Date :  17DEC2018 Time:  9:00AM ************************************************************ Contract Number : 19430 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42338353201 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 14.0 - Architect 15.0 - Landscape Architect Project Description: Districtwide Plans Review Support Services ========================================================== This project is reserved under the Business Development Initiative Project Manager : Brock, Tim Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7 Advertisement Status : Planned Date of Advertisement : 17SEP2018 Shortlist Selection Date :  22OCT2018 Time:  9:00AM Final Selection Meeting Date :  13NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19448 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43215416201 43388816201 44145716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for Bridge projects in Palm Beach County: FM43215416201 SR-800/Spanish River Blvd. over ICWW FM43388816201 SR-A1A/Blue Heron Bridge 930269 over ICWW Replace Fender System FM44145716201 Alternate SR-A1A/SR-811 Ramp to SB I-95 over RCA Center Dr to FEC R/R Project Manager : Sasala, Stacey Contract Amount/Limit: $726,972 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 17SEP2018 Shortlist Selection Date :  22OCT2018 Time:  9:00AM Final Selection Meeting Date :  13NOV2018 Time:  9:00AM 1st Date Negotiations Meetings :  19DEC2018 Time:  9:00AM Last Date Negotiations Meetings:  11FEB2018 Time:  5:00PM ************************************************************ Contract Number : 19458 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44136013201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: A1A from Southern City limit of Hillsboro Beach to Southeast 3rd Street Project Manager : Sonnett, William A Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 17SEP2018 Shortlist Selection Date :  22OCT2018 Time:  9:00AM Final Selection Meeting Date :  10DEC2018 Time:  9:00AM ************************************************************ Contract Number : 19446 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43234416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-804/Boynton Beach from W of Jog Road to Congress Avenue. Project Manager : Sasala, Stacey Contract Amount/Limit: $1,076,659 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 10SEP2018 Shortlist Selection Date :  15OCT2018 Time:  9:00AM Final Selection Meeting Date :  05NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19445 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43215316201 43995916201 44145416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for Various Locations FM 43215316201 SR-858/Hallandale Beach Blvd. for MP 5.241 to MP 5.389. FM 43995916201 SR-838/Sunrise Blvd over SR-7/US-441 (Bridges 860624 and 860625) FM 44145416201 US-27 & I-75 Interchange Project Manager : Sasala, Stacey Contract Amount/Limit: $1,362,261 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 04SEP2018 Shortlist Selection Date :  08OCT2018 Time:  9:00AM Final Selection Meeting Date :  29OCT2018 Time:  9:00AM ************************************************************ Contract Number : 19443 Projects less than $500,000 (Technical Qualification only) Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43770116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-9/I-95 from South of the Rest Area to South of SR-714/Martin Highway. Project Manager : Sasala, Stacey Contract Amount/Limit: $394,720 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7,10 Special Notes: This project is reserved under the Business Development Initiative ============================================================ Advertisement Status : Planned Date of Advertisement : 27AUG2018 Shortlist Selection Date :  01OCT2018 Time:  9:00AM Final Selection Meeting Date :  22OCT2018 Time:  9:00AM ************************************************************ Contract Number : 19441 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 43627916201 Major Work : 9.3 - Highway Materials Testing Minor Work : 10.3 - Construction Materials Inspection Project Description: Districtwide Materials Lab Testing and Construction Support ========================================================= This project is reserved under the Business Development Initiative. Project Manager : Arcalas, Ronald Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7,11,4 Advertisement Status : Planned Date of Advertisement : 20AUG2018 Shortlist Selection Date :  24SEP2018 Time:  9:00AM Final Selection Meeting Date :  15OCT2018 Time:  9:00AM ************************************************************ Contract Number : 19450 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43999913201 Major Work : 3.1 - Minor Highway Design 15.0 - Landscape Architect Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 9.1 - Soil Exploration Project Description: Savannas Preserve State Park Gap Walton Road to Savannas Recreation Area BIKE PATH/TRAIL Project Manager : Freda, Aycel Contract Amount/Limit: $750,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Special Notes: Firms interested in pursuing this project may request a 30 minutes meeting. Project Manager has reserved times during July 16 2018 to August 15 2018. Please contact Aycel Freda at (954)777-4145 to schedule a meeting. Any documentation presented by either the Department or the Consultant during a marketing meeting is a public record subject to the provisions of Chapter 119, Florida Statute. Advertisement Status : Planned Date of Advertisement : 20AUG2018 Shortlist Selection Date :  24SEP2018 Time:  9:00AM Final Selection Meeting Date :  13NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19449 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43288617201 Major Work : 5.1 - Conventional Bridge Inspection Under-Utilized Work Groups: GROUP5 - Bridge Inspection Project Description: District 4 Traffic Signal Mast Arm Inspection Services Project Manager : Radman, Gholamreza Contract Amount/Limit: $1,900,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 13AUG2018 Shortlist Selection Date :  17SEP2018 Time:  9:00AM Final Selection Meeting Date :  05NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19452 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Professional Liability Insurance $: $500,000 Financial Management Number(s): 43234816201 43686916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for SR-732/Jensen Beach from SR-5/US-1 to Savannah Road and SR-A1A from East of Lyons Bridge to SR-732/Jensen Beach Blvd. Project Manager : Sasala, Stacey Contract Amount/Limit: $1,080,659 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Advertisement Status : Planned Date of Advertisement : 13AUG2018 Shortlist Selection Date :  17SEP2018 Time:  9:00AM Final Selection Meeting Date :  05NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19439 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 41242046201 43310956201 43538416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.5.1 - Major Bridge(CEI) - Concrete Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Project Description: CEI Services for I-95 Express 3B-2 ======================================== 41242046201 SR-9/I-95@SR-808/Glades Road 43310956201 SR-9/I-95 from South of Glades Road to South of Linton Blvd. 43538416201 SR-9/I-95@Linton Blvd. Interchange Project Manager : Sasala, Stacey Contract Amount/Limit: $13,638,400 See Descriptions of Standard Notes on Current Advertisements webpage: 9,10 Special Notes: CEI teams interested in providing professional services for the I-95 3B-2 Express Lanes project are invited to contact Palm Beach Operations to schedule a Meet and Greet for the afternoons of July 24, 25, or 26. We have reserved the time of FDOT Team Members, as well as conference rooms at the Palm Beach Operations Center (located at 7900 West Forest Hill Blvd, West Palm Beach, FL 33413) Contact info for meeting: Sharon Shore (561)370-1162 Sharon.Shore@dot.state.fl.us Advertisement Status : Planned Date of Advertisement : 06AUG2018 Shortlist Selection Date :  10SEP2018 Time:  9:00AM Final Selection Meeting Date :  29OCT2018 Time:  9:00AM ************************************************************ Contract Number : 19463 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 23038583201 Major Work : 15.0 - Landscape Architect Minor Work : Project Description: Continuing Services for Landscape Architecture Design/ Production Project Manager : Hassett, Elisabeth Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Advertisement Status : Planned Date of Advertisement : 06AUG2018 Shortlist Selection Date :  10SEP2018 Time:  9:00AM Final Selection Meeting Date :  05NOV2019 Time:  9:00AM ************************************************************ Contract Number : 19426 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42598043201 42598042201 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 6.1 - Traffic Engineering Studies 13.7 - Transportation Statistics Project Description: Continuing Services for Traffic Forecasting and Analysis Support. Provide professional planning and engineering consultant sevices of traffic forecast and analysis to support Department's projects of Project Development and environment (PD&E), Design, Interchange Access Request, and Concept Development. Project Manager : Zhao, Hui Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 23JUL2018 Shortlist Selection Date :  27AUG2018 Time:  9:00AM Final Selection Meeting Date :  08OCT2018 Time:  9:00AM 1st Date Negotiations Meetings :  11OCT2018 Time:  9:00AM Last Date Negotiations Meetings:  10DEC2018 Time:  9:00AM ************************************************************ Contract Number : 19442 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43793423201 Major Work : 3.2 - Major Highway Design 14.0 - Architect 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: I-75 Alligator Alley Environmental Education Project Project Manager : Nagole, Vandana Contract Amount/Limit: $1,200,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 23JUL2018 Shortlist Selection Date :  27AUG2018 Time:  9:00AM Final Selection Meeting Date :  15OCT2018 Time:  9:00AM ************************************************************ Contract Number : 19438 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 43789113201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 14.0 - Architect 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Districtwide Minor Professional Services Design Projects Project Manager : Hughes, James N Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Special Notes: Selection from Expanded Letter of Response ============================================================ Evaluation Criteria: Scope of Services 5 pts. Scope of Services (5pts) ************************************************************ Awareness of Project Issues 30 pts. Understanding of Project Issues (10 pts) Approach to Project Issues (10 pts) Approach to Project Process (10 pts) ************************************************************ Project Management 45 pts. Project Management Approach (10 pts) Control of Proejct Schedule (10 pts) Control of Project Budget (10 pts) Quality Control Process (10 pts) Team Approach (5 pts) ************************************************************ Project Staffing 20 Pts. Staffing Quality and Availability (10 pts) Staffing Experience on Similar Project (10 pts) ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUL2018 Response Deadline Date :  30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  06AUG2018 Time:  10:00AM Shortlist Selection Date :  20AUG2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  28AUG2018 Time:  9:00AM Final Selection Meeting Date :  10SEP2018 Time:  9:00AM 1st Date Negotiations Meetings :  17OCT2018 Time:  9:00AM Last Date Negotiations Meetings:  17DEC2018 Time:  9:00AM Response Deadline : 30JUL2018 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 19440 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 42427063201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Continuing Services for Local Agency Program (LAP) Support Project Manager : Williams, Mya Contract Amount/Limit : $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUL2018 Response Deadline Date :  30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  08AUG2018 Time:  9:00AM Shortlist Selection Date :  20AUG2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  17SEP2018 Time:  10:00AM Final Selection Meeting Date :  08OCT2018 Time:  9:00AM 1st Date Negotiations Meetings :  13NOV2018 Time:  9:00AM Last Date Negotiations Meetings:  14JAN2018 Time:  9:00AM Response Deadline : 30JUL2018 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 19413 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 43288336201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Project Description: CEI Services for ITS Infrastructure and Patterned Pavement Crosswalk for SR-706/Indiantown Road from Turnpike to SR-5/US-1 in Palm Beach County =========================================================== Selection Criteria: *Awareness of and approach to project issues (30): Understanding of project-s intent and scope, technical aspects, challenges and key milestones (10) Understanding of issues that may impact stakeholders, project time and budget, and the ability to resolve these issues. (15) Innovative problem-solving techniques (5) *Construction Project Management and Administration (20): Approach to accomplishing the management, administration, and coordination aspects of the project. (8) Knowledge and experience with project documentation. (8) Optimization of project schedule and budget (4) *Project Staffing (35): Proposed staffing qualifications, experience, and availability (25) Staff's experience and past performance on similar projects (10) *CEI Contract Management (15): Approach to managing the CEI budget (5) The philosophy and methodology that will be used by the consultant to ensure that the work necessary to properly administer the construction contract is accomplished within the staff hours set forth in the CEI contract Approach to CEI quality control (5) Communication abilities (5) Project Manager : Sasala, Stacey Contract Amount/Limit : $466,857 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Special Notes: Plans for this project are available, please forward your request to d4.profserv@dot.state.fl.us ============================================================ This advertisement is extended it is optional for firms that have already submitted LORs to resubmit. ============================================================ Please submit two files via d4.profserv@dot.state.fl.us for this project: 1. LOR letter 2. include all other required documents (resumes,forms,etc) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 25JUN2018 Response Deadline Date :  17JUL2018 Longlist(Tech. Rev. Cmte.) Date:  30JUL2018 Time:  9:00AM Shortlist Selection Date :  06AUG2018 Time:  9:00AM Final Selection Meeting Date :  27AUG2018 Time:  9:00AM 1st Date Negotiations Meetings :  09SEP2018 Time:  9:30AM Last Date Negotiations Meetings:  19NOV2018 Time:  9:00AM Response Deadline : 17JUL2018 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 19432 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42573134B01 Major Work : 22.0 - Acquisition Bus. Damage Estimating & Review Minor Work : Project Description: Districtwide Right of Way CPA Contract for Business Damages Support Services Project Manager : Miller, Josh Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,9 Special Notes: Evaluation Criteria: 1. Awareness of Project Issues 0-25 points: -Understanding od primary tasks (15 points) -Understanding of perceived project challenges (10 points) 2. Approach to Project 0-30 points: -Technical approach to project (20 points) -Proposed quality control process (5 points) -Management of project budget and schedule (5 points) 3. Project Staffing 0-30 points: -Staffing quality and availability (15 points) -Staffing experience on similar projects (10 points) -Proposed subconsultant and inter-relationship between prime and subconsultants (5 points) 4. Other Considerations 0-15 points: -Potential Conflict of interest issues, knowledge of policies, standard law and rules at federal, state and local levels (15 points) This advertisement has been extended through July 16, 2018. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 21JUN2018 Response Deadline Date :  16JUL2018 Longlist(Tech. Rev. Cmte.) Date:  23JUL2018 Time:  1:00PM Shortlist Selection Date :  06AUG2018 Time:  9:00AM Final Selection Meeting Date :  06AUG2018 Time:  9:00AM 1st Date Negotiations Meetings :  05SEP2018 Time:  9:00AM Last Date Negotiations Meetings:  19NOV2018 Time:  5:00AM Response Deadline : 16JUL2018 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 19435 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43839413201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Project Description: Homewood Boulevard from Old Germantown Road to Lowson Boulevard ======================================================== This project is reserved under the Business Development Initiative Project Manager : Dorvil, Carl Contract Amount/Limit : $500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Special Notes: Homewood Boulevard from Germantown Road to Lowson Boulevard scope includes shoulder widening to provide bicycle lanes, provision of sidewalk on the west side of Homewood Boulevard north of Linton Boulevard, miscellaneous sidewalk upgrades to meet ADA, signage upgrades and installation of pedestrian signals at intersection of Homewood Boulevard with Linton Boulevard. ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 18JUN2018 Response Deadline Date :  02JUL2018 Longlist(Tech. Rev. Cmte.) Date:  10JUL2018 Time:  1:00PM Shortlist Selection Date :  23JUL2018 Time:  9:00AM Scope Meeting Date :  02AUG2018 Time:  1:00PM Tech. Rev. Cmte Meeting Date :  23AUG2018 Time:  9:00AM Final Selection Meeting Date :  10SEP2018 Time:  9:00AM 1st Date Negotiations Meetings :  03OCT2018 Time:  9:00AM Last Date Negotiations Meetings:  03DEC2018 Time:  9:00AM Response Deadline : 02JUL2018 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 19434 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 41273312202 41325812202 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.3 - Controlled Access Highway Design Minor Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: PD&E Services for SR-9/I-95 ======================================================== Two projects may be awarded form this advertisement. AD19433 FM412733-1-22-01 SR-9/I-95@10th Ave North in Lake Worth. Estimated cost: $1,000,000 AD19434 FM413258-1-22-01 SR9/I-95@Lantana Road. Estimated cost: $1,000,000 ========================================================= Consultants are required to address BOTH projects on their Letter of Response. Shortlisted firms will be required to present on both projects. Firm ranked #1 will be awarded FM41325812202 Firm ranked #2 will be awarded FM41273312202 The Project Manager for FM413258 is Vandana Nagole. The Project Manager for FM412733 is Humberto Arrieta. Project Manager : Nagole, Vandana Special Notes: Please see updated Scope of Services. Utilities section 4.9. 1 has been reviesed to include a table containing a list of Utilities. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 04JUN2018 Longlist(Tech. Rev. Cmte.) Date:  25JUN2018 Time:  1:00PM Shortlist Selection Date :  09JUL2018 Time:  9:00AM Shortlist Selection Posting :  09JUL2018 Time:  10:00AM Scope Meeting Date :  19JUL2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  13AUG2018 Time:  2:00PM Final Selection Meeting Date :  27AUG2018 Time:  9:00AM 1st Date Negotiations Meetings :  03OCT2018 Time:  9:00AM Last Date Negotiations Meetings:  03DEC2018 Time:  5:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: AMERICAN CONSULTING ENGINEERS OF FL ARCADIS U.S., INC. GOAL ASSOCIATES, INC. METRIC ENGINEERING INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AMERICAN CONSULTING ENGINEERS OF FL ARCADIS U.S., INC. BMA CONSULTING ENGINEERING, INC. Gannett Fleming Project Development GOAL ASSOCIATES, INC. HANSON PROFESSIONAL SERVICES INC. HNTB CORPORATION METRIC ENGINEERING INC. PARSONS TRANSPORTATION GROUP INC. SCALAR CONSULTING GROUP INC. STANLEY CONSULTANTS, INC. WSP USA INC. ************************************************************ Contract Number : 19436 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43783223201 43811713201 44166813201 43783243201 Major Work : 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: I-75 Milling and Resurfacing from N. of Sheridan St. to W. of US-27. Installation of Bike Lane from Glades Pkwy. to Weston Rd. ======================================================== FM43783223201 SR-93/I-75 from Sheridan St. to South of I-595 (Resurfacing) FM43811713201 SR-84 from Glades Parkway to Weston Road (Bike lanes/Sidewalks) FM44166813201 SR-93/I-75 from I-595 to West of US-27 (Resurfacing) FM43783243201 SR-93/I-75 from Sheridan St. to Griffin Rd. Auxiliary Lanes Project Manager : Wang, Bing Special Notes: Reference to the auxiliary lanes would be from the I-75 Express PD&E Study engineering report that also includes the appendices where the concept plans can be found by following this link: I-75 Express Information. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 04JUN2018 Longlist(Tech. Rev. Cmte.) Date:  25JUN2018 Time:  9:00AM Shortlist Selection Date :  09JUL2018 Time:  9:00AM Shortlist Selection Posting :  09JUL2018 Time:  10:15AM Scope Meeting Date :  18JUL2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  13AUG2018 Time:  9:00AM Final Selection Meeting Date :  27AUG2018 Time:  9:00AM 1st Date Negotiations Meetings :  02OCT2018 Time:  9:00AM Last Date Negotiations Meetings:  03DEC2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: GANNETT FLEMING, INC. NETWORK ENGINEERING SERVICES, INC. WANTMAN GROUP, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AIM ENGINEERING & SURVEYING, INC. AMERICAN CONSULTING ENGINEERS OF FL C.H. PEREZ & ASSOCIATES CONSULTING GANNETT FLEMING, INC. H.W. LOCHNER INC HARDESTY & HANOVER, LLC INWOOD CONSULTING ENGINEERS, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. NETWORK ENGINEERING SERVICES, INC. PARSONS TRANSPORTATION GROUP INC. R. J. BEHAR & COMPANY, INC. SCALAR CONSULTING GROUP INC. STANTEC CONSULTING SERVICES INC. WANTMAN GROUP, INC. WSP USA INC. ************************************************************ Contract Number : 19429 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42965033201 Major Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Districtwide Services for Road Safety Audit and Safety Studies Project Manager : Miller, Thomas View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 14MAY2018 Longlist(Tech. Rev. Cmte.) Date:  06JUN2018 Time:  8:30AM Shortlist Selection Date Not Available Final Selection Meeting Date :  06AUG2019 Time:  9:00AM 1st Date Negotiations Meetings :  17SEP2018 Time:  9:30AM Last Date Negotiations Meetings:  12NOV2018 Time:  5:OOPM Meeting Location Notes: The Department is withdrawing the solicitation for this advertisement with the intent to re-advertise. Please continue to monitor the website for any changes. See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: GANNETT FLEMING, INC. TINDALE-OLIVER & ASSOCIATES,INC. VIA PLANNING, INC. Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG ARCADIS U.S., INC. CHOICE ENGINEERING CONSULTANTS, INC CTS ENGINEERING, INC. GANNETT FLEMING, INC. H.W. LOCHNER INC MARLIN ENGINEERING, INC. MCMAHON ASSOCIATES, INC. CROSS REFE METRIC ENGINEERING INC. NETWORK ENGINEERING SERVICES, INC. TINDALE-OLIVER & ASSOCIATES,INC. TRIDENT ENGINEERING, LLC VANASSE HANGEN BRUSTLIN, INC. VIA PLANNING, INC. WSP USA INC. ************************************************************ Contract Number : 19431 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 41515213201 Major Work : 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.2 - Minor Bridge Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: SR-93/I-75@SR-820/Pines Blvd. N from of Miramar Pkwy. to N. of Pines Blvd. Project Manager : Saini, Vanita Special Notes: I-75 @ Pines Blvd. interchange reconstruction. I-75 mainline widening for auxiliary lanes. Pines Blvd. overpass bridge replacement. Park & Ride lot. ============================================================ Scope includes development of conceptual designs for Park & Rid Lot. Project will be subject to Value Engineering work- shop. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 14MAY2018 Longlist(Tech. Rev. Cmte.) Date:  05JUN2018 Time:  8:30AM Shortlist Selection Date :  18JUN2018 Time:  9:00AM Shortlist Selection Posting :  18JUN2018 Time:  10:30AM Scope Meeting Date :  29JUN2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  18JUL2018 Time:  8:30AM Final Selection Meeting Date :  06AUG2018 Time:  9:00AM 1st Date Negotiations Meetings :  12SEP2018 Time:  9:00AM Last Date Negotiations Meetings:  12NOV2018 Time:  500PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: AECOM TECHNICAL SERVICES, INC. NETWORK ENGINEERING SERVICES, INC. WSP USA INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AIM ENGINEERING & SURVEYING, INC. BMA CONSULTING ENGINEERING, INC. H.W. LOCHNER INC INWOOD CONSULTING ENGINEERS, INC. NETWORK ENGINEERING SERVICES, INC. STANLEY CONSULTANTS, INC. STANTEC CONSULTING SERVICES INC. WANTMAN GROUP, INC. WSP USA INC. ************************************************************ Contract Number : 19427 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43993915201 43994015201 44014315201 44014325201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Roadway Improvements on Various Locations along SR-25/US-27 =========================================================== FM43993913201 SR-25/US-27@Boat Ramps FM43994013201 SR-25/US-27 from North of I-75 to Broward/ Palm Beach County Line FM44014313201 SR-25/US-27 from North of I-75 Interchange to Broward/ Palm Beach County FM44014323201 Project Manager : Dorvil, Carl Special Notes: SR 25/US-27 from north of I-75 to Broward/Palm Beach County line - Scope of work includes shoulder widening, providing acceleration/deceleration lanes, installing, replacing and/ or resetting guardrails, signing and pavement marking, installing conduits and providing FPL power to ITS video monopoles. ============================================================ Project inclues Federal funds. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  31MAY2018 Time:  8:30AM Shortlist Selection Date :  11JUN2018 Time:  9:00AM Shortlist Selection Posting :  11JUN2018 Time:  11:00AM Scope Meeting Date :  25JUN2018 Time:  2:00PM Tech. Rev. Cmte Meeting Date :  24JUL2018 Time:  1:30PM Final Selection Meeting Date :  06AUG2018 Time:  9:00AM 1st Date Negotiations Meetings :  05SEP2018 Time:  9:00AM Last Date Negotiations Meetings:  05NOV2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: A & P CONSULTING TRANSPORTATION ENG CTS ENGINEERING, INC. DRMP, INC. Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG AECOM TECHNICAL SERVICES, INC. BASLEE ENGINEERING SOLUTIONS (BES), CTS ENGINEERING, INC. DRMP, INC. GANNETT FLEMING, INC. HARDESTY & HANOVER, LLC KISINGER CAMPO & ASSOCIATES, CORP. PE CONSULTING ENGINEERING D/B/A PE POND & COMPANY CORPORATION PROPEL ENGINEERING, INC. T.Y. LIN INTERNATIONAL TRACE CONSULTANTS, INC. ************************************************************ Contract Number : 19428 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44004313201 Major Work : 4.1.2 - Minor Bridge Design Minor Work : 3.2 - Major Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Project Description: Brant Dr. Bridge Replacement from Oregon Ln to Avocet Rd. ========================================================== Bridge replacement project with bike lanes added on the bridge and the roadway to the nearest intersections Project Manager : Basnet, Binod Special Notes: PROJECT IS RESERVED UNDER THE BUSINESS DEVELOPMENT INTIATIVE ======================================================= View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  31MAY2018 Time:  10:00AM Shortlist Selection Date :  11JUN2018 Time:  9:00AM Shortlist Selection Posting :  11JUN2018 Time:  11:15AM Scope Meeting Date :  19JUN2018 Time:  9:30AM Tech. Rev. Cmte Meeting Date :  18JUL2018 Time:  11:00AM Final Selection Meeting Date :  30JUL2018 Time:  9:00AM 1st Date Negotiations Meetings :  14SEP2018 Time:  9:00AM Last Date Negotiations Meetings:  05NOV2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Shortlisted Firms: ASA CONSULTANTS, INC. FLORIDA BRIDGE AND TRANSPORTATION, PEVIDA HIGHWAY DESIGNERS, LLC Letters Received by the Department: AGENOR & CAMPBELL STRUCTURAL ENGINE ASA CONSULTANTS, INC. BMA CONSULTING ENGINEERING, INC. FLORIDA BRIDGE AND TRANSPORTATION, MASTER CONSULTING ENGINEERS, INC. PATEL, GREENE AND ASSOCIATES, PLLC PEVIDA HIGHWAY DESIGNERS, LLC REGISTE, SLIGER ENGINEERING, INC. SCALAR CONSULTING GROUP INC. ************************************************************ Contract Number : 19419 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 22996496201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Treasure Coast Operations CEI Construction Support ======================================================= Project Manager : Sasala, Stacey Special Notes: Scoring Criteria: ================= Awareness of Contract Issues (20Points) Understanding of the contract's scope and challenges. Demonstrates knowledge of the task work order process, the District's needs to support office staff, and the need to support or augment various FDOT or CCEI staff to accomplish project duties (20) ============================================================ Approach to Contract Management (45 Points) Approach to managing, accounting, and control of funds on a task work order contract (20) Approach to managing the task process (15) Quality control of CCEI personnel, including monitoring staff performance, and how this is managed across potential subconsultants (10) ============================================================ Approach to Staffing Needs (35 Points) The firm's process plan/methodology of providing qualified staff required for jobs (15) Potential availability of staff (10) The Senior Project Engineer and their support staff's qualifications and experience on similar assignments. (10) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 30APR2018 Longlist(Tech. Rev. Cmte.) Date:  23MAY2018 Time:  10:00AM Shortlist Selection Date Not Available Tech. Rev. Cmte Meeting Date :  05JUN2018 Time:  10:00AM Final Selection Meeting Date :  18JUN2018 Time:  9:00AM Final Selection Posting Date :  18JUN2018 Time:  10:30AM 1st Date Negotiations Meetings :  01AUG2018 Time:  9:00AM Last Date Negotiations Meetings:  28SEP2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Rank Consultant 1 AECOM TECHNICAL SERVICES, INC. 2 THE CORRADINO GROUP, INC. 3 CREATIVE ENGINEERING GROUP, INC. 4 TARGET ENGINEERING GROUP, LLC Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. CREATIVE ENGINEERING GROUP, INC. TARGET ENGINEERING GROUP, LLC THE CORRADINO GROUP, INC. ************************************************************ Contract Number : 19424 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 22996693201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Districtwide Drainage Studies and Environmental Permits ========================================================= Please refer to Note 4 of the preamble to this advertisement ========================================================= This contract is intended to handle multiple task work orders related to the Drainage and Enviromental Permitting needs of the District 4 Drainage Design Office. ============================================================ Standard Note 8 was added to this project. The under- utilized work group is 3. The deadline for submission of the Expanded Letter of Response has been extended to May 14, 2018. Project Manager : Poole, JAMES Special Notes: Selection Criteria: ============================================================ Awareness of Project Issues (30 Points) Knowledge of Drainage Criteria and Issues (15) Knowledge of Permitting Criteria and Issues (10) Understanding of Contract Needs and Innovation (5) ============================================================ Approach to Project (30 Points) Technical Approach to Task Work Orders (15) Approach to managing budget and schedule (10) Quality Assurance/Quality Control (5) ============================================================ Project Staffing (30 Points) Staffing Quality & Availabilty (15) Staffing Experience on Similar Projects (10) Relationship between Prime & Subs (5) ============================================================ Other Considerations (10 Points) Perceived quick mobilization and turnaround of tasks (5) Previous experience on similar contracts (3) Familiar with relevant local issues (2) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24APR2018 Longlist(Tech. Rev. Cmte.) Date:  21MAY2018 Time:  9:00AM Shortlist Selection Date :  29MAY2018 Time:  1:00PM Shortlist Selection Posting :  29MAY2018 Time:  2:45PM Tech. Rev. Cmte Meeting Date :  30MAY2018 Time:  1:00PM Final Selection Meeting Date :  04JUN2018 Time:  9:00AM Final Selection Posting Date :  04JUN2018 Time:  9:30AM 1st Date Negotiations Meetings :  01AUG2018 Time:  9:30AM Last Date Negotiations Meetings:  18SEP2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 SCALAR CONSULTING GROUP INC. 2 JOHNSON, MIRMIRAN & THOMPSON, INC. 3 SNUBBS CONSULTING INC. Letters Received by the Department: AES ENGINEERING, INC. AMERICAN CONSULTING ENGINEERS OF FL HDR ENGINEERING, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. KIMLEY-HORN AND ASSOCIATES, INC. SCALAR CONSULTING GROUP INC. SNUBBS CONSULTING INC. STANLEY CONSULTANTS, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19425 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43727912202 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: PD&E Services for SR-9/I-95 from South of Woolbright Road to North of Woolbright Road ============================================================ Project Development & Environment Study for Interchange Improvements at I-95 and Woolbright Road. Project Manager : Arrieta, Humberto Special Notes: Additional files are available for this project send all request to d4.profserv@dot.state.fl.us ============================================================ This advertisement has been modified: Note: Additional work types have been added, work types 9.2 & 9.4.1 have been added as minor work types. The date for LOR's has been extended through May 14,2018. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 23APR2018 Longlist(Tech. Rev. Cmte.) Date:  18MAY2018 Time:  2:30PM Shortlist Selection Date :  29MAY2018 Time:  1:00PM Shortlist Selection Posting :  29MAY2018 Time:  2:45PM Scope Meeting Date :  05JUN2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  22JUN2018 Time:  9:30AM Final Selection Meeting Date :  02JUL2018 Time:  9:00AM Final Selection Posting Date :  02JUL2018 Time:  9:45AM 1st Date Negotiations Meetings :  23AUG2018 Time:  9:00AM Last Date Negotiations Meetings:  22OCT2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 HANSON PROFESSIONAL SERVICES INC. 2 KEITH AND SCHNARS, P.A. 3 VOLKERT, INC. Letters Received by the Department: ARCADIS U.S., INC. BMA CONSULTING ENGINEERING, INC. GOAL ASSOCIATES, INC. HANSON PROFESSIONAL SERVICES INC. KEITH AND SCHNARS, P.A. KIMLEY-HORN AND ASSOCIATES, INC. METRIC ENGINEERING INC. SCALAR CONSULTING GROUP INC. VOLKERT, INC. WANTMAN GROUP, INC. WSP USA INC. ************************************************************ Contract Number : 18428 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43201426201 VARIOUS Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Project Description: Pre-event Natural Disaster Monitoring/Construction Engieering and Inspection Project Manager : Hall, Kelley Special Notes: The Department may select two consultant firms from this advertisement. ============================================================ Provide Disaster Monitoring/Construction Engineering and Inspection (CEI) services required for contract administration, disaster related damage assessment, debris monitoring, recovery moitoring, construction inspection for emergency work and environmental clearance support for the event preparation and recovery efforts in District Four (4) for the contract duration. ============================================================ Scoring Criteria: (20 Points) Experience of CEI team on hurricane recovery - Consultant should demonstrate team members experience and note clearly their roles and responsibilities on hurricane response(s)/recovery(ies) that they participated. ============================================================ (20 Points) Understanding of FHWA & FEMA documentation requirements for reimbursement; - Consultant should demonstrate their familiarity of the FHWA & FEMA programs. What recover activities will be reimbursed under FHWA & what will be under FHWA & what will be under FEMA? What documentations are required for reimbursement? ============================================================ (20 Points) Approaches to ensure cost efficiency in the management of the CEI contract; - Consultant is expected to discuss their management approach in providing the BEST VALUE of services to the Department especially on overhead non-lfederally reimbursement charges and utilization of overtime. Provide discussion on tradeoff between response vs cost expense containment. ============================================================ (20 Points) Approaches to ensure an efficient, effective and accurate CEI process on hurricane recovery effort for VARIOUS categories of storms; - Consultant is expected to discuss their approaches for VARIOUS categories of storms storms (Tropical Storm, Hurricane Cat 1 & 2, Major Hurricane Cat 3 & above). Also, the valocity of the storm (slow or fast). How they are going to perform damage assessment & & recovery? Are they going to pre-position their teams? ============================================================ (10 Points) Communication & reporting structure - how are they going to communicate with each other (various sub-consultants), contractors and eventually with FDOT? How How are they going to ensure accurate & timely communication? How do they communicate when telephone and computer e-mail are not operable? What communication back up system do they have? ============================================================ (5 Points) Documentation- Consultant is to present how data are collected, archived and available to the Department for easy future reference. ============================================================ (5 Points) Innovative Ideas - Points will be awarded based on the value (efficiency/cost savings on the recovery/faster response) of the innovative idea(s). View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09APR2018 Longlist(Tech. Rev. Cmte.) Date:  30APR2018 Time:  10:30AM Shortlist Selection Date Not Available Final Selection Meeting Date :  14MAY2018 Time:  9:00AM Final Selection Posting Date :  14MAY2018 Time:  1:00PM 1st Date Negotiations Meetings :  12JUN2018 Time:  10:30AM Last Date Negotiations Meetings:  22JUN2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Rank Consultant 1 TARGET ENGINEERING GROUP, LLC 2 CSA CENTRAL, INC. 3 EISMAN & RUSSO, INC. 4 STANLEY CONSULTANTS, INC. Letters Received by the Department: CSA CENTRAL, INC. EISMAN & RUSSO, INC. STANLEY CONSULTANTS, INC. TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 18463 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43201426201 VARIOUS Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Project Description: Pre-event Natural Disaster Monitoring/Construction Engieering and Inspection Project Manager : Hall, Kelley Special Notes: The Department may select two consultant firms from this advertisement. ============================================================ Provide Disaster Monitoring/Construction Engineering and Inspection (CEI) services required for contract administration, disaster related damage assessment, debris monitoring, recovery moitoring, construction inspection for emergency work and environmental clearance support for the event preparation and recovery efforts in District Four (4) for the contract duration. ============================================================ Scoring Criteria: (20 Points) Experience of CEI team on hurricane recovery - Consultant should demonstrate team members experience and note clearly their roles and responsibilities on hurricane response(s)/recovery(ies) that they participated. ============================================================ (20 Points) Understanding of FHWA & FEMA documentation requirements for reimbursement; - Consultant should demonstrate their familiarity of the FHWA & FEMA programs. What recover activities will be reimbursed under FHWA & what will be under FHWA & what will be under FEMA? What documentations are required for reimbursement? ============================================================ (20 Points) Approaches to ensure cost efficiency in the management of the CEI contract; - Consultant is expected to discuss their management approach in providing the BEST VALUE of services to the Department especially on overhead non-lfederally reimbursement charges and utilization of overtime. Provide discussion on tradeoff between response vs cost expense containment. ============================================================ (20 Points) Approaches to ensure an efficient, effective and accurate CEI process on hurricane recovery effort for VARIOUS categories of storms; - Consultant is expected to discuss their approaches for VARIOUS categories of storms storms (Tropical Storm, Hurricane Cat 1 & 2, Major Hurricane Cat 3 & above). Also, the valocity of the storm (slow or fast). How they are going to perform damage assessment & & recovery? Are they going to pre-position their teams? ============================================================ (10 Points) Communication & reporting structure - how are they going to communicate with each other (various sub-consultants), contractors and eventually with FDOT? How How are they going to ensure accurate & timely communication? How do they communicate when telephone and computer e-mail are not operable? What communication back up system do they have? ============================================================ (5 Points) Documentation- Consultant is to present how data are collected, archived and available to the Department for easy future reference. ============================================================ (5 Points) Innovative Ideas - Points will be awarded based on the value (efficiency/cost savings on the recovery/faster response) of the innovative idea(s). View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09APR2018 Longlist(Tech. Rev. Cmte.) Date:  30APR2018 Time:  10:30AM Shortlist Selection Date Not Available Final Selection Meeting Date :  14MAY2018 Time:  9:00AM Final Selection Posting Date :  14MAY2018 Time:  12:15PM 1st Date Negotiations Meetings :  21JUN2018 Time:  9:00AM Last Date Negotiations Meetings:  22JUN2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 1 CSA CENTRAL, INC. ************************************************************ Contract Number : 19422 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 41707352201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Continuing Services for PD&E/EDTM Support Activities Project Manager : Davis, Shandra P Special Notes: Continuing Services Project Development &Environment (PD&E) and Efficient Transportation Decision Making (ETFDM) ============================================================ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09APR2018 Shortlist Selection Date :  21MAY2018 Time:  9:00AM Shortlist Selection Posting :  21MAY2018 Time:  9:46AM Tech. Rev. Cmte Meeting Date :  12JUN2018 Time:  2:00PM Final Selection Meeting Date :  09JUL2018 Time:  9:00AM Final Selection Posting Date :  09JUL2018 Time:  9:16AM 1st Date Negotiations Meetings :  08AUG2018 Time:  9:00AM Last Date Negotiations Meetings:  02OCT2018 Time:  5:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 STANTEC CONSULTING SERVICES INC. 2 STANLEY CONSULTANTS, INC. Letters Received by the Department: STANLEY CONSULTANTS, INC. STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 19423 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43971422202 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.3.1 - Complex Bridge Design - Concrete 4.3.2 - Complex Bridge Design - Steel 4.4 - Movable Span Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: SR-5/US-1 from South of New River to North of New River- PD&E Services ========================================================== Project Manager : Basnet, Binod Special Notes: PD&E Study for SR-5/US-1 Pedestrian/Bicyclist crossing over New River. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09APR2018 Longlist(Tech. Rev. Cmte.) Date:  03MAY2018 Time:  8:30AM Shortlist Selection Date :  14MAY2018 Time:  9:00AM Shortlist Selection Posting :  14MAY2018 Time:  10:30AM Scope Meeting Date :  24MAY2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  13JUN2018 Time:  8:30AM 2nd Tech Rev. Cmte Meeting :  15JUN2018 Time:  2:00PM Final Selection Meeting Date :  25JUN2018 Time:  9:00AM Final Selection Posting Date :  25JUN2018 Time:  10:00AM 1st Date Negotiations Meetings :  13AUG2018 Time:  9:00AM Last Date Negotiations Meetings:  08OCT2018 Time:  5:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 HDR ENGINEERING, INC. 2 KEITH AND SCHNARS, P.A. 3 SCALAR CONSULTING GROUP INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. BMA CONSULTING ENGINEERING, INC. HDR ENGINEERING, INC. INWOOD CONSULTING ENGINEERS, INC. KEITH AND SCHNARS, P.A. SCALAR CONSULTING GROUP INC. STANLEY CONSULTANTS, INC. WANTMAN GROUP, INC. WSP USA INC. ************************************************************ Contract Number : 19420 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43119926201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Support for Palm Beach Operations Center Project Manager : Sasala, Stacey Special Notes: CEI Support for Palm Beach Operation Center ============================================================ Selection Criteria:   *Awareness of contract issues (20 POINTS) Understanding of the contract's scope and challenges. Demonstrates knowledge of the task work order process, the the District's needs to support office staff, and the need to support or augment various FDOT or CCEI staff to to accomplish project duties(20)   *Approach to Contract Management (45 POINTS) Approach to managing, accounting, and control of funds on a task work order contract(20) Approach to managing the task work order process(15) Quality control of CCEI personnel, including monitoring staff performance, and how this is managed across potential subconsultants(10)   *Approach to Staffing Needs (35 POINTS) The firm's process plan/methodology of providing qualified staff required for jobs(15) Potential availability of staff (10) The Senior Project Engineer and their support staff's qualifications and experience on similar assignments (10)   In addition to the documents required under Standard Note 4, please submit a Staffing Matrix showing the availability of the proposed personnel (8.5" x 11" and up to three pages). Submit all forms in a separate file in pdf format (unzipped) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Longlist(Tech. Rev. Cmte.) Date:  24APR2018 Time:  1:00PM Shortlist Selection Date Not Available Final Selection Meeting Date :  14MAY2018 Time:  9:00AM Final Selection Posting Date :  14MAY2018 Time:  10:15AM 1st Date Negotiations Meetings :  17JUL2018 Time:  9:00AM Last Date Negotiations Meetings:  28SEP2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Rank Consultant 1 CREATIVE ENGINEERING GROUP, INC. 2 TARGET ENGINEERING GROUP, LLC 3 JOHNSON, MIRMIRAN & THOMPSON, INC. 4 RUMMEL, KLEPPER & KAHL, LLP D/B/A R Letters Received by the Department: CREATIVE ENGINEERING GROUP, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19421 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43779313201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Pompano Park Pl/SW 3rd St. from Powerline Rd. to Cypress Creek Rd.   Adding new bike lanes, filling missing sidewalk sections, bringing ramps at intersections to ADA compliance, adding/ modifying signals, draining and pavement markings to implement the "Compete Street Concept" to this corridor. Project Manager : Arrieta, Humberto Special Notes: Project Plans are included in Scope View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Longlist(Tech. Rev. Cmte.) Date:  27APR2018 Time:  9:00AM Shortlist Selection Date :  14MAY2018 Time:  9:00AM Shortlist Selection Posting :  14MAY2018 Time:  11:15AM Scope Meeting Date :  22MAY2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  13JUN2018 Time:  1:00PM Final Selection Meeting Date :  02JUL2018 Time:  9:00AM Final Selection Posting Date :  02JUL2018 Time:  9:45AM 1st Date Negotiations Meetings :  02AUG2018 Time:  9:00AM Last Date Negotiations Meetings:  01OCT2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 A & P CONSULTING TRANSPORTATION ENG 2 PROPEL ENGINEERING, INC. 3 JOHNSON, MIRMIRAN & THOMPSON, INC. Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG C.H. PEREZ & ASSOCIATES CONSULTING HBC ENGINEERING COMPANY JOHNSON, MIRMIRAN & THOMPSON, INC. KEITH AND ASSOCIATES, INC. KEITH AND SCHNARS, P.A. PE CONSULTING ENGINEERING D/B/A PE PROPEL ENGINEERING, INC. R. J. BEHAR & COMPANY, INC. SNUBBS CONSULTING INC. WSP USA INC. ************************************************************ Contract Number : 19405 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43708611201 43708612201 Major Work : 13.3 - Policy Planning 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 3.2 - Major Highway Design 6.1 - Traffic Engineering Studies 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: Continuing Services General Planning Support ========================================================= The Department requires professional planning and engineering consultant services in areas of policy and systems planning, including metropolitan transportation planning and planning for the Strategic Intermodal System; areawide and corridor analysis/studies; and concept development for transportation projects. Expertise and experience across multiple disciplines, knowledge of the Southeast Florida region, and an ability to stay abreast of evolving topical areas (e.g. emerging technologies) as they relate to planning for and delivering transportation services and facilities will be needed to cover the multiple and diverse potential consultant tasks in the Scope of Services for this continuing services contract. Project Manager : Bush, Lois View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  11APR2018 Time:  11:00AM Shortlist Selection Date :  23APR2018 Time:  9:00AM Shortlist Selection Posting :  23APR2018 Time:  10:00AM Scope Meeting Date :  01MAY2018 Time:  3:00PM Tech. Rev. Cmte Meeting Date :  22MAY2018 Time:  3:00PM Final Selection Meeting Date :  11JUN2018 Time:  9:00AM Final Selection Posting Date :  11JUN2018 Time:  10:30AM 1st Date Negotiations Meetings :  11JUL2018 Time:  9:00AM Last Date Negotiations Meetings:  10SEP2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 CAMBRIDGE SYSTEMATICS, INC. 2 GANNETT FLEMING, INC. 3 TINDALE-OLIVER & ASSOCIATES,INC. Letters Received by the Department: CAMBRIDGE SYSTEMATICS, INC. GANNETT FLEMING, INC. H.W. LOCHNER INC KEITH AND SCHNARS, P.A. TINDALE-OLIVER & ASSOCIATES,INC. ************************************************************ Contract Number : 19418 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42993624201 Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Minor Work : 22.0 - Acquisition Bus. Damage Estimating & Review Project Description: Right of Way Services for SR-A1A North of Bridge over ICWW Bridge # 940045 Project Manager : Miller, Josh Special Notes: Final Plans are available for this project upon request. Please email d4.profserv@dot.state.fl.us to request Final Plans. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  09APR2018 Time:  2:00PM Shortlist Selection Date :  23APR2018 Time:  9:00AM Shortlist Selection Posting :  23APR2018 Time:  10:15AM Scope Meeting Date :  03MAY2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  01JUN2018 Time:  9:00AM Final Selection Meeting Date :  18JUN2018 Time:  9:00AM Final Selection Posting Date :  18JUN2018 Time:  11:15AM 1st Date Negotiations Meetings :  16JUL2018 Time:  10:00AM Last Date Negotiations Meetings:  17SEP2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 HDR ENGINEERING, INC. 2 AECOM TECHNICAL SERVICES, INC. 3 AMERICAN ACQUISITION GROUP, LLC Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AMERICAN ACQUISITION GROUP, LLC FLORIDA ACQUISITION & APPRAISAL,INC HDR ENGINEERING, INC. VOLKERT, INC. ************************************************************ Contract Number : 19415 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42957623201 42957633201 Major Work : 3.2 - Major Highway Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Final Design for SR-7/US-441 Transit Corridor Improvements Project Manager : Lopes, Robert Special Notes: Final Design for SR-7 transit Corridor Improvements. 1. Along SR-7 from Broward Miami Dade county line to North of Sample Road. 2. SR 838 from SR-7 to NW 31st Avenue 3. SR 858 from Edmund Road to SW 58th Avenue. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  02APR2018 Time:  9:00AM Shortlist Selection Date :  16APR2018 Time:  9:00AM Shortlist Selection Posting :  16APR2018 Time:  12:00PM Scope Meeting Date :  26APR2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  23MAY2018 Time:  9:00AM Final Selection Meeting Date :  04JUN2018 Time:  9:00AM Final Selection Posting Date :  04JUN2018 Time:  9:30AM 1st Date Negotiations Meetings :  31JUL2018 Time:  9:00AM Last Date Negotiations Meetings:  10SEP2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 HBC ENGINEERING COMPANY 2 SCALAR CONSULTING GROUP INC. 3 STANLEY CONSULTANTS, INC. Letters Received by the Department: CALTRAN ENGINEERING GROUP, INC. HARDESTY & HANOVER, LLC HBC ENGINEERING COMPANY LOUIS BERGER U.S., INC. PE CONSULTING ENGINEERING D/B/A PE POND & COMPANY CORPORATION SCALAR CONSULTING GROUP INC. STANLEY CONSULTANTS, INC. TRACE CONSULTANTS, INC. ************************************************************ Contract Number : 19416 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42922244201 Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Minor Work : 22.0 - Acquisition Bus. Damage Estimating & Review Project Description: Continuing Services for Right of Way Acquisition/Relocation Project Manager : Miller, Josh Special Notes: The Consultant shall perform services that are to include, but are not limited to, acquisition, negotiation, business damage analysis preparation, business damage report review, preparation of suit information and lawsuit packages, settlements and closings, property management functions, Right of Way Management System (RWMS) input, general contractor services, architectural services, land planner services and traffic engineering services. ============================================================ The scope for this project has been updated. Please use this scope to develop your repsonse to this advertisement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  05APR2018 Time:  9:00AM Shortlist Selection Date :  16APR2018 Time:  9:00AM Shortlist Selection Posting :  16APR2018 Time:  12:00PM Scope Meeting Date :  26APR2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  25MAY2018 Time:  2:00PM Final Selection Meeting Date :  11JUN2018 Time:  9:00AM Final Selection Posting Date :  11JUN2018 Time:  10:30AM 1st Date Negotiations Meetings :  18JUL2018 Time:  10:00AM Last Date Negotiations Meetings:  10SEP2018 Time:  5:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 HDR ENGINEERING, INC. 2 AMERICAN ACQUISITION GROUP, LLC 3 AECOM TECHNICAL SERVICES, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AMERICAN ACQUISITION GROUP, LLC FLORIDA ACQUISITION & APPRAISAL,INC HDR ENGINEERING, INC. INDEPENDENCE ACQUISITION & APPRAISA ************************************************************ Contract Number : 19407 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42925336201 44232916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Broward Operations CEI Consultant Construction Support ======================================================== Two contracts may be awarded from this advertisement: AD19407 FM 42925336201 and AD19408 FM44232916201 Each contract is for a maximum of $1,500,000. Project Manager : Sasala, Stacey Special Notes: Two Contracts to be awarded from this advertisement: AD19407 FM#42925336201 and AD19408 FM#44232916201 Each contract is for a maximum of $1,500,000 Evaluation Criteria: Awareness of contract issues (20 POINTS) Understanding of the contract's scope and challenges. Demonstrates knowledge of the task work order process, the District's needs to support office staff, and the need to support or augment various FDOT or CCEI staff to accomplish project duties(20) ============================================================ Approach to Contract Management (45 POINTS) Approach to managing, accounting, and control of funds on a task work order contract(20) Approach to managing the task work order process(15) Quality control of CCEI personnel, including monitoring staff performance, and how this is managed across potential subconsultants(10) ============================================================ Approached to Staffing Needs (35 POINTS) The firm'' process plan/methodology of providing qualified staff required for jobs(15) Potential availability of staff(10) The Senior Project Engineer and their support staff's qualifications and experience on similar assignments (10) ============================================================ In addition to the documents required under Standard Note 4, please submit a Staffing Matrix showing the availability of the proposed personnel (8.5" x 11" and up to three pages) Submit all forms in a separate file in pdf format (unzipped) ============================================================   The Evaluation Criteria has been added to this advertisement View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  27MAR2018 Time:  10:00AM Shortlist Selection Date Not Available Final Selection Meeting Date :  16APR2018 Time:  9:00AM Final Selection Posting Date :  16APR2018 Time:  10:57AM 1st Date Negotiations Meetings :  13JUN2018 Time:  1:00PM Last Date Negotiations Meetings:  30JUL2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Rank Consultant 1 RUMMEL, KLEPPER & KAHL, LLP D/B/A R 2 CALVIN, GIORDANO & ASSOCIATES,INC. 3 AE ENGINEERING, INC. 4 TARGET ENGINEERING GROUP, LLC 5 EAC CONSULTING, INC. Letters Received by the Department: AE ENGINEERING, INC. CALVIN, GIORDANO & ASSOCIATES,INC. EAC CONSULTING, INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19408 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 42925336201 44232916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : CEI General CEI Const Support Project Manager : Sasala, Stacey View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  27MAR2018 Time:  10:00AM Shortlist Selection Date Not Available Final Selection Meeting Date :  16APR2018 Time:  9:00AM Final Selection Posting Date :  16APR2018 Time:  10:57AM 1st Date Negotiations Meetings :  04JUN2018 Time:  9:00AM Last Date Negotiations Meetings:  30JUL2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 1 CALVIN, GIORDANO & ASSOCIATES,INC. ************************************************************ Contract Number : 19414 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43025731201 Major Work : 13.7 - Transportation Statistics Minor Work : Project Description: Continuing Services for Traffic Data Collection and Routine Counts ============================================================ Provide professional and technical services in collecting and analyzing traffic/Roadway Characteristics Inventory (TCI/RCI) data collection, data reporting, mapping applications, and data analysis to support travel demand modeling, long-range and area wide planning, route planning route planning and scheduling, service design, marketing, and customer communications as mandated by the relevant regulations and policies, and on-site support. Project Manager : Schwartz, Kara View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 26FEB2018 Longlist(Tech. Rev. Cmte.) Date:  20MAR2018 Time:  1:00PM Shortlist Selection Date :  02APR2018 Time:  9:00AM Shortlist Selection Posting :  02APR2018 Time:  9:30AM Tech. Rev. Cmte Meeting Date :  09MAY2018 Time:  1:00PM Final Selection Meeting Date :  21MAY2018 Time:  9:00AM Final Selection Posting Date :  21MAY2018 Time:  9:45AM 1st Date Negotiations Meetings :  26JUN2018 Time:  9:00AM Last Date Negotiations Meetings:  22OCT2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 0 CALTRAN ENGINEERING GROUP, INC. 0 METRIC ENGINEERING INC. 1 F.R. ALEMAN & ASSOCIATES, INC. Letters Received by the Department: CALTRAN ENGINEERING GROUP, INC. F.R. ALEMAN & ASSOCIATES, INC. METRIC ENGINEERING INC. ************************************************************ Contract Number : 19406 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42485533201 Major Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Continuing Services for Road Safety Audit and Safety Studies ------------------------------------------------------------ The general purpose of this contract is to provide the District Traffic Operations Engineer (DTOE), or its designee (hereinafter referred to as the department project manager), with professional services for conducting needed safety studies. Project Manager : Xie, Yujing Special Notes: The general purpose of this contract is to provide the District Traffic Operations Engineer (DTOE), or its designee (hereinafter referred to as the department project manager), with professional services for conducting needed safety studies. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Longlist(Tech. Rev. Cmte.) Date:  14MAR2018 Time:  2:00PM Shortlist Selection Date :  26MAR2018 Time:  9:00AM Shortlist Selection Posting :  26MAR2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  25APR2018 Time:  9:00AM 2nd Tech Rev. Cmte Meeting :  30APR2018 Time:  1:00PM Final Selection Meeting Date :  21MAY2018 Time:  9:00AM Final Selection Posting Date :  21MAY2018 Time:  9:45AM 1st Date Negotiations Meetings :  29JUN2018 Time:  10:00AM Last Date Negotiations Meetings:  20AUG2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 AECOM TECHNICAL SERVICES, INC. 2 GANNETT FLEMING, INC. 3 MCMAHON ASSOCIATES, INC. CROSS REFE Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. CHOICE ENGINEERING CONSULTANTS, INC GANNETT FLEMING, INC. H.W. LOCHNER INC HBC ENGINEERING COMPANY MARLIN ENGINEERING, INC. MCMAHON ASSOCIATES, INC. CROSS REFE THE CORRADINO GROUP, INC. ************************************************************ Contract Number : 19411 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43992913201 43993013201 44010813201 44015013201 44015813201 44163113201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Various Miscellaneous Improvements at Various Locations along SR-25/US-27 and Resurfacing, Restoration and Rehabilitation along SR-25/US-27 from Hendry/Palm Beach County Line to SR-80 ==================================================== Two projects may be selected from this advertisement: *AD19411 for $2,926,716 (estimated contract amount): 439929.1.32.01 SR-25/US-27 FROM MP12.000 TO SOUTH OF SOUTHBAY 439930.1.32.01 SR-25/US-27 AT CR-827 & OKEELANTA RD INTERSECTION 440108.1.32.01 SR-25/US-27 FROM MILEPOST 16.000 TO MILEPOST 20.150 440150.1.32.01 SR-25/US-27 FROM MP12.900 TO 16.000 440158.1.32.01 SR-25/US-27 FROM 5.5MILES SOUTH OF SOUTH BAY TO 25.661 *AD19412 for $1,215,569 (estimated contract amount) FM 441631.1.32.01 SR-25/US-27 FROM HENDRY/PALM BEACH COUNTYLINE TO SR-80 Project Manager : Jasmin, Kenzot Special Notes: Consultant firm ranked number one on final selection will be awarded AD19411. Firm ranked number two will be awarded AD19412. ========================================================= Firms are required to address AD19411 and AD19412 in their Letters of Response. ========================================================== The Scopes for Ad19411 and Ad19412 are combined into the one attached document. Please address both in your response View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Longlist(Tech. Rev. Cmte.) Date:  15MAR2018 Time:  11:00AM Shortlist Selection Date :  26MAR2018 Time:  9:00AM Shortlist Selection Posting :  26MAR2018 Time:  10:30AM Scope Meeting Date :  06APR2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  24APR2018 Time:  9:00AM Final Selection Meeting Date :  14MAY2018 Time:  9:00AM Final Selection Posting Date :  14MAY2018 Time:  11:30AM 1st Date Negotiations Meetings :  27JUN2018 Time:  9:00AM Last Date Negotiations Meetings:  31AUG2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 GOAL ASSOCIATES, INC. 2 EAC CONSULTING, INC. 3 PARSONS TRANSPORTATION GROUP INC. 4 POND & COMPANY CORPORATION Letters Received by the Department: AES ENGINEERING, INC. EAC CONSULTING, INC. GOAL ASSOCIATES, INC. H.W. LOCHNER INC HBC ENGINEERING COMPANY JOHNSON, MIRMIRAN & THOMPSON, INC. KISINGER CAMPO & ASSOCIATES, CORP. PARSONS TRANSPORTATION GROUP INC. POND & COMPANY CORPORATION STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 19412 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43992913201 43993013201 44010813201 44015013201 44015813201 44163113201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Various Miscellaneous Improvements at Various Locations along SR-25/US-27 and Resurfacing, Restoration and Rehabilitation along SR-25/US-27 from Hendry/Palm Beach County Line to SR-80 ==================================================== Two projects may be selected from this advertisement: *AD19411 for $2,926,716 (estimated contract amount): 439929.1.32.01 SR-25/US-27 FROM MP12.000 TO SOUTH OF SOUTHBAY 439930.1.32.01 SR-25/US-27 AT CR-827 & OKEELANTA RD INTERSECTION 440108.1.32.01 SR-25/US-27 FROM MILEPOST 16.000 TO MILEPOST 20.150 440150.1.32.01 SR-25/US-27 FROM MP12.900 TO 16.000 440158.1.32.01 SR-25/US-27 FROM 5.5MILES SOUTH OF SOUTH BAY TO 25.661 *AD19412 for $1,215,569 (estimated contract amount) FM 441631.1.32.01 SR-25/US-27 FROM HENDRY/PALM BEACH COUNTYLINE TO SR-80 Project Manager : Jasmin, Kenzot Special Notes: Consultant firm ranked number one on final selection will be awarded AD19411. Firm ranked number two will be awarded AD19412. ========================================================= Firms are required to address AD19411 and AD19412 in their Letters of Response. ========================================================== The Scopes for Ad19411 and Ad19412 are combined into the one attached document. Please address both in your response View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19FEB2018 Longlist(Tech. Rev. Cmte.) Date:  15MAR2018 Time:  11:00AM Shortlist Selection Date :  26MAR2018 Time:  9:00AM Shortlist Selection Posting :  26MAR2018 Time:  10:30AM Scope Meeting Date :  06APR2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  24APR2018 Time:  9:00AM Final Selection Meeting Date :  14MAY2018 Time:  9:00AM Final Selection Posting Date :  14MAY2018 Time:  11:45AM 1st Date Negotiations Meetings :  26JUN2018 Time:  9:00AM Last Date Negotiations Meetings:  20AUG2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 0 GOAL ASSOCIATES, INC. 0 PARSONS TRANSPORTATION GROUP INC. 0 POND & COMPANY CORPORATION 1 EAC CONSULTING, INC. Letters Received by the Department: AES ENGINEERING, INC. EAC CONSULTING, INC. GOAL ASSOCIATES, INC. H.W. LOCHNER INC HBC ENGINEERING COMPANY JOHNSON, MIRMIRAN & THOMPSON, INC. KISINGER CAMPO & ASSOCIATES, CORP. PARSONS TRANSPORTATION GROUP INC. POND & COMPANY CORPORATION STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 19447 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 41510043201 Major Work : 99.0 - Other Professional Services Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 13.4 - Systems Planning 13.7 - Transportation Statistics Project Description: Continuing Services for South Florida Rail Corridor Project Manager : Olkuch, Birgit Special Notes: The Department requires the assistance of a consultant for a wide range of technical services in support of the Rail and Freight program. The consultant will provide project oversight for Department funded projects as needed, to ensure that maximum value is derived from the Department's grant and funding assistance programs. ========================================================= Consultant must be a licensed professional engineer and have Rail and Freight expertise and experience. The Consultant will be required to provide services, as directed by the Department's Project Manager, including: 1) Support the Rail program with project monitoring and control activities. 2) Provide recommendations to the Department and/or railroads on enhancing rail operations, security, and safety best practices. 3) Consultant will have expertise in rail and freight operations, and intermodal connections. 4) The consultant must have knowledge of passenger rail operations and maintenance procurement actions such as request for proposals, design build criteria packages, invitation to bid; and will assist the Department in the review of the South Florida Regional Transportation Authority (SFRTA) procurements and contracts. 5) Provide project management, production, and coordination for all tasks and work activities assigned. 6) Develop scopes of service, level of effort estimates, and contract provisions for various studies and activities. 7) Consultant will assist the Department with the oversight and management of the South Florida Rail Corridor. 8) The consultant firm shall provide the Department with in- house support to assist with all on-going rail projects. 9) The consultant will inspect track work maintenance, signal work, and provide inventories of State owned spare materials on the Corridor. Consultant shall make recommendations for re-use, storage, and/or scrapping of removed material. 10) In recognition of the significant role that freight mobility plays as an economic driver for the state, an Office of Freight, Logistics, and Passenger Operations has been created. District 4 has a Freight Team that will develop motor carrier, rail, transit, seaport, waterways, and aviation opportunities through program and project management in order to support the Florida Department of Transportation comprehensive multimodal transportation system. The consultant team will support and assist the Department with these efforts. 11) The consultant will advise the Department on the Positive Train Control (PTC) procurement, implementation, installation of equipment, and maintenance. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12FEB2018 Longlist(Tech. Rev. Cmte.) Date:  07MAR2018 Time:  10:00AM Shortlist Selection Date :  19MAR2018 Time:  9:00AM Shortlist Selection Posting :  19MAR2018 Time:  11:00AM Scope Meeting Date :  28MAR2018 Time:  2:00PM Tech. Rev. Cmte Meeting Date :  08MAR2018 Time:  3:30PM 2nd Tech Rev. Cmte Meeting :  20APR2018 Time:  1:00PM Final Selection Meeting Date :  30APR2018 Time:  9:00AM Final Selection Posting Date :  30APR2018 Time:  9:45AM 1st Date Negotiations Meetings :  06JUN2018 Time:  9:00AM Last Date Negotiations Meetings:  30JUL2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 1,9 Rank Consultant 1 H.W. LOCHNER INC 2 AECOM TECHNICAL SERVICES, INC. 3 ARCADIS U.S., INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. ARCADIS U.S., INC. C.H. PEREZ & ASSOCIATES CONSULTING CROUCH ENGINEERING, INC. H.W. LOCHNER INC TRANSYSTEMS CORPORATION D/B/A TRANS ************************************************************ Contract Number : 19409 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 22965844201 43787814201 Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Minor Work : 22.0 - Acquisition Bus. Damage Estimating & Review Project Description: Right of Way Services for SR-806/Atlantic Avenue from West of SR-7/US-441 to East of Lyons Road and SR-809/Military Trail at Forest Hill Blvd. Project Manager : Miller, Josh Special Notes: Right of Way acquisition, relocation assistance production control, property management, business damage analysis review, business damage report review. Plans are available for this project To request plans, please send email request to d4.profserv@dot.state.fl.us Work Type 22.0 has been added as a Minor Work Type. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  27FEB2018 Time:  10:30AM Shortlist Selection Date :  12MAR2018 Time:  9:00AM Shortlist Selection Posting :  12MAR2018 Time:  10:30AM Scope Meeting Date :  20MAR2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  23APR2018 Time:  10:00AM Final Selection Meeting Date :  07MAY2018 Time:  9:00AM Final Selection Posting Date :  07MAY2018 Time:  9:45AM 1st Date Negotiations Meetings :  11JUN2018 Time:  10:00AM Last Date Negotiations Meetings:  06AUG2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 AMERICAN ACQUISITION GROUP, LLC 2 HDR ENGINEERING, INC. 3 GLASS LAND ACQUISITION SERVICE SPEC Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AMERICAN ACQUISITION GROUP, LLC FLORIDA ACQUISITION & APPRAISAL,INC GLASS LAND ACQUISITION SERVICE SPEC HDR ENGINEERING, INC. ************************************************************ Contract Number : 19410 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43839513201 Major Work : 3.2 - Major Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Project Description: Design Services for George Bush Boulevard from NE 2nd Avenue to SR-A1A ============================================================ The project includes adding bike lanes and sidewalk on the north side of the street. Potentially an expanded sidewalk on the south side of the street, lighting, improved drainage, enhanced crosswalks and signage are included. No work is currently proposed on the Intercostal Waterway Bridge. ============================================================ This project is reserved from BDI. Project Manager : james, helen Special Notes: This project is reserved for BDI work Type 8.3 removed from Scope View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  27FEB2018 Time:  3:00PM Shortlist Selection Date :  12MAR2018 Time:  9:00AM Shortlist Selection Posting :  12MAR2018 Time:  11:00AM Scope Meeting Date :  22MAR2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  06APR2018 Time:  10:30AM Final Selection Meeting Date :  30APR2018 Time:  9:00AM Final Selection Posting Date :  30APR2018 Time:  9:45AM 1st Date Negotiations Meetings :  07JUN2018 Time:  10:00AM Last Date Negotiations Meetings:  06AUG2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Rank Consultant 1 VIA ENGINEERING GROUP, INC. 2 CALTRAN ENGINEERING GROUP, INC. 3 THE BALMORAL GROUP, LLC Letters Received by the Department: ALVAREZ ENGINEERS, INC. BASLEE ENGINEERING SOLUTIONS (BES), CALTRAN ENGINEERING GROUP, INC. HBC ENGINEERING COMPANY HSQ GROUP, INC. METRO CONSULTING GROUP, LLC PE CONSULTING ENGINEERING D/B/A PE PROPEL ENGINEERING, INC. R. J. BEHAR & COMPANY, INC. SCALAR CONSULTING GROUP INC. THE BALMORAL GROUP, LLC VIA ENGINEERING GROUP, INC. ************************************************************ Contract Number : 19404 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43373416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Continuing Services for Broward Operations CEI Inspector Support. CEI inspection staff Continuing Services contract for support of projects associated with Broward Operations. Project Manager : Sasala, Stacey Special Notes: EVALUATION CRITERIA: *Awareness of Contract Issues (15 POINTS) Understanding of the contract's scope and challenges. Familiar with the hybrid projects in the District's work plan, and how to provide services for these contracts(15) *Approach to Contract Management (45 POINTS) Approach to managing, accounting, and control of funds on a task work order contract(20) Approach to managing the task work order process(15) Quality control of CCEI personnel, including monitoring staff performance, and how this is managed across potential subconsultants(10) *Approach to Staffing Needs (40 POINTS) The firm's process plan/methodology of providing qualified staff required for jobs(25) Potential availability of staff and geographical coverage(10) The Consultant CEI Engineer and their support staff's qualifications and experience on similar assignments(5) ========================================================== In addition to the documents required under Standard Note 4, please submit a Staffing Matrix showing the availability of the proposed personnel (8.5"x11" and up to three pages). Submit all forms in a separate file in pdf format (unzipped) Note: Scoring Criteria has been revised View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 22JAN2018 Longlist(Tech. Rev. Cmte.) Date:  12FEB2018 Time:  1:30PM Shortlist Selection Date :  26FEB2018 Time:  9:00AM Shortlist Selection Posting :  26FEB2018 Time:  11:30AM Final Selection Meeting Date :  19MAR2018 Time:  9:00AM Final Selection Posting Date :  19MAR2018 Time:  11:00AM 1st Date Negotiations Meetings :  30APR2018 Time:  1:00PM Last Date Negotiations Meetings:  16JUL2018 Time:  5:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,9,10 Rank Consultant 1 TARGET ENGINEERING GROUP, LLC 2 RUMMEL, KLEPPER & KAHL, LLP D/B/A R 3 JOHNSON, MIRMIRAN & THOMPSON, INC. Letters Received by the Department: AE ENGINEERING, INC. CALVIN, GIORDANO & ASSOCIATES,INC. JOHNSON, MIRMIRAN & THOMPSON, INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19403 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43696414201 43989114201 Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Minor Work : 22.0 - Acquisition Bus. Damage Estimating & Review Project Description: Right of Way Services for SR-9/I-95 from South of SW 10th Street to North of Hillboro Blvd and SR-869/SW 10th St. from West of Military Trail Right of Way acquisition, relocation assistance, production control, property management, business damage analysis/ review, business damage report review Project Manager : Miller, Josh View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 08JAN2018 Longlist(Tech. Rev. Cmte.) Date:  31JAN2018 Time:  8:30AM Shortlist Selection Date :  12FEB2018 Time:  9:00AM Shortlist Selection Posting :  12FEB2018 Time:  1:00PM Scope Meeting Date :  21FEB2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  26MAR2018 Time:  10:00AM Final Selection Meeting Date :  09APR2018 Time:  9:00AM Final Selection Posting Date :  09APR2018 Time:  10:00AM 1st Date Negotiations Meetings :  14MAY2018 Time:  9:00AM Last Date Negotiations Meetings:  09JUL2018 Time:  5:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 GLASS LAND ACQUISITION SERVICE SPEC 2 AECOM TECHNICAL SERVICES, INC. 3 FLORIDA ACQUISITION & APPRAISAL,INC Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. FLORIDA ACQUISITION & APPRAISAL,INC GLASS LAND ACQUISITION SERVICE SPEC ************************************************************ Contract Number : 19402 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43789313201 43789323201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 14.0 - Architect 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: Continuing Services for Design projects Project Manager : Nagole, Vandana Special Notes: Two contracts may be selected from this advertisement: AD19401 and AD19402. Each contract is for a maximum amount of $5,000,000. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02JAN2018 Longlist(Tech. Rev. Cmte.) Date:  08FEB2018 Time:  10:00AM Shortlist Selection Date :  12FEB2018 Time:  9:00AM Shortlist Selection Posting :  12FEB2018 Time:  12:30PM Tech. Rev. Cmte Meeting Date :  13MAR2018 Time:  11:00AM Final Selection Meeting Date :  26MAR2018 Time:  9:00AM Final Selection Posting Date :  26MAR2018 Time:  11:00AM 1st Date Negotiations Meetings :  14MAY2018 Time:  1:00PM Last Date Negotiations Meetings:  31JUL2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 0 AECOM TECHNICAL SERVICES, INC. 0 SCALAR CONSULTING GROUP INC. 0 WANTMAN GROUP, INC. 1 WSP USA INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. ALFRED BENESCH & COMPANY ATKINS NORTH AMERICA, INC. CARDNO, INC. DRMP, INC. ERDMAN ANTHONY OF FLORIDA, INC. GANNETT FLEMING, INC. H.W. LOCHNER INC JACOBS ENGINEERING GROUP INC. KIMLEY-HORN AND ASSOCIATES, INC. KISINGER CAMPO & ASSOCIATES, CORP. MARLIN ENGINEERING, INC. PARSONS TRANSPORTATION GROUP INC. RS&H, INC. SCALAR CONSULTING GROUP INC. STANLEY CONSULTANTS, INC. STANTEC CONSULTING SERVICES INC. WANTMAN GROUP, INC. WSP USA INC. ************************************************************ Design/Build Projects Procurement Number : E4T19 Financial Management Number(s): 43310955201 41242045201 43538415201 Project Description: Adjusted Score Design-Build Contract. Phase "3B-2" represents the fifth of five separate I-95 Express Lanes Design-Build projects that will ultimately extend 95 Express from Stirling Road in Broward County to Linton Boulevard in Palm Beach County. The Phase 3B-2 I-95 project limits extend from south of Glades Road to Linton Boulevard. The Project also includes improvements at the I-95 interchange with SR 808/Glades Road and along SR 808/Glades Glades Road from Butts Road to West University Drive and improvements at the I-95 interchange with CR 782/Linton Boulevard and along CR 782/Linton Boulevard from west of Congress Avenue to SW 10th Avenue. In addition, the project includes the reconstruction of the Clint Moore Road bridge (including roadway approaches) over I-95. . Access to the Express Lanes will be limited to designated ingress and egress locations. The Express Lanes will implement congestion based toll pricing. The facility will employ Electronic Toll Collection (ETC) via the Florida Turnpike Enterprises (FTE) SunPassSM system. . Project improvements include: - Milling, resurfacing, overbuild, and widening of I-95 from south of Glades Road to north of Linton Boulevard to accommodate two additional Express Lanes in each direction. -Construction of dual exits (Auxiliary Lane Exit Only coupled with a choice through/exit lane for the outside General Purpose Lanes) for the northbound and southbound exit ramps to Glades Road. - I-95 Bridge widening over the C-15 Canal. - Replacement of the Clint Moore Road Bridge over I-95 and the SFRC, including reconstruction of roadway approaches and construction of a Shared Use Path along Clint Moore Road. - Milling, resurfacing, overbuild, widening, and restriping of I-95 from south of Glades Road to north of Linton Boulevard. (FPN 412420-4-52-01) - Glades Road Bridge widening (eastbound and westbound) over Military Trail, South Florida Rail Corridor and I-95. (FPN 412420-4-52-01) - Reconstruction of the Glades Road entrance ramps to both northbound and southbound I-95. (FPN 412420-4-52-01). - Construction of a new ramp bridge over Airport Road to accommodate westbound Glades Road traffic accessing I-95 in both the northbound and southbound directions. (FPN 412420-4-52-01) - Milling, resurfacing, widening, and restriping Glades Road from Renaissance Way to West University Drive. (FPN 412420-4-52-01) - Milling, resurfacing, widening, and restriping Linton Boulevard from West of Congress Avenue to SW 10th Avenue. (FPN 435384-1-52-01) - Milling, resurfacing, widening and reconfiguration of I-95 entrance ramp at Linton Boulevard. (FPN 435384-1-52-01) . Other project improvements include, but are not limited to, the following: guardrail; barrier wall; attenuators; shoulder gutters; drainage; temporary and permanent retaining walls; noise walls; sign structures; portable traffic monitoring sites; toll gantry and associated infrastructure including toll equipment building; Intelligent Transportation System (ITS); signing and pavement markings; express lane markers; lighting; ramp (metering) signals; utility relocation; landscape relocation; and any additional items required to provide a complete highway system in accordance with all standard Department policies, procedures, and guidelines. . A draft RFP is available via the link provided in this advertisement. . To request DVDs containing reference information to supplement the draft RFP, please email your request to Stacy-Ann Brown, d4.designbuild@dot.state.fl.us . BUDGET AMOUNT: $129,000,000 Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. Project Manager : Saini, Vanita Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 11 - Grading (includes clearing & grubbing, excavation, embarkment) 7 - Drainage (includes all storm drains,pipe culverts, culverts, etc.) 10 - Flexible Paving 15 - Hot Plant-Mixed Bitum. Course (incl structural & surface courses) Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 13.7 - Transportation Statistics 14.0 - Architect 15.0 - Landscape Architect Additional Bridge Design Work Types : QUALIFICATION FORM MUST BE SUBMITTED FOR BRIDGE DESIGN For the bridge structural elements, the D-B Firm must be prequalified in either work type 4.1.2 (Minor Bridge Design), OR 4.2.1 (Major Bridge Design-Concrete), OR 4.2.2 (Major Bridge Design-Steel) OR 4.2.3 (Major Bridge Design- Segmental). The qualifications of the D-B Firm must be consistent with the structure type which will be proposed in the D-B Firm's LOI and Technical Proposal. Technical Questions Should Be Addressed To: All questions should be facilitated through the Bid Questions and Answers website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Special Notes: Release of the final RFP to the short listed firms and award of this contract are contingent upon Legislative budget approval of funds for Fiscal Year 2019. . PREAMBLE: The Notice to Contractor/Consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof. You are responsible for reading it in its entirety. . RESUMES: Provide a one page resume for each of the 9 key positions noted in the preamble. For this project the Department has established project specific requirements for Construction ITS Superintendent and Design ITS Engineer of Record resumes. . RESTRICTIONS ON CONSULTANTS: In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Prime Consultant: HDR Engineering, Inc. (Contracts C9A56 and C9S35) Subconsultants: Cotleur and Hearing, Eland Engineering, Inc., GCME, Inc., Keith and Associates, Inc., Media Relations Group, LLC., RS&H, Inc., and Stantec. . Estimated Contract Time: 1,400 days . Stipend Amount: $374,500 View RFP (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 31MAY2018 Response Deadline Date :  21JUN2018 Phase1 Selection Cmte. Meeting :  23JUL2018 Time:  9:00AM LOI Scores Notification Date :  23JUL2018 Time:  11:00AM Deadline for Election to Participate in Phase2 :  25JUL2018 Time:  5:00PM Posting of Shortlist :  26JUL2018 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  13AUG2018 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  14JAN2019 Time:  12:00PM Price Proposal Due Date :  20MAR2019 Time:  11:00AM Proposal Opening Date :  20MAR2019 Time:  11:00AM Final Selection Meeting Date :  25MAR2019 Time:  9:00AM Phase 1 LOI Response Deadline : 21JUN2018 12:00PM Respond To: E-mail letters to: d4.designbuild@dot.state.fl.us ----------------------------------- Attn: Stacy Brown Procurement Phone: (954)777-4626 d4.designbuild@dot.state.fl.us ************************************************************ Procurement Number : E4S44 Financial Management Number(s): 40935425201 43222215201 Project Description: Adjusted Score Design-Build Contract. Phase "3C" represents the fourth of five separate I-95 Express Lanes Design-Build projects that will ultimately extend 95 Express from Stirling Road in Broward County to Linton Boulevard in Palm Beach County. The Phase 3C I-95 project limits extend from south of Stirling Road to south of Broward Boulevard. The Project also includes improvements along I-595 from SR 7/US 441 to I-95. . Access to the Express Lanes will be limited to designated ingress and egress locations. The Express Lanes will implement congestion based toll pricing. The facility will employ Electronic Toll Collection (ETC) via the Florida Turnpike Enterprises (FTE) SunPassSM system. Project improvements for Bid Alternative 1 include: - Milling, resurfacing, overbuild, and widening of I-95 from south of Hollywood Boulevard to north of Johnson Street to accommodate a southbound ingress and a northbound egress location serving Sheridan Street and interchanges to the north, for traffic to and from the south. - Milling, resurfacing, and restriping of I-95 from north of Johnson Street to south of Stirling Road. - Milling, resurfacing, overbuild, and widening of I-95 from south of Stirling Road to SW 42nd Street, to accommodate one additional Express Lane in each direction, as well as a northbound ingress location and a southbound egress location serving Sheridan Street and interchanges to the south, for for traffic to and from the north. - Reconstruction of I-95 from SW 42nd Street to the South Fork of the New River to accommodate I-595 and SR-84 interchange modifications and one additional Express Lane in each direction. - Milling, resurfacing and restriping of I-95 from South Fork of the New River to south of Broward Boulevard to provide one additional Express Lane in each direction. - I-95 bridge widenings over Hollywood Boulevard, Johnson Street, C-10 Canal (southbound only), Taft Street (southbound only), C-10 Spur Canal, Stirling Road (southbound only), Griffin Road, and Dania Cut-Off Canal. - I-95/I-595 Direct Connectors between northbound and southbound I-95 Express Lanes to I-595, to and from the west. - I-95/SR 84 interchange modifications, including new westbound SR 84 over I-95 bridge and widening of the northbound I-95 on-ramp bridge. - Median widening along I-595 from SR 7 to the bridge over Pond Apple Slough to accommodate additional auxiliary lanes to/from the Direct Connectors, and other ramp improvements. - I-595 Pond Apple Slough bridge median and outside widening from east of SR 7 to east of SW 26th Terrace. - Reconstruction of I-595 from east of SW 26th Terrace to Ravenswood Road. - I-595 westbound bridge widening over eastbound SR 84. - I-595 westbound bridge reconstruction/widening over Ravenswood Road, South Florida Rail Corridor (SFRC), and I-95. - Painting of 14 existing bridges within the influence of the I-95/SR 84 and I-95/I-595 Interchanges (FPN 432222-1-52-01). . Project improvements for Bid Alternative 2 include all the work described above for Bid Alternative 1, as well as the following: - Variable widening of the westbound I-595 over Pond Apple Slough bridge to provide an additional lane (total of 7 full width westbound lanes), from the southbound I-95 to westbound I-595 entrance ramp to the SR 7/SR 84/Florida-s Turnpike exit ramp (Ramp V-1). - Variable widening of existing Ramp V-1 to accommodate a 3-lane ramp configuration (2 dedicated lanes, one choice lane) at the gore with westbound I-595. - Variable widening of existing Ramp V-1 bridge over SR 84. . Other project improvements for Bid Alternatives 1 and 2 include but are not limited to, the following: guardrail; barrier wall; attenuators; shoulder gutters; drainage; bridge maintenance repairs; temporary and permanent retaining walls; reconstruction of impacted existing noise walls; sign structures; portable traffic monitoring sites; toll gantries and associated infrastructure including toll equipment buildings; Intelligent Transportation System (ITS); signing and pavement markings; express lane markers; lighting; ramp (metering) signals; utility relocation; landscape relocation; and any additional items required to provide a complete highway system in accordance with all standard Department policies, procedures,and guidelines. . Scoring Criteria for Phase I LOI's: - Past Performance Evaluations, Design-Build Project Experience, Organization, and Staffing (0-10 Total Points) - Design-Build Project Requirements and Critical Issues (0-10 Total Points) . The entire project scope defined under the Project Description for Bid Alternatives 1 and 2 shall be considered for the Phase I LOI response. . ADDITIONAL PROJECT INFORMATION: A DVD with relevant information is available to interested firms. Please email your request to Stacy-Ann Brown d4.designbuild@dot.state.fl.us. Project Manager : Saini, Vanita Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 12 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 24 - Major Bridge - Curved Steel Girders Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 13.7 - Transportation Statistics 14.0 - Architect 15.0 - Landscape Architect Technical Questions Should Be Addressed To: All questions should be facilitated through the Bid Question and Answers website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Special Notes: Release of the final RFP to the short listed firms and award of this contract are contingent upon Legislative budget approval of funds for Fiscal Year 2018. . PREAMBLE: The Notice to Contractor/Consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof, unless specifically noted in this advertisement. You are responsible for reading it in its entirety. . RESUMES: Provide a one page resume for each of the nine (9) key positions noted in the preamble. For this project the Department has established project specific requirements for Construction ITS Superintendent and Design ITS Engineer of Record resumes. . RESTRICTIONS ON CONSULTANTS: In accordance with Conflict of Interest Procedures for the Department Contracts (TOPIC 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on this Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Prime Consultant: HDR Engineering, Inc. (Contracts C9A56 and C9S35) Subconsultants: Cotleur and Hearing, CTS Engineering, Eland Engineering, Inc., GCME, Inc., Keith and Associates, Inc., Media Relations Group, LLC., Network Engineering Services, Inc., RS&H, Inc., and Stantec, Consulting Services Inc. . Estimated Contract Time: 1,950 days . Stipend Amount: $958,026 . Selection Procedure: Adjusted Score Design Build with Bid Alternatives. Please refer to RFP Sections VII.D and VIII.A for additional information regarding the bid alternatives, priorities and process. View RFP (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 30MAY2017 Phase1 Selection Cmte. Meeting :  24JUL2017 Time:  09:00AM LOI Scores Notification Date :  24JUL2017 Time:  11:00AM Deadline for Election to Participate in Phase2 :  26JUL2017 Time:  05:00PM Posting of Shortlist :  27JUL2017 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  08AUG2017 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  25JAN2018 Time:  12:00PM Price Proposal Due Date :  11APR2018 Time:  11:00AM Proposal Opening Date :  11APR2018 Time:  11:00AM Final Selection Meeting Date :  16APR2018 Time:  09:00AM Posting of Award :  16APR2018 Time:  10:30AM Phase1 Phase2 Prop Bid Price Adjusted Rank Consultant Score Score Time Proposal Score 1 Archer Western Construction, L 17.5 68.5 1950 $456,945,800 5313323 2 Ferrovial Agroman U.S. Corpora 16.8 62.8 1950 $563,000,000 7081761 3 Community Asphalt, Corp - Cond 16.8 66.0 1950 $708,118,797 8557326 Firms not participating in Phase 2 Phase1 Score Astaldi Construction Corporation - 14.8 Flour Enterprises, Inc. - The Lane 15.0 Prince Contracting, LLC - GLF Const 15.3 SKANSKA USA CIVIL SOUTHEAST INC. 15.8 ************************************************************ DISTRICT 5 ************************************************************ Professional Services Consultant Projects Contract Number : 19538 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): TBD Major Work : Minor Work : 3.2 - Major Highway Design Project Description: CSC-011, 012, & 013 Project Manager : Rodriguez, Alison Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 3
Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Multiple contact may be awarded from this advertisement. Advertisement Status : Planned Date of Advertisement : 03DEC2018 Shortlist Selection Date :  28JAN2019 Time:  09:00AM Final Selection Meeting Date :  18MAR2019 Time:  09:00AM ************************************************************ Contract Number : 19534 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): TBD Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Group 179 - NE 36th Ave From NE 20th Pl to North of NE 25th St; SR 326 From SR 326 RXR Cross 627142B to E Of CR 25A (NW Gainesvile Rd); SR 25/500/US441 From SR 35/SE Baseline Rd to SR 200/SW 10th Street Project Manager : Larkin, Denise Contract Amount/Limit: $27,600,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 19NOV2018 Shortlist Selection Date :  31DEC2018 Time:  09:00AM Final Selection Meeting Date :  28JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19535 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43632523201 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications Minor Work : Project Description: Even Management Phase II Design Project Manager : Noemi, Rodriguez Contract Amount/Limit: $500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 19NOV2018 Shortlist Selection Date :  24DEC2018 Time:  09:00AM Final Selection Meeting Date :  04FEB2019 Time:  09:00AM ************************************************************ Contract Number : 19539 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): TBD Major Work : Minor Work : 3.2 - Major Highway Design Project Description: S Sumter Connector Trail from Withlacoochee State Trail to Van Fleet Project Manager : Sullivan, Zachary Contract Amount/Limit: $2,958,340 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 12NOV2018 Shortlist Selection Date :  17DEC2018 Time:  09:00AM Final Selection Meeting Date :  11FEB2019 Time:  09:00AM ************************************************************ Contract Number : 19529 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 43734116201 24248476201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 400 (I-4) W of SR 528 Beachline to W of SR 435 Kirkman Rd, SR 435/Kirkman Rd from N of SR 482 to S of SR 408 Project Manager : Hayden, Kevin Contract Amount/Limit: $6,196,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 05NOV2018 Shortlist Selection Date :  17DEC2018 Time:  09:00AM Final Selection Meeting Date :  14JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19530 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 24493217294 24493717292 24519127205 Major Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating Minor Work : 4.1.1 - Miscellaneous Structures Project Description: Local Govt. Bridge Inspection Project Manager : Blackwelder, Julie Contract Amount/Limit: $1,680,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 2
Special Notes: DBE/SBE Underutilization May be Added at a Later Date. Multiple contact may be awarded from this advertisement. Advertisement Status : Planned Date of Advertisement : 29OCT2018 Shortlist Selection Date :  10DEC2018 Time:  09:00AM Final Selection Meeting Date :  28JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19512 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $1,000,000 Financial Management Number(s): 23839556201 43913816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Construction Engineering Inspection Services (CEI) - CEI Group 180 Project Manager : Jaggers, Eric Contract Amount/Limit: $3,300,892 See Descriptions of Standard Notes on Current Advertisements webpage: 4,10,8 Special Notes: Under-Utilized Work Types may be added prior to advertisement. Advertisement Status : Planned Date of Advertisement : 15OCT2018 Shortlist Selection Date :  19NOV2018 Time:  09:00AM Final Selection Meeting Date :  10DEC2019 Time:  09:00AM ************************************************************ Contract Number : 19527 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : Minor Work : Project Description: Districtwide Value Engineering Project Manager : Elmaghraby, Ashraf Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 15OCT2018 Shortlist Selection Date :  26NOV2018 Time:  09:00AM Final Selection Meeting Date :  28JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19533 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 24381111211 24381111210 Major Work : Minor Work : Project Description: CSC Modeling Support Project Manager : LEARNED, JASON Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 2
Special Notes: DBE/SBE Underutilization May be Added at a Later Date. Multiple contact may be awarded from this advertisement. Advertisement Status : Planned Date of Advertisement : 15OCT2018 Shortlist Selection Date :  26NOV2018 Time:  09:00AM Final Selection Meeting Date :  28JAN2019 Time:  09:00AM ************************************************************ Contract Number : 19546 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): TBD Major Work : Minor Work : 11.0 - Eng Contract Admin and Management Project Description: General Engineering Consultant Contract Project Manager : Rockefeller, Dora Contract Amount/Limit: $35,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 08OCT2018 Longlist(Tech. Rev. Cmte.) Date:  06NOV2018 Time:  01:15PM Shortlist Selection Date :  19NOV2018 Time:  09:00AM Scope Meeting Date :  03DEC2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  14JAN2019 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  14JAN2019 Time:  11:45AM 3rd Tech Rev. Cmte Meeting :  14JAN2019 Time:  02:45PM Final Selection Meeting Date :  11FEB2019 Time:  09:00AM 1st Date Negotiations Meetings :  11MAR2019 Time:  08:30AM ************************************************************ Contract Number : 19525 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: BDI SR 44 from NW 68th Blvd to end of rural section (.25 mi West of I-75) Project Manager : Hatfield, Carol Contract Amount/Limit: $500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Number of contracts that may be awarded from this advertisement: 2
Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Multiple contact may be awarded from this advertisement. Advertisement Status : Planned Date of Advertisement : 01OCT2018 Shortlist Selection Date :  05NOV2018 Time:  09:00AM Final Selection Meeting Date :  17DEC2018 Time:  09:00AM ************************************************************ Contract Number : 19519 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44027112201 Major Work : 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design Minor Work : Project Description: Corridor Pricing Optimization Study Project Manager : Noemi, Rodriguez Contract Amount/Limit: $400,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 17SEP2018 Shortlist Selection Date :  22OCT2018 Time:  09:00AM Final Selection Meeting Date :  26NOV2018 Time:  09:00AM ************************************************************ Contract Number : 19528 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 3/N. Courtenay Pkwy from SR 528 to Kenedy Space Center Gate Project Manager : Varano, Gene Contract Amount/Limit: $1,100,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 17SEP2018 Shortlist Selection Date :  29OCT2018 Time:  09:00AM Final Selection Meeting Date :  17DEC2018 Time:  09:00AM ************************************************************ Contract Number : 19514 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : 14.0 - Architect Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Brevard Traffic Management Center - SR 404 Project Manager : Simpson, Daniel Contract Amount/Limit: $900,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: CAP Due to the specific project needs, please identify the key personnel for the following services: civil site, landscape architechture, structural, mechanical, plumbing, fire suppression, and electrical plans,in the Letter of Response. Advertisement Status : Planned Date of Advertisement : 10SEP2018 Shortlist Selection Date Not Available Final Selection Date Not Posted ************************************************************ Contract Number : 19524 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 19 from CR 452 to Golden Gem Dr., South of Umatilla Project Manager : Hodges, Matthew Contract Amount/Limit: $1,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 04SEP2018 Shortlist Selection Date :  15OCT2018 Time:  09:00AM Final Selection Meeting Date :  10DEC2018 Time:  09:00AM ************************************************************ Contract Number : 19522 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR15/US 441/ Kenansville Rd From Okeechobee County Line to SR 60 Project Manager : Van Gundy, Sarah Contract Amount/Limit: $700,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Number of contracts that may be awarded from this advertisement: 2
Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Multiple contact may be awarded from this advertisement. Advertisement Status : Planned Date of Advertisement : 20AUG2018 Shortlist Selection Date :  01OCT2018 Time:  09:00AM Final Selection Meeting Date :  26NOV2018 Time:  09:00AM ************************************************************ Contract Number : 19521 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Professional Liability Insurance $: $1,500,000 Financial Management Number(s): 43856213201 Major Work : 14.0 - Architect Minor Work : 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP15 - Landscape Architect Project Description: I-75/SR 93 Marion County NB and SB Rest Area Reconstruction located north of SR 484 and south of SR 200. Project Manager : Owens, Megan Contract Amount/Limit: $2,200,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: CAP DBE/SBE Underutilization May be Added at a Later Date. Advertisement Status : Planned Date of Advertisement : 13AUG2018 Longlist(Tech. Rev. Cmte.) Date:  13SEP2018 Time:  02:15PM Shortlist Selection Date :  24SEP2018 Time:  09:00AM Tech. Rev. Cmte Meeting Date :  08OCT2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  08OCT2018 Time:  11:45AM 3rd Tech Rev. Cmte Meeting :  08OCT2018 Time:  02:45PM Final Selection Meeting Date :  19NOV2018 Time:  09:00AM 1st Date Negotiations Meetings :  20DEC2018 Time:  ************************************************************ Contract Number : 19520 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43757513201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Orange Blossom Trail Phase 2A from 30th Street(MP 11.338) to Gore Street (MP 12.630), Orange County Project Manager : Miller, Anthony Contract Amount/Limit: $1,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 30JUL2018 Shortlist Selection Date :  10SEP2018 Time:  09:00AM Final Selection Meeting Date :  05NOV2018 Time:  09:00AM ************************************************************ Contract Number : 19518 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44113613201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP15 - Landscape Architect Project Description: SR25/SR200/US301/US441 From CR 25A To US301/US441 Interchange
The purpose of this project is to rehabilitate the asphalt pavement to extend the longevity of the roadway. The intent of the project is to mill and resurface the roadway, including necessary roadside improvements, in accordance with RRR criteria. The Project in Marion County has begin limits from MP 0.082 to match an existing pavement joint, and the end limits to MP 8.657. Project Manager : Ambare, Sameer Contract Amount/Limit: $1,200,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: CAP Advertisement Status : Planned Date of Advertisement : 23JUL2018 Shortlist Selection Date :  04SEP2018 Time:  09:00AM Final Selection Meeting Date :  22OCT2018 Time:  09:00AM ************************************************************ Contract Number : 19571 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Project Description: Continuing Services Contract BDI - Roadway Design 008, 009 010 Project Manager : Rodriguez, Alison Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,7 Number of contracts that may be awarded from this advertisement: 3
Special Notes: CAP Multiple contact may be awarded from this advertisement. Selections will be made based upon expanded letters of interest. This is a re-advertisement of project number 19511. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 02JUL2018 Response Deadline Date :  16JUL2018 Longlist(Tech. Rev. Cmte.) Date:  26JUL2018 Time:  08:30AM Shortlist Selection Date :  06AUG2018 Time:  09:00AM Final Selection Meeting Date :  20AUG2018 Time:  09:00AM 1st Date Negotiations Meetings :  17SEP2018 Time:  09:00AM Response Deadline : 16JUL2018 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 ************************************************************ Contract Number : 19517 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43914213201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Project Description: SR 44 from SR 44 to 500 feet East of Green Forest Drive Project Manager : Garner, Ty Contract Amount/Limit : $770,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Special Notes: CAP This is a Business Development Initiative contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 18JUN2018 Response Deadline Date :  02JUL2018 Longlist(Tech. Rev. Cmte.) Date:  18JUL2018 Time:  10:00AM Shortlist Selection Date :  30JUL2018 Time:  09:00AM Tech. Rev. Cmte Meeting Date :  21AUG2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  21AUG2018 Time:  11:30AM 3rd Tech Rev. Cmte Meeting :  21AUG2018 Time:  02:30PM Final Selection Meeting Date :  24SEP2018 Time:  09:00AM 1st Date Negotiations Meetings :  13NOV2018 Time:  09:00AM Response Deadline : 02JUL2018 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 ************************************************************ Contract Number : 19510 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $750,000 Financial Management Number(s): 43732716201 43734816201 43612716201 43386016201 43913916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Group 178: SR 25/US 27 FROM OBRIEN ROAD TO ARLINGTON RIDGE; SR 44 FROM 1900' West of CR 437 to Volusia Co.; SR 33 at CR 561; SR 33 over Green Swamp Bridge #110002; SR 25 from Arlington Ridge Blvd to CR 33 Project Manager : Madrid, Karen Contract Amount/Limit : $2,400,000 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 11JUN2018 Response Deadline Date :  25JUN2018 Shortlist Selection Date :  23JUL2018 Time:  09:00AM Final Selection Meeting Date :  20AUG2018 Time:  09:00AM Response Deadline : 25JUN2018 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 ************************************************************ Contract Number : 19509 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $1,500,000 Financial Management Number(s): 43800316201 43800326201 43913616201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Group 176 I-95 from Volusia County Line to N. of Palm Coast Pkwy; I-95 from N. of Palm Coast Pkwy to Pellicer Creek; SR 5/US 1/Route 1 from Woodland Ave to Flagler County Line. Project Manager : Briggs, Christopher View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 04JUN2018 Longlist(Tech. Rev. Cmte.) Date:  25JUN2018 Time:  01:30PM Shortlist Selection Date :  16JUL2018 Time:  09:00AM Shortlist Selection Posting :  16JUL2018 Time:  10:45AM Final Selection Meeting Date :  13AUG2018 Time:  09:00AM 1st Date Negotiations Meetings :  11SEP2018 Time:  01:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Shortlisted Firms: AECOM TECHNICAL SERVICES, INC. G-A-I CONSULTANTS, INC. JACOBS ENGINEERING GROUP INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. ENGLAND, THIMS & MILLER, INC. G-A-I CONSULTANTS, INC. JACOBS ENGINEERING GROUP INC. STANLEY CONSULTANTS, INC. TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19515 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44102013201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: SR 519 from I-95 NB Ramp /Barnes Blvd. (MP 0.460) to North of SR 520 (MP 4.6041) Milling and Resurfacing Project Manager : Jean-Francois, Jude Special Notes: CAP View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21MAY2018 Longlist(Tech. Rev. Cmte.) Date:  27JUN2018 Time:  01:30PM Shortlist Selection Date :  02JUL2018 Time:  09:00AM Shortlist Selection Posting :  02JUL2018 Time:  10:31AM Tech. Rev. Cmte Meeting Date :  07AUG2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  07AUG2018 Time:  11:30AM 3rd Tech Rev. Cmte Meeting :  07AUG2018 Time:  02:30PM Final Selection Meeting Date :  27AUG2018 Time:  09:00AM 1st Date Negotiations Meetings :  17OCT2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: BURGESS & NIPLE, INC. KIMLEY-HORN AND ASSOCIATES, INC. TETRA TECH, INC. Letters Received by the Department: AIM ENGINEERING & SURVEYING, INC. ALFRED BENESCH & COMPANY ATKINS NORTH AMERICA, INC. BASLEE ENGINEERING SOLUTIONS (BES), BENTLEY ARCHITECTS AND ENGINEERS, I BURGESS & NIPLE, INC. COMPREHENSIVE ENGINEERING SERVICES, EAC CONSULTING, INC. ENGLAND, THIMS & MILLER, INC. FALLER, DAVIS & ASSOCIATES, INC. FISHER AND ARNOLD, INC. FRANKLIN SURVEYING & MAPPING, INC. HARRIS CIVIL ENGINEERS, LLC HDR ENGINEERING, INC. HORIZON ENGINEERING GROUP, INC. INWOOD CONSULTING ENGINEERS, INC. KEITH AND ASSOCIATES, INC. KELLY, COLLINS & GENTRY, INC. KIMLEY-HORN AND ASSOCIATES, INC. MOFFATT & NICHOL, INC. NV5, INC. PALMER ENGINEERING CO. CROSS REFERE PETERS AND YAFFEE, INC. POND & COMPANY CORPORATION PROTEAN DESIGN GROUP, INC. QUIGG ENGINEERING, INC. SCALAR CONSULTING GROUP INC. SRD, INC. TETRA TECH, INC. VANASSE HANGEN BRUSTLIN, INC. ************************************************************ Contract Number : 19508 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 23798426219 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Areawide 11 Project Manager : Nazario, Denise Special Notes: Revision to Scope of Services pg 29 5/16. Addition of section 2. Proposed Staffing Chart. Letters of Interest due extended to May 29, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  05JUN2018 Time:  1:15PM Shortlist Selection Date :  18JUN2018 Time:  09:00AM Shortlist Selection Posting :  18JUN2018 Time:  10:15AM Final Selection Meeting Date :  16JUL2018 Time:  09:00AM Final Selection Posting Date :  16JUL2018 Time:  10:15AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 TARGET ENGINEERING GROUP, LLC 2 JOHNSON, MIRMIRAN & THOMPSON, INC. 3 BURNS & MCDONNELL ENGINEERING COMPA Letters Received by the Department: BURNS & MCDONNELL ENGINEERING COMPA JOHNSON, MIRMIRAN & THOMPSON, INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19570 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43794213201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP15 - Landscape Architect Project Description: SR 600 (US 92) Corridor Plan and Roundabout from Halifax River to SR A1A in Volusia County Project Manager : Enot, Kathleen View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  31MAY2018 Time:  9:30AM Shortlist Selection Date :  11JUN2018 Time:  09:00AM Shortlist Selection Posting :  11JUN2018 Time:  10:15AM Scope Meeting Date :  14JUN2018 Time:  3:00PM Tech. Rev. Cmte Meeting Date :  25JUN2018 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  25JUN2018 Time:  12:00AM 3rd Tech Rev. Cmte Meeting :  25JUN2018 Time:  3:15PM Final Selection Meeting Date :  16JUL2018 Time:  09:00AM Final Selection Posting Date :  16JUL2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 INWOOD CONSULTING ENGINEERS, INC. 2 ENGLAND, THIMS & MILLER, INC. 3 BURGESS & NIPLE, INC. Letters Received by the Department: AIM ENGINEERING & SURVEYING, INC. ARCADIS U.S., INC. BURGESS & NIPLE, INC. ENGLAND, THIMS & MILLER, INC. GREENMAN-PEDERSEN, INC. HARRIS CIVIL ENGINEERS, LLC HORIZON ENGINEERING GROUP, INC. INWOOD CONSULTING ENGINEERS, INC. KISINGER CAMPO & ASSOCIATES, CORP. METRO CONSULTING GROUP, LLC NV5, INC. POND & COMPANY CORPORATION SCALAR CONSULTING GROUP INC. TRANSYSTEMS CORPORATION D/B/A TRANS WSP USA INC. ************************************************************ Contract Number : 19511 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Project Description: Continuing Services Contract BDI- Roadway Design 008, 009, 010 Project Manager : Rodriguez, Alison Special Notes: CAP Multiple contact may be awarded from this advertisement. The Department is terminating the solicitation rejecting all submittals with the intent to reissue a solicitation for the work required at a later date. The new advertisement will be 19571. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 16APR2018 Longlist(Tech. Rev. Cmte.) Date:  21MAY2018 Time:  09:00AM Shortlist Selection Date :  29MAY2018 Time:  09:00AM Shortlist Selection Posting :  29MAY2018 Time:  10:45AM Tech. Rev. Cmte Meeting Date :  25JUL2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  25JUL2018 Time:  11:30AM 3rd Tech Rev. Cmte Meeting :  25JUL2018 Time:  02:30PM 4th Tech Rev. Cmte Meeting :  26JUL2018 Time:  09:30AM 5th Tech Rev. Cmte Meeting :  26JUL2018 Time:  11:30AM Final Selection Meeting Date :  20AUG2018 Time:  09:00AM 1st Date Negotiations Meetings :  18SEP2018 Time:  08:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Shortlisted Firms: FRANKLIN SURVEYING & MAPPING, INC. MCCRANIE & ASSOCIATES, INC. PATEL, GREENE AND ASSOCIATES, PLLC PEVIDA HIGHWAY DESIGNERS, LLC SRD, INC. Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BENTLEY ARCHITECTS AND ENGINEERS, I BRINDLEY PIETERS AND ASSOCIATES, IN CONSTRUCTIVE ENGINEERING, INC. FRANKLIN SURVEYING & MAPPING, INC. GOAL ASSOCIATES, INC. HARRIS CIVIL ENGINEERS, LLC LASSITER TRANSPORTATION GROUP, INC. MCCRANIE & ASSOCIATES, INC. NEWKIRK ENGINEERING, INC. PATEL, GREENE AND ASSOCIATES, PLLC PEGASUS ENGINEERING LLC PETERS AND YAFFEE, INC. PEVIDA HIGHWAY DESIGNERS, LLC PROPEL ENGINEERING, INC. SCALAR CONSULTING GROUP INC. SRD, INC. THE BALMORAL GROUP, LLC VIA ENGINEERING GROUP, INC. ************************************************************ Contract Number : 19505 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44161613201 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Orange County ATMS Phase IV Expand the existing Arterial Traffic Management System(ATMS) fiber optic network by providing ITS infrastructure and ITS sub-system components that tie into the Orange County ITS system/network. The proposed project will enchance traffic operations for the overall functionality of the transportation system within Orange County. Overall performance of the system will be enchanced by improving accessibility, reliability, and safety components. Project Manager : Noemi, Rodriguez View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Longlist(Tech. Rev. Cmte.) Date:  01MAY2018 Time:  10:00AM Shortlist Selection Date :  07MAY2018 Time:  09:00AM Shortlist Selection Posting :  07MAY2018 Time:  10:15AM Scope Meeting Date :  10MAY2018 Time:  2:00PM Tech. Rev. Cmte Meeting Date :  24MAY2018 Time:  9:20AM 2nd Tech Rev. Cmte Meeting :  24MAY2018 Time:  10:50AM 3rd Tech Rev. Cmte Meeting :  24MAY2018 Time:  2:20PM Final Selection Meeting Date :  18JUN2018 Time:  09:00AM Final Selection Posting Date :  18JUN2018 Time:  11:45AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 VANASSE HANGEN BRUSTLIN, INC. 2 FALLER, DAVIS & ASSOCIATES, INC. 3 TRAFFIC ENGINEERING DATA SOLUTIONS, Letters Received by the Department: FALLER, DAVIS & ASSOCIATES, INC. METRIC ENGINEERING INC. TRAFFIC ENGINEERING DATA SOLUTIONS, VANASSE HANGEN BRUSTLIN, INC. WSP USA INC. ************************************************************ Contract Number : 19506 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 24111013206 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design Minor Work : 3.2 - Major Highway Design 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Project Description: Districtwide Environmental Compliance and Permitting: Provide the Drainage/Permits Section with permitting and compliance with permit conditions. Project Manager : Lyon, Casey Special Notes: CAP View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Shortlist Selection Date :  30APR2018 Time:  09:00AM Shortlist Selection Posting :  30APR2018 Time:  11:45AM Tech. Rev. Cmte Meeting Date :  23MAY2018 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  23MAY2018 Time:  12:00PM 3rd Tech Rev. Cmte Meeting :  23MAY2018 Time:  3:00PM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Final Selection Posting Date :  25JUN2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 E SCIENCES, INCORPORATED 2 VANASSE HANGEN BRUSTLIN, INC. 3 INWOOD CONSULTING ENGINEERS, INC. Letters Received by the Department: DEWBERRY ENGINEERS INC. E SCIENCES, INCORPORATED INWOOD CONSULTING ENGINEERS, INC. VANASSE HANGEN BRUSTLIN, INC. ************************************************************ Contract Number : 19507 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Financial Management Number(s): 43798312201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.5 - Geotechnical Speciality Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP15 - Landscape Architect Project Description: SR 524 from Friday Rd. to Industry Rd. Project Manager : Grubert, Heather View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  23APR2018 Time:  01:30PM Shortlist Selection Date :  30APR2018 Time:  09:00AM Shortlist Selection Posting :  30APR2018 Time:  11:00AM Scope Meeting Date :  07MAY2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  04JUN2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  04JUN2018 Time:  11:45AM 3rd Tech Rev. Cmte Meeting :  04JUN2018 Time:  02:45PM Final Selection Meeting Date :  25JUN2018 Time:  09:00AM Final Selection Posting Date :  25JUN2018 Time:  11:46AM 1st Date Negotiations Meetings :  16AUG2018 Time:  08:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 INFRASTRUCTURE ENGINEERS, LLC 2 KITTELSON & ASSOCIATES, INC. 3 HARDESTY & HANOVER, LLC Letters Received by the Department: DRMP, INC. G-A-I CONSULTANTS, INC. HARDESTY & HANOVER, LLC INFRASTRUCTURE ENGINEERS, LLC JOHNSON, MIRMIRAN & THOMPSON, INC. KITTELSON & ASSOCIATES, INC. S&ME, INC. SCALAR CONSULTING GROUP INC. WSP USA INC. ************************************************************ Contract Number : 19504 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 44055756201 44055766201 44055776201 43759516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI Group 177: SR A1A Construction Segments 1, 2 & 3 Dune Repair/ Revetment/ Sheet Pile Wall/ SR 5 US 1 Roundabout Project Manager : Briggs, Christopher View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  03APR2018 Time:  01:30PM Shortlist Selection Date :  16APR2018 Time:  09:00AM Shortlist Selection Posting :  16APR2018 Time:  10:30AM Final Selection Meeting Date :  14MAY2018 Time:  09:00AM Final Selection Posting Date :  14MAY2018 Time:  10:00AM 1st Date Negotiations Meetings :  07JUN2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 ATKINS NORTH AMERICA, INC. 2 AE ENGINEERING, INC. 3 TARGET ENGINEERING GROUP, LLC 4 MEHTA AND ASSOCIATES, INC. Letters Received by the Department: AE ENGINEERING, INC. ATKINS NORTH AMERICA, INC. ENGLAND, THIMS & MILLER, INC. MEHTA AND ASSOCIATES, INC. MICHAEL BAKER INTERNATIONAL, INC. D TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19544 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43632813202 Major Work : 13.5 - Subarea/Corridor Planning Under-Utilized Work Groups: GROUP13 - Planning Project Description: Integrated Corridor Management Modeling Services- Modeling consultant services to prepare a mesoscopic model for the Central Florida Region. Project Manager : Patel, Tushar View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  26MAR2018 Time:  01:30PM Shortlist Selection Date :  02APR2018 Time:  09:00AM Shortlist Selection Posting :  02APR2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  17APR2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  17APR2018 Time:  11:30AM 3rd Tech Rev. Cmte Meeting :  17APR2018 Time:  02:30PM Final Selection Meeting Date :  14MAY2018 Time:  09:00AM Final Selection Posting Date :  14MAY2018 Time:  10:15AM 1st Date Negotiations Meetings :  21JUN2018 Time:  08:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 CAMBRIDGE SYSTEMATICS, INC. 2 HDR ENGINEERING, INC. 3 STANTEC CONSULTING SERVICES INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. CAMBRIDGE SYSTEMATICS, INC. GREENMAN-PEDERSEN, INC. HDR ENGINEERING, INC. STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 19501 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 41199813216 41199813217 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Minor Work : Project Description: Continuing Services Contract for Districtwide Survey & Mapping. . Project Manager : LaCorte, Thomas Special Notes: CAP . Multiple contracts may be awarded from this advertisement View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12FEB2018 Longlist(Tech. Rev. Cmte.) Date:  08MAR2018 Time:  10:00AM Shortlist Selection Date :  19MAR2018 Time:  09:00AM Shortlist Selection Posting :  19MAR2018 Time:  9:31AM Scope Meeting Date :  23MAR2018 Time:  02:30PM Tech. Rev. Cmte Meeting Date :  12APR2018 Time:  01:30PM Final Selection Meeting Date :  30APR2018 Time:  09:00AM Final Selection Posting Date :  30APR2018 Time:  10:45AM 1st Date Negotiations Meetings :  24MAY2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 DRMP, INC. 2 DEWBERRY ENGINEERS INC. 3 McKim & Creed, Inc. 4 JONES, WOOD & GENTRY, INC. 5 CIVILSURV DESIGN GROUP, INC. Letters Received by the Department: AMEC FOSTER WHEELER ENVIRONMENT & I BOWMAN CONSULTING GROUP, LTD., INC. CARDNO, INC. CIVILSURV DESIGN GROUP, INC. CRIBB PHILBECK WEAVER GROUP, INC. DEWBERRY ENGINEERS INC. DRMP, INC. ESP ASSOCIATES OF NORTH CAROLINA, P GPI GEOSPATIAL, INC. JONES, WOOD & GENTRY, INC. McKim & Creed, Inc. MANUEL G. VERA & ASSOCIATES, INC. NV5, INC. SOUTHEASTERN SURVEYING AND MAPPING VOLKERT, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19503 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 40585411211 Major Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.3 - Policy Planning 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP13 - Planning Project Description: Continuing Services Contract for Districtwide Corridor Planning Project Manager : Cucek, Lorena Special Notes: CAP . Planning contract with 3-year term limited with FHWA oversight. . This Advertisement has been extended. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12FEB2018 Longlist(Tech. Rev. Cmte.) Date:  27MAR2018 Time:  08:00AM Shortlist Selection Date :  09APR2018 Time:  09:00AM Shortlist Selection Posting :  09APR2018 Time:  11:00AM Scope Meeting Date :  12APR2018 Time:  11:30AM Tech. Rev. Cmte Meeting Date :  01MAY2018 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  01MAY2018 Time:  11:30AM 3rd Tech Rev. Cmte Meeting :  01MAY2018 Time:  02:30AM Final Selection Meeting Date :  21MAY2018 Time:  09:00AM Final Selection Posting Date :  21MAY2018 Time:  10:15AM 1st Date Negotiations Meetings :  13JUN2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 VANASSE HANGEN BRUSTLIN, INC. 2 LASSITER TRANSPORTATION GROUP, INC. 3 ALFRED BENESCH & COMPANY Letters Received by the Department: ALFRED BENESCH & COMPANY LASSITER TRANSPORTATION GROUP, INC. VANASSE HANGEN BRUSTLIN, INC. ************************************************************ Contract Number : 19569 Projects less than $500,000 (Technical Qualification only) Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 23971416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI GROUP 175 SR600 US 17/92 1900' W of Poinciana Blvd to CR 535 Project Manager : Gopal, Uvendra View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12FEB2018 Longlist(Tech. Rev. Cmte.) Date:  19MAR2018 Time:  1:15PM Shortlist Selection Date :  26MAR2018 Time:  9:00AM Shortlist Selection Posting :  26MAR2018 Time:  10:30AM Final Selection Meeting Date :  23APR2018 Time:  9:00AM Final Selection Posting Date :  23APR2018 Time:  10:30AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 HILL INTERNATIONAL, INC. 2 ELIPSIS ENGINEERING & CONSULTING, L 3 KINARD - STONE, INC. 4 MEHTA AND ASSOCIATES, INC. Letters Received by the Department: ELIPSIS ENGINEERING & CONSULTING, L HILL INTERNATIONAL, INC. KINARD - STONE, INC. MEHTA AND ASSOCIATES, INC. ************************************************************ Contract Number : 13506 Technically Prequalified & Unlimited Audit required Financial Management Number(s): 43180712201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 13.5 - Subarea/Corridor Planning Project Description: Sanford Amtrak Autotrain Gateway Improvements Project Manager : McGehee, Mary Special Notes: THE DEPARTMENT IS TERMINATING THIS SOLICITATION REJECTING ALL SUBMITTALS WITH THE INTENT TO REISSUE A SOLICITATIION FOR THE WORK REQUIRED AT A LATER DATE. SEE AD NUMBER 13535 Advertisement Status : Advertised Date of Advertisement : 26MAR2012 Response Deadline Date :  06APR2012 Shortlist Selection Date Not Available Final Selection Date Not Posted Response Deadline : 06APR2012 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan - PSU Phone: (386)943-5528 ************************************************************ Design/Build Projects Procurement Number : E5Z61 Financial Management Number(s): 43544625201 Project Description: Adjusted Score Design-Build Contract. FDOT District 5 Transit Signal Priority - Phase III will expand the Transit Signal Priority (TSP) system in District 5 deployed by Phases I and II, with a focus on enhancing transit operations and delivery of travelers to and from the SunRail Phase 2 South stations. Work includes installation, integration, and testing of transit signal priority at signalized intersections in Orange County and Osceola County and on Lynx buses. Integration with Lynx's existing Automatic Vehicle Location (AVL) and Bus Scheduling Software is required, as is integration with FDOT District 5's TSP Central Management Software. Any modifications at signalized intersections, on buses, at the District 5 Regional Transportation Management Center (RTMC), or at the Lynx Transit Management Center required for full functionality of the TSP system are part of the scope of work. Project Manager : Noemi, Rodriguez Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 16 - Intelligent Transportation Systems Contractor 39 - Traffic Signal Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.2 - Major Highway Design 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Technical Questions Should Be Addressed To: All questions for this project must be submitted through the Department's Bid Question and Answer website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ DBE/MBE Requirements: See preamble. Special Notes: In accordance with Conflict of Interest Procedure for Department Contracts (Procedure 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District Five Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. . Traffic Engineering Data Solutions, Inc., CP915 Metric Engineering, Inc., CP915 Wantman Group, Inc., CP915 . ESTIMATED CONTRACT TIME: 550 days . BUDGET AMOUNT: $2,898,534 Actual commitment and final execution of this Contract is contingent upon an approved legislative budget and availability of funds. . STIPEND AMOUNT: $25,000 . PREAMBLE: Unless specifically noted otherwise, the preamble at the top of this webpage is applicable to this project and is an official part of the advertisement. Design-Build firms are responsible for reading it. . PUBLIC MEETING LOCATION NOTES: Mandatory Pre-Proposal Meeting September 11, 2018; 1:00PM Florida Department of Transportation, District 5 719 S. Woodland Boulevard DeLand, FL 32720 View RFP (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 02JUL2018 Response Deadline Date :  23JUL2018 Phase1 Selection Cmte. Meeting :  27AUG2018 Time:  9:00AM LOI Scores Notification Date :  27AUG2018 Time:  12:00PM Deadline for Election to Participate in Phase2 :  29AUG2018 Time:  12:00PM Posting of Shortlist :  29AUG2018 Time:  4:00PM Mand. Pre-Proposal Meeting Date:  11SEP2018 Time:  1:00PM Phase 2 Tech. Proposal Due Date:  22JAN2019 Time:  2:30PM Price Proposal Due Date :  13MAR2019 Time:  2:30PM Proposal Opening Date :  13MAR2019 Time:  2:30PM Final Selection Meeting Date :  25MAR2019 Time:  9:00AM Phase 1 LOI Response Deadline : 23JUL2018 5:00PM Respond To: Florida DOT - District 5 719 South Woodland Blvd. DeLand, FL 32720 Attn: Michelle Sloan - Design Build Procurement Office Phone: 386-943-5528 d5.designbuild@dot.state.fl.us ************************************************************ Procurement Number : E5Z18 Financial Management Number(s): 24020045201 Project Description: SR 429/Wekiva Parkway (Section 8) from Orange Boulevard to East of Rinehart Road. The successful bidder will be responsible for the implementation of this project from concept to completion of construction. .. SPECIAL NOTES: In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District Five Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. .. CH2M HILL, INC. - Contract Number C9G22 .. Estimated Contract Time: 1,400 Maximum Calendar Days .. Budget Amount: $273,931,078.00 Actual commitment and final execution of this Contract is contingent upon an approved legislative budget and availability of funds. .. Stipend Amount: $595,575.94 .. PREAMBLE: Unless specifically noted otherwise, the preamble at the top of this web page is applicable to the project and is an official part of the advertisement. Design-Build Firms are responsible for reading it. .. PUBLIC MEETING LOCATION NOTES: Mandatory Pre-Proposal Meeting Date/Time/Location: December 18, 2017, 10:00AM FDOT DeLand District Office 719 S. Woodland Blvd DeLand, FL 32720 Cypress A&B Conference Rooms .. PREQUALIFICATION REQUIREMENTS UNDER 14-22 FAC: Work Class 7 Drainage, Work Class 11 Grading, for this project contractors must be prequalified in either Work Class 24 Major Bridge - Curved Steel Girders OR Work Class 25 Major Bridge - Multi-Level Roadways Project Manager : Aguib, Hatem Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 11 - Grading (includes clearing & grubbing, excavation, embarkment) 7 - Drainage (includes all storm drains,pipe culverts, culverts, etc.) 24 - Major Bridge - Curved Steel Girders 25 - Major Bridge - Multi-Level Roadways Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 5.4 - Bridge Load Rating 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Additional Bridge Design Work Types : QUALIFICATION FORM MUST BE SUBMITTED FOR BRIDGE DESIGN For the bridge structural elements, the D-B Firm must be prequalified in either work type 4.1.2 (Minor Bridge Design), OR 4.2.1 (Major Bridge Design-Concrete), OR 4.2.2 (Major Bridge Design-Steel), OR 4.2.3 (Major Bridge Design-Segmental). The qualifications of the D-B Firm must be consistent with the structure type which will be proposed in the D-B Firm's ELOI and Technical Proposal. Technical Questions Should Be Addressed To: All questions for this project must be submitted through the Department's Bid Question and Answer website at: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Reference Contract Number: E5Z18 You are responsible for monitoring this site for questions and answers up to 1 day before the price opening. DBE/MBE Requirements: The Department has reviewed this project and established a 10.65% DBE Availability Goal. See preamble. View RFP (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02OCT2017 Phase1 Selection Cmte. Meeting :  04DEC2017 Time:  9:00AM LOI Scores Notification Date :  04DEC2017 Time:  12:00PM Deadline for Election to Participate in Phase2 :  06DEC2017 Time:  12:00PM Posting of Shortlist :  06DEC2017 Time:  5:00PM Mand. Pre-Proposal Meeting Date:  18DEC2017 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  11JUN2018 Time:  2:30PM Price Proposal Due Date :  22AUG2018 Time:  2:30PM Proposal Opening Date :  22AUG2018 Time:  2:30PM Final Selection Meeting Date :  27AUG2018 Time:  9:00AM Shortlisted Firms Phase1 Score Archer Western Construction, LLC 17.0 LANE CONSTRUCTION CORPORATION 17.3 SKANSKA USA CIVIL SOUTHEAST INC. 16.0 SUPERIOR CONSTRUCTION COMPANY SOUTH 17.3 Firms not participating in Phase 2 Phase1 Score Astaldi Construction Corporation - 13.0 Community Asphalt, Corp - Condotte 15.7 GLF Construction Corporation 16.0 HUBBARD CONSTRUCTION COMPANY 14.3 JOHNSON BROS. CORPORATION 15.3 THE MIDDLESEX CORPORATION 15.0 ************************************************************ DISTRICT 6 ************************************************************ Professional Services Consultant Projects Contract Number : 19628 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 25067636201 Major Work : Minor Work : Project Description: 018 DISTRICTWIDE MISCELLANEOUS CONSTRUCTION SURVEY Project Manager : WYNN, ISAAC Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Advertisement Status : Planned Date of Advertisement : 07JAN2019 Longlist(Tech. Rev. Cmte.) Date:  04FEB2019 Time:  Shortlist Selection Date :  18FEB2019 Time:  10:00AM Final Selection Meeting Date :  04MAR2019 Time:  10:00AM ************************************************************ Contract Number : 19606 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 42105341202 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 3.2 - Major Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: Districtwide Complete Streets
The purpose of this contract is to provide the Florida Department of Transportation with professional services in support of the District Six Planning Office staff in the development, evaluation and implementation of transportation projects. It will also plan for the design, construction or reconstruction, and operation of a context-sensitive, community-oriented transportation network that works for all modes of travel and promotes economic development in Florida This analysis will identify cost feasible complete street improvements and strategies within their respective corridors that improve safety, mobility and access, and quality of life for all users of the transportation system. Project Manager : Stacey, Elizabeth Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 05NOV2018 Longlist(Tech. Rev. Cmte.) Date:  04DEC2018 Time:  10:00AM Shortlist Selection Date :  10DEC2018 Time:  10:00AM Final Selection Meeting Date :  04FEB2019 Time:  10:00AM 1st Date Negotiations Meetings :  25MAR2019 Time:  09:00AM ************************************************************ Contract Number : 19643 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 25075932203 Major Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Project Description: Districtwide Resurfacing Scoping Reports. Resurfacing, Restoration and Rehabilitation (RRR) Pavement Restoration Assessment Studies and Reports; including Field Work (review as-built Construction Drawings, Straight Line Diagrams, Traffic Data, and other historical records). Comply with the requirements of the 2018 FDOT Design Manual, Chapter 114 (RRR). Project Manager : Mason, Calvin R Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Advertisement Status : Planned Date of Advertisement : 22OCT2018 Longlist(Tech. Rev. Cmte.) Date:  13NOV2018 Time:  Shortlist Selection Date :  19NOV2018 Time:  10:00AM Scope Meeting Date :  27NOV2018 Time:  Final Selection Meeting Date :  22JAN2019 Time:  10:00AM 1st Date Negotiations Meetings :  18MAR2019 Time:  ************************************************************ Contract Number : 19605 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 42105331204 Major Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 15.0 - Landscape Architect Project Description: Districtwide Intermodal Systems Planning.
The objective of this contract is to provide professional engineering and planning services and technical personnel on a task work order basis, to supplement the Department's D6 Planning Office staff in the development, implementation and evaluation of transportation projects. Project Manager : Yee-Fong, Shereen Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 2
Special Notes: Two (2) contracts will be awarded from advertisement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 10SEP2018 Longlist(Tech. Rev. Cmte.) Date:  02OCT2018 Time:  11:00AM Shortlist Selection Date :  08OCT2018 Time:  10:00AM Final Selection Meeting Date :  19NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19627 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Professional Liability Insurance $: $250,000 Financial Management Number(s): 43305641201 Major Work : 99.0 - Other Professional Services Minor Work : 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 11.0 - Eng Contract Admin and Management Project Description: Districtwide MDO Rail Consultant Services Project Manager : Quero, Ana Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 10SEP2018 Longlist(Tech. Rev. Cmte.) Date:  02OCT2018 Time:  Shortlist Selection Date :  08OCT2018 Time:  10:00AM Final Selection Meeting Date :  19NOV2018 Time:  10:00AM 1st Date Negotiations Meetings :  23JAN2019 Time:  ************************************************************ Contract Number : 19646 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 42105331205 Major Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 15.0 - Landscape Architect Project Description: Districtwide Intermodal Systems Planning Project Manager : Yee-Fong, Shereen Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 2
Special Notes: This project is being advertised under #19605. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 10SEP2018 Longlist(Tech. Rev. Cmte.) Date:  02OCT2018 Time:  11:00AM Shortlist Selection Date :  08OCT2018 Time:  10:00AM Final Selection Meeting Date :  19NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19625 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43514031201 Major Work : 3.1 - Minor Highway Design Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.4 - Right of Way Mapping 10.1 - Rdwy Construction Engineering Inspection Project Description: Modal Consultant Services (Advertising with 19626) These contracts will involve multimodal inspections and reports, project site visits, multimodal inventories, transit systems safety plans reviews, transit system vehicl inventory, park-and-ride inventory, for Aviation, Intermoda Rail, Seaport and Transit projects in Miami-Dade and Monroe Counties on a task assignment basis. Project Manager : RICHARDSON, DIONNE Contract Amount/Limit: $2,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 2
Special Notes: Two (2) contracts will be awarded from advertisement. This project is being advertised with #19626. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 04SEP2018 Longlist(Tech. Rev. Cmte.) Date:  01OCT2018 Time:  Shortlist Selection Date :  08OCT2018 Time:  10:00AM Final Selection Meeting Date :  19NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19626 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43514031202 Major Work : Minor Work : Project Description: Modal Inspection Consultant Services These contracts will involve multimodal inspections and reports, project site visits, multimodal inventories, transit systems safety plans reviews, transit system vehicle inventory, park-and-ride inventory, for Aviation, Intermodal Rail, Seaport and Transit projects in Miami-Dade and Monroe Counties on a task assignment basis. Project Manager : RICHARDSON, DIONNE Contract Amount/Limit: $2,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 2
Special Notes: Two (2) contracts will be awarded from advertisement. This project is being advertised under #19625. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 04SEP2018 Longlist(Tech. Rev. Cmte.) Date:  01OCT2018 Time:  Shortlist Selection Date :  08OCT2018 Time:  10:00AM Final Selection Meeting Date :  19NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19638 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43998113201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: Resurfacing for SR 924 / 119th Street / Gratigny Rd. from NW 27th Avenue to NW 7th Avenue To prepare design plans for this resurfacing project. Project Manager : Baoying, Wang Contract Amount/Limit: $780,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Advertisement Status : Planned Date of Advertisement : 04SEP2018 Longlist(Tech. Rev. Cmte.) Date:  27SEP2018 Time:  Shortlist Selection Date :  08OCT2018 Time:  10:00AM Final Selection Meeting Date :  10DEC2018 Time:  10:00AM ************************************************************ Contract Number : 19636 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 41143323202 Major Work : 3.1 - Minor Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Districtwide Drainage Design & Plans Review Consultant. The awarded Consultant will assist the Department with the review of construction plans, drainage support, and prepara- tion of a complete set of construction contract plans and special provisions, if necessary for roadway drainage impro- vements, push button projects with drainage involvement. Project Manager : Dominguez, Mario Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8,11 Advertisement Status : Planned Date of Advertisement : 20AUG2018 Longlist(Tech. Rev. Cmte.) Date:  11SEP2018 Time:  11:00AM Shortlist Selection Date :  17SEP2018 Time:  10:00AM Final Selection Meeting Date :  05NOV2018 Time:  10:00AM ************************************************************ Contract Number : 19637 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43476833201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: NW 103rd Street/NW 49th Street from West 3rd Avenue to East 10th Avenue Project Manager : Riverol, Elsa Contract Amount/Limit: $410,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Special Notes: The 3R Report is available to download at District 6's FTP website, under the Advertisement Number 19637: http://www.fdot.gov/procurement/FTP%20Sites.shtm View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 20AUG2018 Longlist(Tech. Rev. Cmte.) Date:  11SEP2018 Time:  10:00AM Shortlist Selection Date :  17SEP2018 Time:  10:00AM Final Selection Meeting Date :  05NOV2018 Time:  10:00AM 1st Date Negotiations Meetings :  07JAN2018 Time:  ************************************************************ Contract Number : 19635 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 43971213203 Major Work : 3.1 - Minor Highway Design 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: Districtwide Miscellaneous PE Design Consultant The purpose of this project is to provide Design engineerin services to design retro-fit LED lighting for the pedestria crossings to meet new minimum lighting levels. Project Manager : Marchant, Patrick Contract Amount/Limit: $150,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 13AUG2018 Longlist(Tech. Rev. Cmte.) Date:  06SEP2018 Time:  Shortlist Selection Date :  17SEP2018 Time:  10:00AM Final Selection Meeting Date :  08OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  29OCT2018 Time:  ************************************************************ Contract Number : 19632 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43467312202 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 13.4 - Systems Planning 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Districtwide Noise & Air Quality Assessments. The DEPARTMENT desires to obtain services from the Consultant for the performance of miscellaneous Transportation Noise Analysis, Air Quality Analysis, and Reporting services Districtwide. The Consultant shall provide Professional expertise required to coordinate, review, analyze, report, plan, develop, design, and inspect miscellaneous Transportation Projects and any other miscellaneous tasks associated with the Department, consultants, local government agencies, and individuals, as requested. Project Manager : McMullen, Robert Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 8 Advertisement Status : Planned Date of Advertisement : 06AUG2018 Longlist(Tech. Rev. Cmte.) Date:  28AUG2018 Time:  Shortlist Selection Date :  04SEP2018 Time:  10:00AM Scope Meeting Date :  11SEP2018 Time:  Final Selection Meeting Date :  22OCT2018 Time:  10:00AM ************************************************************ Contract Number : 19623 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43305631201 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 14.0 - Architect Project Description: Districtwide MDO Transit Consultant Services This contract will involve project plans and specifications review; technical reports/studies review; master plans review; transit and modal inventories; transit system safety plans review; design services; engineering contract administration and management services and program administriation assistance for Transit projects in Miami- Dade and Monroe Counties on a task assignment basis. Project Manager : Freeman, Raymond Contract Amount/Limit : $750,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  06AUG2018 Time:  Shortlist Selection Date :  20AUG2018 Time:  10:00AM Final Selection Meeting Date :  22OCT2018 Time:  10:00AM 1st Date Negotiations Meetings :  28NOV2018 Time:  Response Deadline : 23JUL2018 Respond To: d6.profserv@dot.state.fl.us Attn.: Catrina Wilson Phone: (305)470-5326 ************************************************************ Contract Number : 19630 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42540213206 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: Districtwide Landscape Design Consultant Two (2) contracts will be awarded from advertisement. This project is being advertised under #19630 along with #19631. Project Manager : Schot, Kevin Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Number of contracts that may be awarded from this advertisement: 2
Special Notes: Two (2) contracts will be awarded from advertisement. This project is being advertised with #19631. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  07AUG2018 Time:  Shortlist Selection Date :  20AUG2018 Time:  10:00AM Final Selection Meeting Date :  08OCT2018 Time:  10:00AM Response Deadline : 23JUL2018 Respond To: d6.profserv@dot.state.fl.us Attn.: Catrina Wilson Phone: (305)470-5326 ************************************************************ Contract Number : 19631 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42540213207 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: Districtwide Landscape Design Consultant Two (2) contracts will be awarded from advertisement. This project is being advertised under #19630. Project Manager : Schot, Kevin Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: Two (2) contracts will be awarded from advertisement. This project is being advertised under #19630. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2018 Response Deadline Date :  23JUL2018 Longlist(Tech. Rev. Cmte.) Date:  06AUG2018 Time:  Shortlist Selection Date :  20AUG2018 Time:  10:00AM Final Selection Meeting Date :  08OCT2018 Time:  10:00AM Response Deadline : 23JUL2018 Respond To: d6.profserv@dot.state.fl.us Attn.: Catrina Wilson Phone: (305)470-5326 ************************************************************ Contract Number : 19622 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43274843201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Project Description: SR 933/ NW 12 AVE from S OF NW 20th Street to N of NW 29 St RRR Milling and Resurfacing Project with Signalization, Signing and Pavement Marking Project Manager : Manzanares, Adriana Contract Amount/Limit : $250,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 25JUN2018 Response Deadline Date :  09JUL2018 Longlist(Tech. Rev. Cmte.) Date:  23JUL2018 Time:  Shortlist Selection Date :  06AUG2018 Time:  10:00AM Final Selection Meeting Date :  17SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  25OCT2018 Time:  Response Deadline : 09JUL2018 Respond To: d6.profserv@dot.state.fl.us Attn.: Catrina Wilson Phone: (305)470-5326 ************************************************************ Contract Number : 19624 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43997613201 43997623201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Project Description: SR 909/WEST DIXIE HWY FROM NE 119 STREET TO N OF NE 124 STREET (RRR) FPID 439976-1 & SR 909/WEST DIXIE HWY AT NE 119 STREET AND NE 124 STREET (SAFETY) FPID 439976-2. Project Manager : Gonzalez, Fabiana Contract Amount/Limit : $191,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Number of contracts that may be awarded from this advertisement: 2
Special Notes: Edit: One contract will be awarded from this advertisement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 25JUN2018 Response Deadline Date :  09JUL2018 Longlist(Tech. Rev. Cmte.) Date:  17JUL2018 Time:  11:30AM Shortlist Selection Date :  23JUL2018 Time:  10:00AM Scope Meeting Date :  25JUL2018 Time:  11:00AM Final Selection Meeting Date :  17SEP2018 Time:  10:00AM 1st Date Negotiations Meetings :  30OCT2018 Time:  Response Deadline : 09JUL2018 Respond To: d6.profserv@dot.state.fl.us Attn.: Catrina Wilson Phone: (305)470-5326 ************************************************************ Contract Number : 19620 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 44182713201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: SR 5/South Dixie Highway from N of SW 336th Street to S of SW 304th Street. Project Manager : Benitez, Auraliz Special Notes: Two (2) contracts will be awarded from this advertisement. - Only one (1) Letter of Response is required to be submitted. - The Letter of Response should focus on the project scope of advertisement no. 19620, FM no. 441827-1-52-01. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 11JUN2018 Longlist(Tech. Rev. Cmte.) Date:  03JUL2018 Time:  11:00AM Shortlist Selection Date :  09JUL2018 Time:  10:00AM Shortlist Selection Posting :  09JUL2018 Time:  11:15AM Scope Meeting Date :  17JUL2018 Time:  02:00PM Final Selection Meeting Date :  20AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  15OCT2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: CARNAHAN, PROCTOR AND CROSS, INC. GRAEF-USA INC. KISINGER CAMPO & ASSOCIATES, CORP. LOUIS BERGER U.S., INC. Letters Received by the Department: AES ENGINEERING, INC. BASLEE ENGINEERING SOLUTIONS (BES), BMA CONSULTING ENGINEERING, INC. CALTRAN ENGINEERING GROUP, INC. CARNAHAN, PROCTOR AND CROSS, INC. GRAEF-USA INC. KISINGER CAMPO & ASSOCIATES, CORP. LOUIS BERGER U.S., INC. PE CONSULTING ENGINEERING D/B/A PE PREMIERE DESIGN SOLUTIONS, INC. PROPEL ENGINEERING, INC. STANLEY CONSULTANTS, INC. THE CORRADINO GROUP, INC. ************************************************************ Contract Number : 19621 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 44181213201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: SR 5/South Dixie Highway from N of Card Sound Road to S of SW 336th Street. Project Manager : Benitez, Auraliz Special Notes: This project is being advertised under #19620. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 11JUN2018 Longlist(Tech. Rev. Cmte.) Date:  02JUL2018 Time:  11:00AM Shortlist Selection Date :  09JUL2018 Time:  10:00AM Shortlist Selection Posting :  09JUL2018 Time:  11:15AM Scope Meeting Date :  17JUL2018 Time:  02:00PM Final Selection Meeting Date :  20AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  15OCT2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: CARNAHAN, PROCTOR AND CROSS, INC. GRAEF-USA INC. KISINGER CAMPO & ASSOCIATES, CORP. LOUIS BERGER U.S., INC. Letters Received by the Department: AES ENGINEERING, INC. BASLEE ENGINEERING SOLUTIONS (BES), BMA CONSULTING ENGINEERING, INC. CALTRAN ENGINEERING GROUP, INC. CARNAHAN, PROCTOR AND CROSS, INC. GRAEF-USA INC. KISINGER CAMPO & ASSOCIATES, CORP. LOUIS BERGER U.S., INC. PE CONSULTING ENGINEERING D/B/A PE PREMIERE DESIGN SOLUTIONS, INC. PROPEL ENGINEERING, INC. STANLEY CONSULTANTS, INC. THE CORRADINO GROUP, INC. ************************************************************ Contract Number : 19604 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 24979693201 Major Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Project Description: Districtwide Traffic Operations Safety Studies Consultant Project Manager : Patulot, Arthuro View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 29MAY2018 Longlist(Tech. Rev. Cmte.) Date:  21JUN2018 Time:  02:30PM Shortlist Selection Date :  09JUL2018 Time:  10:00AM Shortlist Selection Posting :  09JUL2018 Time:  11:15AM Final Selection Meeting Date :  20AUG2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Shortlisted Firms: C.H. PEREZ & ASSOCIATES CONSULTING CALTRAN ENGINEERING GROUP, INC. NETWORK ENGINEERING SERVICES, INC. Letters Received by the Department: C.H. PEREZ & ASSOCIATES CONSULTING CALTRAN ENGINEERING GROUP, INC. CTS ENGINEERING, INC. HBC ENGINEERING COMPANY NETWORK ENGINEERING SERVICES, INC. R. J. BEHAR & COMPANY, INC. TRIDENT ENGINEERING, LLC ************************************************************ Contract Number : 19601 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $375,000 Financial Management Number(s): 42440716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.5.2 - Major Bridge(CEI) - Steel Minor Work : 99.0 - Other Professional Services Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 968/SW 1st Street - Bascule Bridge over Miami River - Bridge Replacement. Providing CEI Services for Bascule Bridge Replacement project along State Road (SR) 968/ SW 1st Street from SW 6th Avenue to SW 2nd Avenue and reconstructing the roadway within project limits. Project Manager : Berisiartu, Andres Special Notes: Type of Work 99.0 is defined as Movable Span Bridge CEI. This project involves the CEI of bascule bridges and other movable bridges, including all structural, electrical and mechanical requirements. The consultant firm qualifying for this project must have experience in CEI for the construction of bascule bridges. . QUALIFICATION REQUIREMENTS: The consultant firm applying for this project must be pre-qualified in type of work 10.5.2 - Major Bridge CEI - Steel. In addition to the experience requirements for 10.5.2, the consultant firm must have on staff: two (2) professional engineers with a minimum of five years experience in the performance of CEI for movable span bridges and three (3) engineers/technicians with a minimum of three years of movable bridge experience in the performance of CEI. At least one of the professional engineers or engineer/technicians will have experience in CEI of at least two movable bridge electrical control systems within the last 10 years and one will have experience in CEI of at least two movable bridge drive systems within the last 10 years. . Subconsultants may be utilized to meet the requirement for an electrical engineer/specialist and a mechanical engineer/specialist. The electrical engineer/specialist will have experience in CEI of at least two movable bridge electrical control systems within the last 10 years and experience with the commonly used bridge leaf motion control techniques used within the last 30 years. The mechanical engineer/specialist will have experience in CEI of at least two movable bridge drive systems within the last 10 years and experience with the bridge drive systems commonly used within the last 30 years. . Responses should include a two (2) page Professional Resume for each key staff team member, as well as an organization chart that defines the staffing plan for the project. resumes are to display the signature of the proposed individual. . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for other instructions. . If additional unanticipated projects not having the Financial Management Numbers listed in this advertise- ment are let within the general geographical area and time period that will achieve economic efficiency through the shared use of personnel, equipment, facilities and other resources, the Department may, at its sole discretion assign any required CEI services for those projects to the contract resulting from this advertisement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21MAY2018 Longlist(Tech. Rev. Cmte.) Date:  19JUN2018 Time:  10:00AM Shortlist Selection Date :  25JUN2018 Time:  10:00AM Shortlist Selection Posting :  25JUN2018 Time:  2:30PM Scope Meeting Date :  03JUL2018 Time:  10:00AM Final Selection Meeting Date :  06AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  12SEP2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8,10 Shortlisted Firms: PINNACLE CONSULTING ENTERPRISES, IN TARGET ENGINEERING GROUP, LLC WSP USA INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. METRIC ENGINEERING INC. PINNACLE CONSULTING ENTERPRISES, IN TARGET ENGINEERING GROUP, LLC WSP USA INC. ************************************************************ Contract Number : 19611 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 42344813203 Major Work : 8.4 - Right of Way Mapping Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: Districtwide Right-of-Way The purpose of this project is to produce Right-of-Way monumentation maps, set Right-of-Way monuments at all break- ins, Right-of-Way related maps, revise and review maps and title searches. Project Manager : Albury, Christina View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 14MAY2018 Longlist(Tech. Rev. Cmte.) Date:  05JUN2018 Time:  Shortlist Selection Date :  11JUN2018 Time:  10:00AM Shortlist Selection Posting :  11JUN2018 Time:  11:45AM Scope Meeting Date :  20JUN2018 Time:  Final Selection Meeting Date :  23JUL2018 Time:  10:00AM 1st Date Negotiations Meetings :  27AUG2018 Time:  Last Date Negotiations Meetings:  04SEP2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 9 Shortlisted Firms: BISCAYNE ENGINEERING COMPANY, INC. MANUEL G. VERA & ASSOCIATES, INC. MASER CONSULTING P.A. Letters Received by the Department: BISCAYNE ENGINEERING COMPANY, INC. C.H. PEREZ & ASSOCIATES CONSULTING CSA CENTRAL, INC. GPI GEOSPATIAL, INC. MANUEL G. VERA & ASSOCIATES, INC. MASER CONSULTING P.A. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19617 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42751823201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: SR 860/Miami Gardens/NW 183rd St from E of NW 57th Avenue to W of NW 27th Avenue (RRR). Project Manager : Quintela, Raul View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 14MAY2018 Longlist(Tech. Rev. Cmte.) Date:  21JUN2018 Time:  10:00AM Shortlist Selection Date :  25JUN2018 Time:  10:00AM Shortlist Selection Posting :  25JUN2018 Time:  1:14PM Scope Meeting Date :  28JUN2018 Time:  02:00PM Final Selection Meeting Date :  06AUG2018 Time:  10:00AM 1st Date Negotiations Meetings :  17SEP2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: GOAL ASSOCIATES, INC. THE CORRADINO GROUP, INC. WANTMAN GROUP, INC. Letters Received by the Department: A & P CONSTRUCTION SERVICES, INC. ALVAREZ ENGINEERS, INC. AMERICAN CONSULTING ENGINEERS OF FL ATKINS NORTH AMERICA, INC. BASLEE ENGINEERING SOLUTIONS (BES), C.H. PEREZ & ASSOCIATES CONSULTING Civil Works, Inc. GOAL ASSOCIATES, INC. H.W. LOCHNER INC HAKS ENGINEERS, ARCHITECTS AND LAND HARDESTY & HANOVER, LLC HBC ENGINEERING COMPANY HDR ENGINEERING, INC. KIMLEY-HORN AND ASSOCIATES, INC. PE CONSULTING ENGINEERING D/B/A PE PROPEL ENGINEERING, INC. RIBBECK ENGINEERING, INC. SCALAR CONSULTING GROUP INC. SNUBBS CONSULTING INC. THE CORRADINO GROUP, INC. TRANSYSTEMS CORPORATION D/B/A TRANS WANTMAN GROUP, INC. ************************************************************ Contract Number : 19618 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43245141201 Major Work : 99.0 - Other Professional Services Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 11.0 - Eng Contract Admin and Management 13.5 - Subarea/Corridor Planning Project Description: Districtwide Modal Development Consultant Services This contract will involve project plans and specifications review; technial reports/studies review; master plans revie ; multimodal inventories; transit system safety plans revie ; design services; engieering contract administration and management services and program administration assistance for Aviation, Freight, Intermodal, Rail, Seaport and Transi projects in Miami-Dade and Monroe Counties on a task assignment basis. Project Manager : RICHARDSON, DIONNE View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  05JUN2018 Time:  Shortlist Selection Date :  11JUN2018 Time:  10:00AM Shortlist Selection Posting :  11JUN2018 Time:  11:45AM Final Selection Meeting Date :  06AUG2018 Time:  10:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Shortlisted Firms: ATKINS NORTH AMERICA, INC. CALTRAN ENGINEERING GROUP, INC. TINDALE-OLIVER & ASSOCIATES,INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. ATKINS NORTH AMERICA, INC. CALTRAN ENGINEERING GROUP, INC. RENAISSANCE PLANNING GROUP, INC. TINDALE-OLIVER & ASSOCIATES,INC. ************************************************************ Contract Number : 19619 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 42904713202 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design Project Description: I-75 from 178th Street to NW 202nd Street Project Manager : Schot, Kevin View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  05JUN2018 Time:  10:00AM Shortlist Selection Date :  11JUN2018 Time:  10:00AM Shortlist Selection Posting :  11JUN2018 Time:  2:52PM Scope Meeting Date :  21JUN2018 Time:  10:00AM Final Selection Meeting Date :  23JUL2018 Time:  10:00AM 1st Date Negotiations Meetings :  17SEP2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 7 Shortlisted Firms: FERNANDEZ-BERAUD, INC. MILLER, LEGG & ASSOCIATES,INC. MONARCH LANDSCAPE ARCHITECTURE, LLC Letters Received by the Department: CURTIS & ROGERS DESIGN STUDIO, INC. FERNANDEZ-BERAUD, INC. LANDSCAPE DE, LLC MILLER, LEGG & ASSOCIATES,INC. MONARCH LANDSCAPE ARCHITECTURE, LLC ************************************************************ Contract Number : 19641 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): TBA Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Pre-Event Disaster Monitoring/CEI Project Manager : Salazar, Leonard Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . Final Selection will be made from Expanded Letters of Response. In addition to the minimum information required In the -Notice to Professional Services Consultants- page, it should also address the following items in order to assess each firm-s potential to satisfactorily accomplish this form project: . Scope of Services *Understanding of Scope of Services (10 points) . Awareness of the Project Issues * Understanding Project Issues (10 points) * Approach to the Project Issues (10 points) * Approach to Project Process (10 points) . Project Management * Project Management Approach (10 points) * Control of Project Schedule (10 points) * Quality Control Process (10 points) * Team Approach (5 points) . Project Staffing * Staffing Quality & Availability (15 points) * Staffing Experience on Similar Projects (10 points) . Not included in the page limitation of LOR, responses should include a two (2) page Professional Resume for key staff team members, as well as, a one (1) page organizational chart on either 11"x17" or 8-1/2"x11" in length. Construction Training & Qualification Program (CTQP) printouts may also be submitted. Required forms and certifications. . *Required forms and certifications are as follows: - Truth in Negotiations Certificate (Form No. 375-030-30) - Certification of Disclosure of Lobbying Activities (Form No. 375-030-34) - Certification for Disclosure of Lobbying (Form No. 375-030-33) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form No. 375-030-32) - Vendor Certification Regarding Scrutinized Companies Lists (Form No. 375-030-60) - Professional Services DBE or Small Business Commitment Form (Form No. 375-030-83) - Proposed Subconsultant Listing . Since Final Selection will be made from Letters of Response, teams must be prequalified for all identified types of work, both Major and Minor. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us. Questions posed before 5PM (EST) on the seventh calendar day prior to submittal Deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: http://www.fdot.gov/procurement/FTP%20Sites.shtm . Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR, accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for primes and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room or District Auditorium, located at 1000 NW 111th Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Leonard Salazar . Two (2) contracts will be awarded from advertisement. The number 1 ranked firm will have the first pick on which County to choose from. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  11JUN2018 Time:  10:00AM Shortlist Selection Date :  11JUN2018 Time:  10:00AM Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  11JUN2018 Time:  3:45PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,10 Rank Consultant 1 TARGET ENGINEERING GROUP, LLC 2 HDR CONSTRUCTION CONTROL CORPORATIO 3 METRIC ENGINEERING INC. Letters Received by the Department: HDR CONSTRUCTION CONTROL CORPORATIO METRIC ENGINEERING INC. TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19642 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): TBA Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Pre-Event Disaster Monitoring/CEI Project Manager : Salazar, Leonard Special Notes: This project is being advertised under #19641. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07MAY2018 Longlist(Tech. Rev. Cmte.) Date:  11JUN2018 Time:  10:00AM Shortlist Selection Date :  11JUN2018 Time:  10:00AM Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  11JUN2018 Time:  3:45PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,10 Rank Consultant 1 TARGET ENGINEERING GROUP, LLC 2 HDR CONSTRUCTION CONTROL CORPORATIO 3 METRIC ENGINEERING INC. Letters Received by the Department: HDR CONSTRUCTION CONTROL CORPORATIO METRIC ENGINEERING INC. TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19613 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 43094923201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Project Description: RRR project along SR A1A Collins Avenue from North of Haulover Inlet to South of Bayview drive. The project improvements include roadway, signing and pavement markings, signalization, lighting, and landscape. Project Manager : Funtanellas, Ivette View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 23APR2018 Longlist(Tech. Rev. Cmte.) Date:  15MAY2018 Time:  03:00PM Shortlist Selection Date :  21MAY2018 Time:  10:00AM Shortlist Selection Posting :  21MAY2018 Time:  1:46PM Final Selection Meeting Date :  09JUL2018 Time:  10:00AM Final Selection Posting Date :  09JUL2018 Time:  11:15AM 1st Date Negotiations Meetings :  15AUG2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 A.D.A. ENGINEERING, INC. 2 AES ENGINEERING, INC. 3 VIA ENGINEERING GROUP, INC. Letters Received by the Department: A.D.A. ENGINEERING, INC. AES ENGINEERING, INC. BASLEE ENGINEERING SOLUTIONS (BES), BAXTER & WOODMAN, INC. D/B/A MATHEW C.H. PEREZ & ASSOCIATES CONSULTING CHOICE ENGINEERING CONSULTANTS, INC CONSTRUCTIVE ENGINEERING, INC. KISINGER CAMPO & ASSOCIATES, CORP. LOUIS BERGER U.S., INC. PROPEL ENGINEERING, INC. VIA ENGINEERING GROUP, INC. ************************************************************ Contract Number : 19633 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 25060533201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Districtwide Miscellaneous PE Design Consultants. Project Manager : Pulido, Nathaniel Special Notes: Two (2) contracts will be awarded from this advertisement. . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . Final Selection will be made from Expanded Letters of Response. In addition to the minimum information required In the -Notice to Professional Services Consultants- page, it should also address the following items in order to assess each firm-s potential to satisfactorily accomplish this form project: . Scope of Services *Understanding of Scope of Services (5 points) . Awareness of the Project Issues * Approach to the Project Issues (30 points) . Project Management * Project Management Approach (15 points) * Control of Project Schedule (10 points) * Control of Budget (10 points) * Quality Control Process (5 points) * Team Approach (5 points) . Project Staffing * Staffing Quality & Availability (10 points) * Staffing Experience on Similar Projects (10 points) . Not included in the page limitation of LOR, responses should include a two (2) page Professional Resume for key staff team members, as well as, a one (1) page organizational chart on either 11"x17" or 8-1/2"x11" in length. On the resume, please reference the contact name and number of the projects you have worked on. . *Required forms and certifications are as follows: - Truth in Negotiations Certificate (Form No. 375-030-30) - Certification of Disclosure of Lobbying Activities (Form No. 375-030-34) - Certification for Disclosure of Lobbying (Form No. 375-030-33) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form No. 375-030-32) - Vendor Certification Regarding Scrutinized Companies Lists (Form No. 375-030-60) - Professional Services DBE or Small Business Commitment Form (Form No. 375-030-83) - Proposed Subconsultant Listing . Since Final Selection will be made from Letters of Response, teams must be prequalified for all identified types of work, both Major and Minor. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us. Questions posed before 5PM (EST) on the seventh calendar day prior to submittal Deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: http://www.fdot.gov/procurement/FTP%20Sites.shtm . Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR, accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for primes and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room or District Auditorium, located at 1000 NW 111th Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Nathaniel Pulido View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 16APR2018 Longlist(Tech. Rev. Cmte.) Date:  14MAY2018 Time:  02:00PM Shortlist Selection Date :  21MAY2018 Time:  10:00AM Shortlist Selection Posting :  21MAY2018 Time:  2:45PM Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  11JUN2018 Time:  3:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,11 Rank Consultant 1 C.H. PEREZ & ASSOCIATES CONSULTING 2 H.W. LOCHNER INC 3 A.D.A. ENGINEERING, INC. 4 CALTRAN ENGINEERING GROUP, INC. Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG A.D.A. ENGINEERING, INC. AES ENGINEERING, INC. AMERICAN CONSULTING ENGINEERS OF FL C.H. PEREZ & ASSOCIATES CONSULTING CALTRAN ENGINEERING GROUP, INC. CHOICE ENGINEERING CONSULTANTS, INC GOAL ASSOCIATES, INC. H.W. LOCHNER INC HAKS ENGINEERS, ARCHITECTS AND LAND HARDESTY & HANOVER, LLC HDR ENGINEERING, INC. INFRASTRUCTURE ENGINEERS, LLC KEITH AND ASSOCIATES, INC. KEITH AND SCHNARS, P.A. MARLIN ENGINEERING, INC. METRIC ENGINEERING INC. NETWORK ENGINEERING SERVICES, INC. PARSONS TRANSPORTATION GROUP INC. PROPEL ENGINEERING, INC. R. J. BEHAR & COMPANY, INC. T.Y. LIN INTERNATIONAL THE CORRADINO GROUP, INC. TINDALE-OLIVER & ASSOCIATES,INC. WANTMAN GROUP, INC. WSP USA INC. ************************************************************ Contract Number : 19634 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Financial Management Number(s): 25060533202 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Districtwide Miscellaneous PE Design Consultant. Project Manager : Pulido, Nathaniel Special Notes: This project is being advertised under #19633. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 16APR2018 Longlist(Tech. Rev. Cmte.) Date:  14MAY2018 Time:  02:00PM Shortlist Selection Date :  21MAY2018 Time:  10:00AM Shortlist Selection Posting :  21MAY2018 Time:  2:45PM Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  11JUN2018 Time:  3:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,11 Rank Consultant 1 C.H. PEREZ & ASSOCIATES CONSULTING 2 H.W. LOCHNER INC 3 A.D.A. ENGINEERING, INC. 4 CALTRAN ENGINEERING GROUP, INC. Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG A.D.A. ENGINEERING, INC. AES ENGINEERING, INC. AMERICAN CONSULTING ENGINEERS OF FL C.H. PEREZ & ASSOCIATES CONSULTING CALTRAN ENGINEERING GROUP, INC. CHOICE ENGINEERING CONSULTANTS, INC GOAL ASSOCIATES, INC. H.W. LOCHNER INC HAKS ENGINEERS, ARCHITECTS AND LAND HARDESTY & HANOVER, LLC HDR ENGINEERING, INC. INFRASTRUCTURE ENGINEERS, LLC KEITH AND ASSOCIATES, INC. KEITH AND SCHNARS, P.A. MARLIN ENGINEERING, INC. METRIC ENGINEERING INC. NETWORK ENGINEERING SERVICES, INC. PARSONS TRANSPORTATION GROUP INC. PROPEL ENGINEERING, INC. R. J. BEHAR & COMPANY, INC. T.Y. LIN INTERNATIONAL THE CORRADINO GROUP, INC. TINDALE-OLIVER & ASSOCIATES,INC. WANTMAN GROUP, INC. WSP USA INC. ************************************************************ Contract Number : 19602 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $250,000 Financial Management Number(s): 42736926201 42736936201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CEI 018 Krome Avenue South #3 to provide CEI Services for SR 997/Krome Avenue from SW 232nd St. to SW 184th St./Eureka Drive - Add Lanes & Reconstruct and SR 997/Krome Avenue from SW 184th St. to 136th St. - Add Lanes & Reconstruct within project limits. Project Manager : Fundora, Jonathan Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . Final Selection will be made from Expanded Letters of Response. In addition to the minimum information required In the -Notice to Professional Services Consultants- page, it should also address the following items in order to assess each firm-s potential to satisfactorily accomplish this form project: . Scope of Services. (5 points) . Awareness of the Project Issues * Awareness of project coordination & public outreach. (5 points) * Understanding of issues that may impact project time & budget. (10 points) * Understanding of project technical issues. (10 points) . Project Management * Management approach to contract administration in order to accomplish time, money & quality goals. (10 points) * Detailed quality assurance program. (5 points) * Management approach to project coordination & public outreach. (5 points) * Management approach to succesful resolution of project technical issues. Provide examples. (10 points) . Proposed Staffing * Staff qualifications & experience (10 points) * Team's similar past project experience (15 points) * Staff availability & organizational chart (10 points) * Key personnel performance on previous construction contracts (5 points) . Not included in the page limitation of LOR, responses should include a two (2) page Professional Resume for key staff team members, as well as, a one (1) page organizational chart on either 11"x17" or 8-1/2"x11" in length. Construction Training & Qualification Program (CTQP) printouts may also be submitted. Required forms and certifications. . *Required forms and certifications are as follows: - Truth in Negotiations Certificate (Form No. 375-030-30) - Certification of Disclosure of Lobbying Activities (Form No. 375-030-34) - Certification for Disclosure of Lobbying (Form No. 375-030-33) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form No. 375-030-32) - Vendor Certification Regarding Scrutinized Companies Lists (Form No. 375-030-60) - Professional Services DBE or Small Business Commitment Form (Form No. 375-030-83) - Proposed Subconsultant Listing . Since Final Selection will be made from Letters of Response, teams must be prequalified for all identified types of work, both Major and Minor. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us. Questions posed before 5PM (EST) on the seventh calendar day prior to submittal Deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: http://www.fdot.gov/procurement/FTP%20Sites.shtm . Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR, accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for primes and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room or District Auditorium, located at 1000 NW 111th Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Jonathan Fundora View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Longlist(Tech. Rev. Cmte.) Date:  30APR2018 Time:  10:00AM Shortlist Selection Date :  21MAY2018 Time:  10:00AM Shortlist Selection Posting :  21MAY2018 Time:  2:00PM Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  11JUN2018 Time:  3:30PM 1st Date Negotiations Meetings :  26JUL2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 THE CORRADINO GROUP, INC. 2 TARGET ENGINEERING GROUP, LLC 3 F&J ENGINEERING GROUP, INC. Letters Received by the Department: AMERICAN ENGINEERING GROUP, INC. BCC ENGINEERING, INC. CIMA ENGINEERING CORP. F&J ENGINEERING GROUP, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. KEITH AND SCHNARS, P.A. NEW MILLENNIUM ENGINEERING, INC. TARGET ENGINEERING GROUP, LLC THE CORRADINO GROUP, INC. ************************************************************ Contract Number : 19614 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 43794912201 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.2 - Intelligent Trans Systems Implementation 13.4 - Systems Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: City of Hialeah Freight Mobility Implementation Plan: The objective of this contract is to analyze potential and existing proposed locations in the City of Hialeah, and the related transportation networks to determine the necessary infrastructure needs to accommodate future regional and statewide freight demands in an efficient manner throughout the area. Project Manager : Castro, Carlos View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Longlist(Tech. Rev. Cmte.) Date:  01MAY2018 Time:  Shortlist Selection Date :  07MAY2018 Time:  10:00AM Shortlist Selection Posting :  07MAY2018 Time:  12:30PM Final Selection Meeting Date :  25JUN2018 Time:  10:00AM Final Selection Posting Date :  25JUN2018 Time:  11:15AM 1st Date Negotiations Meetings :  07AUG2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 TRANSYSTEMS CORPORATION D/B/A TRANS 2 CALTRAN ENGINEERING GROUP, INC. 3 MARLIN ENGINEERING, INC. Letters Received by the Department: ATKINS NORTH AMERICA, INC. CALTRAN ENGINEERING GROUP, INC. CAMBRIDGE SYSTEMATICS, INC. H.W. LOCHNER INC MARLIN ENGINEERING, INC. PREMIERE DESIGN SOLUTIONS, INC. TRANSYSTEMS CORPORATION D/B/A TRANS WSP USA INC. ************************************************************ Contract Number : 19615 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 25078227205 Major Work : 5.4 - Bridge Load Rating Minor Work : 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Districtwide Load Rating Structures The purpose of this contract is to obtain the structural capacity of the bridges in District 6 and must follow the Bridge Load Rating Manual (Topic No. 850-010-0035, Jan. 2018) includig the load rating flowchart. The Load Rating should be based on the Superstructure. The substructure will not be routinely load rates unless it displays damage, deter ioration or other conditions that may significantly affect its load carrying capacity and merits an analysis. Project Manager : Noto, Guiseppe View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02APR2018 Longlist(Tech. Rev. Cmte.) Date:  01MAY2018 Time:  Shortlist Selection Date :  07MAY2018 Time:  10:00AM Shortlist Selection Posting :  07MAY2018 Time:  12:30PM Final Selection Meeting Date :  25JUN2018 Time:  10:00AM Final Selection Posting Date :  25JUN2018 Time:  11:46AM 1st Date Negotiations Meetings :  07AUG2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 EAC CONSULTING, INC. 2 PEVIDA HIGHWAY DESIGNERS, LLC 3 BCC ENGINEERING, INC. Letters Received by the Department: AI ENGINEERS, INC. BCC ENGINEERING, INC. BOTAS ENGINEERING, INC. EAC CONSULTING, INC. H.W. LOCHNER INC HAKS ENGINEERS, ARCHITECTS AND LAND INFRASTRUCTURE ENGINEERS, LLC LAKES ENGINEERING, INC. MASTER CONSULTING ENGINEERS, INC. PEVIDA HIGHWAY DESIGNERS, LLC STANTEC CONSULTING SERVICES INC. T.Y. LIN INTERNATIONAL TRANSYSTEMS CORPORATION D/B/A TRANS ************************************************************ Contract Number : 19612 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42928643201 Major Work : 6.2 - Traffic Signal Timing 6.1 - Traffic Engineering Studies Minor Work : Project Description: Traffic Engineering Support Services COnsultant Project Manager : Defrant, Jacques View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  03APR2018 Time:  03:00PM Shortlist Selection Date :  09APR2018 Time:  10:00AM Shortlist Selection Posting :  09APR2018 Time:  11:33AM Final Selection Meeting Date :  21MAY2018 Time:  10:00AM Final Selection Posting Date :  21MAY2018 Time:  2:30PM 1st Date Negotiations Meetings :  16JUL2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 METRIC ENGINEERING INC. 2 AECOM TECHNICAL SERVICES, INC. 3 A & P CONSULTING TRANSPORTATION ENG Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG AECOM TECHNICAL SERVICES, INC. C.H. PEREZ & ASSOCIATES CONSULTING GANNETT FLEMING, INC. GOAL ASSOCIATES, INC. H.W. LOCHNER INC HDR ENGINEERING, INC. MARLIN ENGINEERING, INC. METRIC ENGINEERING INC. NETWORK ENGINEERING SERVICES, INC. TINDALE-OLIVER & ASSOCIATES,INC. ************************************************************ Contract Number : 19616 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 43044433201 Major Work : 3.2 - Major Highway Design Minor Work : 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: SR 907 / ALTON ROAD TO WESTBOUND SR 112 / I-195 / JULIA TUTTLE CAUSEWAY Design services for SR 907/ Alton Rd. to West-bound SR112 I-195 / Julia Tuttle Cswy Project Manager : Benitez, Auraliz View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  11APR2018 Time:  Shortlist Selection Date :  23APR2018 Time:  10:00AM Shortlist Selection Posting :  23APR2018 Time:  1:04PM Scope Meeting Date :  07MAY2018 Time:  Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  11JUN2018 Time:  10:45AM 1st Date Negotiations Meetings :  30JUL2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 VIA ENGINEERING GROUP, INC. 2 RIBBECK ENGINEERING, INC. 3 CONSTRUCTIVE ENGINEERING, INC. Letters Received by the Department: CONSTRUCTIVE ENGINEERING, INC. CSA CENTRAL, INC. H.W. LOCHNER INC LOUIS BERGER U.S., INC. PREMIERE DESIGN SOLUTIONS, INC. RIBBECK ENGINEERING, INC. SCALAR CONSULTING GROUP INC. VIA ENGINEERING GROUP, INC. ************************************************************ Contract Number : 19650 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 25060523209 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 15.0 - Landscape Architect Project Description: Districtwide Miscellaneous PE Design Consultant. Project Manager : Perdomo, Maria I View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAR2018 Longlist(Tech. Rev. Cmte.) Date:  03APR2018 Time:  02:00PM Shortlist Selection Date :  09APR2018 Time:  10:00AM Shortlist Selection Posting :  09APR2018 Time:  12:02PM Scope Meeting Date :  18APR2018 Time:  11:00AM Final Selection Meeting Date :  11JUN2018 Time:  10:00AM Final Selection Posting Date :  11JUN2018 Time:  3:45PM 1st Date Negotiations Meetings :  12NOV2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 7 Rank Consultant 1 TRACE CONSULTANTS, INC. 2 C.H. PEREZ & ASSOCIATES CONSULTING 3 AES ENGINEERING, INC. Letters Received by the Department: A.D.A. ENGINEERING, INC. AES ENGINEERING, INC. ALVAREZ ENGINEERS, INC. BASLEE ENGINEERING SOLUTIONS (BES), C.H. PEREZ & ASSOCIATES CONSULTING Civil Works, Inc. CALTRAN ENGINEERING GROUP, INC. CONSTRUCTIVE ENGINEERING, INC. CTS ENGINEERING, INC. GOAL ASSOCIATES, INC. NETWORK ENGINEERING SERVICES, INC. PE CONSULTING ENGINEERING D/B/A PE PROPEL ENGINEERING, INC. RIBBECK ENGINEERING, INC. SCALAR CONSULTING GROUP INC. SNUBBS CONSULTING INC. TRACE CONSULTANTS, INC. ************************************************************ Contract Number : 19603 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $375,000 Financial Management Number(s): 43063716201 43063736201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 847/NW 47 Avenue from SR 860/NW 183 St to N. of NW 199 St SR 847/NW 47 Avenue from N. of NW 199 St to Premier Pky Construction, Engineering and Inspection (CEI) services which are required for contract administration, inspection, and materials sampling and testing for the construction projects listed above. Project Manager : Garzia, John M Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . Final Selection will be made from Expanded Letters of Response. In addition to the minimum information required In the -Notice to Professional Services Consultants- page, it should also address the following items in order to assess each firm-s potential to satisfactorily accomplish this form project: . Scope of Services *Understanding of Scope of Services (5 points) . Awareness of the Project Issues * Understanding of Project Issues (10 points) * Approach to the Project Issues (15 points) . Project Management * Project Management Approach (10 points) * Control of Project Schedule (10 points) * Control of Budget (5 points) * Quality Control Process (5 points) . Proposed Staffing * Staffing Quality & Availability (20 points) * Staffing Experience on Similar Projects (20 points) . Not included in the page limitation of LOR, responses should include a two (2) page Professional Resume for key staff team members, as well as, a one (1) page organizational chart on either 11"x17" or 8-1/2"x11" in length. Construction Training & Qualification Program (CTQP) printouts may also be submitted. Required forms and certifications. . *Required forms and certifications are as follows: - Truth in Negotiations Certificate (Form No. 375-030-30) - Certification of Disclosure of Lobbying Activities (Form No. 375-030-34) - Certification for Disclosure of Lobbying (Form No. 375-030-33) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form No. 375-030-32) - Vendor Certification Regarding Scrutinized Companies Lists (Form No. 375-030-60) - Professional Services DBE or Small Business Commitment Form (Form No. 375-030-83) - Proposed Subconsultant Listing . Since Final Selection will be made from Letters of Response, teams must be prequalified for all identified types of work, both Major and Minor. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us. Questions posed before 5PM (EST) on the seventh calendar day prior to submittal Deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: http://www.fdot.gov/procurement/FTP%20Sites.shtm . Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR, accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for primes and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room or District Auditorium, located at 1000 NW 111th Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: John Garzia View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12FEB2018 Longlist(Tech. Rev. Cmte.) Date:  14MAR2018 Time:  10:00AM Shortlist Selection Date :  19MAR2018 Time:  10:00AM Shortlist Selection Posting :  19MAR2018 Time:  1:59PM Final Selection Meeting Date :  09APR2018 Time:  10:00AM Final Selection Posting Date :  09APR2018 Time:  11:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Rank Consultant 1 SOLID CONSULTING ENGINEERS, INC. 2 TARGET ENGINEERING GROUP, LLC 3 AMERICAN ENGINEERING GROUP, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AMERICAN ENGINEERING GROUP, INC. CSA CENTRAL, INC. NEW MILLENNIUM ENGINEERING, INC. SOLID CONSULTING ENGINEERS, INC. TARGET ENGINEERING GROUP, LLC ************************************************************ Contract Number : 19607 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 24979683201 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 3.1 - Minor Highway Design Project Description: Districtwide Traffic Operations Safety Studies Consultants to perform engineering traffic studies in Miami Dade and Monroe Counties. Project Manager : Caldera, Miguel View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  14MAR2018 Time:  11:00AM Shortlist Selection Date :  19MAR2018 Time:  10:00AM Shortlist Selection Posting :  19MAR2018 Time:  1:59PM Final Selection Meeting Date :  07MAY2018 Time:  10:00AM Final Selection Posting Date :  07MAY2018 Time:  11:30AM 1st Date Negotiations Meetings :  02JUL2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 KIMLEY-HORN AND ASSOCIATES, INC. 2 CALVIN, GIORDANO & ASSOCIATES,INC. 3 METRIC ENGINEERING INC. Letters Received by the Department: AES ENGINEERING, INC. ARCADIS U.S., INC. C.H. PEREZ & ASSOCIATES CONSULTING CALVIN, GIORDANO & ASSOCIATES,INC. DRMP, INC. H.W. LOCHNER INC HBC ENGINEERING COMPANY KIMLEY-HORN AND ASSOCIATES, INC. KITTELSON & ASSOCIATES, INC. METRIC ENGINEERING INC. NETWORK ENGINEERING SERVICES, INC. THE CORRADINO GROUP, INC. TINDALE-OLIVER & ASSOCIATES,INC. TRIDENT ENGINEERING, LLC ************************************************************ Contract Number : 19608 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 43163553201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge DW Traffic Operation Push-Button Design Cont. Svcs. Project Manager : Funtanellas, Ivette View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  05MAR2018 Time:  Shortlist Selection Date :  19MAR2018 Time:  10:00AM Shortlist Selection Posting :  19MAR2018 Time:  1:00PM Scope Meeting Date :  02APR2018 Time:  Final Selection Meeting Date :  07MAY2018 Time:  10:00AM Final Selection Posting Date :  07MAY2018 Time:  12:00PM 1st Date Negotiations Meetings :  19JUN2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 TINDALE-OLIVER & ASSOCIATES,INC. 2 LAKES ENGINEERING, INC. 3 CTS ENGINEERING, INC. Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG ALVAREZ ENGINEERS, INC. BCC ENGINEERING, INC. BMA CONSULTING ENGINEERING, INC. C.H. PEREZ & ASSOCIATES CONSULTING CALTRAN ENGINEERING GROUP, INC. CHOICE ENGINEERING CONSULTANTS, INC CTS ENGINEERING, INC. DRMP, INC. GANNETT FLEMING, INC. GOAL ASSOCIATES, INC. KIMLEY-HORN AND ASSOCIATES, INC. LAKES ENGINEERING, INC. METRIC ENGINEERING INC. RIBBECK ENGINEERING, INC. SCALAR CONSULTING GROUP INC. TINDALE-OLIVER & ASSOCIATES,INC. ************************************************************ Contract Number : 19609 Projects less than $500,000 (Technical Qualification only) Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 41056847202 Major Work : 5.1 - Conventional Bridge Inspection Minor Work : Project Description: Districtwide Traffic Signal Mast Arms and High Mast Light Poles Inspections To perform routine and emergency inspection including reporting and minor remediala ction on Traffic Signal Mast Arms and High Mast Light Poles on the State Highway System in Miami-Dade County. Project Manager : SOSA, OSCAR View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  27FEB2018 Time:  Shortlist Selection Date :  19MAR2018 Time:  10:00AM Shortlist Selection Posting :  19MAR2018 Time:  3:49PM Scope Meeting Date :  28MAR2018 Time:  Final Selection Meeting Date :  07MAY2018 Time:  10:00AM Final Selection Posting Date :  07MAY2018 Time:  12:15PM 1st Date Negotiations Meetings :  28JUN2018 Time:  See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 MARLIN ENGINEERING, INC. 2 LOUIS BERGER U.S., INC. 3 KISINGER CAMPO & ASSOCIATES, CORP. Letters Received by the Department: INFRASTRUCTURE PRESERVATION CORPORA KISINGER CAMPO & ASSOCIATES, CORP. LAKES ENGINEERING, INC. LOUIS BERGER U.S., INC. MARLIN ENGINEERING, INC. TRANSYSTEMS CORPORATION D/B/A TRANS VOLKERT, INC. ************************************************************ Contract Number : 19610 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43520143201 Major Work : 6.2 - Traffic Signal Timing Minor Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.3 - Signalization 13.7 - Transportation Statistics Project Description: Continuing Services D6 Signal Retiming Services. The Department requires professional signal retiming and traffic operational Consultant services to support and supplement FDOT District 6 Transportation Systems Management and Operations Office for tasks associated with the Active Aerial Management of the State's highway system. Project Manager : Bravo, Sergio View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  28FEB2018 Time:  10:00AM Shortlist Selection Date :  05MAR2018 Time:  10:00AM Shortlist Selection Posting :  05MAR2018 Time:  2:00PM Scope Meeting Date :  13MAR2018 Time:  01:30PM Final Selection Meeting Date :  23APR2018 Time:  10:00AM Final Selection Posting Date :  23APR2018 Time:  12:45PM 1st Date Negotiations Meetings :  18JUN2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 CHOICE ENGINEERING CONSULTANTS, INC 2 A & P CONSULTING TRANSPORTATION ENG 3 METRIC ENGINEERING INC. Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG CHOICE ENGINEERING CONSULTANTS, INC CTS ENGINEERING, INC. ELAND ENGINEERING, INC. H.W. LOCHNER INC METRIC ENGINEERING INC. ************************************************************ Contract Number : 19629 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 42832737201 Major Work : 3.1 - Minor Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Districtwide NPDES Push-Button Specialized Consultant Services. Assessment of Outfalls in Miami-Dade County discharging to the intra-coastal waterway and to Canals. The awarded Consultant will assist the Department in the continuation of the assessment report for the assigned locations where the outfalls are requested. Project Manager : Dominguez, Mario View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  27FEB2018 Time:  03:00PM Shortlist Selection Date :  05MAR2018 Time:  10:00AM Shortlist Selection Posting :  05MAR2018 Time:  2:00PM Final Selection Meeting Date :  23APR2018 Time:  10:00AM Final Selection Posting Date :  23APR2018 Time:  1:00PM 1st Date Negotiations Meetings :  18JUN2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 A & P CONSULTING TRANSPORTATION ENG 2 HDR ENGINEERING, INC. 3 T.Y. LIN INTERNATIONAL Letters Received by the Department: A & P CONSULTING TRANSPORTATION ENG AES ENGINEERING, INC. HDR ENGINEERING, INC. T.Y. LIN INTERNATIONAL ************************************************************ Design/Build Projects Procurement Number : E6L38 Financial Management Number(s): 25168465201 Project Description: This Project is for the design and construction of the Golden Glades Multimodal Transportation Facility (GGMTF) located in the southwest quadrant of the Golden Glades Interchange in northern Miami-Dade County. The Project includes all work necessary to design, permit, and construct the GGMTF. Work will include the demolition of existing structures and design/construction of the following improvements: At-grade surface parking (regular, carpools/vanpools, motorcycle, baby stroller parking) A multi-story parking garage Landscaping, hardscaping, gateway features, and lighting for the facility Kiss-and-Ride areas Taxi/Transportation Network Companies staging area for passenger pick-ups and drop-offs . Bus bays and layover bays accessible from the South and the North Bus drivers' break lounge in the center island of the Transit Terminal Area A transit hub building with passenger waiting areas and amenities Intercity Bus Terminal and Bus hub Continuous sidewalks and bicycle lanes accessible to and from the facility Canopy structures Continuously covered terminal platforms Electric vehicle charging stations Infrastructure for Parking Management System Infrastructure for Real-time Bus Information System Infrastructure for Site Security Surveillance System Gateway and Monument signs at the facility-s entrances Benches, trash collection receptacles, bicycle racks, and bicycle enclosures Guide signs along perimeter roadways and wayfinding signs within the site Improvements to access roadways including SR 9, SR 7 and the SR 9/SR 7 Connector Road, including signalized intersections Roadway lighting, drainage and utilities Noise Wall Widening of the I-95 Express Lanes ramps New I-95 Express Lanes ITS facilities, including gates and DMS sign structures New Incident Response Area to support I-95 Express Lanes operations PREAMBLE: Unless specifically noted otherwise, the preamble at the top of this web page is applicable to the project and is an official part of the advertisement. Design-Build Firms are responsible for reading it. Project Manager : Quintela, Raul Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor Certified by the Florida Construction Industry Board as General Contractor Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 8.2 - Design, Right of Way, & Const. Surveying 14.0 - Architect 3.1 - Minor Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Additional Bridge Design Work Types : QUALIFICATION FORM MUST BE SUBMITTED FOR BRIDGE DESIGN: Must be prequalified in work type 4.1.2 (Minor Bridge Design) Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit completed and signed Bridge Design Qualification Form (see the link to the "Bridge Qualification form" above) along with the LOI by the date/time deadline established for the LOI. Please refer to the preamble and advertisement for additional submittal directions. Technical Questions Should Be Addressed To: All questions for this project should be submitted through the Department's Bid Question and Answers website: https://fdotwp1.dot.state.fl.us/BidQuestionsandAnswers/ Proposal.aspx/SearchProposal DB Firms are responsible for monitoring this site for questions and answers. Special Notes: The DB Firm must have staff with experience in the design of buildings (vertical construction) and parking garages, including but not limited to, architectural design, design of structural, mechanical, electrical, plumbing, and fire protection systems. The DB Firm must be able to demonstrate experience in the Letter of Interest. The DB Firm shall have specific expertise and experience in performing building construction including precast concrete parking garages. The DB Firm may use one or more subcontractors to meet the expertise and experience requirements for one or more work elements. Certificates of Qualification from other states will not be accepted in lieu of FDOT certification. All interested firms must be pre-qualified before the due date and time for the Letters of Interest. Contractors performing the site work shall be prequalified with FDOT Contract Administration Office, in the work classes as follows: 1) Grading 2) Flexible Paving 3) Drainage 4) Hot Plant-Mixed Bitum Course 5) Portland Cement Concrete Roadway Paving BUDGET: The Department has established a Maximum Price of $56,331,962.00 for this project. Any price proposal submitted which exceeds the maximum price will result in the Proposer being found non-responsive If found non-responsive, there will be no further evaluation of that particular Proposer. Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. SELECTION: The Award of the Project will be based on an Adjusted Score using a combination of the Technical Proposal Scores(combined scores from LOI & Technical Proposal) and Price. RESPONSE: The Letter of Interest (LOI) shall follow the page limit, format, and the requirements outlined in the LOI Requirements located in the preamble at the top of this web page. Restriction on Consultants Eligibility: In accordance Conflict of Interest Procedure for Department Contracts (Procuredure No. 375-030-066-B) the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District Six Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Gannett Fleming, Inc. AECOM Technical Services Inc. Curtis + Rogers Design Studio, AES Engineering, Inc. . HDR, Inc. . A&P Consulting Transportation Engineers Corp. Estimated Contract Time: Not to exceed 1,000 Calendar Days Stipend Amount: $165,164.00 The Department will pay Stipends to the short-listed firms based on the requirements stated in the preamble at the top of this web page. View RFP (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 31JUL2017 Phase1 Selection Cmte. Meeting :  25SEP2017 Time:  10:00AM LOI Scores Notification Date :  25SEP2017 Time:  05:00PM Deadline for Election to Participate in Phase2 :  27SEP2017 Time:  01:00PM Posting of Shortlist :  27SEP2017 Time:  05:00PM Mand. Pre-Proposal Meeting Date:  10OCT2017 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  08MAR2018 Time:  04:00PM Price Proposal Due Date :  02MAY2018 Time:  02:00PM Proposal Opening Date :  02MAY2018 Time:  03:00PM Final Selection Meeting Date :  07MAY2018 Time:  02:00PM Posting of Award :  07MAY2018 Time:  12:45PM Meeting Location Notes: Mandatory Pre-Proposal Meeting Location: October 9, 2017, at 10:00AM ... State of Florida Department of Transportation District 6, Adam Leigh Cann Building 1000 NW 111th Avenue Miami, FL 33172 ... Mandatory Utility Meeting: October 16, 2017 (meeting times to be assigned) ... State of Florida Department of Transportation District 6, Adam Leigh Cann Building 1000 NW 111th Avenue Miami, FL 33172 Phase1 Phase2 Prop Bid Price Adjusted Rank Consultant Score Score Time Proposal Score 1 Lead Engineering Contractors, 17.7 72.7 1000 $56,331,262 90.33 99 COMMUNITY ASPHALT CORP. 18.0 78.3 1000 $74,139,000 96.33 99 CONDOTTE AMERICA, INC. 17.7 68.7 1000 $64,342,800 86.34 99 Halley Engineering Contractors 17.7 57.3 1000 $80,139,000 75.00 99 Munilla Construction Managemen 16.7 62.7 1000 79.33 Firms not participating in Phase 2 Phase1 Score Baker-Central JV (Baker Concrete Co 16.0 ************************************************************ DISTRICT 7 ************************************************************ Professional Services Consultant Projects Contract Number : 19720 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $1,500,000 Financial Management Number(s): 41673236201 41673246201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.3 - Construction Materials Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 50 from US 98/McKethan Rd to US 301 and SR 50 from Windmere Rd/Bronson Blvd to US 98/McKethan Rd Project Manager : Stringer, Zachary Contract Amount/Limit: $3,704,861 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. ************************************************************ The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ Consultant staff Hours on summary sheet (one sheet per FPN showing the hours of prime and all subs) will be submitted. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. *********************************************************** All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-30) 2. Proposed Project Staffing (0-60) A. Management Staff (0-35) B. Inspection Staff (0-25) 3. Demonstrated Commitment to FDOT (0-10) *********************************************************** The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Dave Bouffard 813-975-6628. *********************************************************** The Technical Review Committee Members for the project are: Zachary Stringer, Richard Frank, Josh Ebner *********************************************************** Technical Review Committee Members are subject to change. *********************************************************** The Special TRC Meeting will be: 06/28/2019 ************************************************************ Advertisement Status : Planned Date of Advertisement : 10DEC2018 Longlist(Tech. Rev. Cmte.) Date:  22JAN2019 Time:  10:30AM Shortlist Selection Date :  29JAN2019 Time:  1:30PM Tech. Rev. Cmte Meeting Date :  19FEB2019 Time:  10:30AM Final Selection Meeting Date :  26FEB2019 Time:  1:30PM ************************************************************ Contract Number : 19719 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $2,000,000 Financial Management Number(s): 43514216201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.3 - Construction Materials Inspection Project Description: 19719 43514216201 SR 52 Realignment from Uradco Place to W of FOrt King Road Project Manager : Matthews, Tyler Contract Amount/Limit: $5,571,937 See Descriptions of Standard Notes on Current Advertisements webpage: 4,10 Special Notes: SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. ************************************************************ The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ Consultant staff Hours on summary sheet (one sheet showing The hours of prime and all subs) will be submitted. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. ************************************************************ All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-30) 2. Proposed Project Staffing (0-60) A. Management Staff (0-35) B. Inspection Staff (0-25) 3. Demonstrated Commitment to FDOT (0-10) ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Tami Sanchez 813-975-6281 *********************************************************** The Technical Review Committee Members for the project are: Tyler Matthews, Tana Johnston-Schultz and Nick Zaccaro.***** Technical Review Committee Members are subject to change. *********************************************************** The Special TRC Meeting will be: 12/12/2018 at 2:00 PM ************************************************************ Advertisement Status : Planned Date of Advertisement : 24SEP2018 Longlist(Tech. Rev. Cmte.) Date:  31OCT2018 Time:  02:00PM Shortlist Selection Date :  13NOV2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  12DEC2018 Time:  02:00PM Final Selection Meeting Date :  08JAN2019 Time:  01:30PM 1st Date Negotiations Meetings :  22JAN2019 Time:  1:00PM ************************************************************ Contract Number : 19713 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 25940117211 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.1 - Minor Highway Design 8.1 - Control Surveying Project Description: 19713, FPN:259401 1 72 11 District Wide NPDES (National Pollutant Discharge Elimination System) Project Manager : Moore, Susan C Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Casey Horn 813-975-6412. *********************************************************** The Technical Review Committee Members for the project are: Susan Moore, Anita Montjoy, Daniel Lauricello Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: 11/14/18 at 8:30 am ************************************************************ A marketing meeting has been scheduled for this contract on August 9, 2018 from 8:30AM to 9:30AM in the Headquarters Operations Conference Room. Any consultant wishing to attend this meeting must sign in at the reception desk and be escorted from the lobby to the Operations Conference Room. Please be prompt in order for the meeting to start on time. ************************************************************ When marketing, you may bring written marketing information to support your relevant project experience. All marketing information left with the Department is Subject to public records law. ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 27AUG2018 Longlist(Tech. Rev. Cmte.) Date:  02OCT2018 Time:  9:00AM Shortlist Selection Date :  09OCT2018 Time:  1:30PM Scope Meeting Date :  17OCT2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  14NOV2018 Time:  12:00PM Final Selection Meeting Date :  11DEC2018 Time:  1:30PM 1st Date Negotiations Meetings :  02JAN2018 Time:  9:00AM ************************************************************ Contract Number : 19715 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 25454733202 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design Minor Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Project Description: Engineering Support Services - continuing contract __ Project Manager : Chupka, Frank Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Jose Vazquez 813-975-6453. *********************************************************** The Technical Review Committee Members for the project are: Frank Chupka, Allan Urbonas, Chad Stewart Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: November 15, 2018 ************************************************************ The Interview/Oral Presentation/Special TRC Meeting will be: ************************************************************ Advertisement Status : Planned Date of Advertisement : 27AUG2018 Longlist(Tech. Rev. Cmte.) Date:  02OCT2018 Time:  9:00AM Shortlist Selection Date :  09OCT2018 Time:  1:30PM Scope Meeting Date :  16OCT2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  15NOV2018 Time:  1:00PM Final Selection Meeting Date :  11DEC2018 Time:  1:30PM 1st Date Negotiations Meetings :  03JAN2019 Time:  9:00AM ************************************************************ Contract Number : 19717 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $1,500,000 Financial Management Number(s): 25632316201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.3 - Construction Materials Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: SR 52 (Schrader Hwy) from W of Suncoast Pkwy to E of US 41 (SR 45) Project Manager : Matthews, Tyler Contract Amount/Limit: $3,301,638 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. ************************************************************ The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ Consultant staff Hours on summary sheet (one sheet per FPN showing the hours of prime and all subs) will be submitted. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. *********************************************************** All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-30) 2. Proposed Project Staffing (0-60) A. Management Staff (0-35) B. Inspection Staff (0-25) 3. Demonstrated Commitment to FDOT (0-10) *********************************************************** The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Dave Bouffard 813-975-6628. *********************************************************** The Technical Review Committee Members for the project are: Tyler Matthews, Mike Kopotic and Rohan Abraham. Technical Review Committee Members are subject to change. *********************************************************** The Special TRC Meeting will be: 11/15/2018 ************************************************************ Advertisement Status : Planned Date of Advertisement : 27AUG2018 Longlist(Tech. Rev. Cmte.) Date:  10OCT2018 Time:  8:30AM Shortlist Selection Date :  30OCT2018 Time:  1:30PM Tech. Rev. Cmte Meeting Date :  15NOV2018 Time:  2:00PM Final Selection Meeting Date :  11DEC2018 Time:  1:30PM 1st Date Negotiations Meetings :  03JAN2019 Time:  9:00AM ************************************************************ Contract Number : 19718 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $500,000 Financial Management Number(s): 43763816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.3 - Construction Materials Inspection Project Description: 19718 43763816201 I-75/sr 93A from beginning of NB Ramp# 10075001 to end of NB Ramp Project Manager : Anna, Geismar Contract Amount/Limit: $1,429,148 See Descriptions of Standard Notes on Current Advertisements webpage: 4,10 Special Notes: SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. ************************************************************ The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ Consultant Staff Hours on summary sheet (one sheet showing the hours of prime and all subs) will be submitted. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. *********************************************************** All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-30) 2. Proposed Project Staffing (0-60) A. Management Staff (0-35) B. Inspection Staff (0-25) 3. Demonstrated Commitment to FDOT (0-10) ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Rayesha Cotton 813-975-6656. *********************************************************** The Technical Review Committee Members for the project are: Anna Geismar, TBD Technical Review Committee Members are subject to change. ************************************************************ The Special TRC Meeting will be:11/14/18 at 2:00 pm ************************************************************ Advertisement Status : Planned Date of Advertisement : 27AUG2018 Longlist(Tech. Rev. Cmte.) Date:  02OCT2018 Time:  09:00AM Shortlist Selection Date :  09OCT2018 Time:  01:30PM Tech. Rev. Cmte Meeting Date :  14NOV2018 Time:  02:00PM Final Selection Meeting Date :  11DEC2018 Time:  01:30PM ************************************************************ Contract Number : 19729 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $500,000 Financial Management Number(s): 43258416201 43258426201 43258436201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.3 - Construction Materials Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CCEI US 92/SR 600/Hillsborough Avenue 432584 1 62 01 from E of N Central Ave to W of SR583/N 56th 432584 2 62 01 from Nebraska to N 13th St 432584 3 62 01 at Nebraska Ave and 34th St Project Manager : Maghrebi, Ghada Contract Amount/Limit: $673,339 See Descriptions of Standard Notes on Current Advertisements webpage: 4,8,10 Special Notes: SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. ************************************************************ The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ Consultant staff Hours on summary sheet (one sheet per FPN showing the hours of prime and all subs) will be submitted. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. *********************************************************** All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-30) 2. Proposed Project Staffing (0-60) A. Management Staff (0-35) B. Inspection Staff (0-25) 3. Demonstrated Commitment to FDOT (0-10) *********************************************************** The Special TRC Meeting will be: November 11, 2018 ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, David Bouffard 813-975-6628. *********************************************************** The Technical Review Committee Members for the project are: Ghada Maghrebi, Rohan Abraham and Tim O'Brien Technical Review Committee Members are subject to change. *********************************************************** Advertisement Status : Planned Date of Advertisement : 27AUG2018 Longlist(Tech. Rev. Cmte.) Date:  11OCT2018 Time:  9:00AM Shortlist Selection Date :  30OCT2018 Time:  1:30PM Tech. Rev. Cmte Meeting Date :  14NOV2018 Time:  8:00AM Final Selection Meeting Date :  11DEC2018 Time:  1:30PM 1st Date Negotiations Meetings :  03JAN2019 Time:  9:00AM ************************************************************ Contract Number : 19721 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 43954716201 Major Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.1 - Rdwy Construction Engineering Inspection Project Description: I-275 Sunshine Skyway from Bridge #150189 over Tampa Bay Project Manager : Lenhart, Michael Contract Amount/Limit: $886,039 See Descriptions of Standard Notes on Current Advertisements webpage: 7,10 Special Notes: Type of Selection for CEI project: 2 page LOR & Interview ************************************************************ This project is advertised as Ad Note 7 ************************************************************ This project has been reserved for competition among only Small Businesses in accordance with the Departments Business Development Initiative (BDI) program. The maximum amount for 19721 will exceed $500,000, therefore, only Consultants who are fully prequalified (unlimited status) will be eligible for selection. Information on the Business Development Initiative (BDI) program is at the following website: BDI Info ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Rayesha Cotton 813-975-6656. *********************************************************** The Technical Review Committee Members for the project are: Michael Lenhart, Julie Ostoski, Mike Kopotic ************************************************************ Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: 10-23-2018 ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  05SEP2018 Time:  1:00PM Shortlist Selection Date :  11SEP2018 Time:  1:30PM Scope Meeting Date :  19SEP2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  23OCT2018 Time:  12:00PM Final Selection Meeting Date :  30OCT2018 Time:  1:30PM 1st Date Negotiations Meetings :  12NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19722 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Financial Management Number(s): 43437213202 Major Work : 6.1 - Traffic Engineering Studies Minor Work : Project Description: District Wide for Traffic Data Collection Project Manager : Dunn, Kevin L Contract Amount/Limit: $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 7 Special Notes: ************************************************************ This project is advertised as Ad Note 7 ************************************************************ This project has been reserved for competition among only Small Businesses in accordance with the Departments Business Development Initiative (BDI) program. The maximum amount for 19722 will exceed $500,000, therefore, only Consultants who are fully prequalified (unlimited status) will be eligible for selection. Information on the Business Development Initiative (BDI) program is at the following website: BDI Info ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Jose Vazquez 813-975-6453. *********************************************************** The Technical Review Committee Members for the project are: Kevin Dunn, Joe Bugel, William Riha Technical Review Committee Members are subject to change. *********************************************************** The Special TRC meeting will be: October 23, 2018 ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  04SEP2018 Time:  10:00AM Shortlist Selection Date :  11SEP2018 Time:  1:30PM Scope Meeting Date :  19SEP2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  23OCT2018 Time:  1:00PM Final Selection Meeting Date :  30OCT2018 Time:  1:30PM 1st Date Negotiations Meetings :  13NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19725 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 41146111210 42279921212 Major Work : 13.3 - Policy Planning 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 3.1 - Minor Highway Design 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: Modal Development (MD) Support - continuing Project Manager : Hunter, Brian Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Dawn Krockta 813-975-6414. *********************************************************** The Technical Review Committee Members for the project are: Brian Hunter, George Boyle and Dave Newell. *********************************************************** Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: October 24, 2018 ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  05SEP2018 Time:  9:00AM Shortlist Selection Date :  11SEP2018 Time:  1:30PM Scope Meeting Date :  19SEP2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  24OCT2018 Time:  12:00PM Final Selection Meeting Date :  30OCT2018 Time:  1:30PM 1st Date Negotiations Meetings :  13NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19727 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44378717201 Major Work : 7.2 - Lighting Minor Work : Project Description: Lighting Data - continuing Project Manager : Fisher, Ronni D Contract Amount/Limit: $5,000,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Casey Horn 813-975-6412. *********************************************************** The Technical Review Committee Members for the project are: Jacqueline Beebe, Eugene Giambra, and Ronni Fisher. Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: October 18, 2018. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 30JUL2018 Longlist(Tech. Rev. Cmte.) Date:  05SEP2018 Time:  9:30AM Shortlist Selection Date :  11SEP2018 Time:  1:30PM Scope Meeting Date :  18SEP2018 Time:  10:30AM Tech. Rev. Cmte Meeting Date :  18OCT2018 Time:  12:00PM Final Selection Meeting Date :  30OCT2018 Time:  1:30PM 1st Date Negotiations Meetings :  13NOV2018 Time:  9:00AM ************************************************************ Contract Number : 19728 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 25460613215 Major Work : 6.1 - Traffic Engineering Studies Minor Work : Project Description: DW Access Management Support Project Manager : Skrelunas, David Contract Amount/Limit : $1,500,000 See Descriptions of Standard Notes on Current Advertisements webpage: 9 Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Elise Potts 813-975-6468. *********************************************************** The Technical Review Committee Members for the project are: David Skrelunas, JoEllyn Guthrie and Christopher Gregory Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: October 2, 2018. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 25JUN2018 Response Deadline Date :  16JUL2018 Longlist(Tech. Rev. Cmte.) Date:  02AUG2018 Time:  10:00AM Shortlist Selection Date :  14AUG2018 Time:  1:30PM Scope Meeting Date :  22AUG2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  02OCT2018 Time:  12:00PM Final Selection Meeting Date :  09OCT2018 Time:  1:30PM 1st Date Negotiations Meetings :  23OCT2018 Time:  9:00AM Response Deadline : 16JUL2018 Respond To: d7.profserv@dot.state.fl.us Attn.: Elise L. Potts Phone: 813-975-6468 ************************************************************ Contract Number : 19726 Technically Prequalified & Unlimited Audit required Selection Method   : Expedited Procurement Method Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 14.0 - Architect 15.0 - Landscape Architect Project Description: DW Pre Event Emergency Relief Projects Misc Design Project Manager : Aborizk, Angela M Special Notes: This project is an EXPEDITED Procurement Process. ************************************************************ SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ This project is advertised as Ad Note 7 ************************************************************ This project has been reserved for competition among only Small Businesses in accordance with the Departments Business Development Initiative (BDI) program. The maximum amount for 19726 will exceed $500,000, therefore, only Consultants who are fully prequalified (unlimited status) will be eligible for selection. Information on the Business Development Initiative (BDI) program is at the following website: BDI Info ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, William "Casey" Horn 813-975-6414 *********************************************************** The Technical Review Committee Members for the project are: Angela Aborizk, Timothy Drawhorn and Megan Arasteh. Technical Review Committee Members are subject to change. *********************************************************** Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or a staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, ms, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however, Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. *********************************************************** All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-25) 2. Project Approach (0-35) 3. Proposed Project Staffing (0-30) 4. Proposed Project Review (0-10) ************************************************************ The Special TRC Meeting will be: June 22, 2018 ************************************************************ This contract is being acquired by the Expedited Procurement process and will only be advertised for one (1) week. The selected consultant must commit to submitting their complete fee proposal to William C. Horn by June 29, 2018, close of business. Failure to do so could result in forfeiting the contract and the contract being awarded to the #2 ranked consultant. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 11JUN2018 Shortlist Selection Date :  26JUN2018 Time:  1:30PM Tech. Rev. Cmte Meeting Date :  22JUN2018 Time:  9:00AM Request Fee Proposal Due :  29JUN2018 Anticipated Execution :  31JUL2018 Final Selection Meeting Date :  26JUN2018 Time:  1:30PM Final Selection Posting Date :  26JUN2018 Time:  2:30PM 1st Date Negotiations Meetings :  27JUN2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,7 Rank Consultant 1 SRD, INC. Letters Received by the Department: SRD, INC. ************************************************************ Contract Number : 19731 Technically Prequalified & Unlimited Audit required Selection Method   : Expedited Procurement Method Professional Liability Insurance $: $250,000 Financial Management Number(s): TBD Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 9.1 - Soil Exploration 9.3 - Highway Materials Testing Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Pre-Event Disaster Monitoring/Construction Engineering & Inspection (CEI) Project Manager : Aborizk, Angela M Special Notes: This project is an EXPEDITED Procurement Process. ************************************************************ SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Rebecca Schwarz 813-975-6461. *********************************************************** The Technical Review Committee Members for the project are: Angela Aborizk, Douglas Todd Crosby and Kevin O'Donnell Technical Review Committee Members are subject to change. *********************************************************** Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or a staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, ms, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however, Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. *********************************************************** All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-40) 2. Proposed Project Staffing (0-30) 3. Quality Assurance (0-10) 4. Communication (0-20) ************************************************************ The Special TRC Meeting will be: June 21, 2018 ************************************************************ This contract is being acquired by the Expedited Procurement process and will only be advertised for one (1) week. The selected consultant must commit to submitting their complete fee proposal to Rebecca Schwarz by June 29, 2018, close of business. Failure to do so could result in forfeiting the contract and the contract being awarded to the #2 ranked consultant. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 11JUN2018 Shortlist Selection Date :  26JUN2018 Time:  1:30PM Tech. Rev. Cmte Meeting Date :  25JUN2018 Time:  1:30PM Request Fee Proposal Due :  29JUN2018 Anticipated Execution :  31JUL2018 Final Selection Meeting Date :  26JUN2018 Time:  1:30PM Final Selection Posting Date :  26JUN2018 Time:  2:30PM 1st Date Negotiations Meetings :  29JUN2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 4,8 Rank Consultant 1 EXP U.S. SERVICES INC. 2 STANLEY CONSULTANTS, INC. 3 HDR CONSTRUCTION CONTROL CORPORATIO 4 NEEL-SCHAFFER, INC. 5 ATKINS NORTH AMERICA, INC. Letters Received by the Department: ATKINS NORTH AMERICA, INC. EXP U.S. SERVICES INC. HDR CONSTRUCTION CONTROL CORPORATIO NEEL-SCHAFFER, INC. STANLEY CONSULTANTS, INC. ************************************************************ Contract Number : 19712 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Financial Management Number(s): 44033823201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: 19712 FPN 440338 2 32 01 SR 39/Alexander St from W of SR 39 to I-4/SR 400 Segment 2 Project Manager : Gardner, Colin E Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Rayesha Cotton 813-975-6656. *********************************************************** The Technical Review Committee Members for the project are: Tim Drawhorn, Vincenzo Corazza, and Bill McTeer Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: 07/11/18 at 8:30 a.m. ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 25APR2018 Longlist(Tech. Rev. Cmte.) Date:  23MAY2018 Time:  09:00AM Shortlist Selection Date :  29MAY2018 Time:  01:30PM Shortlist Selection Posting :  29MAY2018 Time:  2:15PM Scope Meeting Date :  06JUN2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  11JUL2018 Time:  12:00PM 2nd Tech Rev. Cmte Meeting :  24MAY2018 Time:  01:00PM Final Selection Meeting Date :  31JUL2018 Time:  01:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: GRESHAM, SMITH AND PARTNERS MICHAEL BAKER INTERNATIONAL, INC. D SAM SCHWARTZ ENGINEERING, DPC, PA Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BURGESS & NIPLE, INC. CARDNO, INC. CONNELLY & WICKER INC. CRIBB PHILBECK WEAVER GROUP, INC. GRESHAM, SMITH AND PARTNERS JOHNSON, MIRMIRAN & THOMPSON, INC. KEITH AND ASSOCIATES, INC. KISINGER CAMPO & ASSOCIATES, CORP. MICHAEL BAKER INTERNATIONAL, INC. D PETERS AND YAFFEE, INC. POND & COMPANY CORPORATION PROPEL ENGINEERING, INC. QUIGG ENGINEERING, INC. SAM SCHWARTZ ENGINEERING, DPC, PA T.Y. LIN INTERNATIONAL WADE TRIM, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19708 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 42745433201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: 19708, FPN 427454 3 32 01, I-75 NB on Ramp from NB US 301 to I-75 NB Project Manager : Flores, Manuel Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, David Bouffard 813-975-6628. *********************************************************** The Technical Review Committee Members for the project are: Tracy Hood, Allan Urbonas and Christopher Speese Technical Review Committee Members are subject to change. ************************************************************ The Interview will be: July 12, 2018 at 8:30 AM ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 23APR2018 Longlist(Tech. Rev. Cmte.) Date:  22MAY2018 Time:  1:00PM Shortlist Selection Date :  29MAY2018 Time:  1:30PM Shortlist Selection Posting :  29MAY2018 Time:  2:15PM Scope Meeting Date :  05JUN2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  12JUL2018 Time:  1:00PM Final Selection Meeting Date :  31JUL2018 Time:  1:30PM 1st Date Negotiations Meetings :  14AUG2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Shortlisted Firms: AIM ENGINEERING & SURVEYING, INC. PARSONS TRANSPORTATION GROUP INC. PATEL, GREENE AND ASSOCIATES, PLLC Letters Received by the Department: AIM ENGINEERING & SURVEYING, INC. ARCADIS U.S., INC. G-A-I CONSULTANTS, INC. ICON CONSULTANT GROUP, INC. INFRASTRUCTURE CONSULTING & ENGINEE KENNEDY ENGINEERING & ASSOCIATES GR KISINGER CAMPO & ASSOCIATES, CORP. MICHAEL BAKER INTERNATIONAL, INC. D PARSONS TRANSPORTATION GROUP INC. PATEL, GREENE AND ASSOCIATES, PLLC PETERS AND YAFFEE, INC. PROPEL ENGINEERING, INC. PROTEAN DESIGN GROUP, INC. QUIGG ENGINEERING, INC. SCALAR CONSULTING GROUP INC. TRANSYSTEMS CORPORATION D/B/A TRANS WADE TRIM, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19710 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 44025213201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: 19710, FPN: 440252 1 32 01, US 301/SR 41 from N Breckenridge Pkwy/Sligh Ave to I-75/SR 93A ************************************************************ 19711, FPN: 441650 1 32 01, SR 694 from W of US 19/SR 55 to E of Grand Ave/S Frontage Rd ************************************************************ Project Manager : Genco, DeJuana F Special Notes: **************MULTIPLE CONTRACTS WILL BE AWARDED************ Two contracts will be selected from one advertisement. Consultants pursuing these contracts will submit a Letter of Response ONLY for contract #19710. All information included in the Letter of Response will be for contract #19710 alone. The Interview Questions will be developed ONLY for Contract 19710. ************************************************************ The #1 ranked firm will receive contract 19710. The #2 ranked firm will receive contract 19711. ************************************************************ 19710-Design Est. $853,413 19711-Design Est. $785,944 ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, including this project's scope of services, must be directed to the Professional Services Unit staff, preferably the Contract Analyst, Jose Vazquez at 813-975-6453. ************************************************************ The Technical Review Committee Members for the project will be:DeJuana Genco, Tim O'Brien, Chad Stewart ************************************************************ Technical Review Committee Members are subject to change. ************************************************************ The interview will be June 19, 2018 at 8:30 am. ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  01MAY2018 Time:  2:00PM Shortlist Selection Date :  07MAY2018 Time:  10:30AM Shortlist Selection Posting :  07MAY2018 Time:  11:46AM Scope Meeting Date :  17MAY2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  14JUN2018 Time:  2:00PM Final Selection Meeting Date :  26JUN2018 Time:  1:30PM Final Selection Posting Date :  26JUN2018 Time:  2:15PM 1st Date Negotiations Meetings :  11JUL2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Rank Consultant 1 SCALAR CONSULTING GROUP INC. 2 SRD, INC. 3 PROTEAN DESIGN GROUP, INC. 4 PEGASUS ENGINEERING LLC Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BRINDLEY PIETERS AND ASSOCIATES, IN CONSTRUCTIVE ENGINEERING, INC. CRIBB PHILBECK WEAVER GROUP, INC. FRANKLIN SURVEYING & MAPPING, INC. KELLY, COLLINS & GENTRY, INC. KENNEDY ENGINEERING & ASSOCIATES GR LIGHTHOUSE ENGINEERING INC. D/B/A L PATEL, GREENE AND ASSOCIATES, PLLC PEGASUS ENGINEERING LLC PETERS AND YAFFEE, INC. PEVIDA HIGHWAY DESIGNERS, LLC PROTEAN DESIGN GROUP, INC. SCALAR CONSULTING GROUP INC. SRD, INC. ************************************************************ Contract Number : 19711 Projects less than $500,000 (Technical Qualification only) Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 44165013201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: 19711, FPN: 4650 1 32 01, SR694 from W of US19/SR 55 to E of Grand Ave/S Frontage Rd Project Manager : Xie, Charlie I Special Notes: **************MULTIPLE CONTRACTS WILL BE AWARDED************ Two contracts will be selected from one advertisement. Consultants pursuing these contracts will submit a Letter of Response ONLY for contract #19710. All information included in the Letter of Response will be for contract #19710 alone. The Interview Questions will be developed ONLY for Contract 19710. ************************************************************ The #1 ranked firm will receive contract 19710. The #2 ranked firm will receive contract 19711. ************************************************************ 19710-Design Est. $918,824 19711-Design Est. $785,944 ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, including this project's scope of services, must be directed to the Professional Services Unit staff, preferably the Contract Analyst, Tami Sanchez at 813-975-6281. ************************************************************ The Technical Review Committee Members for the project will be: DeJuana Genco, Tim O'Brien, Chad Stewart ************************************************************ Technical Review Committee Members are subject to change. ************************************************************ The Interview will be 6/19/18 at 8:30 am ************************************************************ Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  01MAY2018 Time:  2:00PM Shortlist Selection Date :  07MAY2018 Time:  10:30AM Scope Meeting Date :  17MAY2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  14JUN2018 Time:  2:00PM Final Selection Meeting Date :  26JUN2018 Time:  1:30PM Final Selection Posting Date :  27JUN2018 Time:  8:00AM 1st Date Negotiations Meetings :  12JUL2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 7 Rank Consultant 1 SCALAR CONSULTING GROUP INC. 2 SRD, INC. 3 PROTEAN DESIGN GROUP, INC. 4 PEGASUS ENGINEERING LLC Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BRINDLEY PIETERS AND ASSOCIATES, IN CONSTRUCTIVE ENGINEERING, INC. CRIBB PHILBECK WEAVER GROUP, INC. FRANKLIN SURVEYING & MAPPING, INC. KELLY, COLLINS & GENTRY, INC. KENNEDY ENGINEERING & ASSOCIATES GR LIGHTHOUSE ENGINEERING INC. D/B/A L PATEL, GREENE AND ASSOCIATES, PLLC PEGASUS ENGINEERING LLC PETERS AND YAFFEE, INC. PEVIDA HIGHWAY DESIGNERS, LLC PROTEAN DESIGN GROUP, INC. SCALAR CONSULTING GROUP INC. SRD, INC. ************************************************************ Contract Number : 19714 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 40456913214 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 14.0 - Architect 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP15 - Landscape Architect Project Description: 19714, FPN: 404569 1 32 14, Miscellaneous Design - Continuing Project Manager : Lee, Kevin I Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Michele Turosz 813-975-6417M *********************************************************** The Technical Review Committee Members for the project are: William Parman, Abdul Waris, Tracy Hood Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: June 21st, 2018 at 8:30 am ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  18APR2018 Time:  09:00AM Shortlist Selection Date :  07MAY2018 Time:  10:30AM Shortlist Selection Posting :  07MAY2018 Time:  11:45AM Scope Meeting Date :  16MAY2018 Time:  09:00AM Tech. Rev. Cmte Meeting Date :  21JUN2018 Time:  12:00PM Final Selection Meeting Date :  10JUL2018 Time:  01:30PM Final Selection Posting Date :  10JUL2018 Time:  3:15PM 1st Date Negotiations Meetings :  24JUL2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 T.Y. LIN INTERNATIONAL 2 COMPREHENSIVE ENGINEERING SERVICES, 3 CARDNO, INC. Letters Received by the Department: AIM ENGINEERING & SURVEYING, INC. AYRES ASSOCIATES INC CARDNO, INC. COMPREHENSIVE ENGINEERING SERVICES, DRMP, INC. G-A-I CONSULTANTS, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. KIMLEY-HORN AND ASSOCIATES, INC. SCALAR CONSULTING GROUP INC. T.Y. LIN INTERNATIONAL TRANSYSTEMS CORPORATION D/B/A TRANS WADE TRIM, INC. ************************************************************ Contract Number : 19716 Technically Prequalified & Unlimited Audit required Selection Method   : Selection from Expanded Letter of Response Professional Liability Insurance $: $750,000 Financial Management Number(s): 25729856201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 10.3 - Construction Materials Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: CR 578 (County Line Rd) from Suncoast Pkwy to US 41 @ Ayres Rd Project Manager : Frank, Richard W Special Notes: NOTE to Consultants - Archaeological Services is required in the scope of services for this project. Team accordingly when preparing your ELOR and manpower estimate. ************************************************************ SELECTION WILL BE DIRECTLY FROM EXPANDED LETTERS OF RESPONSE ************************************************************ Expanded Letters of Response must be submitted on the Standard FDOT Expanded Letter of Response form, Form No. 375-030-23. Consultant shall also submit resumes which are restricted to 2 pages each and an organization chart or staffing chart (one page, can be either 8-1/2x11 or 11x17, at the discretion of the Consultant). All submittals except organization chart, staffing chart, other required forms, and certifications shall adhere to a font size of 11, with one-half inch margins. Resumes, organization chart or staffing chart shall be submitted in the same e-mail with the Expanded Letter of Response. The Expanded Letter of Response file size is not restricted to 1MB, however Consultants are advised that the Expanded Letter of Response Form electronic submittal should not exceed FDOT-s internal server file size restriction of 15 MB. ************************************************************ The required forms are: Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies Lists, and Voluntary Exclusion for Federal Aid Contracts, Certification for Disclosure of Lobbying Activities on Federal Aid Contracts and Disclosure of Lobbying Activities. Please indicate your firm's proposed DBE utilization on the Professional Services DBE or Small Business Commitment Form. The forms are available on the FDOT Procurement website, go to the Index, and then go to the Professional Services Forms link. A list of forms and form numbers are included as an attachment to the Scope of Services. ************************************************************ Consultant staff Hours on summary sheet (one sheet per FPN showing the hours of prime and all subs) will be submitted. ************************************************************ All e-mail submittals must be received prior to 5:00PM Eastern on the Response deadline date and should be sent to the address noted in the Respond To: section of this Advertisement. *********************************************************** All Letters of Response will address the criteria set forth in this advertisement. The Technical Review Committee shall consider and weigh the following areas in their Evaluation Process - Evaluation Criteria is as follows: ************************************************************ 1. Understanding the Scope (0-30) 2. Proposed Project Staffing (0-60) A. Management Staff (0-35) B. Inspection Staff (0-25) 3. Demonstrated Commitment to FDOT (0-10) *********************************************************** The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Elise Potts 813-975-6468. *********************************************************** The Technical Review Committee Members for the project are: Zachary Stringer, Cleo Babb and Tyler Matthews. Technical Review Committee Members are subject to change. *********************************************************** The Special TRC Meeting will be:: 05/30/2018 ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAR2018 Longlist(Tech. Rev. Cmte.) Date:  24APR2018 Time:  10:30AM Shortlist Selection Date :  07MAY2018 Time:  10:30AM Shortlist Selection Posting :  07MAY2018 Time:  12:00PM Tech. Rev. Cmte Meeting Date :  29MAY2018 Time:  10:30AM Final Selection Meeting Date :  12JUN2018 Time:  01:30PM Final Selection Posting Date :  12JUN2018 Time:  2:45PM See Descriptions of Standard Notes on Current Advertisements webpage: 4,10,8 Rank Consultant 1 JBS ENGINEERING TECHNICAL SERVICES, 2 RUMMEL, KLEPPER & KAHL, LLP D/B/A R 3 EXP U.S. SERVICES INC. Letters Received by the Department: EXP U.S. SERVICES INC. HDR CONSTRUCTION CONTROL CORPORATIO JBS ENGINEERING TECHNICAL SERVICES, KCCS, INC. KCI TECHNOLOGIES, INC. KINARD - STONE, INC. RUMMEL, KLEPPER & KAHL, LLP D/B/A R VOLKERT, INC. ************************************************************ Contract Number : 19724 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 41259313212 Major Work : 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.2.3 - Major Bridge Design - Segmental 4.4 - Movable Span Bridge Design Minor Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.4 - Bridge Load Rating 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP5 - Bridge Inspection Project Description: 19724 412593 1 32 12 Bridge Engineering Design Services - continuing Project Manager : Pye, Bronoris Special Notes: ************************************************************ The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Tami Sanchez 813-975-6281. *********************************************************** The Technical Review Committee Members for the project are: James Jacobsen, Brian Pickard and Marshall Hampton. *********************************************************** Technical Review Committee Members are subject to change. *********************************************************** The Interview will be: June 5, 2018 ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAR2018 Longlist(Tech. Rev. Cmte.) Date:  04APR2018 Time:  2:00PM Shortlist Selection Date :  24APR2018 Time:  1:30PM Shortlist Selection Posting :  24APR2018 Time:  5:00PM Scope Meeting Date :  02MAY2018 Time:  1:00PM Tech. Rev. Cmte Meeting Date :  05JUN2018 Time:  12:00PM Final Selection Meeting Date :  12JUN2018 Time:  1:30PM Final Selection Posting Date :  12JUN2018 Time:  2:45PM 1st Date Negotiations Meetings :  25JUN2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 T.Y. LIN INTERNATIONAL 2 WSP USA INC. 3 AYRES ASSOCIATES INC Letters Received by the Department: AYRES ASSOCIATES INC T.Y. LIN INTERNATIONAL WSP USA INC. ************************************************************ Contract Number : 19701 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Oral Presentation Professional Liability Insurance $: $8,000,000 Financial Management Number(s): 42290426201 42290446201 44111116201 Major Work : 10.5.1 - Major Bridge(CEI) - Concrete 10.5.2 - Major Bridge(CEI) - Steel Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 10.1 - Rdwy Construction Engineering Inspection 10.3 - Construction Materials Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: 19701 FPN 422904 2 62 01, I-275 (Howard Frankland) from N. of SR 687 (4th St. N.) to N. of Howard Frankland Bridge, FPN 422904 4 62 01, I-275 (Howard Frankland) from N. of Howard Frankland Bridge to S. of SR 60 and FPN 441111 1 62 01, I-275 / SR 93 from S. of Kennedy Blvd. to S. of Lois Ave. Project Manager : Lay, Tom Special Notes: ************************************************************ NOTE: We have updated the work types for this project: added 10.3 and removed 99.0. Schedule remains the same. ************************************************************ ATTENTION CONSULTANTS "SPECIAL SELECTION METHOD" ************************************************************ This project will be evaluated by Oral Presentation. To be considered for longlist Consultants must submit a five (5) page Letter of Response (LOR) using the Expanded Letter of Response form number 375-030-23 dated 10/2017. Please provide the following information within your 5 page LOR: * Proposed approach and understanding of critical issues. * Relevant project experience - Similar type of work ..experience. * Other content provided by firm * Proposed key personnel and their proposed roles (DO NOT ..include resumes). ************************************************************ No attachments to the 5 page LOR is required. ************************************************************ Please note that the Professional Liability Insurance required for this contract is $8 million. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Dave Bouffard 813-975-6628 *********************************************************** The Technical Review Committee Members for the project are: Tom Lay, Mike Kopotic, Conrad Campbell, Virginia Creighton and Amy Neidringhaus *********************************************************** Technical Review Committee Members are subject to change, *********************************************************** The Oral Presentation will be: April 17, 2018 at 8:30 am ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05FEB2018 Longlist(Tech. Rev. Cmte.) Date:  06MAR2018 Time:  2:00PM Shortlist Selection Date :  13MAR2018 Time:  1:30PM Shortlist Selection Posting :  13MAR2018 Time:  3:30PM Scope Meeting Date :  21MAR2018 Time:  2:00PM Tech. Rev. Cmte Meeting Date :  17APR2018 Time:  12:00PM Final Selection Meeting Date :  07MAY2018 Time:  10:30AM Final Selection Posting Date :  07MAY2018 Time:  12:30PM 1st Date Negotiations Meetings :  24MAY2018 Time:  09:00AM Last Date Negotiations Meetings:  09AUG2018 Time:  05:00PM See Descriptions of Standard Notes on Current Advertisements webpage: 8,10 Rank Consultant 1 ATKINS NORTH AMERICA, INC. 2 EXP U.S. SERVICES INC. 3 GENESIS C E & I SERVICES, LLC Letters Received by the Department: ATKINS NORTH AMERICA, INC. EXP U.S. SERVICES INC. GENESIS C E & I SERVICES, LLC ************************************************************ Contract Number : 19707 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $1,000,000 Financial Management Number(s): 44140313201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Design for Resurfacing I-75/SR 93A from North of CR 672 to South of Progress Boulevard Project Manager : Flores, Manuel Special Notes: The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Rayesha Cotton, 813-975-6656 *********************************************************** The Technical Review Committee Members for the project are: Amy Neidringhaus; DeJuana Genco; Chad Stewart Technical Review Committee Members are subject to change, according to availability. *********************************************************** The Interviews and TRC Meeting following Interview Sessions will be held on April 18, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  06MAR2018 Time:  09:00AM Shortlist Selection Date :  13MAR2018 Time:  01:30PM Shortlist Selection Posting :  13MAR2018 Time:  3:30PM Scope Meeting Date :  22MAR2018 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  18APR2018 Time:  12:30PM Final Selection Meeting Date :  07MAY2018 Time:  10:30AM Final Selection Posting Date :  07MAY2018 Time:  12:45PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 PARSONS TRANSPORTATION GROUP INC. 2 AECOM TECHNICAL SERVICES, INC. 3 DEWBERRY ENGINEERS INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. AMERICAN CONSULTING ENGINEERS OF FL BASLEE ENGINEERING SOLUTIONS (BES), DEWBERRY ENGINEERS INC. DRMP, INC. FALLER, DAVIS & ASSOCIATES, INC. G-A-I CONSULTANTS, INC. KISINGER CAMPO & ASSOCIATES, CORP. PARSONS TRANSPORTATION GROUP INC. PATEL, GREENE AND ASSOCIATES, PLLC POND & COMPANY CORPORATION PROTEAN DESIGN GROUP, INC. T.Y. LIN INTERNATIONAL ************************************************************ Contract Number : 19709 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 43762513201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: 19709, FPN: 437625 1 32 01, US 19/SR 55/34th St N from S of 44th Ave N to N of Park Blvd Project Manager : Gonzalez, Sandra Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Elise Potts 813-975-6468. *********************************************************** The Technical Review Committee Members for the project are: Sandra Gonzalez, Anita Wang, and Brian Zimmerman. Technical Review Committee Members are subject to change, according to availability. *********************************************************** ********************************************************* The Interviews and TRC Meeting following Interview Session will be held on April 17, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29JAN2018 Longlist(Tech. Rev. Cmte.) Date:  07MAR2018 Time:  02:00PM Shortlist Selection Date :  13MAR2018 Time:  01:30PM Shortlist Selection Posting :  13MAR2018 Time:  3:30PM Scope Meeting Date :  21MAR2018 Time:  02:00PM Tech. Rev. Cmte Meeting Date :  17APR2018 Time:  12:00PM Final Selection Meeting Date :  07MAY2018 Time:  10:30AM Final Selection Posting Date :  07MAY2018 Time:  12:45PM 1st Date Negotiations Meetings :  22MAY2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 WANTMAN GROUP, INC. 2 ICON CONSULTANT GROUP, INC. 3 CARDNO, INC. Letters Received by the Department: BURGESS & NIPLE, INC. CARDNO, INC. CONNELLY & WICKER INC. DEWBERRY CONSULTANTS LLC ICON CONSULTANT GROUP, INC. JOHNSON, MIRMIRAN & THOMPSON, INC. KIMLEY-HORN AND ASSOCIATES, INC. SRD, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19723 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): 44274813201 Major Work : 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: District Wide Traffic Signal Studies and Design Project Manager : Bugel, Joe Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Jose Vazquez 813-975-6453. *********************************************************** The Technical Review Committee Members for the project are: Joe Bugel, Julie Scanlon, and Rick Napora ************************************************************ Technical Review Committee Members are subject to change, according to availability. *********************************************************** The Interview will be:April 4, 2018 ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 22JAN2018 Longlist(Tech. Rev. Cmte.) Date:  21FEB2018 Time:  10:00AM Shortlist Selection Date :  27FEB2018 Time:  1:30PM Shortlist Selection Posting :  27FEB2018 Time:  3:30PM Scope Meeting Date :  08MAR2018 Time:  1:00PM Tech. Rev. Cmte Meeting Date :  04APR2018 Time:  12:00PM Final Selection Meeting Date :  10APR2018 Time:  1:30PM Final Selection Posting Date :  10APR2018 Time:  3:30PM 1st Date Negotiations Meetings :  27APR2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 VANASSE HANGEN BRUSTLIN, INC. 2 HNTB CORPORATION 3 VIBENGINEERING, INC. Letters Received by the Department: CARDNO, INC. HNTB CORPORATION TRAFFIC ENGINEERING DATA SOLUTIONS, VANASSE HANGEN BRUSTLIN, INC. VIBENGINEERING, INC. ************************************************************ Contract Number : 19704 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $1,000,000 Financial Management Number(s): 44138713201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: 19704, FPN: 441387 1 32 01, US 41/SR 45 from N of 15th Ave. to S. of Bullfrog Creek ************************************************************ 19705, FPN: 441388 1 32 01 US 301/SR 46 from N of Lake Saint Charles Blvd. to N. of Progress Blvd. ************************************************************ 19706, FPN: 441386 1 32 01 US 41/SR 45/Broad St. from . of Ingram St. to S. of SR 700/Ponce De Leon Project Manager : Xie, Charlie I Special Notes: **************MULTIPLE CONTRACTS WILL BE AWARDED************ Three contracts will be selected from one advertisement. Consultants pursuing these contracts will submit a Letter of Response ONLY for contract #19704. All information included in the Letter of Response will be for contract #19704 alone. The Interview Questions will be developed ONLY for Contract 19704. ************************************************************ The #1 ranked firm will receive contract 19704. The #2 ranked firm will receive contract 19705. The #3 ranked firm will receive contract 19706. ************************************************************ 19704-Design Est. $2,624,215 19705-Design Est. $905,404. 19706-Design Est. $890,241. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, including this project's scope of services, must be directed to the Professional Services Unit staff, preferably the Contract Analyst, Rayesha Cotton at 813-975-6656. ************************************************************ The Technical Review Committee Members for the project will be: Bharathi Gundurao, Michael MacKinnon, Daniel Lauricello ************************************************************ Technical Review Committee Members are subject to change, according to availability. ************************************************************ The interview will be 4/03/18 at 8:30 am ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 08JAN2018 Longlist(Tech. Rev. Cmte.) Date:  15FEB2018 Time:  08:00AM Shortlist Selection Date :  27FEB2018 Time:  01:30PM Shortlist Selection Posting :  27FEB2018 Time:  3:30PM Scope Meeting Date :  08MAR2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  03APR2018 Time:  03:15PM Final Selection Meeting Date :  10APR2018 Time:  01:30PM Final Selection Posting Date :  10APR2018 Time:  3:30PM 1st Date Negotiations Meetings :  24APR2018 Time:  09:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 KIMLEY-HORN AND ASSOCIATES, INC. 2 VOLKERT, INC. 3 FLORIDA TRANSPORTATION ENGINEERING, 4 DEWBERRY ENGINEERS INC. 5 T.Y. LIN INTERNATIONAL Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BURGESS & NIPLE, INC. CARDNO, INC. CH2M HILL, INC. CONNELLY & WICKER INC. DEWBERRY ENGINEERS INC. EAC CONSULTING, INC. FALLER, DAVIS & ASSOCIATES, INC. FLORIDA TRANSPORTATION ENGINEERING, HATCH ASSOCIATES CONSULTANTS, INC. KIMLEY-HORN AND ASSOCIATES, INC. KISINGER CAMPO & ASSOCIATES, CORP. POND & COMPANY CORPORATION SCALAR CONSULTING GROUP INC. T.Y. LIN INTERNATIONAL VOLKERT, INC. WADE TRIM, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19705 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Financial Management Number(s): 44138813201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: 19705, FPN 441388 1 32 01, US 301/SR 43 FROM N OF LAKE SAINT CHARLES BLVD TO N OF PROGRESS BLVD Project Manager : Cash, Eyra E Special Notes: *************MULTIPLE CONTRACTS WILL BE AWARDED************* Three contracts will be selected from one advertisement. Consultants pursuing these contracts will submit a Letter of Response ONLY for contract #19704. All information included in the Letter of Response will be for contract #19704 alone. The Interview Questions will be developed ONLY for Contract #19704 ************************************************************ The #1 ranked firm will receive contract 19704. The #2 ranked firm will receive contract 19705. The #3 ranked firm will receive contract 19706. ************************************************************ 19704-Design Est. $2,624,215 19705-Design Est. $905,404 19706-Design Est. $890,241 ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, including this project's scope of services, must be directed to the Professional Services Unit staff, preferably the Contract Analyst, Elise Potts at 813-975-6468. ************************************************************ The Technical Review Committee Members for the project will be: Bharathi Gundurao, Michael MacKinnon, Abdul Waris ************************************************************ Technical Review Committee Members are subject to change, according to availability. The Interview will be 4/03/18 at 8:30am ************************************************************ Advertisement Status : Final Selection Date of Advertisement : 08JAN2018 Longlist(Tech. Rev. Cmte.) Date:  15FEB2018 Time:  8:00AM Shortlist Selection Date :  27FEB2018 Time:  1:30PM Scope Meeting Date :  08MAR2018 Time:  10:00AM Tech. Rev. Cmte Meeting Date :  03APR2018 Time:  3:15PM Final Selection Meeting Date :  10APR2018 Time:  01:30PM Final Selection Posting Date :  27JUN2018 Time:  8:00AM 1st Date Negotiations Meetings :  25APR2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 KIMLEY-HORN AND ASSOCIATES, INC. 2 VOLKERT, INC. 3 FLORIDA TRANSPORTATION ENGINEERING, 4 DEWBERRY ENGINEERS INC. 5 T.Y. LIN INTERNATIONAL Letters Received by the Department: BASLEE ENGINEERING SOLUTIONS (BES), BURGESS & NIPLE, INC. CARDNO, INC. CH2M HILL, INC. CONNELLY & WICKER INC. DEWBERRY ENGINEERS INC. EAC CONSULTING, INC. FALLER, DAVIS & ASSOCIATES, INC. FLORIDA TRANSPORTATION ENGINEERING, HATCH ASSOCIATES CONSULTANTS, INC. KIMLEY-HORN AND ASSOCIATES, INC. KISINGER CAMPO & ASSOCIATES, CORP. POND & COMPANY CORPORATION SCALAR CONSULTING GROUP INC. T.Y. LIN INTERNATIONAL VOLKERT, INC. WADE TRIM, INC. WANTMAN GROUP, INC. ************************************************************ Contract Number : 19702 Technically Prequalified & Unlimited Audit required Selection Method   : LOR and Abbreviated Technical Proposal Professional Liability Insurance $: $250,000 Financial Management Number(s): 25453913224 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Project Description: 19702, FPN: 254539 1 32 24, District Wide Survey Project Manager : Croonquist, Thomas R Special Notes: ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst,Jose Vazquez 813-975-6453. *********************************************************** The Technical Review Committee Members for the project are: Thomas Croonquist, Tim Hinton and James Ledbetter. Technical Review Committee Members are subject to change, according to availability. *********************************************************** The Department reserves the right to add or delete projects The Special TRC Meeting Will be: 3/29/18 at 9:00 AM ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst,Jose Vazquez 813-975-6453. *********************************************************** The Technical Review Committee Members for the project are: Thomas Croonquist, Tim Hinton and James Ledbetter. Technical Review Committee Members are subject to change, according to availability. *********************************************************** The Special TRC Meeting Will be: 3/29/18 at 9:00 AM ************************************************************ View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 18DEC2017 Longlist(Tech. Rev. Cmte.) Date:  31JAN2018 Time:  1:00PM Shortlist Selection Date :  12FEB2018 Time:  1:30PM Shortlist Selection Posting :  12FEB2018 Time:  1:30PM Scope Meeting Date :  22FEB2018 Time:  9:00AM Tech. Rev. Cmte Meeting Date :  28MAR2018 Time:  1:00PM Final Selection Meeting Date :  10APR2018 Time:  1:30PM Final Selection Posting Date :  10APR2018 Time:  3:00PM 1st Date Negotiations Meetings :  25APR2018 Time:  9:00AM See Descriptions of Standard Notes on Current Advertisements webpage: 9 Rank Consultant 1 CUMBEY AND FAIR, INC. 2 McKim & Creed, Inc. 3 CARDNO, INC. Letters Received by the Department: AIM ENGINEERING & SURVEYING, INC. AMEC E&I, INC. BOWMAN CONSULTING GROUP, LTD., INC. CARDNO, INC. CIVILSURV DESIGN GROUP, INC. CUMBEY AND FAIR, INC. DRMP, INC. ESP ASSOCIATES OF NORTH CAROLINA, P JOHNSON, MIRMIRAN & THOMPSON, INC. McKim & Creed, Inc. MANUEL G. VERA & ASSOCIATES, INC. MASER CONSULTING P.A. OMNI COMMUNICATIONS, LLC SOUTHEASTERN SURVEYING AND MAPPING VOLKERT, INC. ************************************************************ Contract Number : 19703 Technically Prequalified & Unlimited Audit required Selection Method   : Letter of Response and Interview Professional Liability Insurance $: $250,000 Financial Management Number(s): TBD Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP15 - Landscape Architect Project Description: Landscape Design Support - Continuing Services Contract Project Manager : Kidde, Michael Special Notes: The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, David Bouffard, 813-975-6628 *********************************************************** The Technical Review Committee Members for the project are: Michael Kidde, Jackie Beebe, Eugene Giambra Technical Review Committee Members are subject to change, according to availability. *********************************************************** The Interview Sessions and Technical Review Committee Meeting following the Interview Sessions will be held on March 29, 2018 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 18DEC2017 Longlist(Tech. Rev. Cmte.) Date:  31JAN2018 Time:  09:00AM Shortlist Selection Date :  12FEB2018 Time:  01:30AM Shortlist Selection Posting :  12FEB2018 Time:  1:30PM Scope Meeting Date :  26FEB2018 Time:  11:00AM Tech. Rev. Cmte Meeting Date :  29MAR2018 Time:  12:30PM Final Selection Meeting Date :  10APR2018 Time:  01:30PM Final Selection Posting Date :  10APR2018 Time:  3:30PM See Descriptions of Standard Notes on Current Advertisements webpage: 8 Rank Consultant 1 KEITH AND SCHNARS, P.A. 2 AECOM TECHNICAL SERVICES, INC. 3 KIMLEY-HORN AND ASSOCIATES, INC. Letters Received by the Department: AECOM TECHNICAL SERVICES, INC. CRIBB PHILBECK WEAVER GROUP, INC. DAVID CONNER AND ASSOCIATES, INC. G-A-I CONSULTANTS, INC. GGI, LLC D/B/A GENESIS GROUP KEITH AND ASSOCIATES, INC. KEITH AND SCHNARS, P.A. KIMLEY-HORN AND ASSOCIATES, INC. MILLER, LEGG & ASSOCIATES,INC. WANTMAN GROUP, INC. ************************************************************ Design/Build Projects Procurement Number : E7R10 Financial Management Number(s): 42290425201 42290445201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design and construction of a new southbound bridge carrying I-275 over Tampa Bay (Bridge No. 150303) and removal of the existing northbound bridge over Tampa Bay (Bridge No. 150107). Project Manager : Hampton, Marshall T Contract Amount/Limit: $814,401,002 Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 20 - Major Bridge - Bridges of conventional construction Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 5.4 - Bridge Load Rating 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 9.1 - Soil Exploration 9.4.2 - Non-Redundant Bridge Foundation Studies 15.0 - Landscape Architect Additional Bridge Design Work Types : For the bridge structural elements, the D-B Firm must be prequalified in either work type 4.1.2 (Minor Bridge Design) OR 4.2.1 (Major Bridge Design-Concrete), OR 4.2.2 (Major Bridge Design-Steel), OR 4.2.3 (Major Bridge Design-Segmental). The qualifications of the D-B Firm must be consistent with the structure type which will be proposed in the D-B Firm-s LOI and technical proposal. Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchResultByDistrict?district=07 See contract number E7R10. Design-Build Teams are responsible for monitoring the Bid Q&A site during the procurement process. DBE/MBE Requirements: See Preamble. Special Notes: In accordance with Conflict of Interest Procedure for Department Contracts (Procedure 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District Seven Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Arcadis Element Engineering Group, LLC HNTB Corporation Intertek-PSI, Inc. Patel, Greene & Associates, LLC STV Inc. <><> TRC Members: Megan Arasteh, Assistant District Construction Engineer Greg Deese, Resident Engineer Gautom Dey, District Structures Engineer Sam Joseph, District Materials And Research Engineer Tom Lay, CCEI Construction Project Manager <><> Exempt Documents are available for this project. To receive the documents, please download, complete the Exempt Documents Request Form Rahnee Oliver in the Procurement Office at d7.designbuild@dot.state.fl.us. The documents will be emailed to you upon receipt of this form. <><> Stipend Amount: $1,589,056 View RFP (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 10DEC2018 Phase1 Selection Cmte. Meeting :  12FEB2019 Time:  01:30PM Posting of Shortlist :  18FEB2019 Time:  12:00PM Mand. Pre-Proposal Meeting Date:  07MAR2019 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  06AUG2019 Time:  12:00PM Price Proposal Due Date :  08OCT2019 Time:  02:30PM Proposal Opening Date :  08OCT2019 Time:  02:30PM Final Selection Meeting Date :  15OCT2019 Time:  01:30PM ************************************************************ Procurement Number : E7R12 Financial Management Number(s): 43763815201 43763815202 Project Description: The project shall design and reconstruct the northbound I-75 Rest Area site located in Hillsborough County. The project includes design, permitting and reconstruction of the site including a new building, parking areas, roadway/site lighting, picnic pavilions and associated amenities. The Project also includes demolition of the existing structures and the establishment of new utility connections for potable water supply and sanitary sewer connections to Hillsborough County Public Facilities, as well as the decommissioning and razing of the existing on-site waste water treatment facility and appurtenances. The Rest Area Building shall accommodate the large building guidelines. The project will also include the design and construction of a Truck Parking Availability system. Project Manager : Hall, Justin P Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 7 - Drainage (includes all storm drains,pipe culverts, culverts, etc.) 10 - Flexible Paving 11 - Grading (includes clearing & grubbing, excavation, embarkment) 15 - Hot Plant-Mixed Bitum. Course (incl structural & surface courses) 29 - Portland Cement Concrete Roadway Paving Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 3.2 - Major Highway Design 7.2 - Lighting 7.3 - Signalization 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchResultByDistrict?district=07 See contract number E7R12. Design-Build Teams are responsible for monitoring the Bid Q&A site during the procurement process. DBE/MBE Requirements: See preamble. Special Notes: In accordance with Conflict of Interest Procedure for Department Contracts (Procedure 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District Seven Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Atkins, HDR, American Consulting, Lochner <><> Stipend Amount: $71,434.00 View RFP (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 18JUL2018 Response Deadline Date :  08AUG2018 Phase1 Selection Cmte. Meeting :  11SEP2018 Time:  01:30PM LOI Scores Notification Date :  11SEP2018 Time:  05:00PM Deadline for Election to Participate in Phase2 :  13SEP2018 Time:  12:00PM Posting of Shortlist :  13SEP2018 Time:  05:00PM Phase 2 Tech. Proposal Due Date:  07FEB2019 Time:  12:00PM Price Proposal Due Date :  29MAR2019 Time:  02:30PM Proposal Opening Date :  29MAR2019 Time:  02:30PM Final Selection Meeting Date :  09APR2019 Time:  01:30PM Phase 1 LOI Response Deadline : 08AUG2018 12:00PM Respond To: Florida DOT - District 7 ----- ----- Attn: Rahnee Oliver Procurement Services Phone: 813-975-6463 d7.designbuild@dot.state.fl.us ************************************************************ Procurement Number : E7R16 Financial Management Number(s): 44255215201 Project Description: The project shall design and construct an additional lane(s) in the southbound/eastbound direction on State Road (SR) 589/SR 60 from Independence Parkway to George Bean Parkway. This work will include the widening, milling, and resurfacing of existing asphalt pavement, drainage, signing, pavement markings and related work. Project Manager : Boulnois, Christina F Selection Method : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 10 - Flexible Paving 11 - Grading (includes clearing & grubbing, excavation, embarkment) 15 - Hot Plant-Mixed Bitum. Course (incl structural & surface courses) 7 - Drainage (includes all storm drains,pipe culverts, culverts, etc.) Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ <> Please reference contract number E7R16. Design-Build Firms are responsible for monitoring this Q&A Site throughout the entire contract acquisition process. DBE/MBE Requirements: See preamble. Special Notes: To receive Exempt Documents that are available for this project, please download and complete the Exempt Document Request Form and submit it along with a copy of the required identification as specified on the Form to Rahnee Oliver at rahnee.oliver@dot.state.fl.us The Exempt Documents that are available will be emailed to the requestor upon receipt of the Form. <><><><> In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 07 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. HNTB, HW Lochner <><><><> Budget Amount: Actual commitment and final execution of the contract is contingent upon an approved legislative budget and availability of funds. <><><><> Stipends are not applicable to Low Bid Design-Build procurements. View RFP (Adobe Acrobat® PDF file) Low Bid Design-Build Qualification Validation Form Advertisement Status : Advertised Date of Advertisement : 09MAY2018 Response Deadline Date :  24JUL2018 Pre-Bid Meeting Date :  25MAY2018 Time:  10:00AM Bids Due Date :  24JUL2018 Time:  02:30PM Bid Opening Date :  24JUL2018 Time:  02:30PM Tech. Rev. Cmte Meeting Date :  27JUL2018 Time:  01:30PM Final Selection Meeting Date :  31JUL2018 Time:  01:30PM Award Committee Meeting Date :  31JUL2018 Time:  01:30PM Response Deadline : 24JUL2018 Respond To: Florida DOT - District 7 ----- ----- Attn: Rahnee Oliver Procurement Services Phone: 813-975-6463 d7.designbuild@dot.state.fl.us ************************************************************ Procurement Number : E7R13 Financial Management Number(s): 44111115201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design and construction of an Operational Improvement along I-275 from south of Kennedy Blvd. to south of Lois Ave. The primary scope of work of the project involves the construction of an additional northbound lane(s) along I-275 fromsouth of the Kennedy Blvd. Interchange to the Lois Ave. Interchange and in the southbound direction from Memorial Hwy. (SR 60) to south ofthe Kennedy Blvd. Interchange. This work will include thewidening, milling, and resurfacing of the existing asphalt pavement, widening of concrete pavement, bridge widening, noise walls, drainage, lighting, signing, pavement markings, signalization, ITS and related work. Project Manager : Boulnois, Christina F Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 7 - Drainage (includes all storm drains,pipe culverts, culverts, etc.) 10 - Flexible Paving 11 - Grading (includes clearing & grubbing, excavation, embarkment) 29 - Portland Cement Concrete Roadway Paving Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 3.1 - Minor Highway Design 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 7.1 - Signing, Pavement Marking & Channelization 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 15.0 - Landscape Architect Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ <><> See contract number E7R13. Design-Build Teams are responsible for monitoring the Bid Q&A site during the procurement process. DBE/MBE Requirements: See preamble. Special Notes: PREAMBLE: Unless specifically noted otherwise, the preamble at the top of this web page is applicable to this project and is an official part of the advertisement. Design-Build Firms are responsible for reading it. <> Design-Build Firm Contact Information: Include in LOI both Contractor contact name & phone number and a Consultant contact name & phone number. <> In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this project. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. HW Lochner <><><><> Estimated Contract Time: Not to exceed 550 calendar days. <><><><> Budget Amount: Actual commitment and final execution of the contract is contingent upon an approved legislative budget and availability of funds. <><><><> Stipend Amount: $99,513 <><><><> Exempt Documents are available for this project. To receive the documents, please download, complete the Exempt Documents Request Form, and submit it along with the photo ID as specified per the form to Rahnee Oliver in the Procurement Office at rahnee.Oliver@dot.state.fl.us. The documents will be emailed to you upon receipt of this form. Advertisement Status : Shortlisted Date of Advertisement : 30APR2018 Phase1 Selection Cmte. Meeting :  26JUN2018 Time:  01:30PM LOI Scores Notification Date :  26JUN2018 Time:  05:00PM Deadline for Election to Participate in Phase2 :  29JUN2018 Time:  05:00PM Posting of Shortlist :  02JUL2018 Time:  12:00PM Mand. Pre-Proposal Meeting Date:  17JUL2018 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  09NOV2018 Time:  12:00PM Price Proposal Due Date :  10JAN2019 Time:  02:30PM Proposal Opening Date :  10JAN2019 Time:  02:30PM Final Selection Meeting Date :  14JAN2019 Time:  09:30AM Shortlisted Firms Phase1 Score AJAX PAVING INDUSTRIES OF FL, LLC 16.0 CONE & GRAHAM INC 16.0 Pepper Contracting Services, Inc. 14.0 THE MIDDLESEX CORPORATION 16.8 Firms not participating in Phase 2 Phase1 Score GRANITE CONSTRUCTION COMPANY 14.0 PRINCE CONTRACTING, LLC. 12.4 SEMA CONSTRUCTION, INC. 13.6 SUPERIOR CONSTRUCTION COMPANY SOUTH 13.8 ************************************************************ Procurement Number : E7R14 Financial Management Number(s): 43402715201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design and construction of the Intelligent Transportation System (ITS) on I-75 from Big Bend Road to Progress Boulevard. In general, the scope of work includes all investigations, design, permitting, coordination, final approved construction documents and the construction activities necessary to complete the Project as detailed in the RFP. <><><><> The Project length is approximately 8.0 miles. This Project will be a portion of Tampa Bay SunGuideTM. The Design-Build Firm shall design and prepare a complete set of constructionplans, specifications package, and technical special provisions for the infrastructure included in the Project. Selection Method : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(es): 16 - Intelligent Transportation Systems Contractor Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Types: 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: https://fdotwp1.dot.state.fl.us/BidQuestionsAndAnswers/ See contract number E7R14. Design-Build Teams are responsible for monitoring the Bid Q&A site during the procurement process. DBE/MBE Requirements: See preamble. Special Notes: PREAMBLE: Unless specifically noted otherwise, the preamble at the top of this web page is applicable to this project and is an official part of the ad. Design-BuildFirms are responsible for reading it. <> Design-Build Firm Contact Information: Include in LOI both Contractor contact name & phone number and a Consultant contact name & phone number. <> In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal forthis project. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. VIBEngineering, HW Lochner <><><><> Estimated Contract Time: Not to exceed 485 calendar days. <><><><> Budget Amount: Actual commitment and final execution of the contract is contingent upon an approved legislative budget and availability of funds. <><><><> Stipend Amount: $25000 <><><><> This procurement is currently suspended pending prtoest resolution. Posted: June 29, 2018 View RFP (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 23APR2018 Phase1 Selection Cmte. Meeting :  12JUN2018 Time:  01:30PM LOI Scores Notification Date :  12JUN2018 Time:  05:00PM Deadline for Election to Participate in Phase2 :  15JUN2018 Time:  05:00PM Posting of Shortlist :  18JUN2018 Time:  12:00PM Mand. Pre-Proposal Meeting Date:  29JUN2018 Time:  10:00AM Phase 2 Tech. Proposal Due Date:  10OCT2018 Time:  12:00PM Price Proposal Due Date :  06NOV2018 Time:  02:30PM Proposal Opening Date :  06NOV2018 Time:  02:30PM Final Selection Meeting Date :  13NOV2018 Time:  01:30PM Shortlisted Firms Phase1 Score FLORIDA SAFETY CONTRACTORS,INC. 17.0 Gannett Fleming Project Development 16.5 HIGHWAY SAFETY DEVICES,INC. 18.0 TRAFFIC CONTROL DEVICES,INC. 17.8 TRANSCORE ITS, LLC 17.3 Firms not participating in Phase 2 Phase1 Score HORSEPOWER ELECTRIC INC. 13.0 Traffic Management Solutions, Inc. 15.0 ************************************************************ Procurement Number : E7R11 Financial Management Number(s): 25467715233 25467725292 Project Description: <>READVERTISEMENT<>READVERTISEMENT<>READVERTISEMENT<> Task Work Orders issued for this districtwide Traffic Operations Design-Build PushButton Contract may contain Federal Highway Administration (FHWA) mandates that require FHWA approval as well as State mandates that require State approval. <> The successful bidder will be responsible for the implementation of projects from concept to completion of construction. <> Typical projects will consist of but are not limited to: * minor roadway design and construction * median revisions * minor structure projects * safety improvements * minor intersection improvements * lighting upgrades * traffic signal installations * signing and pavement marking projects * intelligent transportation systems (ITS) upgrades * other traffic operations and safety improvements <> Individual projects may be assigned for a period of 3 years from the date of Notice to Proceed (NTP) of this Contract being issued, with a maximum of 3 optional annual renewals which must be approved by the FDOT Chief Engineer prior to renewal being issued, or until a total maximum accumulated compensation of $30,000,000* is reached, of which a maximum of $5,000,000 in Federal Funds could be allocated for Task Work Order assignements during each year of the contract. <> Individual Task Work Order assignments will not exceed $1,000,000 and will not exceed 1 year in duration. <><><><><><><><> *Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. <> In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 7 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retaine