All(Work Plan, Advertised, Results) Projects
 
Click Here to go to myFlorida.com Link to the Florida Department of Transportation home page
 
 
 
PROCUREMENT OFFICE
All(Work Plan, Advertised, Results) Projects

Procurement Office Home Page
 
 
Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes.  
 
All Professional Services and All Design/Build Advertisements:
This web page provides detailed information, including public meeting schedules on professional services and design/build projects in all stages in the acquisition process including planned, current(new), shortlist, and final selection results. Changes to meeting dates and times will be displayed on this page.
 
 
District: 1 2 3 4 5 6 7 Turnpike Central Office
 
Updated: Monday July 28 2014  

 
 
 
DISTRICT 1    

************************************************************
Professional Services Consultant Projects

Contract Number         : 15129  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  43142216201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  US41 (SR90) from Mosquito Canal to SR29, Collier County
  In addition to a-k above in the response procedure, letters
  should also include: Resumes  for all proposed staff are
  required as an addendum to the Letter of Interest and must
  include TINS and CTQP printouts, project dates, and updated
  work references, including names and telephone numbers.
  The following forms are to submitted as well: Consultant
  Affidavit; Certification Regarding Debarment, Suspension,
  Ineligibility (375-030-32); Certification for Disclosure of
  Lobbying Activities (375-030-33); Truth-In-Negotiation
  Certification (375-030-30); DBE Participation Statement (375
  -030-21).
  The letters of response will be graded on the following-
  EVALUATION CRITERIA:
  Awarenes of/Approach to Project Issues (0-35)-
  A. Understanding of the Scope of the Project (0-15)
  B. Identification of unique project issues (0-15)
  C. Best or Value Added (0-5)
  Proposed Staffing (0-55)
  A. Quantity Proposed (0-12)
  B. Availability of Staff (0-9)
  C. Qualifications/Certifications of Staff (0-9)
  D. Quality/Experience on Similar Projects (0-13)
  E. Team's Past Performance on Similar Projects (0-12)
  Other Considerations (0-10)
  A. COmmunication Abilities (0-5)
  B. Commitment to satisfy Department's needs (0-5)
Project Manager    : ELLIOTT, LEIGHTON
Budget Amount      :   $1,288,525



Advertisement Status           : Planned
Date of Advertisement          : 04AUG2014
Longlist(Tech. Rev. Cmte.) Date:  03SEP2014  Time:  08:30AM
Shortlst Selection Date        :  16SEP2014  Time:  01:45PM
Final Selection Meeting Date   :  13OCT2014  Time:  09:30AM
1st Negotiations Meeting       :  21NOV2014  Time:  08:00AM


                                                            
************************************************************

Contract Number         : 15121  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  19801746201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  US41 (venice Bypass) from Gulf Coast Blvd to Bird Bay,
  Sarasota County
  In addition to a-k above in the response procedure, letters
  are to include: Resumes for all proposed staff are required
  as an addendum to letter of Interest and must include TINS
  and CTQP printouts, work references including names and
  telephone numbers. A Manhour staffing estimate must also be
  included. DBE and Small Business Participation form is
  required. The following forms are to be submitted as well:
  Consultant Affidavit; Certification Regarding Debarment,
  Suspension, Ineligibility (375-030-32); Certification for
  Disclosure of Lobbing Activities (375-030-33); Truth-In-
  Negotation Certificate (375-030-30); DBE Participation
  Statement (375-030-21).
  The letters of response will be graded on the following-
  EVALUATION CRITERIA:
  Awareness of/Approach to Project Issues (0-35)-
  A. Understanding of the Scope of the Project (0-15)
  B. Identification of unique project issues (0-15)
  C. Best or Value Added (0-5)
  Proposed Staffing (0-55)-
  A. Quantity Proposed (0-10)
  B. Availability to Staff (0-10)
  C. Qualifications/Certification of Staff (0-10)
  D. Quality/Experience on Similar Projects (0-13)
  E. Teams's Past Performance of Similar Projects (0-12)
  Other Considerations (0-10)-
  A. Communication Abilities (0-5)
  B. Commitment to Satisfy Department's Needs(0-5)
  All submittals should be done through D1.profserv inbox.
Project Manager    : NICHOLS, JAMES
Budget Amount      :   $1,919,571

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Planned
Date of Advertisement          : 28JUL2014
Longlist(Tech. Rev. Cmte.) Date:  28AUG2014  Time:  09:30AM
Shortlst Selection Date        :  16SEP2014  Time:  01:15PM
Final Selection Meeting Date   :  13OCT2014  Time:  09:30AM
1st Negotiations Meeting       :  01DEC2014  Time:  08:00AM


                                                            
************************************************************

Contract Number         : 15114  Minor Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43365713201
Major Work   :
  15.0   - Landscape Architect
Minor Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  3.1    - Minor Highway Design

  US27 AT SR60 INTERCHANGE
Project Manager    : LAUK, JOSEPH
Estimated Contract Amt: $250,000
See Standard Notes Above: 7

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Advertised
Date of Advertisement          : 07JUL2014
Response Deadline              : 18JUL2014
Longlist(Tech. Rev. Cmte.) Date:  29JUL2014  Time:  01:00PM
Shortlst Selection Date        :  13AUG2014  Time:  02:00PM
Scope Meeting Date             :  25AUG2014  Time:  09:30AM
Tech. Rev. Cmte Meeting        :  18SEP2014  Time:  02:30PM
Final Selection Meeting Date   :  13OCT2014  Time:  09:30AM
1st Negotiations Meeting       :  02DEC2014  Time:  08:00AM



Response Deadline              :  18JUL2014
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Cheryl L. Sanchious
  Phone: (863)519-2598
                                                            
************************************************************

Contract Number         : 15131  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  42518316201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
  10.4   - Minor Bridge & Misc. Structures(CEI)
Minor Work   :
Project Description:
  SR72 (Stickney Pt) from East of SR758 to West of Beachwood
  Avenue, Sarasota County
  In addition to a-k above in the response procedure, letters
  should also include: Resumes and a 1 sheet Summary of Staff
  hours are required as an addendum to the letter of response
  and must include TIN's and CTQP printouts, and updated work
  references including names and telephone numbers.DBE and
  Small Business Participation form is required. The following
  forms are to be submitted as well: COnsultant Affidavit;
  Certification Regarding Debarment, Suspension, Ineligibility
  (375-030-32); Certification for Disclosure  of Lobbying
  Activities (375-030-33); Truth-In-Negotiation Certification
  (375-030-30); DBE Participation Statement (375-030-21).
  Consultant must have demonstrated experience under Florida
  Administrative Code 14-75; Work Type 10.7.
  The letters of response will be graded on the following-
  EVALUTATION CRITERIA:
  Awareness of/Approach to Project Issues (0-35)-
  A. Understanding of the Scope of the Project (0-15)
  B. Identification of unique project issues (0-15)
  C. Best or Value Added (0-5)
  Project Staffing (0-55)-
  A. Quantity Proposed (0-10)
  B. Availability of Staff (0-10)
  C. Qualifications/Certifications of Staff (0-10)
  D. Quality/Experience on Similar Projects (0-15)
  E. Team's Past Performance on Similar Projects (0-10)
  Other Considerations (0-10)-
  A. Communication Abilities (0-5)
  B. Commitment to satisfy Department's Needs (0-5)
Project Manager    : Callahan, Raymond
Estimated Contract Amt: $850,607
See Standard Notes Above: 4,9

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Advertised
Date of Advertisement          : 07JUL2014
Response Deadline              : 25JUL2014
Longlist(Tech. Rev. Cmte.) Date:  14AUG2014  Time:  09:30AM
Shortlst Selection Date        :  05SEP2014  Time:  10:00AM
Final Selection Meeting Date   :  02OCT2014  Time:  10:00AM
1st Negotiations Meeting       :  17NOV2014  Time:  08:00AM



Response Deadline              :  25JUL2014
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Cheryl L. Sanchious
  Phone: (863)519-2598
                                                            
************************************************************

Contract Number         : 15141  Major Project
Selection Procedure: Letter of Response and Oral Presentation   
Financial Management Number(s):
  41787843201
Major Work   :
  3.2    - Major Highway Design
Minor Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  6.1    - Traffic Engineering Studies
  7.1    - Signing, Pavement Marking & Channelization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
  9.3    - Highway Materials Testing
  15.0   - Landscape Architect

Project Description:
  SR 29, FROM SR 82 TO HENDRY COUNTY LINE, COLLIER COUNTY
Project Manager    : PORTER, RAY
Estimated Contract Amt: $3,000,000
See Standard Notes Above: 9

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Advertised
Date of Advertisement          : 07JUL2014
Response Deadline              : 18JUL2014
Longlist(Tech. Rev. Cmte.) Date:  31JUL2014  Time:  01:30PM
Shortlst Selection Date        :  13AUG2014  Time:  02:00PM
Scope Meeting Date             :  26AUG2014  Time:  09:00AM
Tech. Rev. Cmte Meeting        :  25SEP2014  Time:  02:30PM
Final Selection Meeting Date   :  13OCT2014  Time:  09:30AM
1st Negotiations Meeting       :  18NOV2014  Time:  01:30PM



Response Deadline              :  18JUL2014
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Cheryl L. Sanchious
  Phone: (863)519-2598
                                                            
************************************************************

Contract Number         : 15104  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43385612201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  3.2    - Major Highway Design
Minor Work   :
  6.1    - Traffic Engineering Studies
Under-Utilized Work Groups:
  GROUP2  - PD&E Studies

Project Description:
  SR60/CR630 Kissimmee River Bridge
Project Manager    : Turley, David C
Estimated Contract Amt: $1,250,000
See Standard Notes Above: 8

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Advertised
Date of Advertisement          : 24JUN2014
Response Deadline              : 08JUL2014
Longlist(Tech. Rev. Cmte.) Date:  23JUL2014  Time:  10:00AM
Shortlst Selection Date        :  13AUG2014  Time:  02:00PM
Scope Meeting Date             :  11SEP2014  Time:  09:30AM
Final Selection Meeting Date   :  30OCT2014  Time:  10:00AM
1st Negotiations Meeting       :  16DEC2014  Time:  08:00AM



Response Deadline              :  08JUL2014
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Elizabeth Serdynski
  Phone: (863)519-2901
                                                            
************************************************************

Contract Number         : 15140  Major Project
Selection Procedure: Letter of Response and Oral Presentation   
Financial Management Number(s):
  20121533201
Major Work   :
  3.3    - Controlled Access Highway Design
Minor Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  4.1.2  - Minor Bridge Design
  6.1    - Traffic Engineering Studies
  6.2    - Traffic Signal Timing
  6.3.1  - Intelligent Trans Sys. Analysis & Design
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
  9.3    - Highway Materials Testing
  9.4.1  - Standard Foundation Studies
  9.5    - Geotechnical Speciality Lab Testing
  15.0   - Landscape Architect

  I-4 AT SR 557
Project Manager    : LAUK, JOSEPH
Estimated Contract Amt: $3,000,000
See Standard Notes Above: 9

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Advertised
Date of Advertisement          : 16JUN2014
Response Deadline              : 27JUN2014
Longlist(Tech. Rev. Cmte.) Date:  17JUL2014  Time:  09:30AM
Shortlst Selection Date        :  31JUL2014  Time:  01:30PM
Scope Meeting Date             :  13AUG2014  Time:  10:30AM
Final Selection Meeting Date   :  02OCT2014  Time:  10:00AM
1st Negotiations Meeting       :  20NOV2014  Time:  08:00AM



Response Deadline              :  27JUN2014
Respond To:
  d1.profserv@dot.state.fl.us 
  Attn.: Elizabeth Serdynski
  Phone: (863)519-2901
                                                            
************************************************************

Contract Number         : 15148  Minor Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43504013201
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
  4.1.1  - Miscellaneous Structures
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying

Project Description:
  435040-1-32-01 & 435040-1-32-02
  US41 from N of Pine Ridge Rd to S of Pelican Bay Blvd.
Project Manager    : Reck, Justin R

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 09JUN2014
Longlist(Tech. Rev. Cmte.) Date:  08JUL2014  Time:  10:45AM
Shortlst Selection Date        :  14JUL2014  Time:  01:15PM
Shortlist Selection Posting    :  14JUL2014
Scope Meeting Date             :  22JUL2014  Time:  08:30AM
Tech. Rev. Cmte Meeting        :  18AUG2014  Time:  02:30PM
Final Selection Meeting Date   :  16SEP2014  Time:  01:15PM
1st Negotiations Meeting       :  23OCT2014  Time:  08:00AM



Shortlisted Firms:
  COMPREHENSIVE ENGINEERING SERVICES,
  GARRETT ENGINEERING GROUP, INC.    
  HIGHSPANS ENGINEERING, INC.        
                                                            
************************************************************

Contract Number         : 15138  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  20207311205
Major Work   :
  6.1    - Traffic Engineering Studies
Minor Work   :
  13.7   - Transportation Statistics

Project Description:
  202073-1-12-05 Statistics Traffic Data Collection
Project Manager    : Martin, George

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 28MAY2014
Longlist(Tech. Rev. Cmte.) Date:  17JUN2014  Time:  08:45AM
Shortlst Selection Date        :  24JUN2014  Time:  03:00PM
Shortlist Selection Posting    :  24JUN2014
Scope Meeting Date             :  07JUL2014  Time:  02:30PM
Final Selection Meeting Date   :  27AUG2014  Time:  09:30AM



Shortlisted Firms:
  CALTRAN ENGINEERING GROUP, INC.    
  SOUTHERN TRAFFIC SERVICES, INC.    
                                                            
************************************************************

Contract Number         : 15103  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43511112201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  4.1.2  - Minor Bridge Design
Minor Work   :
  3.2    - Major Highway Design
Under-Utilized Work Groups:
  GROUP2  - PD&E Studies

Project Description:
  SR951 from Manatee Rd to N of Tower Rd.
  Collier County
Project Manager    : Andrews, Steven A

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 27MAY2014
Longlist(Tech. Rev. Cmte.) Date:  25JUN2014  Time:  10:30AM
Shortlst Selection Date        :  14JUL2014  Time:  01:15PM
Shortlist Selection Posting    :  14JUL2014
Scope Meeting Date             :  05AUG2014  Time:  02:00PM
Final Selection Meeting Date   :  02OCT2014  Time:  10:00AM
1st Negotiations Meeting       :  20NOV2014  Time:  08:00AM



Shortlisted Firms:
  INWOOD CONSULTING ENGINEERS, INC.  
  PARSONS BRINCKERHOFF, INC.         
  VOLKERT, INC.                      
                                                            
************************************************************

Contract Number         : 15142  Major Project
Selection Procedure: Letter of Response and Oral Presentation   
Financial Management Number(s):
  41924323201
Major Work   :
  3.2    - Major Highway Design
  4.1.2  - Minor Bridge Design
Minor Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  4.1.1  - Miscellaneous Structures
  6.1    - Traffic Engineering Studies
  6.2    - Traffic Signal Timing
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
  9.3    - Highway Materials Testing
  9.4.1  - Standard Foundation Studies
  9.5    - Geotechnical Speciality Lab Testing
  15.0   - Landscape Architect
Under-Utilized Work Groups:
  GROUP2  - PD&E Studies

Project Description:
  US 27 FROM HIGHLANDS COUNTY LINE TO CR 630A
Project Manager    : SHERRARD, KATI

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 27MAY2014
Longlist(Tech. Rev. Cmte.) Date:  24JUN2014  Time:  10:00AM
Shortlst Selection Date        :  14JUL2014  Time:  01:15PM
Shortlist Selection Posting    :  14JUL2014
Scope Meeting Date             :  22JUL2014  Time:  09:30AM
Tech. Rev. Cmte Meeting        :  20AUG2014  Time:  02:30PM
Final Selection Meeting Date   :  16SEP2014  Time:  01:15PM
1st Negotiations Meeting       :  21OCT2014  Time:  08:00AM



Shortlisted Firms:
  AIM ENGINEERING AND SURVEYING, INC.
  PATEL, GREENE AND ASSOCIATES, PLLC 
  RS&H, INC.                         
                                                            
************************************************************

Contract Number         : 15139  Major Project
Selection Procedure: LOR and Abbreviated Technical Proposal     
Financial Management Number(s):
  TBA
Major Work   :
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
Minor Work   :
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping

Project Description:
  TBA / D/W Surveying and Mapping Consultant / 15139
Project Manager    : Rutkosky, Dan

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 19MAY2014
Longlist(Tech. Rev. Cmte.) Date:  23JUN2014  Time:  09:30AM
Shortlst Selection Date        :  14JUL2014  Time:  01:15PM
Shortlist Selection Posting    :  14JUL2014
Final Selection Meeting Date   :  27AUG2014  Time:  09:30AM



Shortlisted Firms:
  CIVILSURV DESIGN GROUP, INC.       
  DEWBERRY ENGINEERS INC. D/B/A DEWBE
  ELEMENT ENGINEERING GROUP, LLC     
                                                            
************************************************************

Contract Number         : 15117  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  40403213209
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
  4.1.1  - Miscellaneous Structures
  4.1.2  - Minor Bridge Design
  6.1    - Traffic Engineering Studies
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing

Project Description:
  404032-1-32-09 D/W Resurfacing Design Contract
Project Manager    : ZEIGLER, CHRIS

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 12MAY2014
Longlist(Tech. Rev. Cmte.) Date:  06JUN2014  Time:  01:30PM
Shortlst Selection Date        :  24JUN2014  Time:  03:00PM
Shortlist Selection Posting    :  24JUN2014
Scope Meeting Date             :  07JUL2014  Time:  01:30PM
Tech. Rev. Cmte Meeting        :  07AUG2014  Time:  02:30PM
Final Selection Meeting Date   :  05SEP2014  Time:  10:00AM



Shortlisted Firms:
  AIM ENGINEERING AND SURVEYING      
  COMPREHENSIVE ENGINEERING SERVICES 
  DRMP, INC.                         
                                                            
************************************************************

Contract Number         : 15135  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  41255013209
Major Work   :
  4.2.1  - Major Bridge Design - Concrete
  4.2.2  - Major Bridge Design - Steel
  4.4    - Movable Span Bridge Design
Minor Work   :
  5.1    - Conventional Bridge Inspection
  5.2    - Movable Bridge Inspection
  5.4    - Bridge Load Rating

Project Description:
  412550 1 32 09 & 412550 1 32 10
  Bridge Engineering Design/CEI Support Services
  Multiple contracts may be awarded.
Project Manager    : LOESER, BENJAMIN

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 05MAY2014
Longlist(Tech. Rev. Cmte.) Date:  06JUN2014  Time:  09:30AM
Shortlst Selection Date        :  24JUN2014  Time:  03:00PM
Shortlist Selection Posting    :  24JUN2014
Scope Meeting Date             :  03JUL2014  Time:  10:00AM
Tech. Rev. Cmte Meeting        :  24JUL2014  Time:  04:15PM
Final Selection Meeting Date   :  13AUG2014  Time:  02:00PM



Shortlisted Firms:
  AYRES ASSOCIATES INC               
  KISINGER CAMPO & ASSOC. CORP.      
  PARSONS BRINCKERHOFF, INC.         
  T. Y. LIN INTERNATIONAL, INC.      
  URS CORPORATION SOUTHERN           
  VOLKERT, INC.                      
                                                            
************************************************************

Contract Number         : 15137  Major Project
Selection Procedure: LOR and Abbreviated Technical Proposal     
Financial Management Number(s):
  19829613211
Major Work   :
  9.1    - Soil Exploration
  9.2    - Geotechnical Classification Lab Testing
  9.4.1  - Standard Foundation Studies
  10.3   - Construction Materials Inspection
Minor Work   :
  9.5    - Geotechnical Speciality Lab Testing
Under-Utilized Work Groups:
  GROUP9  - Soil Exploration, Materials Testing
  GROUP10  - Rdwy Construction Engineering Inspection

Project Description:
  198296 1 32 11; DISTRICT WIDE GEOTECHNICAL DESIGN SUPPORT
Project Manager    : DiBrino, Michelle

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 21APR2014
Longlist(Tech. Rev. Cmte.) Date:  20MAY2014  Time:  08:30AM
Shortlst Selection Date        :  28MAY2014  Time:  02:00PM
Shortlist Selection Posting    :  28MAY2014
Final Selection Meeting Date   :  14JUL2014  Time:  01:15PM
Final Selection Posting Date   :  14JUL2014


Rank  Consultant
  1      ARDAMAN & ASSOCIATES, INC.         
  2      GANNETT FLEMING, INC.              
  3      MADRID ENGINEERING GROUP, INC.     
                                                            
************************************************************

Contract Number         : 15101  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  42224411204
Major Work   :
  13.4   - Systems Planning
  13.5   - Subarea/Corridor Planning
Minor Work   :
  13.6   - Land Planning/Engineering

  D/W GROWTH MANAGEMENT
Project Manager    : Massey, Lawrence

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 31MAR2014
Longlist(Tech. Rev. Cmte.) Date:  07MAY2014  Time:  09:30AM
Shortlst Selection Date        :  29MAY2014  Time:  10:00AM
Shortlist Selection Posting    :  29MAY2014
Scope Meeting Date             :  19JUN2014  Time:  01:00PM
Final Selection Meeting Date   :  13AUG2014  Time:  10:00AM



Shortlisted Firms:
  KITTELSON & ASSOCIATES, INC.       
  TINDALE-OLIVER AND ASSOCIATES,INC. 
  TRAF-O-DATA CORPORATION            
                                                            
************************************************************

Contract Number         : 15102  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43536812201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  3.2    - Major Highway Design
Minor Work   :
  6.1    - Traffic Engineering Studies
Under-Utilized Work Groups:
  GROUP2  - PD&E Studies

Project Description:
  CR846 /Immokalee Rd at Randall Blvd.
Project Manager    : KASTER, AARON

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 31MAR2014
Longlist(Tech. Rev. Cmte.) Date:  12MAY2014  Time:  10:00AM
Shortlst Selection Date        :  29MAY2014  Time:  10:00AM
Shortlist Selection Posting    :  29MAY2014
Final Selection Meeting Date   :  13AUG2014  Time:  10:00AM
1st Negotiations Meeting       :  22SEP2014  Time:  08:00AM



Shortlisted Firms:
  CH2M HILL, INC.                    
  THE HEIMBURG GROUP, INC.           
  VOLKERT, INC.                      
                                                            
************************************************************

Contract Number         : 15132  Minor Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43502313201
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
  4.1.1  - Miscellaneous Structures
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying

Project Description:
  435023 1 32 01 & 435023 1 32 02
  Pine Island Rd from Chiquita Blvd to Santa Barbara Blvd
Project Manager    : Dipola, Mario

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 17MAR2014
Longlist(Tech. Rev. Cmte.) Date:  22APR2014  Time:  10:30AM
Shortlst Selection Date        :  12MAY2014  Time:  09:00AM
Shortlist Selection Posting    :  12MAY2014
Final Selection Meeting Date   :  31JUL2014  Time:  09:00AM
1st Negotiations Meeting       :  15SEP2014  Time:  08:00AM



Shortlisted Firms:
  CONNELLY & WICKER INC.             
  DAVID DOUGLAS ASSOCIATES, INC.     
  THE ASH GROUP, INC.                
                                                            
************************************************************

Contract Number         : 15134  Major Project
Selection Procedure: Letter of Response and Oral Presentation   
Financial Management Number(s):
  42545013201
Major Work   :
  3.1    - Minor Highway Design
  4.1.2  - Minor Bridge Design
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
  8.4    - Right of Way Mapping
Minor Work   :
  7.1    - Signing, Pavement Marking & Channelization

Project Description:
  425450 1 32 01 & 435450 1 32 02
  Trail Bridge over Laurel Rd Legacy Trail
Project Manager    : WEEKS, RYAN

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 17MAR2014
Longlist(Tech. Rev. Cmte.) Date:  21APR2014  Time:  09:00AM
Shortlst Selection Date        :  12MAY2014  Time:  09:00AM
Shortlist Selection Posting    :  12MAY2014
Tech. Rev. Cmte Meeting        :  18JUN2014  Time:  02:30PM
Final Selection Meeting Date   :  14JUL2014  Time:  09:00AM
Final Selection Posting Date   :  14JUL2014
1st Negotiations Meeting       :  15OCT2014  Time:  08:00AM


Rank  Consultant
  1      PATEL, GREENE & ASSOCIATES, PLLC   
  2      AGENOR & CAMPBELL STRUCTURAL ENGINE
  3      FLORIDA BRIDGE AND TRANSPORTATION  
                                                            
************************************************************

Contract Number         : 15133  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43509013201
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
  4.1.1  - Miscellaneous Structures
  7.1    - Signing, Pavement Marking & Channelization
  7.2    - Lighting
  7.3    - Signalization
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying

Project Description:
  435090 1 32 01 & 435090 1 32 02
  9th Ave E at 15th St East
  Within the city of Bradenton
Project Manager    : Middleton, Janet

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 10MAR2014
Longlist(Tech. Rev. Cmte.) Date:  15APR2014  Time:  01:00PM
Shortlst Selection Date        :  12MAY2014  Time:  09:00AM
Shortlist Selection Posting    :  12MAY2014
Final Selection Meeting Date   :  24JUN2014  Time:  09:00AM
Final Selection Posting Date   :  24JUN2014


Rank  Consultant
  1      CONNELLY & WICKER INC.             
  2      CIVILSURV DESIGN GROUP, INC.       
  3      PE CONSULTING ENGINEERING          
                                                            
************************************************************

Contract Number         : 15118  Major Project
Selection Procedure: Letter of Response and Oral Presentation   
Financial Management Number(s):
  42731513201
Major Work   :
  6.3.1  - Intelligent Trans Sys. Analysis & Design
  6.3.2  - Intelligent Trans Systems Implementation
  6.3.3  - Intelligent Trans Traffic Eng. Communications
Minor Work   :
  6.1    - Traffic Engineering Studies

Project Description:
  427315 1 32 01
  I-4 Fog Detection from East of the Polk Parkway to the
  Osceola County Line
  Please submit any technical questions to D1.profserv@dot.
  state.fl.us
Project Manager    : Roberts, Mark A

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 24FEB2014
Longlist(Tech. Rev. Cmte.) Date:  18MAR2014  Time:  09:00AM
Shortlst Selection Date        :  03APR2014  Time:  10:00AM
Shortlist Selection Posting    :  03APR2014
Final Selection Meeting Date   :  09JUN2014  Time:  10:00AM
Final Selection Date Not Posted
1st Negotiations Meeting       :  01JUL2014  Time:  08:00AM



Shortlisted Firms:
  ATKINS NORTH AMERICA, INC.         
  PARSONS BRINCKERHOFF, INC.         
  VIBENGINEERING, INC.               
                                                            
************************************************************

Contract Number         : 15109  Major Project
Selection Procedure: LOR and Abbreviated Technical Proposal     
Financial Management Number(s):
  19804913209
Major Work   :
  8.1    - Control Surveying
  8.2    - Design, Right of Way, & Const. Surveying
Minor Work   :
  8.3    - Photogrammetric Mapping
  8.4    - Right of Way Mapping

Project Description:
  198049 1 32 09 & 198050 1 32 09  (15109 & 15110)
  District Wide Surveying and Mapping
  Multiple contracts may be awarded.
  Please submit letters to D1.profserv@dot.state.fl.us
Project Manager    : Rutkosky, Dan

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 17FEB2014
Longlist(Tech. Rev. Cmte.) Date:  24MAR2014  Time:  09:00AM
Shortlst Selection Date        :  03APR2014  Time:  10:00AM
Shortlist Selection Posting    :  03APR2014
Final Selection Meeting Date   :  28MAY2014  Time:  02:00PM
Final Selection Posting Date   :  28MAY2014


Rank  Consultant
  1      MCKIM & CREED, INC.                
  2      TBE GROUP, INC.                    
  3      CIVILSURV DESIGN GROUP, INC.       
  4      DEWBERRY ENGINEERS INC.            
  5      ELEMENT ENGINEERING GROUP,LLC      
  6      CUMBEY & FAIR, INC.                
                                                            
************************************************************

Contract Number         : 15130  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  19828516205
Major Work   :
  8.2    - Design, Right of Way, & Const. Surveying
Minor Work   :
  8.1    - Control Surveying

Project Description:
  District Wide Construction Survey Support and Misc.
  Engineering Services
  In addition to a-k in the above response procedure, letters
  should also include: Resumes are requires as an addendum
  to the letter of response and must include TIN's and CTQP
  printouts, work references including names and telephone
  number(s). DBE and Small Business Participation form is
  required. The following forms are to be submitted as well:
  Consultant Affidavit; Certification Regarding Debarment,
  Suspension, Ineligibility (375-030-32); Certification for
  Disclosure of Lobbying Activities (375-030-33); Truth-In-
  Negotiation Certification (375-030-30); DBE Participation
  Statement (375-030-21).
  EVALUATION CRITERIA:
  The letters of response will be graded on the following-
  AWARENESS OF/APPROACH TO PROJECT ISSUES (0-35)
  A. Understanding of the Scope of the Project (0-13)
  B. Indentification of unique project issues (0-12)
  C. Best or Value added (0-10)
  PROPOSED STAFFING (0-55)
  A. Quantity Proposed (0-12)
  B. Availability of Staff (0-10)
  C. Qualifications/Certifications of Staff (0-10)
  D. Quality/Experience on Similar Projects (0-10)
  E. Team's Past Performance on Similar Projects (0-13)
  OTHER CONSIDERATIONS (0-10)
  A. Communication Abilities (0-5)
  B. Commitment to satisfy the Department's needs(0-5)
  All submittals should be sent through the D1.profserv inbox.
Project Manager    : Thompson, Evelyn J

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 10FEB2014
Longlist(Tech. Rev. Cmte.) Date:  13MAR2014  Time:  8:30 AM
Shortlst Selection Date        :  03APR2014  Time:  10:00AM
Shortlist Selection Posting    :  03APR2014
Final Selection Meeting Date   :  29MAY2014  Time:  10:00AM
Final Selection Posting Date   :  29MAY2014


Rank  Consultant
  1      MCKIM & CREED, INC.                
  2      AIM ENGINEERING AND SURVEYING      
  3      DRMP, INC.                         
  4      CIVILSURV DESIGN GROUP, INC.       
                                                            
************************************************************

Contract Number         : 15119  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  19389826201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  193898 2 62 01 - US 17 from CR 760A (Nocatee) to Heard St.
  Desoto County
  In addition to a-k above in the response procedure, letters
  should also include: Resumes are required as an
  addendum to the letter of response and must include TIN's
  and CTQP printouts, work references including names and
  telephone number(s). The following forms are to be submitted
  as well: Consultant Affidavit; Certification Regarding
  Debarment, Suspension, Ineligibility (375-030-32;
  Certification for Disclosure of Lobbying Activities (375-030
  -33); Truth-In-Negotiation Certification (375-030-30); DBE
  Participation Statement (375-030-21).
  EVALUATION CRITERIA:
  AWARENESS OF/APPROACH TO PROJECT ISSUES (0-35)
  A. Understanding of the Scopr of the Project (0-10)
  B. Identification of unique project issues (0-15)
  C. Best or Added Value (0-10)
  PROPOSED STAFFING (0-55)
  A. Quality Proposed (0-10)
  B. Availability of Staff (0-10)
  C. Qualifications/Certifications of Staff (0-10)
  D. Quality/Experience on Similar Projects (0-10)
  E. Team's Past Performance on Similar Projects (0-15)
  OTHER CONSIDERATIONS (0-10)
  A.Communication Abilities (0-5)
  B. Commitment to satisfy Department's needs (0-5)
  All submittals should be through the D1.profserv inbox.
Project Manager    : Thompson, Evelyn J

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 03FEB2014
Longlist(Tech. Rev. Cmte.) Date:  19MAR2014  Time:  01:30PM
Shortlst Selection Date        :  03APR2014  Time:  10:00AM
Shortlist Selection Posting    :  03APR2014
Final Selection Meeting Date   :  01MAY2014  Time:  09:00AM
Final Selection Posting Date   :  12MAY2014
1st Negotiations Meeting       :  18JUN2014  Time:  08:00AM


Rank  Consultant
  1      AMEC ENVIRONMENT & INFRASTRUCTURE, 
  2      HDR CONSTRUCTION CONTROL CORP.     
  3      TETRA TECH, INC.                   
                                                            
************************************************************

Contract Number         : 15127  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  42910316201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  429103 1 62 01; 431209 1 62 01; 433402 1 62 01 & 433409 1 62
  01
  US 17/ SR 555 from Van Fleet Drive to 1st Street, SR 60 from
  Van Fleet Drive to Connersville Rd, SR 60 at South Creek Dr
  & SR 60 at Willow Oak Road
  In addition to a-k above in the response procedure, letters
  should also include: Resumes are required as an
  addendum to the letter of response and must include TIN's
  and CTQP printouts, work references including names and
  telephone number(s). The following forms are to be submitted
  as well: COnsultant Affidavit; Certification Regarding
  Debarment, Suspension, Ineligibility (375-030-32);
  Certification for Disclosure of Lobbying Activities (375-030
  -33); Truth-In-Negotiation Certification (375-030-30); DBE
  Participation Statement (375-030-21).
  EVALUATION CRITERIA:
  AWARENESS OF/APPROACH TO PROJECT ISSUES (0-35)
  A. Understanding of the scope of the Project (0-10)
  B. Identification of unique project issues (0-15)
  C. Best or Value Added (0-10)
  PROPOSED STAFFING (0-55)
  A. Quality Proposed (0-15)
  B. Availability of Staff (0-10)
  C. Qualifications/Certifications of Staff (0-10)
  D. Quality/Experience on Similar Projects (0-10)
  E. Team's Past Performance on Similar Projects (0-10)
  OTHER CONSIDERATIONS (0-10)
  A. Communication Abilities (0-5)
  B. Commitment to satify Department's needs (0-5)
  All submittals must be done through the D1.profserv inbox.
Project Manager    : Thompson, Evelyn J

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 03FEB2014
Longlist(Tech. Rev. Cmte.) Date:  05MAR2014  Time:  01:30PM
Shortlst Selection Date        :  18MAR2014  Time:  09:00AM
Shortlist Selection Posting    :  19MAR2014
Final Selection Meeting Date   :  23APR2014  Time:  02:00PM
Final Selection Posting Date   :  24APR2014
1st Negotiations Meeting       :  05JUN2014  Time:  08:00AM


Rank  Consultant
  1      RUMMEL, KLEPPER & KAHL, LLP        
  2      JOHNSON-ADAMS & ASSOCIATES, LLC    
  3      PARSONS BRINCKERHOFF, INC.         
                                                            
************************************************************

Design/Build Projects

Procurement Number      : E1N86
Financial Management Number(s):
  43341215201 43341515201 43341615201 42732175201
  42739975201 42732185201 42739985201

Project Description:
  Design and construct projects will be issued through Task
  Work Orders (TWO).  Projects may include signal revisions /
  installations, median revisions, extend turn lanes, widen to
  provide for turn lanes, lighting, signing and pavement
  markings, drainage installations / modifications and ITS
  installation / modifications.  The Tasks will require all
  elements of work to design and construction the various
  projects including, but not limited to, survey, utility
  coordination, geotechnical activities, specifications,
  environmental permitting, MOT and incidental items to
  perform the work.
  WORK MIX: Projects may require widening, grading, asphalt
  work, curb and gutter, signals, ITS features, signing and
  pavement markings, lighting and other elements as necessary.
  STIPEND AMOUNT: $15,000.00
  RESPONSE PROCEDURES:
  The ELOI and required attachments shall be submitted
  electronically in adobe.pdf format (unzipped) and attached
  to a single E-mail.  The Department has a 5MB limit on
  E-mail.  E-mails which exceed this 5MB server limit may be
  rejected by the Department's E-mail server.  It is solely
  the Design Build Firm's responsibility to ensure that the
  ELOI is received by the Department's server by the ELOI due
  date and time.  Only (1) ELOI per legal entity is acceptable
  All ELOI files should be sent to:
  D1.designbuild@dot.state.fl.us
  SPECIAL NOTES:
  In accordance with RESTRICTIONS ON CONSULTANTS' ELIGIBILITY
  TO COMPETE FOR DEPARTMENT CONTRACTS (Topic 375-030-006-B),
  the following firms particiŤated in the development of the
  conceptual plans or Request for Proposal for this Project
  and are restricted from participation on a Design-Build Firm
  without approval from the District One Secretary.  The Firms
  identified below may not represent a comprehensive list.
  Firms not listed below who performed services or who are
  subject to restriction unless an exception is obtained from
  the Department.
  ATKINS NORTH AMERICA
  BUDGET AMOUNT*: FY 14/15 $3,769,688; FY 15/16 $3,774,305;
  FY 16/17 $2,035,708
  *Actual commitment and final execution of this contract is
  contingent upon an approved legislative budget and
  availability of funds.
  See Consultant Eligibility in the Advertisement Preamble to
  ensure that the Nine Key Staff Positions are identified and
  Resumes are provided.
  The Department will judge the relative ability of
  each submitting company/entity to perform the required
  services based on qualification information and the ELOI.
  Unless otherwise noted in the specific Design-Build
  Advertisement the criteria for evaluating the Phase I
  submittals will include:
  1) Past Performance Evaluations:   Total of 3 Points
  Contractor grades
  Design Consultant grades
  Performance history with other states or agencies if
  none with the Department
  2) Project Experience and Resources:   Total of 4 Points
  Design-Build experience of the Contrator and Design
  Consultant
  Similar types of work experience
  Contractor Experience Modification Rating (Current Year)
  Firm organization, staffing plan, resources, location
  Environmental Record
  3) Project Approach and Understanding of Critical Issues:
  Total of 13 Points:
  Outline plan for completing the work
  Approach and understanding
  Coordination Plan
  4) Other content in the Expanded Letter of Interest
  Total of 0 Points
Project Manager    : SHERRARD, KATI
Selection Procedure     : ADJUSTED SCORE TYPE
Response Requested      : LETTER OF INTEREST
Maximum Number of Pages: 10 

Prequalification Requirements:
  Contractor must be qualified under Rule, 14-22, Florida
  Administrative Code - Work Class(s):
     Traffic Signals
  Professional Team Member Qualified under Rule 14-75,
  Florida Administrative Code - Work Class(es):
     3.2 - Major Highway Design
     3.1 - Minor Highway Design
     4.1.1 - Miscellaneous Structures
     4.1.2 - Minor Bridge Design
     6.1 - Traffic Engineering Studies
     6.2 - Traffic Signal Timing
     6.3.1 - Intelligent Trans Sys. Analysis & Design
     6.3.3 - Intelligent Trans Traffic Eng. Communications
     7.1 - Signing, Pavement Marking & Channelization
     7.2 - Lighting
     7.3 - Signalization
     8.2 - Design, Right of Way, & Const. Surveying
     9.1 - Soil Exploration
     9.4.1 - Standard Foundation Studies

Additional Bridge Design Work Types       :
  SEE PREAMBLE ABOVE FOR THE NEW FORM THAT MUST BE SUBMITTED
  FOR BRIDGE DESIGN PROJECTS.

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Shortlisted
Date of Advertisement          : 21APR2014
PhaseI Selection Cmte. Meeting :  28MAY2014  Time:  2:00PM
ELOI Scores Notification Date  :  28MAY2014  Time:  3:00PM
Deadline for Election to
Participate in Ph. II          :  30MAY2014  Time:  2:00PM
Posting of Shortlist           :  30MAY2014  Time:  4:00PM
PhaseII Tech. Proposal Due Date:  11AUG2014  Time:  4:00PM
Final Selection Meeting Date   :  16SEP2014  Time:  1:15PM


Shortlisted Firms                   PhaseI Score
  AMERICAN LIGHTING & SIGNALIZATION     14.0
  FLORIDA SAFETY CONTRACTORS,INC.       17.3
  HIGHWAY SAFETY DEVICES,INC.           16.0
Firms not participating in PhaseII  PhaseI Score
  TRAFFIC CONTROL DEVICES,INC.          14.7
                                                            
************************************************************

Procurement Number      : E1N21
Financial Management Number(s):
  42391715201

Project Description:
  The design and construction of the following facility is
  as follows:
  The Florida Department of Transportation, District One is
  proposing to replace its existing operations center in___
  Sarasota, Florida.
  The new proposed operations center will be known as the
  Manatee Operations Center and will be located on SR 64 east
  of Rye Road, and west of Lorraine Road in East Bradenton,
  Manatee County, Florida.  The new site consists of three
  contiguous parcels totaling approximately 42 acres of
  undeveloped land.
  Site development will include selective clearing of trees;
  site grading; installation of all utilities; and
  construction of drainage structures including a retention
  area, paved parking and roadways, sidewalks, landscaping,
  security fencing, miscellaneous site structures and
  buildings listed below.
  Administration Building/Auditorium/EOC
  Auto Shop/Workspace and Warehouse
  Hazardous Materials Storage Sheds
  Material Storage Buildings
  Field Crew Building
  Covered Highway Equipment Building
  Inmate Toilet and Pavilion
  Refueling Station
  Vehicle Wash
  County:  Manatee
  STIPEND:  There will be a stipend in the amount of $45,000.
  The Department will pay stipends to the shortlisted firms
  based on the guidelines noted in the preamble of this
  advertisement.
  PREAMBLE:  The notice to contractor/consultant preamble
  at the top of this web page is applicable to this
  advertisement unless stated otherwise and is made a part
  hereof.  You are responsible for reading it.
Project Manager    : Hall, Dennis
Selection Procedure     : ADJUSTED SCORE TYPE
Response Requested      : LETTER OF INTEREST
Maximum Number of Pages: 10 

Prequalification Requirements:
  Contractor Certified by the Florida Construction Industry
  Board as General Contractor
  Professional Team Member Qualified under Rule 14-75,
  Florida Administrative Code - Work Class(es):
     8.1 - Control Surveying
     9.1 - Soil Exploration
     14.0 - Architect
     15.0 - Landscape Architect

Technical Questions Should Be Addressed To:
  All questions are to be submitted to the following website:
  https://www3.dot.state.fl.us/BidQuestionsAndAnswers/
  Proposal.aspx
  When submitting questions, reference contract number E1N21.
  You are responsible for monitoring this site for responses
  to questions up to one day prior to the price opening.

DBE/MBE Requirements:                      
  For this project, the Department has established an
  aspiration goal of 9.0% DBE usage and an additional 3.0%
  Non-DBE Small Business usage, representing a cumulative
  12.0% commitment of total contract costs. Firms proposing
  for this Project shall aspire to have 9.0% or more of the
  total contract costs performed by DBE's and an additional
  3.0% or more of the total contract costs performed by
  Non-DBE Small Businesses.
  Although not a contract requirement, the Department
  believes that the aforementioned aspiration goal can
  realistically be achieved based on current availability of
  DBEs and small businesses.  The Department further believes
  that the 12% overall goal can be achieved through race
  neutral mens, using standard competitive procurement
  processes.  Pursuant to the provisions of Section 339.0805,
  Florida Statutes, and rule 14.78.005,  Florida
  Administrative Code, the Department has adopted rules
  to provide certified DBEs opportunities to participate in
  the business activities of the Department as vendors,
  contractors, subcontractors, and consultants. The Department
  has adopted the DBE definition set forth in Code 49
  of Federal Regulations Section 26.5.

Special Notes:              
  PHASE 1 ASSIGNED SCORING POINTS:
  1. Past Performance Evaluation (5 maximum points)
  Contractor and Design Consultant grades, performance
  history with other states or agencies if not with the
  Department.
  2. Project Experience and Resources (7 maximum points)
  Design-Build experience of the Contractor and Design
  Consultant, similar types of work experience, contractor
  experience modification rating (Current Year), frim
  organization, staffing plan, resources, location,
  environmental record.
  3. Project Approach and Understanding of Critical Issues
  (8 Maximum points)
  Outline plan for completing the work, approach and
  understanding, coordination plan.
  4. Other content in the Expanded Letter of Interest(0 point)
  RESTRICTIONS ON CONSULTANTS:
  In accordance with RESTRICTION ON CONSULTANTS - ELIGIBILITY
  TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B),
  the following Firms participated in the development of the
  conceptual plans or Request for Proposal for this Project
  and are restricted from participation on a Design-Build
  Firm without approval from the District One Secretary.
  The firms identified below may not represent a
  comprehensive list.  Firms not listed below who performed
  services or who are later retained to perform services
  on this Project are subject to restriction unless an
  exception is obtained from the Department.
  Jacobs Engineering Group, Inc.    C9G50
  URS Corporation                   C8U24
  EXPANDED LETTERS OF INTEREST: The Department will not
  consider expanded letters of interest (ELOI) not in
  conformance with the response requirements.  Read the
  preamble of this ad for ELOI requirements.
  RESPONSE PROCEDURE: The ELOI and required attachments
  shall be submitted electronically in adobe.pdf format
  unzipped) and attached to a single email. The Department
  has a 5MB limit on email. Emails that exceed this 5MB email
  limit may be rejected by the Department's email server.
  It is solely the Design Build Firm's responsibility to
  ensure that the ELOI is received by the Department's server
  by the ELOI due date and time. Only (1) ELOI per legal
  entity is acceptable. All ELOI files should be sent to
  d1.designbuild@dot.state.fl.us and must be received by the
  Department by the Phase I ELOI response deadline shown
  below.
  Actual commitment and final execution of this contract is
  contingent upon approved legislative budget and availability
  of funds.
  FIRMS DECLARATION TO CONTINUE TO PHASE II:  All responsive
  firms must declare their intent to continue on to Phase II
  by notifying the Department Procurement office in writing
  no later than Thursday, November 21, 2013 by 1:00 pm EST.
  Submit notification by email to:
  d1.designbuild@dot.state.fl.us
  The Lead Contractor or Lead Design Professional shall not
  team with other Proposers to submit more than one proposal
  per project.
  Note:  The Department reserves the right to reject all
  Proposals and/or to waive minor Proposal irregularities.
  Respond To:
  Email ELOIs To:
  d1.designbuild@dot.state.fl.us
  Procurement MS 1-18

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 07OCT2013
PhaseI Selection Cmte. Meeting :  09DEC2013  Time:  09:30AM
ELOI Scores Notification Date  :  09DEC2013  Time:  11:00AM
Deadline for Election to
Participate in Ph. II          :  11DEC2013  Time:  11:00AM
Posting of Shortlist           :  11DEC2013  Time:  01:00PM
Mand. Pre-Proposal Meeting Date:  30DEC2013  Time:  09:30AM
PhaseII Tech. Proposal Due Date:  13MAR2014  Time:  10:00AM
Price Proposal Due Date        :  09APR2014  Time:  11:00AM
Proposal Opening Date          :  09APR2014  Time:  11:00AM
Final Selection Meeting Date   :  16APR2014  Time:  10:00AM
Posting of Award               :  16APR2014  Time:  12:00PM


                                        PhaseI PhaseII Prop Bid Price
Rank Consultant                         Score  Score   Time Proposal
1    THE HASKELL COMPANY                17.2   65.0    630  $14,700,000
2    DAVID NELSON CONSTRUCTION CO.      17.2   70.6    730  $16,317,750
3    CONE & GRAHAM INC                  16.4   66.8    600  $20,520,000
Firms not participating in PhaseII  PhaseI Score
  Ajax Building Corporation             14.4
  BILTMORE CONSTRUCTION CO,INC.         15.6
  DANA B. KENYON COMPANY                12.6
  OHL BUILDING, INC                     14.8
  TANDEM CONSTRUCTION, INC              14.2
  THE A.D. MORGAN CORPORATION           11.8
  Walbridge Aldinger Company            15.0
  WRIGHT CONSTRUCTION GROUP             15.4
                                                            
************************************************************

Procurement Number      : E1M73
Financial Management Number(s):
  43275515201

Project Description:
  PROJECT NAME: US 41 from South of Coconut Rd. to San Carlos
  Blvd., Lee County.
  PROJECT DESCRIPTION: Design and construct a lighting system
  on US 41 for the roadway and sidewalk from 600 ft. South of
  Coconut Rd. to the southern return of San Carlos Blvd., a
  project length of approximately 4.86 miles.
  CONTRACT NUMBER: E1M73
  FINANCIAL PROJECT NUMBER(S): 432755-1-52-01
  FEDERAL PROJECT NUMBER(S): 3012 122 P
  ESTIMATED CONTRACT TIME: 240 Calendar Days
  *Estimated Budget Amount: $2,286,828.00
  *Contingent upon Legislative Approval and Availability of
  Funds.
  Stipend Amount: $15,000.00
  Please provide an one (1) page resume for each of the
  following five (5) key staff positions, as applicable:
  a. Construction Project Manager
  b. Construction Design-Build Coordinator
  c. Construction Roadway Superintendent
  d. Design Project Manager
  e. Design Roadway Engineer of Record
  The criteria for evaluating the Phase I submittals will
  include:
  1) Past Performance Evaluations (Total 5 points) - The
  Technical Review Committee (TRC) Members will be reviewing
  Contractor Grades, Design Consultant Grades, and Performance
  history with other states or agencies if none with the
  Department.
  2) Project Experience and Resources (Total 5 points) - The
  TRC Members will be reviewing Design-Build experience of the
  Contractor and Design Consultant, Similar types of work
  experience, and Contractor Experience Modification Rating
  (Current Year), Firm organization, staffing plan, resources,
  location, and Environmental Record.
  3) Project Approach and Understanding of Critical Issues
  (Total 8 points) - The TRC Members will be reviewing Outline
  plan for completing work, Approach and Understanding, and
  Coordination Plan.
  4) Other content in the Expanded Letter of Interest (Total 2
  points).
  SPECIAL NOTES: In accordance with RESTRICTION ON CONSULTANTS
  EILIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC NO.
  375-030-006-B), the following Firms participated in the
  development of the conceptual plans or Request for Proposal
  for this Project and are restricted from participation on a
  Design-Build Firm without approval from the District One
  Secretary. The Firms identified below may not represent a
  comprehensive list.  Firms not listed below who performed
  services or who are later retained to perform services on
  this Project are subject to restriction unless an exception
  is obtained from the Department:
  Atkins North America, Inc. (Contract No. C8Z04)
  HNTB (Contract No. C8Z03)
  Expanded Letters of Interest are to be submitted on or
  before, 4:00 p.m., April 12, 2013, to the E-Mail address
  indicated below.
Project Manager    : LAUK, JOSEPH
Selection Procedure     : ADJUSTED SCORE TYPE
Response Requested      : LETTER OF INTEREST
Maximum Number of Pages: 10 

Prequalification Requirements:
  Contractor must be qualified under Rule, 14-22, Florida
  Administrative Code - Work Class(s):
     ELECTRICAL WORK
  Professional Team Member Qualified under Rule 14-75,
  Florida Administrative Code - Work Class(es):
     6.3.1 - Intelligent Trans Sys. Analysis & Design
     7.2 - Lighting
     8.1 - Control Surveying
     9.4.1 - Standard Foundation Studies

Technical Questions Should Be Addressed To:
  Technical questions shall be address to:
  http://www2.dot.state.fl.us/construction/bidquestionmain.asp

DBE/MBE Requirements:                      
  The Department has assigned an 8.6% DBE Availability Goal to
  this Project.

View proposed scope
(Adobe Acrobat® PDF file)



Advertisement Status           : Final Selection
Date of Advertisement          : 25MAR2013
PhaseI Selection Cmte. Meeting :  02MAY2013  Time:  10:00AM
ELOI Scores Notification Date  :  02MAY2013  Time:  2:00 PM
Deadline for Election to
Participate in Ph. II          :  06MAY2013  Time:  2:00 PM
Posting of Shortlist           :  06MAY2013  Time:  3:00 PM
Mand. Pre-Proposal Meeting Date:  13MAY2013  Time:  10:30AM
PhaseII Tech. Proposal Due Date:  19JUL2013  Time:  4:00 PM
Price Proposal Due Date        :  27SEP2013  Time:  2:00 PM
Proposal Opening Date          :  27SEP2013  Time:  2:00 PM
Final Selection Meeting Date   :  06MAR2014  Time:  9:00AM
Posting of Award               :  03OCT2013  Time:  1:00PM



Meeting Location Notes:
  Final Selection of this Design Build project will be
  re-evaluated by the Selection Committee during the 03/06/14
  Selection Meeting.
 
All Bids Rejected
     ALL BIDS REJECTED AND PROJECT WILL BE RE-ADVERTISED.
                                                            
************************************************************

DISTRICT 2    

************************************************************
Professional Services Consultant Projects

Contract Number         : 15232  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  20930136201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  I-295 (SR9A) FROM SR 202/JT BUTLER TO SR 9B MANAGED LANE
Project Manager    : GARZA, MELISSA
Budget Amount      : $156,560,000



Advertisement Status           : Planned
Date of Advertisement          : 02MAR2015
Shortlst Selection Date        :  07APR2015  Time:  08:30AM
Final Selection Meeting Date   :  07APR2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15235  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  21002846201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  SR 15 (US 17) FROM HORSE LDG ROAD TO N BOUNDARY ROAD
  SAN MATEO
Project Manager    : WILLIAMS, JEFF
Budget Amount      :  $15,559,216



Advertisement Status           : Planned
Date of Advertisement          : 09FEB2015
Shortlst Selection Date        :  17MAY2015  Time:  08:30AM
Final Selection Meeting Date   :  17MAY2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15240  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  42747416201 42747426201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  42747416201 I-75 (SR 93) FR SR 24 IN ALACHUA CTY TO GEORGIA
  S/L
  42747426201 I-75 (SR 93) FR SR 24 IN ALACHUA CTY TO GEORGIA
  S/L
Project Manager    : GARZA, MELISSA
Budget Amount      :  $21,985,400



Advertisement Status           : Planned
Date of Advertisement          : 09FEB2015
Shortlst Selection Date        :  17MAR2015  Time:  08:30AM
Final Selection Meeting Date   :  17MAR2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15241  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  42747616201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  I-95 FROM US 1 CR 210 REST AREA
Project Manager    : WILLIAMS, JEFF
Budget Amount      :   $5,600,000



Advertisement Status           : Planned
Date of Advertisement          : 09FEB2015
Shortlst Selection Date        :  17MAR2015  Time:  08:30AM
Final Selection Meeting Date   :  17MAR2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15246  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  43091116201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  SR 10 (ATLANTIC) FROM ARLINGTON EXPRESSWAY TO EAST OF
  MONUMENT ROAD
Project Manager    : GARZA, MELISSA
Budget Amount      :   $5,710,252



Advertisement Status           : Planned
Date of Advertisement          : 09FEB2015
Shortlst Selection Date        :  17MAR2015  Time:  08:30AM
Final Selection Meeting Date   :  17MAR2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15252  Minor Project
Selection Procedure: LOR and Written Technical Proposal         
Major Work   :
  9.1    - Soil Exploration
  9.4.1  - Standard Foundation Studies
Minor Work   :
  9.2    - Geotechnical Classification Lab Testing
  9.3    - Highway Materials Testing
  9.4.2  - Non-Redundant Bridge Foundation Studies

Project Description:
  DISTRICT WIDE MATERIALS
Project Manager    : BLOOMFIELD, LESLIE
Budget Amount      :     $499,999



Advertisement Status           : Planned
Date of Advertisement          : 19JAN2015
Shortlst Selection Date        :  17FEB2015  Time:  08:30AM
Final Selection Meeting Date   :  14APR2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15234  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  20965936201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
  10.5.1 - Major Bridge(CEI) - Concrete
  10.5.2 - Major Bridge(CEI) - Steel
Minor Work   :
Project Description:
  I-10 (SR 8) INTERCHANGE AT SR 10 (US 90) AND SR 23
Project Manager    : Mendez, Guelmary
Budget Amount      :  $41,200,000



Advertisement Status           : Planned
Date of Advertisement          : 12JAN2015
Shortlst Selection Date        :  17FEB2015  Time:  08:30AM
Final Selection Meeting Date   :  17FEB2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15207  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43225922201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  3.1    - Minor Highway Design
Minor Work   :
Project Description:
  I-95 (SR 9) FR SR 202 (JT BUTLER) TO ATLANTIC BLVD
Project Manager    : KNIGHT, JAMES M
Budget Amount      :   $1,500,000



Advertisement Status           : Planned
Date of Advertisement          : 05JAN2015
Shortlst Selection Date        :  03FEB2015  Time:  08:30AM
Final Selection Meeting Date   :  07APR2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15258  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43582113201
Major Work   :
  2.0    - Proj. Dev. & Environ. (PD&E) Studies
  3.2    - Major Highway Design
Minor Work   :
Project Description:
  SR 200 (US 301) at Crawford Road
  PD&E/Design
Project Manager    : LYONS, WILL
Budget Amount      :   $1,000,000



Advertisement Status           : Planned
Date of Advertisement          : 05JAN2015
Shortlst Selection Date        :  03FEB2015  Time:  10:00AM
Final Selection Meeting Date   :  14APR2015  Time:  10:00AM


                                                            
************************************************************

Contract Number         : 15238  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  43015816201 42442416201 43194516201
Major Work   :
  10.4   - Minor Bridge & Misc. Structures(CEI)
Minor Work   :
Project Description:
  43015816201 SR 228 (HART BR) AT ST JOHNS RIVER BRIDGE 720107
  42442416201 SR 5 (US 1 MAIN ST) @ ST JOHNS RIVER BR 720022
  43194516201 SR 228 HART BRIDGE @ ST JOHNS RIVER BR 720107
Project Manager    : BENTON, BRIAN
Budget Amount      :   $8,615,547



Advertisement Status           : Planned
Date of Advertisement          : 17NOV2014
Shortlst Selection Date        :  29DEC2014  Time:  08:30AM
Final Selection Meeting Date   :  29DEC2014  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15248  Major Project
Selection Procedure: Letter of Response and Interview           
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
Project Description:
  District Wide Minor Design
Project Manager    : CHARRON, DAVID
Budget Amount      :   $1,500,000



Advertisement Status           : Planned
Date of Advertisement          : 13OCT2014
Shortlst Selection Date        :  10NOV2014  Time:  08:30AM
Final Selection Meeting Date   :  01JAN2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15218  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43430013201 43430113201 43430313201
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
Project Description:
  The following three projects will be advertised together and
  five firms will be shortlisted. The top three ranked firms
  will each receive a contract for one of the projects.
  434300-1-32-01 - SR 13 FR CORNELL TO SAN MARCO BLVD.
  Estimated construction cost is $4,194,835. The Project
  Manager is John Thrasher
  434301-1-32-01 - SR 105 FR BLOUNT ISLAND ENT TO FERRY
  ENTRANCE. Estimated construction cost is $4,670,213.
  The Project Manager is Jeff Bailey.
  434303-1-32-01 - SR 104 FR I-295 TO BISCAYNE BLVD.
  Estimated construction cost is $4,110,605. The Project
  Manager is Myrna Widmer.
  Estimated Construction Cost: See project description.
Project Manager    : THRASHER, JOHN



Advertisement Status           : Planned
Date of Advertisement          : 06OCT2014
Shortlst Selection Date        :  03NOV2014  Time:  10:00AM
Final Selection Meeting Date   :  15DEC2014  Time:  10:00AM


                                                            
************************************************************

Contract Number         : 15243  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  42879613204
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
Project Description:
  SR 116 (WONDERWOOD) FROM SR 9A TO SR 101
Project Manager    : SHIMER, ERIC
Budget Amount      :   $5,236,800



Advertisement Status           : Planned
Date of Advertisement          : 06OCT2014
Shortlst Selection Date        :  04NOV2014  Time:  08:30AM
Final Selection Meeting Date   :  06JAN2015  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15251  Major Project
Selection Procedure: Selection from Expanded Letter of Response 
Financial Management Number(s):
  43054616201
Major Work   :
  10.1   - Rdwy Construction Engineering Inspection
Minor Work   :
Project Description:
  SR10(ATLANTIC BOULEVARD) FROM BROOKVIEW TO KERNAN BOULEVARD)
  THIS IS A BDI PROJECT.
Project Manager    : BENTON, BRIAN
Budget Amount      :   $2,725,000



Advertisement Status           : Planned
Date of Advertisement          : 01SEP2014
Shortlst Selection Date        :  14OCT2014  Time:  08:30AM
Final Selection Meeting Date   :  14OCT2014  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15211  Major Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  20956523201 43239513201
Major Work   :
  3.1    - Minor Highway Design
  7.3    - Signalization
Minor Work   :
Project Description:
  SR 111 (CASSAT AVE) FROM SR 21 (BLANDING) TO EDGEWOOD
  SR 10 (US 90) FROM KINGMAN AVENUE TO BARTRAM RD
Project Manager    : WILLIAMS, AMY
Budget Amount      :   $2,914,741



Advertisement Status           : Planned
Date of Advertisement          : 11AUG2014
Shortlst Selection Date        :  09SEP2014  Time:  08:30AM
Final Selection Meeting Date   :  11NOV2014  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15257  Major Project
Selection Procedure: Letter of Response and Interview           
Major Work   :
  3.2    - Major Highway Design
Minor Work   :
Project Description:
  DISTRICT WIDE RFP PRODUCTION CONTRACT
Project Manager    : Bedenbaugh, Nelson
Budget Amount      :   $1,500,000



Advertisement Status           : Planned
Date of Advertisement          : 04AUG2014
Shortlst Selection Date        :  01SEP2014  Time:  08:30AM
Final Selection Meeting Date   :  27OCT2014  Time:  08:30AM


                                                            
************************************************************

Contract Number         : 15214  Minor Project
Selection Procedure: Letter of Response and Interview           
Financial Management Number(s):
  43230813201 43226813201 43432013201
Major Work   :
  3.1    - Minor Highway Design
Minor Work   :
  7.1    - Signing, Pavement Marking & Channelization
  7.3    - Signalization

Project Description:
  The following three projects will be advertised together and
  five firms will be shortlisted. The top three ranked firms
  will each receive a contract for one of the projects.
  Milling and Resurfacing.
  432308-1-32-01 - SR 10 (US 90) FR STOCKTON TO OCEAN - BDI.
  Estimated construction cost is $2,079,082. The Project
  Manager is Nelson Bedenbaugh.
  432268-1-32-01 - SR 111 FR OLD KINGS ROAD TO US 1 - BDI.
  Estimated construction cost is $926,785. The Project Manager
  is Michael Carter.
  434320-1-32-01 - SR 45 (US 41) FR SE 6TH AVE TO US 441 - BDI
  Estimated construction cost is $446,130. The Project Manager
  is David Charron.
Project Manager    : CARTER, MICHAEL
Estimated Contract Amt: $499,999
See Standard Notes Above: 7
Multiple contracts may be awarded from this advertisement.
Special Notes: When submitting Letters of Response, include Financial Management (FM) number 432308-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 21JUL2014 Response Deadline : 01AUG2014 Longlist(Tech. Rev. Cmte.) Date:  12AUG2014 Time:  01:30PM Shortlst Selection Date :  02SEP2014 Time:  10:00AM Scope Meeting Date :  09SEP2014 Time:  02:00PM Tech. Rev. Cmte Meeting :  06OCT2014 Time:  02:00PM Final Selection Meeting Date :  27OCT2014 Time:  10:00AM 1st Negotiations Meeting :  29OCT2014 Time:  10:00AM Response Deadline : 01AUG2014 Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 ************************************************************ Contract Number : 15223 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43434213201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization Project Description: CR 218 FROM US 301 (SR 200) TO SR 16 0543 - Pave Shoulders Project Manager : THRASHER, JOHN Est. Construction Cost: $3,200,000 See Standard Notes Above: 9 Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434342-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 14JUL2014 Response Deadline : 25JUL2014 Longlist(Tech. Rev. Cmte.) Date:  04AUG2014 Time:  01:00PM Shortlst Selection Date :  11AUG2014 Time:  10:00AM Scope Meeting Date :  19AUG2014 Time:  01:30PM Tech. Rev. Cmte Meeting :  15SEP2014 Time:  11:00AM Final Selection Meeting Date :  06OCT2014 Time:  10:00AM 1st Negotiations Meeting :  07OCT2014 Time:  01:00PM Response Deadline : 25JUL2014 Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 ************************************************************ Contract Number : 15253 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Major Work : 4.3.1 - Complex Bridge Design - Concrete 4.3.2 - Complex Bridge Design - Steel 4.4 - Movable Span Bridge Design Minor Work : Project Description: THIS IS A RE-ADVERTISEMENT DISTRICT WIDE COMPLEX AND MOVEABLE BRIDGE REPAIRS MISCELLANEOUS BRIDGE REPAIRS & INVESTIGATIONS Project Manager : BAILEY, JEFF H Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Special Notes: When submitting Letters of Response, include Financial Management TCN 15253 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting and the Scope Clarification Meeting Begin Negotiations meetings will be held at Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 14JUL2014 Response Deadline : 25JUL2014 Longlist(Tech. Rev. Cmte.) Date:  05AUG2014 Time:  09:00AM Shortlst Selection Date :  11AUG2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  04SEP2014 Time:  03:00PM Final Selection Meeting Date :  22SEP2014 Time:  10:00AM 1st Negotiations Meeting :  24SEP2014 Time:  01:00PM Response Deadline : 25JUL2014 Respond To: d2.profserv@dot.state.fl.us Attn.: Sally B. Morgan, MS 2016 Phone: 386-961-7595 ************************************************************ Contract Number : 15228 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 21099513214 Major Work : 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.5 - Geotechnical Speciality Lab Testing Minor Work : 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: DISTRICT WIDE CONSULTANT PE-LAB TESTING MATERIALS LAB Geotechnical and Materials Testing Projects Project Manager : WELLS, CAROLYN Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Special Notes: When submitting Letters of Response, include Financial Management (FM) number 210995-1-32-01 and firm name on the subject line. The Scope Clarification Meeting/Begin Negotiations meeting will be held at the District Materials Office in Lake City. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 18JUL2014 Longlist(Tech. Rev. Cmte.) Date:  29JUL2014 Time:  09:00AM Shortlst Selection Date :  11AUG2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  28AUG2014 Time:  11:30AM Final Selection Meeting Date :  29SEP2014 Time:  10:00AM 1st Negotiations Meeting :  01OCT2014 Time:  10:00AM Response Deadline : 18JUL2014 Respond To: d2.profserv@dot.state.fl.us Attn.: Robert Williams, MS 2016 Phone: 386-961-7568 ************************************************************ Contract Number : 15245 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43402813201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies Project Description: Timucuan Trail from Ft. George Trailhead to Huguenot Park Duval County Bike Path/Trail Project Manager : TEAL, CRAIG Estimated Contract Amt: $500,000 See Standard Notes Above: 9 Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434028-1-32-01 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 18JUL2014 Longlist(Tech. Rev. Cmte.) Date:  28JUL2014 Time:  09:00AM Shortlst Selection Date :  04AUG2014 Time:  10:00AM Scope Meeting Date :  12AUG2014 Time:  02:00PM Tech. Rev. Cmte Meeting :  08SEP2014 Time:  04:00PM 2nd Tech Rev. Cmte Meeting :  16SEP2014 Time:  10:00AM Final Selection Meeting Date :  14OCT2014 Time:  10:00AM 1st Negotiations Meeting :  16OCT2014 Time:  02:00PM Response Deadline : 18JUL2014 Respond To: d2.profserv@dot.state.fl.us Attn.: Debi Dahlberg, MS-2016 Phone: 386-961-7523 ************************************************************ Contract Number : 15250 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43054716201 43055416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: This project is being re-advertised. This is a BDI Project (Business Development Initiative) Reserved for Consultant CEI Services. This is a Minor Project not to exceed $499,990.00 contract amount. SR 121 Resurfacing (SR 24 to NW 5th Avenue); SR 200 Resurfacing (Marion CL to CR 325) Project Manager : SUAREZ, FRANK Estimated Contract Amt: $499,990 See Standard Notes Above: 4,7 Special Notes: When submitting LOR, include Financial Management (FM) Number 430547-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Gainesville Operations Office. Designer of Records: Hiren H. Patel, P.E.; Patel, Green and Associates, PLLC Christopher Q. Dicks, P.E.; FDOT Roadway Design View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 01JUL2014 Response Deadline : 11JUL2014 Longlist(Tech. Rev. Cmte.) Date:  21JUL2014 Time:  08:30AM Shortlst Selection Date :  11AUG2014 Time:  10:00AM Final Selection Meeting Date :  11AUG2014 Time:  10:00AM 1st Negotiations Meeting :  13AUG2014 Time:  01:30PM Response Deadline : 11JUL2014 Respond To: d2.profserv@dot.state.fl.us Attn.: Debi Dahlberg, MS-2016 Phone: 386-961-7523 ************************************************************ Contract Number : 15231 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 20821176201 43035226201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: 20821176201 SR21/BLANDING BLVD. RESURFACING FROM (800' SOUTH OF BRANNAN FIELD ROAD TO OLD JENNINGS ROAD); 43035226201 SR 200/US 301 RESURFACING (BRADFORD COUNTY LINE TO DUVAL COUNTY LINE Project Manager : Olivella, Joaquin Special Notes: When submitting LOR, include Financial Management (FM) Number 208211-7-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Gainesville Operations Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 23JUN2014 Longlist(Tech. Rev. Cmte.) Date:  14JUL2014 Time:  09:00AM Shortlst Selection Date :  21JUL2014 Time:  10:00AM Shortlist Selection Posting :  22JUL2014 Final Selection Meeting Date :  11AUG2014 Time:  10:00AM 1st Negotiations Meeting :  13AUG2014 Time:  09:30AM Shortlisted Firms: KCCS, INC. PARSONS BRINCKERHOFF, INC. VIA CONSULTING SERVICES, INC. ************************************************************ Contract Number : 15256 Major Project Selection Procedure: Letter of Response and Interview Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.2 - Minor Bridge Design 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: DISTRICT WIDE DRAINAGE Drainage Improvements Project Manager : SHIMER, ERIC Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Special Notes: When submitting Letters of Response, include TCN 15256 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. The Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 23JUN2014 Response Deadline : 07JUL2014 Longlist(Tech. Rev. Cmte.) Date:  16JUL2014 Time:  03:00PM Shortlst Selection Date :  04AUG2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  20AUG2014 Time:  01:30PM Final Selection Meeting Date :  22SEP2014 Time:  10:00AM 1st Negotiations Meeting :  25SEP2014 Time:  01:30PM Response Deadline : 07JUL2014 Respond To: d2.profserv@dot.state.fl.us Attn.: Cindy Duffany, MS-2016 Phone: 386-961-7596 ************************************************************ Contract Number : 15216 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43239613201 43240113201 43434013201 Major Work : 7.2 - Lighting 7.3 - Signalization Minor Work : 3.1 - Minor Highway Design Project Description: SR 13/SAN JOSE BLVD.FROM JULINGTON CREEK ROAD TO MANDARIN ROAD, DUVAL COUNTY SR 109 UNIVERSITY BLVD. FROM LOS SANTOS WAY TO MERRILL ROAD DUVAL COUNTY SR 15/(US 17) FROM CR 220 TO CREIGHTON ROAD, CLAY COUNTY SIGNAL REBUILDS AND LIGHTING Project Manager : CHARRON, DAVID Special Notes: When submitting Letters of Response, include Financial Management (FM) number 432396-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 16JUN2014 Longlist(Tech. Rev. Cmte.) Date:  10JUL2014 Time:  09:00AM Shortlst Selection Date :  21JUL2014 Time:  10:00AM Shortlist Selection Posting :  22JUL2014 Tech. Rev. Cmte Meeting :  20AUG2014 Time:  09:00AM Final Selection Meeting Date :  15SEP2014 Time:  10:00AM 1st Negotiations Meeting :  18SEP2014 Time:  01:15PM Shortlisted Firms: BASLEE ENGINEERING SOLUTIONS, INC. COMPREHENSIVE ENGINEERING SERVICES, KIMLEY-HORN AND ASSOCIATES, INC. ************************************************************ Contract Number : 14252 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43351926201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: District Two Systemic Intersection Improvements, Various Counties; Design-Build Project Manager : Lovelace, Joseph S Special Notes: When submitting LOR, include Financial Management (FM) Number 433519-2-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Lake City Operations Center in the Santa Fe & Suwannee Conference Rooms This construction contract is a Design-Build. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAY2014 Shortlst Selection Date :  24JUN2014 Time:  08:30AM Tech. Rev. Cmte Meeting :  10JUN2014 Time:  09:00AM Final Selection Meeting Date :  24JUN2014 Time:  08:30AM Final Selection Posting Date :  24JUN2014 1st Negotiations Meeting :  25JUN2014 Time:  09:30AM Rank Consultant 1 G-A-I CONSULTANTS, INC. 2 RS&H, Inc. ************************************************************ Contract Number : 15254 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43587513201 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design Project Description: LANDSCAPE & IRRIGATION DESIGN ON SR 9A/I-295 @ COLLINS ROAD INTERCHANGE FROM 0.5 MILE SOUTH OF COLLINS ROAD TO PARK CITY DRIVE COLLINS ROAD @ I-295 INTERCHANGE LANDSCAPING Project Manager : WILLIAMS, AMY Special Notes: When submitting Letters of Response, include Financial Management (FM) number 435875-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Longlist(Tech. Rev. Cmte.) Date:  06JUN2014 Time:  09:00AM Shortlst Selection Date :  17JUN2014 Time:  08:30AM Shortlist Selection Posting :  17JUN2014 Tech. Rev. Cmte Meeting :  09JUL2014 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  16JUL2014 Time:  11:30AM Final Selection Meeting Date :  11AUG2014 Time:  10:00AM 1st Negotiations Meeting :  14AUG2014 Time:  10:00AM Shortlisted Firms: BUFORD DAVIS & ASSOCIATES PROSSER HALLOCK, INC. URS CORPORATION SOUTHERN ************************************************************ Contract Number : 15204 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43310611201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 13.4 - Systems Planning Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: I-10 FROM CR 125 TO I-95 MANAGED LANES STUDY. I-10 MANAGED LANES STUDY. Project Manager : KNIGHT, JAMES M Special Notes: When submitting Letters of Response, include Financial Management (FM) number 433106-1-12-01 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Longlist(Tech. Rev. Cmte.) Date:  03JUN2014 Time:  08:30AM Shortlst Selection Date :  17JUN2014 Time:  08:30AM Shortlist Selection Posting :  17JUN2014 Tech. Rev. Cmte Meeting :  17JUL2014 Time:  01:30PM 2nd Tech Rev. Cmte Meeting :  28JUL2014 Time:  11:30AM Final Selection Meeting Date :  11AUG2014 Time:  10:00AM 1st Negotiations Meeting :  14AUG2014 Time:  10:00AM Shortlisted Firms: ARCADIS U.S., INC. HDR ENGINEERING, INC. RS&H, Inc. ************************************************************ Contract Number : 15213 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43204813201 43384313201 43219513201 Major Work : 4.2.1 - Major Bridge Design - Concrete Minor Work : Project Description: SR A1A @ HOSPITAL CREEK BRIDGE #780071 SR 5 @ OYSTER CREEK BRIDGE #780103 & SR 13 @ ST JOHNS RIVER BRIDGE #720570 AND #720571 MISCELLANEOUS BRIDGE REPAIRS Project Manager : BAILEY, JEFF H Special Notes: When submitting Letters of Response, include Financial Management (FM) number 432048-1-32-01 and firm name on the subject line View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Longlist(Tech. Rev. Cmte.) Date:  29MAY2014 Time:  09:00AM Shortlst Selection Date :  17JUN2014 Time:  08:30AM Shortlist Selection Posting :  17JUN2014 Tech. Rev. Cmte Meeting :  15JUL2014 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  31JUL2014 Time:  11:30AM Final Selection Meeting Date :  02SEP2014 Time:  08:30AM 1st Negotiations Meeting :  04SEP2014 Time:  10:00AM Shortlisted Firms: KISINGER CAMPO & ASSOC. CORP. RS&H, Inc. TRANSYSTEMS CORPORATION ************************************************************ Contract Number : 15236 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43054816201 42880316201 42307116201 43054216201 43068736201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: 43054816201 SR 24 RESURFACING (SR 55/US19 TO BRONSON CITY LIMITS 42880316201 I-75 RESURFACING (SOUTH OF SR 222 TO NORTH OF SR 25/US441) 4230716201 I-75 INTERCAHNGE IMPROVEMENT AT SR 222/39TH AVENUE 43054216201 SR 26/NEWBERRY RD RESURFACING (WEST OF NW 80TH TO SW 38TH AVENUE) 43068736201 CR 351 PAVE SHOULDERS (SR55/US19 TO SR 349) Project Manager : WOODINGTON, AUSTIN Special Notes: When submitting LOR, include Financial Management (FM) Number 430548-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Paynes Prairie Room in Gainesville, FL. Designer of Record(s): James M. Driggers, Jr., III, P.E.: FDOT (430548-1) Gus Hunter, P.E.; Faller, Davis & Associates, Ins. (428803-1) Kevin Tasillo, P.E.; Kisinger Campo & Associates, Corp. (423071-1) Donald S. Padgett, P.E.; URS Corporation Southern (430542-1) Travis N. Humphries, P.E.; FDOT Roadway Design (430687-3) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAY2014 Shortlst Selection Date :  24JUN2014 Time:  08:30AM Tech. Rev. Cmte Meeting :  05JUN2014 Time:  01:30PM Final Selection Meeting Date :  24JUN2014 Time:  08:30AM Final Selection Posting Date :  24JUN2014 1st Negotiations Meeting :  01JUL2014 Time:  10:30AM Rank Consultant 1 TARGET ENGINEERING GROUP, INC. 2 RS&H, Inc. 3 CALVIN, GIORDANO & ASSOCIATES,INC. 4 CALTROP CORPORATION 5 BERGMANN ASSOCIATES, ARCHITECTS, EN ************************************************************ Contract Number : 15239 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42698416201 43112916201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: 42698416201 I-10 (SR 8) RESURFACING (FROM JEFFERSON COUNTY LINE TO MP 11.333) 43112916201 SR 6 RESURFACING (MADISON COUNTY LINE TO US 41) Project Manager : BORDNER, JASON Special Notes: When submitting LOR, include Financial Management (FM) Number 426984-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Lake Jeffery Operations Complex. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAY2014 Shortlst Selection Date :  17JUN2014 Time:  08:30AM Shortlist Selection Posting :  17JUN2014 Tech. Rev. Cmte Meeting :  05JUN2014 Time:  09:00AM Final Selection Meeting Date :  30JUN2014 Time:  10:00AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  07JUL2014 Time:  04:00PM Rank Consultant 1 G-A-I CONSULTANTS, INC. 2 ATKINS NORTH AMERICA, INC. 3 RS&H, Inc. ************************************************************ Contract Number : 15247 Major Project Selection Procedure: Letter of Response and Interview Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.2 - Major Highway Design Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: District Wide Environmental Services Miscellaneous Design & Environmental Management Activities Project Manager : BENNETT, LEIGH ANN Special Notes: When submitting Letters of Response, include Financial Management (FM) number TCN 15247 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Longlist(Tech. Rev. Cmte.) Date:  04JUN2014 Time:  10:00AM Shortlst Selection Date :  17JUN2014 Time:  08:30AM Shortlist Selection Posting :  17JUN2014 Scope Meeting Date :  26JUN2013 Time:  03:30PM Tech. Rev. Cmte Meeting :  02JUL2014 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  09JUL2014 Time:  12:00PM Final Selection Meeting Date :  28JUL2014 Time:  10:00AM 1st Negotiations Meeting :  01AUG2014 Time:  10:00AM Shortlisted Firms: ARCADIS U.S., INC. KIMLEY-HORN & ASSOCIATES, INC. OSIRIS 9 CONSULTING, LLC ************************************************************ Contract Number : 15230 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 21099616216 Major Work : 9.3 - Highway Materials Testing Minor Work : 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: DISTRICT WIDE TESTING/MATERIALS EAST GEOTECHNICAL AND MATERIALS TESTING PROJECTS Project Manager : BLOOMFIELD, LESLIE Special Notes: When submitting Letters of Response, include Financial Management (FM) number 210996-1-62-16 and firm name on the subject line. Contract will begin with zero funding. Teaming of the firms is encouraged. Prime firm may be required to sub 50% of the Test Pile Program to a qualified sub-consultant(s). The selected prime consultant will not be able to work for the Contractor, on this contract, in any capacity. Field concrete and earthwork testing will be performed by CCEI personnel. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 05MAY2014 Longlist(Tech. Rev. Cmte.) Date:  02JUN2014 Time:  11:00AM Shortlst Selection Date :  10JUN2014 Time:  08:30AM Shortlist Selection Posting :  10JUN2014 Tech. Rev. Cmte Meeting :  01JUL2014 Time:  01:30PM Final Selection Meeting Date :  28JUL2014 Time:  10:00AM 1st Negotiations Meeting :  31JUL2014 Time:  01:30PM Shortlisted Firms: ELLIS & ASSOCIATES, INC. GANNETT FLEMING, INC. TERRACON CONSULTANTS, INC. ************************************************************ Contract Number : 15220 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43430213201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Project Description: SR 102/AIRPORT ROAD FROM WEST OF THE SR 243/INTERNATIONAL AIRPORT ROAD TO EAST OF I-95 MILLING AND RESURFACING Project Manager : BRINKLEY, RENEE Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434302-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21APR2014 Longlist(Tech. Rev. Cmte.) Date:  14MAY2014 Time:  10:00AM Shortlst Selection Date :  27MAY2014 Time:  08:30AM Shortlist Selection Posting :  27MAY2014 Scope Meeting Date :  03JUN2014 Time:  03:00PM Tech. Rev. Cmte Meeting :  17JUN2014 Time:  01:30PM 2nd Tech Rev. Cmte Meeting :  24JUN2014 Time:  11:30AM Final Selection Meeting Date :  14JUL2014 Time:  10:00AM Final Selection Posting Date :  14JUL2014 1st Negotiations Meeting :  16JUL2014 Time:  01:30PM Rank Consultant 1 PETERS AND YAFFEE, INC. 2 HANSON PROFESSIONAL SERVICES, INC. 3 KISINGER CAMPO & ASSOC. CORP. ************************************************************ Contract Number : 15237 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42442216201 42849116201 Major Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : 10.1 - Rdwy Construction Engineering Inspection Project Description: I-295/SR 9A AT BUCKMAN BRIDGE PAINTING AND CONCRETE REPAIR; I-295/SR 9A BRIDGE PAINTING AT SEVEN LOCATIONS (SR 228 TO NORTH OF US 1) DUVAL COUNTY Project Manager : Lahey, Daniel B Special Notes: When submitting LOR, include Financial Management (FM) Number 424422-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Shortlst Selection Date :  20MAY2014 Time:  08:30AM Tech. Rev. Cmte Meeting :  05MAY2014 Time:  01:30PM Final Selection Meeting Date :  20MAY2014 Time:  08:30AM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  27MAY2014 Time:  10:00AM Rank Consultant 1 GREENMAN-PEDERSEN, INC. 2 G-A-I CONSULTANTS, INC. 3 URS CORPORATION SOUTHERN 4 AMEC ENVIRONMENT & INFRASTRUCTURE, ************************************************************ Contract Number : 15244 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42880816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: I-95/SR 9 RESURFACING (MYRTLE AVENUE BRIDGE TO PEDESTRIAN OVERPASS) Project Manager : BENTON, BRIAN Special Notes: When submitting LOR, include Financial Management (FM) Number 428808-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Shortlst Selection Date :  20MAY2014 Time:  08:30AM Shortlist Selection Posting :  21MAY2014 Tech. Rev. Cmte Meeting :  05MAY2014 Time:  10:45AM Final Selection Meeting Date :  17JUN2014 Time:  08:30AM Final Selection Posting Date :  17JUN2014 1st Negotiations Meeting :  18JUN2014 Time:  01:00PM Rank Consultant 1 JEA CONSTRUCTION ENGINEERING SERVIC 2 AMEC ENVIRONMENT & INFRASTRUCTURE, 3 G-A-I CONSULTANTS, INC. ************************************************************ Contract Number : 15205 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 21284432201 41524812201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : Project Description: SR 105/HECKSCHER DR @ SIMPSON CREEK AND SR 105/HERKSCHER DR @ MYRTLE CREEK DUVAL COUNTY (SECOND CONTRACT) SR 200/US 301 AT ALLIGATOR CREEK BRIDGE, BRADFORD COUNTY (THIRD CONTRACT) CR 361 / CYPRESS CREEK BRIDGE AND CR 361 / FISH CREEK BRIDGE, TAYLOR COUNTY AWARD THREE CONTRACTS FROM ADVERTISEMENT AS DESCRIBED ABOVE. SHORTLISTED FIRMS WILL HAVE INTERVIEWS BASED ON THESE FMs 434041-1-22-01 & 434042-1-22-01 (FIRST CONTRACT) Project Manager : BRINKLEY, RENEE Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434041-1-22-01 and firm name on the subject line. Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Longlist(Tech. Rev. Cmte.) Date:  25APR2014 Time:  10:00AM Shortlst Selection Date :  06MAY2014 Time:  08:30AM Scope Meeting Date :  12MAY2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  02JUN2014 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  09JUN2014 Time:  11:30AM Final Selection Meeting Date :  30JUN2014 Time:  10:00AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  02JUL2014 Time:  10:00AM Rank Consultant 1 STV INCORPORATED 2 SAI CONSULTING ENGINEERS, INC. 3 CIVIL SERVICES INC. 4 BCC ENGINEERING, INC. 5 MICHAEL BAKER JR., INC. ************************************************************ Contract Number : 15208 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43403812201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: SR 105/HECKSCHER DR @ SIMPSON CREEK AND SR 105/HERKSCHER DR @ MYRTLE CREEK DUVAL COUNTY (SECOND CONTRACT) SR 200/US 301 AT ALLIGATOR CREEK BRIDGE, BRADFORD COUNTY (THIRD CONTRACT) CR 361 / CYPRESS CREEK BRIDGE AND CR 361 / FISH CREEK BRIDGE, TAYLOR COUNTY AWARD THREE CONTRACTS FROM ADVERTISEMENT AS DESCRIBED ABOVE. SHORTLISTED FIRMS WILL HAVE INTERVIEWS BASED ON THESE FMs 434041-1-22-01 & 434042-1-22-01 (FIRST CONTRACT) Project Manager : WILLIAMS, AMY Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434041-1-22-01 and firm name on the subject line. Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Longlist(Tech. Rev. Cmte.) Date:  25APR2014 Time:  10:00AM Shortlst Selection Date :  06MAY2014 Time:  08:30AM Scope Meeting Date :  12MAY2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  02JUN2014 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  09JUN2014 Time:  11:30AM Final Selection Meeting Date :  30JUN2014 Time:  10:00AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  02JUL2014 Time:  10:00AM Rank Consultant 1 STV INCORPORATED 2 SAI CONSULTING ENGINEERS, INC. 3 CIVIL SERVICES INC. 4 BCC ENGINEERING, INC. 5 MICHAEL BAKER JR., INC. ************************************************************ Contract Number : 15209 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43404112201 43404212201 43403812201 21284432201 41524812201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: (FIRST CONTRACT) SR 105/HECKSCHER DR @ SIMPSON CREEK AND SR 105/HERKSCHER DR @ MYRTLE CREEK DUVAL COUNTY (SECOND CONTRACT) SR 200/US 301 AT ALLIGATOR CREEK BRIDGE, BRADFORD COUNTY (THIRD CONTRACT) CR 361 / CYPRESS CREEK BRIDGE AND CR 361 / FISH CREEK BRIDGE, TAYLOR COUNTY AWARD THREE CONTRACTS FROM ADVERTISEMENT AS DESCRIBED ABOVE. SHORTLISTED FIRMS WILL HAVE INTERVIEWS BASED ON THESE FMs 434041-1-22-01 & 434042-1-22-01 (FIRST CONTRACT) Project Manager : BRINKLEY, RENEE Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434041-1-22-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Longlist(Tech. Rev. Cmte.) Date:  25APR2014 Time:  10:00AM Shortlst Selection Date :  06MAY2014 Time:  08:30AM Shortlist Selection Posting :  06MAY2014 Scope Meeting Date :  12MAY2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  02JUN2014 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  09JUN2014 Time:  11:30AM Final Selection Meeting Date :  30JUN2014 Time:  10:00AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  02JUL2014 Time:  10:00PM Rank Consultant 1 STV INCORPORATED 2 SAI CONSULTING ENGINEERS, INC. 3 CIVIL SERVICES INC. 4 BCC ENGINEERING, INC. 5 MICHAEL BAKER JR., INC. ************************************************************ Contract Number : 15233 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 20939966201 42871116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Project Description: 20939966201 SR 243 JIA NORTH ACCESS ROAD NEW ROAD CONSTRUCT- ION (AIRPORT ROAD TO PECAN PARK ROAD/I-95) NASSAU AND DUVAL COUNTIES. 42871116201 SR 15/US 1 RESURFACING (DUVAL COUNTY LINE TO 5TH AVENUE) Project Manager : GEISENDORFF, KENNY Special Notes: When submitting LOR, include Financial Management (FM) Number 209399-6-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Jacksonville Urban Office. Designer of Record(s): James Driggers, Jr., P.E.; FDOT and C. Brian Alley, P.E., Connelly & Wicker, Inc. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Shortlst Selection Date :  13MAY2014 Time:  08:00AM Shortlist Selection Posting :  13MAY2014 Tech. Rev. Cmte Meeting :  05MAY2014 Time:  09:00AM Final Selection Meeting Date :  03JUN2014 Time:  08:30AM Final Selection Posting Date :  03JUN2014 1st Negotiations Meeting :  04JUN2014 Time:  01:00PM Rank Consultant 1 RS&H, Inc. 2 CALTROP CORPORATION 3 G-A-I CONSULTANTS, INC. ************************************************************ Contract Number : 15242 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42880216201 42889616201 43061416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: 42880216201 I-75(SR 93) RESURFACING (NORTH OF SR 25/US 441 TO SANTA FE RIVER) 42889616201 UF CAMPUS GREENWAY BIKE LANE/SIDEWALK (SR 121/SW 34TH STREET TO GALE LEMERAND DRIVE) 43061416201 UF CAMPUS GREENWAY BIKE LANE/SIDEWALK (GALE LEMERAND DRIVE TO SR 24/ARCHER ROAD) ALACHUA COUNTY Project Manager : SUAREZ, FRANK Special Notes: When submitting LOR, include Financial Management (FM) Number 428802-1-62-01 and firm name on the subject line. Staff hours on summary sheet not applicable on this project. Resumes- a two-page resume or work history sheet for key personnel to include the positions of Senior Project Engineer, Project Administrator, Contract Support Specialist and Senior Inspector shall be included. The Technical Committee shall consider and weigh the following in their selection process (0-100): 1. Awareness of and Approach to Project (30) -Understanding of project scope, challenges and key milestones -Identification of potential issues related to the scope -Approach and understanding of Consultant CEI Services 2. Staffing and Organization (30) -Availability of key personnel -Experience of personnel on similar projects -Qualifications and Certifications applicable to the project -Quality of proposed staff 3. Construction Project Administration (25) -Knowledge and application of FDOT procedures -Knowledge and experience with construction scheduling -Identification of construction management methods and techniques -Ability to make decisions and facilitate resolution 4. Other Considerations (15) -Past performance on similar projects -Proximity to the project -Approach to CEI quality control During the acquisition phase of this project, Consultants are requested to refrain from contacting District Staff to market their firms until Final Ranking has occurred. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Gainesville Operations Center Paynes Praire Room View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Shortlst Selection Date :  13MAY2014 Time:  08:00AM Tech. Rev. Cmte Meeting :  23APR2014 Time:  01:30PM Final Selection Meeting Date :  13MAY2014 Time:  08:00AM Final Selection Posting Date :  13MAY2014 1st Negotiations Meeting :  15MAY2014 Time:  01:30PM Rank Consultant 1 HNTB CORPORATION 2 KCCS, INC. 3 AMEC ENVIRONMENT & INFRASTRUCTURE, 4 BERGMANN ASSOCIATES, ARCHITECTS, EN ************************************************************ Contract Number : 15210 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43455212201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.3 - Controlled Access Highway Design Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: SR 9B WIDENING PROJECT FROM US 1 TO THE SR 9A/SR9B SPLIT Project Manager : Daugharty, Jeff Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434552-1-22-01 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. The Scope Clarification Meeting/Begin Negotiation meeting will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  07APR2014 Time:  03:00PM Shortlst Selection Date :  15APR2014 Time:  08:30AM Shortlist Selection Posting :  15APR2014 Tech. Rev. Cmte Meeting :  14MAY2014 Time:  03:30PM 2nd Tech Rev. Cmte Meeting :  27MAY2014 Time:  11:15AM Final Selection Meeting Date :  17JUN2014 Time:  08:30AM Final Selection Posting Date :  17JUN2014 1st Negotiations Meeting :  18JUN2014 Time:  09:00AM Rank Consultant 1 G-A-I CONSULTANTS, INC. 2 PARSONS TRANSPORTATION GROUP, INC. 3 METRO CONSULTING GROUP, LLC ************************************************************ Contract Number : 15224 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43454113201 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design Project Description: LANDSCAPE DESIGN DISTRICT WIDE PUSH BUTTON Project Manager : TEAL, CRAIG Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434541-1-32-01 and firm name on the subject line. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10MAR2014 Longlist(Tech. Rev. Cmte.) Date:  31MAR2014 Time:  09:00AM Shortlst Selection Date :  08APR2014 Time:  08:30AM Shortlist Selection Posting :  08APR2014 Scope Meeting Date :  16APR2014 Time:  08:30AM Tech. Rev. Cmte Meeting :  15MAY2014 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  28MAY2014 Time:  11:15AM Final Selection Meeting Date :  10JUN2014 Time:  08:30AM Final Selection Posting Date :  10JUN2014 1st Negotiations Meeting :  16JUN2014 Time:  09:30AM Rank Consultant 1 HARDEMAN, KEMPTON & ASSOCIATES, INC 2 G-A-I CONSULTANTS, INC. 3 PROSSER HALLOCK, INC. ************************************************************ Contract Number : 15226 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 21108113215 Major Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Minor Work : 6.1 - Traffic Engineering Studies Project Description: DISTRICT WIDE TRAFFIC OPERATIONS MINOR DESIGN Project Manager : DAVID, TYLER Special Notes: When submitting Letters of Response, include Financial Management (FM) number 211081-1-32-15 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 03MAR2014 Longlist(Tech. Rev. Cmte.) Date:  19MAR2014 Time:  03:30PM Shortlst Selection Date :  01APR2014 Time:  08:30AM Shortlist Selection Posting :  01APR2014 Scope Meeting Date :  03APR2014 Time:  02:00PM Tech. Rev. Cmte Meeting :  22APR2014 Time:  01:30PM 2nd Tech Rev. Cmte Meeting :  06MAY2014 Time:  11:30AM Final Selection Meeting Date :  27MAY2014 Time:  08:30AM Final Selection Posting Date :  27MAY2014 1st Negotiations Meeting :  29MAY2014 Time:  01:30PM Rank Consultant 1 FALLER, DAVIS & ASSOCIATES, INC. 2 METRIC ENGINEERING, INC. 3 COMPREHENSIVE ENGINEERING SERVICES ************************************************************ Contract Number : 15222 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43433713201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Project Description: SR 134/103rd STREET AT I-295 NB & SB & AT FIRESTONE ROAD OPERATIONAL IMPROVEMENTS Project Manager : BRINKLEY, RENEE Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434337-1-32-01 and firm name on the subject line. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Longlist(Tech. Rev. Cmte.) Date:  17MAR2014 Time:  10:00AM Shortlst Selection Date :  25MAR2014 Time:  08:30AM Shortlist Selection Posting :  25MAR2014 Tech. Rev. Cmte Meeting :  16APR2014 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  30APR2014 Time:  11:30AM Final Selection Meeting Date :  20MAY2014 Time:  08:30AM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  21MAY2014 Time:  02:30PM Rank Consultant 1 DRMP, INC. 2 CONNELLY & WICKER INC. 3 LANDMARK ENGINEERING INC. ************************************************************ Contract Number : 15225 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Major Work : 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.1 - Control Surveying 8.4 - Right of Way Mapping Project Description: THIS IS A RE-ADVERTISEMENT DISTRICT WIDE MISCELLANEOUS SURVEY - TWO CONTRACTS FROM ONE ADVERTISEMENT DISTRICT WIDE SURVEYING AND MAPPING Project Manager : VAUGHAN, ROBERT Special Notes: When submitting Letters of Response, include Financial Management (FM) number TCN 15225 and firm name on the subject line. The consultant selected will be required to have the ability to perform electronic data collection using F.D.O.T. Electronic Field Book (EFB) and "CAiCE" software. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Longlist(Tech. Rev. Cmte.) Date:  24MAR2014 Time:  11:00AM Shortlst Selection Date :  01APR2014 Time:  08:30AM Shortlist Selection Posting :  01APR2014 Final Selection Meeting Date :  20MAY2014 Time:  08:30AM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  20MAY2014 Time:  08:30AM Rank Consultant 1 CLARY & ASSOCIATES, INC. 2 VOLKERT, INC. 3 LOCHRANE ENGINEERING INCORPORATED 4 ROBERT M. ANGAS ASSOCIATES, INC. ************************************************************ Contract Number : 15249 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Major Work : 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.1 - Control Surveying 8.4 - Right of Way Mapping Project Description: THIS IS A RE-ADVERTISEMENT DISTRICT WIDE MISCELLANEOUS SURVEY - TWO CONTRACTS FROM ONE ADVERTISEMENT DISTRICT WIDE SURVEYING AND MAPPING Project Manager : VAUGHAN, ROBERT Special Notes: When submitting Letters of Response, include Financial Management (FM) number TCN 15225 and firm name on the subject line. The consultant selected will be required to have the ability to perform electronic data collection using F.D.O.T. Electronic Field Book (EFB) and "CAiCE" software. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Longlist(Tech. Rev. Cmte.) Date:  24MAR2014 Time:  11:00AM Shortlst Selection Date :  01APR2014 Time:  08:30AM Final Selection Meeting Date :  20MAY2014 Time:  08:30AM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  20MAY2014 Time:  08:30AM Rank Consultant 1 CLARY & ASSOCIATES, INC. 2 VOLKERT, INC. 3 LOCHRANE ENGINEERING INCORPORATED 4 ROBERT M. ANGAS ASSOCIATES, INC. ************************************************************ Contract Number : 15217 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43429913201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization Project Description: SR 103/LANE AVENUE FROM SR 228/NORMANDY BOULEVARD TO SR 10/ US98/BEAVER STREET, DUVAL COUNTY This is a BDI Project. Project Manager : WIDMER, MYRNA Special Notes: When submitting Letters of Response, include Financial Management (FM) number 434299-1-32-01 and firm name on the subject line. Also, firms are required to indicate their percentage of Disadvantaged Business Enterprise (DBE) commitment on this contract or to fill out the attached DBE Participation Statement and return it in Portable Digital Format (PDF) along with the LOR. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17FEB2014 Longlist(Tech. Rev. Cmte.) Date:  12MAR2014 Time:  08:30AM Shortlst Selection Date :  25MAR2014 Time:  08:30AM Shortlist Selection Posting :  25MAR2014 Tech. Rev. Cmte Meeting :  22APR2014 Time:  11:00AM Final Selection Meeting Date :  20MAY2014 Time:  08:30AM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  22MAY2014 Time:  09:30AM Rank Consultant 1 PATEL, GREENE & ASSOCIATES, PLLC 2 BAYSIDE ENGINEERING, INC. 3 MCCRANIE & ASSOCIATES, INC. ************************************************************ Contract Number : 15203 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43110411201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 13.4 - Systems Planning Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: I-295 (SR 91) WESTERN BELTWAY MANAGED LANES STUDY Project Manager : BROWNING, STEPHEN Special Notes: When submitting Letters of Response, include Financial Management (FM) number 431104-1-12-01 and firm name on the subject line. Also, firms are required to indicate their percentage of Disadvantaged Business Enterprise (DBE) commitment on this contract or to fill out the attached DBE Participation Statement and return it in Portable Digital Format (PDF) along with the LOR. The project manager will participate as a member of the Technical Review Committee for this contract. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10FEB2014 Longlist(Tech. Rev. Cmte.) Date:  04MAR2014 Time:  03:00PM Shortlst Selection Date :  18MAR2014 Time:  08:30AM Shortlist Selection Posting :  18MAR2014 Tech. Rev. Cmte Meeting :  25MAR2014 Time:  11:00AM Final Selection Meeting Date :  06MAY2014 Time:  08:30AM Final Selection Posting Date :  06MAY2014 1st Negotiations Meeting :  12MAY2014 Time:  01:30PM Rank Consultant 1 THE CORRADINO GROUP, INC. 2 HNTB CORPORATION 3 PARSONS BRINCKERHOFF, INC. 4 ARCADIS U.S., INC. 5 BCC ENGINEERING, INC. ************************************************************ Contract Number : 15212 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42747613201 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design Minor Work : 6.3.3 - Intelligent Trans Traffic Eng. Communications Project Description: I-95 (SR 9) FROM SR 5 (US-1) TO REST AREA NORTH OF CR 210 Project Manager : Daugharty, Jeff Special Notes: When submitting Letters of Response, include Financial Management (FM) number 427476-1-32-01 and firm name on the subject line. Also, firms are required to indicate their percentage of Disadvantaged Business Enterprise (DBE) commitment on this contract or to fill out the attached DBE Participation Statement and return it in Portable Digital Format (PDF) along with the LOR. The project manager will participate as a member of the Technical Review Committee for this contract. The Technical Review Committee Meeting, Technical Interviews and the Scope Clarification Meeting/Begin Negotiations meetings will be held at the Jacksonville Urban Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10FEB2014 Longlist(Tech. Rev. Cmte.) Date:  04MAR2014 Time:  10:00AM Shortlst Selection Date :  18MAR2014 Time:  08:30AM Shortlist Selection Posting :  18MAR2014 Tech. Rev. Cmte Meeting :  15APR2014 Time:  10:00AM Final Selection Meeting Date :  06MAY2014 Time:  08:30AM Final Selection Posting Date :  06MAY2014 1st Negotiations Meeting :  08MAY2014 Time:  10:00AM Rank Consultant 1 ARCADIS U.S., INC. 2 TELVENT USA, LLC 3 VANASSE HANGEN BRUSTLIN, INC. ************************************************************ Contract Number : 15229 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 21099616215 Major Work : 9.3 - Highway Materials Testing Minor Work : 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: DISTRICT WIDE GEOTECHNICAL AND MATERIALS TESTING PROJECTS Project Manager : BLOOMFIELD, LESLIE Special Notes: When submitting Letters of Response, include Financial Management (FM) number 210996-1-62-15 and firm name on the subject line. Also, firms are required to indicate their percentage of Disadvantaged Business Enterprise (DBE) commitment on this contract or to fill out the attached DBE Participation Statement and return it in Portable Digital Format (PDF) along with the LOR. The Technical Review Committee Meeting and Scope Clarification Meeting/Begin Negotiations Meeting will be held at the Materials Conference Room. Contract will begin with zero funding. Teaming of the firms is encouraged. Prime firm may be required to sub 50% of the Test Pile Program to a Qualified Sub-consultant(s). The selected prime consulant will not able to work for the Contractor, on this contract, in any capacity. Field concrete and earthwork testing will be performed by CCEI personnel. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10FEB2014 Longlist(Tech. Rev. Cmte.) Date:  27FEB2014 Time:  01:30PM Shortlst Selection Date :  11MAR2014 Time:  08:30AM Shortlist Selection Posting :  11MAR2014 Tech. Rev. Cmte Meeting :  10APR2014 Time:  09:00AM Final Selection Meeting Date :  06MAY2014 Time:  08:30AM Final Selection Posting Date :  06MAY2014 1st Negotiations Meeting :  07MAY2014 Time:  10:00AM Rank Consultant 1 UNIVERSAL ENGINEERING SCIENCES, INC 2 ELLIS & ASSOCIATES, INC. 3 TERRACON CONSULTANTS, INC. 4 AMEC ENVIRONMENT & INFRASTRUCTURE, ************************************************************ Design/Build Projects Procurement Number : E2Q65 Financial Management Number(s): 20820745201 Project Description: Landscaping, perimeter wall, drainage improvements, and other incidental construction on SR 15 (US 17) from Holly Point Road to East Elbow Road in Clay County Project Manager : TEAL, CRAIG Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 5 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading and Landscaping Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 15.0 - Landscape Architect DBE/MBE Requirements: DBE Availability is 8.6% CLICK HERE FOR ADDITIONAL INFORMATION Advertisement Status : Shortlisted Date of Advertisement : 17JAN2412 PhaseI Selection Cmte. Meeting :  24JAN2412 Time:  08:30AM ELOI Scores Notification Date :  24JAN2412 Time:  08:30AM Deadline for Election to Participate in Ph. II :  30JAN2412 Time:  02:00PM Posting of Shortlist :  30JAN2412 Time:  02:00PM Mand. Pre-Proposal Meeting Date:  31JAN2412 Time:  10:00AM PhaseII Tech. Proposal Due Date:  29MAR2412 Time:  02:00PM Tech. Rev. Cmte Meeting :  19JAN2012 Time:  10:00AM Price Proposal Due Date :  29MAR2412 Time:  02:00PM Proposal Opening Date :  29MAR2412 Time:  02:00PM Final Selection Meeting Date :  03APR2412 Time:  08:30AM Award Committee Meeting Date :  03APR2012 Time:  08:30AM ************************************************************ Procurement Number : E2N43 Financial Management Number(s): 42598615201 42598715201 Project Description: THIS PROJECT HAS BEEN PULLED FROM THE FEBRUARY 17, 2010 . The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive bids & proposals from Proposers for the upgrade of an addition to an existing ITS system along SR15 (US 17) from Creighton Road in Clay County to Collins Road in Duval County. DESCRIPTION OF WORK: The ITS project consist of installation of four (4) arterial dynamic message signs (ADMS), interconnection with the existing FDOT District 2 fiber optic network (FON), adjustments to existing closed-circuit television (CCTV) camera mounting equipment, and the installation of an ITS cabinet at the intersection of SR 15 and Kingsley Avenue. The project shall also include all ancillary components and device configuration needed to connect and operate a complete ITS. Where complete shall be defined as command and control of all ITS interconnected components required by the identified command and control agencies specified in these contract documents. Existing multi-mode (MM) fiber optic cable (FOC) shall be utilized as the FOC backbone for the Project. DESIGN BUILD TEAM REQUIREMENTS:The contractor and Design professionals cannot be on more than one team. The secondary member (i.e.,designer or contractor) of the design build team cannot change, after award, without the written approval of the District Secretary. . A professional firm shall not submit a proposal for CEI services, either as a Prime or a Sub, for a Design-Build contract for which the same firm or its affiliate is the Engineer of Record (EOR) or is Sub to the EOR. . A consultant firm, its affiliate, or sub consultant that is under contract with the Department to develop the Request for Proposal for a Design Team proposing on that contract cannot be a part of a Design Build Team proposing on that contract as a prime or a sub consultant. A consultant firm, its affiliate, or sub consultant, that is under contract with the Department to provide Construction Engineering and Inspection (CEI) services on the Design Build contract cannot be a part of a Design Build Team proposing on that contract as a prime or sub consultant. PREQUALIFIFCATION:Prequalification requirements for Design Build Advertisements for the contractor and design professional members of the Design Build team must be in
  1. Contractors submitting as a lead or primary party with the design build team must be qualified in the work classes, in accordance with the provisions of Rule Chapter 14-22. F.A.C. In this case, where the design professional is not the lead of the design-build team, the design professional will be utilized to meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C.
  2. Design Professionals submitting as lead of the design build team may utilize subcontractors to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22 F.A.C. In this case, the lead design professional will meet the professional consultant work type requirements, in accordance with provisions of Rule 14-45, F.A.C.
  3. When a joint venture party submits a Letter of Interest, one of the contractor members of the joint venture party must be assigned to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, the design professional member of the team will be utilized to meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C.
RESPONSE PROCEDURE:Prequalified firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting a Fax Order Form found at the District Two website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2 . SELECTION PROCEDURE: if it is responsive and responsible. If the proposal is proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor irregularities. . PROTEST RIGHTS: section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes." . ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. Project Manager : WILLIAMS, AMY Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): INTELLEGENT TRANSPORTATION SYSTEM Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications Technical Questions Should Be Addressed To: DUE DATE FOR BID PROPOSALS WITH TECHNICAL PROPOSALS: Bid Proposals with technical proposals will be due to the District Contracts Office on February 17, 2010 on or before 2:00 p.m. deadline of the bid due date. . Prior to letting, direct questions through: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Bidders shall take responsibility to review and be familiar with all questions and responses posted on this website up through 2 business days prior to the bid opening and to make any necessary adjustments in the proposal accordingly. Bonding Requirements: BONDING REQUIREMENTS: Firms submitting bids will be required to provide a 5% bid bond for each bid in excess of $150,000.00. . The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid. The successful firm will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Florida. . The legal entity contracting with the Department must provide project specific Professional Liability Insurance covering errors and omissions in the amount of $1,000,000 unless each team member providing professional services carries and maintains blanket Professional Liability Insurance covering errors and omissions in the amount of $1,000,000. Project specific insurance is insurance covering only this project. Blanket insurance is insurance that covers all projects. The awarded contractor will be required to provide certificates of Insurance for General Liability, Auto's and Worker's Compensation. For GENERAL LIABILITY INSURANCE, the description area MUST state that the State of Florida Department of Transportation is endorsed as an additional insured. For GENERAL LIABILITY INSURANCE, THE DESIGN BUILD TEAM MUST PROVIDE an ENDORSEMENT PAGE OF THE INSURANCE POLICY THAT ACTUALLY STATES FDOT IS ENDORSED. . The Professional Liability Insurance must be provided by Liability Insurance must be provided by the Designer/ Consultant. ALL CERTIFICATES OF INSURANCE MUST HAVE ORIGINAL SIGNATURES. DBE/MBE Requirements: DBE REQUIREMENTS: The Florida Department of Transportation (hereinafter referred to as the "Department"),in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement,minority business enterprises and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan CLICK HERE FOR ADDITIONAL INFORMATION View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 14DEC2400 Pre-Bid Meeting Date :  27JAN2400 Time:  10:00AM Bid Opening Date :  17FEB2400 Time:  02:00PM Tech. Rev. Cmte Meeting :  25FEB2400 Time:  08:30AM Final Selection Meeting Date :  01MAR2400 Time:  08:30AM ************************************************************ Procurement Number : E2L04 Financial Management Number(s): 4229381 SEE ADDEND6 Project Description: The First Coast Outer Beltway Project - The Florida Department of Transportation, an agency of the State of Florida requests sealed submittal of Statements of Qualification from Proposers desiring to Develop, Design, Construct, Finance, Maintain, Operate and Toll the project. - FDOT is seeking a private partner experienced in undertaking large transportation (road and bridge) infrastructure projects under a concession approach and who is willing to share risks. The successful Proposer must have proven ability to arrange and close financing on favorable terms. as well as a demonstrated skill in designing, building, managing and operating complex transportation (road and bridge) projects on behalf of public sector owners. - The Project is a minmum four-lane limited access toll the St. Johns River in the vicinity of the existing SR 16 crossing (Shands Bridge) of the St Johns River to Inter- state 10 in Duval County. The Project is comprised of the St. Johns River Crossing segment in St. Johns and Clay Counties and the Branen Field-Chaffee Road segment in Clay and Duval Counties. The total length of the Project is approximatgely 46.5 miles. - For a complete Request for Qualification package, the map, any addendums and the Project Information Memorandum go to: http://www.fdotfirstcoastouterbeltway.com - The Statement of Qualifications will be sent by mail to the address in the Requalification for Qualification. Project Manager : Jones-Redd, Jane E Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: ___ Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Major Bridge Bridges of conventional construction which are over a water opening of 1,000 feet or more Minor Bridge Grading Drainage Flexible Pavement Portland Cement Concrete Paving Hot Plant-Mix Bituminous Intelligent Transportation Systems Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.2.3 - Major Bridge Design - Segmental 5.1 - Conventional Bridge Inspection 5.3 - Complex Bridge Inspection 5.4 - Bridge Load Rating 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Technical Questions Should Be Addressed To: email address: FCOBprocurement@dot.state.fl.us Special Notes: Please see the Request for Qualification package (Scope) for additional information. Note: An second addendum was added to the scope on February 8, 2008.  In addition, a Questions and Answers document has been added to the end of addendum two. (page 118)   Please download the revised document. CLICK HERE FOR ADDITIONAL INFORMATION View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 04DEC2400 PhaseI Selection Cmte. Meeting :  08APR2400 Time:  08:30AM Posting of Shortlist :  25SEP2400 Time:  Mand. Pre-Proposal Meeting Date:  23APR2400 Time:  02:00PM PhaseII Tech. Proposal Due Date:  24SEP2400 Time:  Tech. Rev. Cmte Meeting :  19NOV2008 Time:  02:00PM Final Selection Meeting Date :  25NOV2400 Time:  08:30AM On Hold ************************************************************ Procurement Number : E2O87 Financial Management Number(s): 42821415201 21149425201 MILL, RESURFACE ON SR224 Project Manager : BRINKLEY, RENEE Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design Advertisement Status : Shortlisted Date of Advertisement : 18OCT2400 Bid Opening Date :  02NOV2400 Time:  02:00PM Tech. Rev. Cmte Meeting :  08NOV2400 Time:  01:30PM 2nd Tech Rev. Cmte Meeting :  10NOV2400 Time:  10:00AM Final Selection Meeting Date :  16NOV2400 Time:  08:30AM ************************************************************ Procurement Number : E2L32 Financial Management Number(s): 20820235201 Project Description: NOTICE OF WITHDRAWAL DUE TO CHANGES NECESSARY ON BID PACKAGE E2L32, WE HAVE DECIDED TO PULL THIS PROJECT FROM THE SEPTEMBER 25, 2008 LETTING. WE APOLOGIZE FOR ANY INCONVENIENCE THIS MAY HAVE CAUSED YOU. HOWEVER, SINCE WE DO ANTICIPATE RE-LETTING THIS PROJECT IN ITS REVISED FORM IN THE VERY NEAR FUTURE, WE WOULD RECOMMEND THAT YOU SAVE THE WORK YOU HAVE DONE THUS FAR AS MUCH OF IT SHOULD BE APPLICABLE TO THE NEXT PROJECT. The Florida Department of Transportation has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for landscape design and installation of median landscaping for SR 15 from Gum Street to Lamont Street (0.937 miles) and SR 21 from Halpren's Way to CR 220 (1.396 miles) in Clay County. DESCRIPTION OF WORK On Project 20820235201 - SR 15 (N. Orange Avenue) from Gum St. to Lamont St., Clay County, the work shall consist of removal of existing landscaping, design and implement a new landscape plan which includes cabbage palms, crape myrtles, shrubs, ornamental grass and perennial peanut sod as well as flower bed preparation on each median nose. Project includes design and construction of a permanent irrigation system per each median. Finally, maintenance including mowing of the medians will be required of the contractor during the contract and throughout the one (1) year establishment period. On Project 20821165201 - SR 21 (Blanding Blvd.) from Halpren's Way to CR 220, Clay County, the work shall consist of removal of existing landscaping, design and implement a new landscape design with crape myrtles planted throughout the center of the curbed medians at the appropriate spacing. Also, maintenance including mowing of the medians will be required of the contractor during the contract and throughout the one (1) year establishment period. . The Design-Build Firm shall be responsible for survey, geotechnical investigation, design, acquisition of all permits not acquired by the Department, any required modification of permits acquired by the Department, maintenance of traffic, demolition, and construction on or before the date indicated in their proposal. The Design- Build Firm will coordinate all utility relocations. The Design and Construction Criteria (Section VI) sets forth requirements regarding survey, design, construction, maintenance of traffic during construction, requirements relative to project management, scheduling and coordination with other agencies and entities such as state and local government, utilities, environmental permitting agencies and the public. The Design-Build Firm shall demonstrate good project management practices while working on this project. These include communication with the Department and the District Landscape Architect and others as necessary, documentation, management of time and resources. There will be a one (1) year establishment period following installation. During this time period the Design-Build Firm will be responsible for planting survival, project maintenance, and mowing as stated in FDOT Standard Specification Section 580. DESIGN-BUILD TEAM REQUIREMENTS: The Contractor and Design professionals cannot be on more than one team. The secondary member (i.e., designer or contractor) of the Design-Build team cannot change, after award, without the written approval of the District Secretary. A professional firm shall not submit a proposal for CEI services, either as a Prime or a Sub, for a Design-Build contract for which the same firm or its affiliate is the Engineer of Record (EOR) or is Sub to the EOR. a consultant firm, its affiliate, or subconsultant that is under contract with the Department to develop the Request for Proposal for a Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or a subconsultant. A consultant firm, its affiliate, or subconsultant, that is under contract with the Department to provide Construction Engineering and Inspection (CEI) services on the Design-Build contract cannot be part of a Design-Build Team proposing on that contract as a prime or subconsultant. PREQUALIFICATION: Pre-qualification requirements for Design-Build Advertise- ments for the contractor and design professional members of the Design-Build team must be in accordance with the following (Rule Chapter 14-91, F.A.C.). (1) Contractors submitting as a lead or primary party with the Design-Build team must be qualified in the advertised construction contractor work classes, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, where the design professional is not the lead of the Design-Build team, the design professional will be utilized to meet the professional consultant work type requirements, in accordance with provision of Rule 14-75, F.A.C. (2) Design professionals submitting as lead of the Design- Build team may utilize subcontractors to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, the lead design professional will meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C. (3) When a joint venture party submits a Letter of Interest, one of the contractor members of the joint venture party must be assigned to meet the advertised construction contractor work class requirements, in accordance with the provisions of Rule Chapter 14-22, F.A.C. In this case, the design professional member of the team will be utilized to meet the professional consultant work type requirements, in accordance with provisions of Rule 14-75, F.A.C. RESPONSE PROCEDURE: Prequalified firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting the fax request form found on the District Two District Contracts website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2. SELECTION PROCEDURE: Firms shall submit a bid proposal and a technical proposal. All bids will be opened and the technical proposal of the lowest bidder shall be evaluated by the FDOT to determine if it is responsive and responsible. If the proposal of deemed non-responsive or non-responsible, the technical proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor proposal irregularities. PROTEST RIGHTS: "Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time frame allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes." ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. Project Manager : THRASHER, JOHN Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Landscaping Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 15.0 - Landscape Architect Technical Questions Should Be Addressed To: Prior to letting, direct questions through: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Bidders shall take responsibility to review and be familiar with all questions and responses posted on this website up through 2 business days prior to the bid opening and to make any necessary adjustments in the proposal accordingly. Bonding Requirements: Firms submitting bids will be required to provide a 5% bid bond for each bid in excess of $150,000.00. . The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid. The successful firm will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Florida. . The legal entity contracting with the Department must provide project specific Professional Liability Insurance covering errors and omissions in the amount of $1,000,000.00 unless each team member providing professional services carries and maintains blanket Professional Liability Insurance covering errors and omissions in the amount of $1,000,000.00. Project specific insurance is insurance covering only this project. Blanket insurance is insurance that covers all projects. All certificates of insurance shall name the Florida Department of Transportation as an additional insured and must have original signatures. DBE/MBE Requirements: The Florida Department of Transportation (hereinafter referred to as the "Department"), in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21 Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Further, the Department will not discriminate against bidders on the grounds of race, color, national origin, sex, age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 08JUL2400 Pre-Bid Meeting Date :  10SEP2400 Time:  10:00AM Bids Due Date :  25SEP2400 Time:  02:00PM Bid Opening Date :  25SEP2400 Time:  02:00PM Final Selection Meeting Date :  07OCT2400 Time:  08:30AM Project Withdrawn ************************************************************ Procurement Number : E2P15 Financial Management Number(s): 42930415201 42930425201 Project Description: SR 23 Frontage roads from old Jennings Road to Oakleaf Plantation Parkway, New Road Construction, Orange Park Project Manager : THOMAS, KATHY Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 5 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading, Drainage, Flexible Paving, Hot Plant Mix Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.2 - Minor Bridge Design CLICK HERE FOR ADDITIONAL INFORMATION Advertisement Status : Shortlisted Date of Advertisement : 18APR2400 1st Pre-Longlist(TRC)Date :  22APR2011 Time:  10:00AM PhaseI Selection Cmte. Meeting :  26APR2400 Time:  08:30AM Posting of Shortlist :  28APR2400 Time:  Mand. Pre-Proposal Meeting Date:  03MAY2411 Time:  10:00AM PhaseII Tech. Proposal Due Date:  12JUL2411 Time:  Price Proposal Due Date :  11AUG2411 Time:  02:00PM Proposal Opening Date :  11AUG2411 Time:  02:00PM Final Selection Meeting Date :  16AUG2411 Time:  08:30AM Award Committee Meeting Date :  16AUG2011 Time:  08:30AM ************************************************************ Procurement Number : E2M00 Financial Management Number(s): 21149425201 Project Description: PROJECT NAME AND DESCRIPTION The Florida Department of Transportation (Department), District 2 has identified this Federal project for Design Build for Safe Sidewalk (5' wide by 4" thick) in Starke between the existing sidewalk and North Westmoreland Street in Starke, Florida. . Note: The RFP will contain Davis Bacon Wage Rate, FHWA 1273, Buy America and the monthly reporting information required by FHWA. . There will be no stipends for this project. . ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. . DESIGN BUILD TEAM REQUIREMENT LIMITATIONS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . RESPONSE PROCEDURE: Firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting the fax request form found on the District Two District Contracts website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2. Project packages will be e-mailed to those firms that have requested them. . Technical proposals with Bid packages must be submitted by 2:00 pm on the date indicated in the Calendar of Events. . Bid openings and public meetings will be held in district headquarters unless otherwise noted. . PREQUALIFICATION: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . PROTEST RIGHTS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . "Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes." . SELECTION PROCEDURE: Firms shall submit a bid proposal and a technical proposal. Bids will be opened and the technical proposal of the lowest bidder shall be evaluated by the FDOT to determine if it is responsive and responsible. If the proposal is deemed non-responsive or non responsible, the technical proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor proposal irregularities. . The Department shall determine the relative ability of the proposer to perform the services required for this project based on * 14-22 and 14-75 prequalification information, *Technical Proposal with other experience and other documentation of pertinent information requested. . The selection results will be posted on the Department's website (www.dot.state.fl.us/procurement) at the indicated date and time indicated in the advertisement. . A contractor must have a current certificate of qualification in accordance with Rule Chapter 14-22, F.A.C. on the due date of the Technical proposals and the sealed bid. In order for the Department to have the information required to determine a bidder's Current Capacity, it is necessary that the bidder enter his "Work Underway". This certification shall be accomplished electronically by submitting the Certification of Work Underway (Online Web Application) http://www.dot.state.fl.us/cc-admin/PreQual Info/prequalified.shtm to the Department concurrently with the bid submittal for the first letting in the calendar month that the bidder submits a bid. . proposer to perform the services required for this project based on *14-22 and 14-75 prequalification information, *Technical Proposal with other experience and other documentation of pertinent information requested. . ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. . NOTE: A contractor must have a current certificate of qualification in accordance with Rule Chapter 14-22, F.A.C. on the due date of the Technical proposals and the sealed bid. In order for the Department to have the information required to determine a bidder's Current Capacity, it is necessary that the bidder enter his "Work Underway". This certification shall be accomplished electronically by submitting the Certification of Work Underway (Online Web Application) http://www.dot.state.fl.us/cc-admin/PreQual Info/prequalified.shtm to the Department concurrently with the bid submittal for the first letting in the calendar month that the bidder submits a bid. . Project Manager : BRINKLEY, RENEE Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Prequalification for Construction is: Drainage or Sidewalk . Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design Technical Questions Should Be Addressed To: Direct questions to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Proposers are responsible for viewing the website and shall be familiar with all questions and responses posted on this website up to the due date of the Technical Proposal with the price package and are responsible for making necessary adjustments to the information to be presented. . Bonding Requirements: The Price Package shall contain the Bid Bond. . Bid Bond At bid time, a Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bankdraft of any national or state bank,or a Surety Bid Bond made payable to the Florida Departmentof Transportation must accompany each bid. A check or draft in an amount less than five percent (5%) of the actual bidwill invalidate the bid proposal. . Performance and Payment Bond At award time the following is applicable: The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid before execution of the contract. The successful proposer will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Florida. . INSURANCE REQUIREMENTS Workers' Compensation Insurance Provide in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefits of the Florida Workers' Compensation Law for all employees. If subletting any of the work, ensure employees of the subcontractors are covered by similar insurance. Ensure that any equipment rental agreements that include operators who are employees of independent contractors, sole proprietorships or partners are covered by similar insurance. The Engineer will accept equivalent approved protection in lieu of insurance. . Contractors' Public Liability and Property Damage Liability Insurance Furnish evidence to the Department that, with respect to the operations performed, regular Contractors' Public Liability Insurance providing for a limit of not less than $1,000,000 for all damages arising out of bodily injuries to, or death of, one person and, subject to that limit for each person, a total limit of $5,000,000 for all damages arising out of bodily injuries to, or death of, two or more persons in any one occurrence; and regular Contractors' Property Damage Liability Insurance providing for a limit of not less than $50,000 for all damages arising out of injury to, or destruction of, property in any one occurrence and, subject to that limit per occurrence, a total (or aggregate) limit of $100,000 for all damages arising out of injury to, or destruction of, property during the policy period is carried. . Cause the Department to be an additional insured party on the Contractor's Public Liability and Property Damages Liability Insurance policies that insure the Contractor for the described work that it performs under the Contract. . Contractors' Protective Public Liability and Property Damage Liability Insurance Furnish evidence to the Department that, with respect to the operations performed by subcontractors, regular Contractors' Protective Public Liability Insurance providing for a limit of not less than $1,000,000 for all damages arising out of bodily injuries to, or death of, one person and, subject to that limit for each person, a total limit of $5,000,000 for all damages arising out of bodily injuries to, or death of, two or more persons in any one occurrence; and regular Contractors' Protective Property Damage Liability Insurance providing for a limit of not less than $50,000 for all damages arising out of injury to, or destruction of, property in any one occurrence and, subject to that limit per occurrence, a total (or aggregate) limit of $100,000 for all damages arising out of injury to, or destruction of, property during the policy period is carried. . Cause the Department to be an additional insured party on the Contractor's Protective Public Liabilityand Property Damage Liability Insurance policies that insure the Contractor for the described work that it performs under the Contract. . Insurance for Protection of Utility Owners When work under the Contract involves work on or in the vicinity of utility-owned property or facilities, furnish the Department with evidence that, with respect to the operations performed, General Comprehensive Liability Insurance or its equivalent providing for a limit of not less than $1,000,000 for bodily injury or death to person(s) per occurrence and $300,000 property damage each occurrence is carried. . The Department and Utility Company are to be Additional Named Insured, and the policy will be primary to any coverage maintained by the Department or Company. Do not make any material change or cancellation to the policy without providing the Department with ten days prior written notice. . Submission and Approval of Policies; Termination Certificates of such insurance shall be filed at the time of Contract execution with the District Contracts Administrator. These certificates shall contain a provision that coverages afforded under the policies will not be canceled until at least thirty (30) days after the Department accepts the work. . Professional Liability The Design-Build Firm shall have and maintain during the period of this Contract, professional liability insurance policy or policies with a company or companies authorized to do business in the State of Florida, affording professional liability coverage for the professional services to be rendered in accordance with this Agreement in the following amounts: Total D-B Contract Price - Up to $30 Million Minimum Coverage Limits - Minimum Coverage Limits . DBE/MBE Requirements: * A DBE Affirmative Action Plan must be approved and on file prior to award of any contract. * The Federal DBE program requires states to maintain a database of all firms that are participating, or attempting to participate on DOT assisted contracts. This list must include both DBE and NON DBE companies. * The Bid Opportunity List form must be submitted with the RFP, (Note: The RFP and price are to be in separate packages.) * The Anticipated DBE Participation Statement shall be submitted with the price proposal. * The Design Build Firm is required to report monthly actual payments to subcontractors and suppliers. * DBEs are encouraged to utilize the DBE Supportive Services Provider. Contact Blackmon Roberts at 863-802-1280 for assistance. * The Department of Transportation has an overall eight point one eighteen percent (8.18%) race-neutral DBE goal. This means that the State-s goal is to spend at least 8.18% of the highway dollars with certified DBEs as prime Design Build Firms or as subcontractors or sub consultants. Race- neutral means that the Department believes that the 8.18% overall goal can be achieved through the normal competitive procurement process. The Department reviewed this project and the percentage will be given at RFP time. The Department believes that this percentage can be realistically achieved. * The Florida Department of Transportation (hereinafter referred to as the "Department"), in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Further, the Department will not discriminate against bidders on the grounds of race, color, national origin, sex, age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan. . Special Notes: . CLICK HERE FOR ADDITIONAL INFORMATION View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 29MAR2400 Bid Opening Date :  25MAY2400 Time:  02:00PM Tech. Rev. Cmte Meeting :  01JUN2400 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  03JUN2400 Time:  09:00AM 3rd Tech Rev. Cmte Meeting :  15JUN2400 Time:  09:00AM 4th Tech Rev. Cmte Meeting :  17JUN2400 Time:  09:00AM Final Selection Meeting Date :  08JUN2400 Time:  08:30AM ************************************************************ Procurement Number : E2O56 Financial Management Number(s): 42830615201 Project Description: no bids received. will be re-let under contract # E2O78 THIS PROJECT IS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) . The Florida Department of Transportation (Department) has identified this Federal project for Design Build for Bridge Rail Retrofit and other miscellaneous work on CR 214 over SR 9 (I-95) in St. Johns County. . Note: The RFP will contain Davis Bacon Wage Rates, FHWA 1273, But America and the monthly reporting information required by FHWA. . There will be no stipends for this project. . Prequalification for Design is: 3.1 Highway Minor Design, 4.1.2 Minor Bridge Design. . Prequalification for Construction is: Guardrail and Hot Plant Mix. . SELECTION PROCEDURE: LOW BID TECHNICALLY ACCEPTABLE . AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 This project is funded through the American Recovery and Reinvestment Act of 2009 (ARRA). Sections 1201 and 1512 of the American Recovery and Reinvestment Act requires states to fulfill employment reporting obligations for each ARRA funded project. The Design Build Firm on each ARRA project will provide the initial employment reporting information within five calendar days after the notice to proceed is issued by the Department. Thereafter, the reporting information will be due on a monthly basis on or before the 10th of each month until completion of the contract. Design Build Firms are required to provide the necessary employment information (employees, hours, and payroll wages) for their own workforce as well as the workforce of all subcontractors that are active on their ARRA funded project(s) for the reporting month. FDOT has automated the form which will be used to collect employment information. The prime contractor can access FDOT's ARRA Employment Reporting System from the following website: www2.dot.state.fl.us/ARRAEmploymentReporting. Failure to timely report the required information may cause for rejection of the monthly invoice for contract payment. Please refer to the informational brochure available at the following link, which provides summary information on the employment reporting requirements for ARRA: http://www.dot.state.fl.us/inspectorgeneral/ARRA/ARRA BrochurefinalVersion.pdf. Additional training information on ARRA employment reporting can also be accessed at: http://www.dot.state.fl.us/inspectorgeneral/ARRA.shtm Another critical reporting component is a requirement for prime consultants/contractors to have a Dun & Bradstreet (DUNS) number. This is a unique nine-digit firm identification number issued by Dun & Bradstreet. It is not the same as a firm's Tax ID Number. Design/Build Firms who don't already have a DUNS number can register for it thru the following website: http://www.dnb.com/us. Design Build Firms who do not already have a DUNS number should begin the application process. According to the D&B website, it takes a minimum of 30 business days for a new D&B DUNS Number to be processed. . DESIGN BUILD TEAM REQUIREMENT LIMITATIONS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advbld.htm . RESPONSE PROCEDURE: Firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting the Fax Order Form found on the District Two District Contracts website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2 Project packages will be e-mailed to those firms that have requested them. . Technical proposals with Bid packages must be submitted by 2:00 p.m. on the date indicated in the Calendar of Events. . Bid Openings and public meetings will be held in the district headquarters unless otherwise noted. . PREQUALIFICATION: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advbld. htm . PROTEST RIGHTS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advbld. htm . "Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes." Project Manager : TEAL, CRAIG Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Guardrail and Hot Plant Mix Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Technical Questions Should Be Addressed To: Direct questions to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Proposers are responsible for viewing the website and shall be familiar with all questions and responses posted on this website up to the due date of the Technical Proposal with the Price Package and are responsible for making necessary adjustments to the information to be presented. . DUE DATE FOR BID PROPOSALS WITH TECHNICAL PROPOSALS: Bid proposals with technical proposals will be due to the District Contracts Office as advertised in the Calendar of Events on or before 2:00 p.m. Not late bids with technical proposals will be accepted after the 2:00 p.m. deadline of the bid due date. . SELECTION PROCEDURE: Firms shall submit a bid proposal and a technical proposal. Bids will be opened and the technical proposal of the lowest bidder shall be evaluated by the FDOT to determine if it is responsive and responsible. If the proposal is deemed non responsive or non responsible, the technical proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor irregularities. . The Department shall determine the relative ability of the proposer to perform the services required for the project based on: * 14-22 and 14-75 F.A.C. prequalification information * Technical Proposal with other experience and other documentation of pertinent information requested. Bonding Requirements: The Request for Proposal will have the following requirements in the documents: The Price Proposal shall contain the Bid Bond. . Bid Bond: At bid time, a Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurers check, bank draft of any national or state bank, or a Surety Bid Bond made payable to the Florida Department of Transportation must accompany each bid. A check or draft in an amount less than five percent (5%) of the actual bid will invalidate the bid proposal. Bid Bonds shall conform to DOT Form 375-020-09 furnished in the Bid proposal package. . Performance and Payment Bond: At award time the following is applicable: The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid before execution of the contract. The successful proposer will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount. The Surety Company must be authorized to do business in the State of Florida. . INSURANCE REQUIREMENTS: Workers' Compensation Insurance: Provide in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefits of the Florida Workers' Compensation Law for all employees. If subletting any of the work, ensure employees of the subcontractors are covered by similar insurance. Ensure that any equipment rental agreements that include operators who are employees of independent contractors, sole proprietorships or partners are covered by similar insurance. The Engineer will accept equivalent approved protection in lieu of insurance. . Contractors' Public Liability and Property Damage Liability Insurance: Furnish evidence to the Department that, with respect to to the operations performed, regular Contractors' Public Liability Insurance providing for a limit of not less than $1,000,000 for all damages arising out of bodily injuries to, death of, one person and, subject to that limit for each person, a total limit of $5,000,000 for all damages arising out of bodily injuries to, or death of, two or more persons in any one occurrence, and regular Contractors' Property Damage Liability Insurance providing for a limit of not less that $50,000 for all damages arising out of injury to, or destruction of, property in any one occurrence and, subject to that limit per occurrence, a total (or aggregate) limit of $100,000 for all damages arising out of injury to, or destruction of, property during the policy period is carried . Cause the Department to be an additional insured party on the Contractors' Public Liability and Property Damages Liability Insurance policies that insure the Contractor for the described work that it performs under that Contract. . Contractors' Protective Public Liability and Property Damage Liability Insurance: Furnish evidence to the Department that, with respect to the operations performed by subcontractors, regular Contractors' Protective Public Liability Insurance providing for a limit of not less than $1,000,000 for all damages arising out of bodily injuries to, or death of, one person and, subject to that limit for each person, a total limit of $5,000,000 for all damages arising out of bodily injuries to, or death of, two or more persons in any one occurrence, and regular Contractors' Protective Property Damage Liability Insurance providing for a limit of not less than $50,000 for all damages arising out of injury to, or destruction of, property in any one occurrence and, subject to that limit per occurrence, a total (or aggregate) limit of $100,000 or all damages arising out of injury to, or destruction of, property during the policy period is carried. . Cause the Department to be an additional insured party on the Contractors' Protective Public Liability and Property Damage Liability Insurance policies that insure the Contractor for the described work that it performs under the Contract. . Insurance for Protection of Utility Owners: When work under the Contract involves work on or in the vicinity of utility-owned property or facilities, furnish the Department with evidence that, with respect to the operations performed. General Comprehensive Liability Insurance or its equivalent providing for a limit of not less that $1,000,000 for bodily injury or death to person(s) per occurrence and $300,000 property damage each occurrence is carried. . The Department and Utility Company are to be Additional Named Insured, and the policy will be primary to any coverage maintained by the Department or Company. Do not make any material change or cancellation to the policy without providing the Department with ten days prior written notice. . Submission and Approval of Policies, Termination: Certificates of such insurance shall be filed at the time of Contract Execution with the District Contracts Administrator These certificates shall contain a provision that coverage's afforded under the policies will not be canceled until at least thirty (30) days after the Department accepts the work. . Professional Liability: The Design Firm shall have and maintain during the period of this Contract, professional Liability Insurance policy or policies with a company or companies authorized to do business in the State of Florida, affording professional liability coverage for the professional services to be rendered in accordance with this Agreement in the following amounts: . .....Total D-B Contract Price....Minimum Coverage Limits .......Up to $30 Million............$1 Million Coverage DBE/MBE Requirements: * A DBE Affirmative Action Plan must be approved and on file prior to award of any contract. * The Federal DBE program requires states to maintain a database of all firms that are participating, or attempting to participate on DOT assisted contracts. This list must include both DBE and NON DBE companies. * The Bid Opportunity List must be submitted with the Technical Proposal. (Note: The Technical Proposal and Price Proposal are to be in separate packages.) * The Anticipated DBE Participation Statement shall be submitted with the Price Proposal. * The Design Build Firm is required to report monthly actual payments to subcontractors and suppliers. * DBEs are encouraged to utilize the DBE Supportive Services Provider. Contact Blackmon Roberts at 863-802-1280 for assistance. * The Department of Transportation has an overall eight point eighteen (8.18%) race-neutral DBE goal. This means that the State's goal is to spend at least 8.18% of the highway dollars with certified DBEs as prime Design Build Firms or as subcontractors or sub consultants. Race-neutral means that the Department believes that the 8.18% overall goal can be achieved through the normal competitive procurement process. The Department believes that this percentage can be realistically achieved. * The Florida Department of Transportation (hereinafter referred as the "Department", in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notified all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprise and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Further, the Department will not discriminate against bidders on the grounds of race, color, national origin, sex, age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan CLICK HERE FOR ADDITIONAL INFORMATION View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 22MAR2400 Bids Due Date :  27APR2400 Time:  02:00PM Bid Opening Date :  27APR2400 Time:  02:00PM Tech. Rev. Cmte Meeting :  04MAY2400 Time:  11:30AM 2nd Tech Rev. Cmte Meeting :  06MAY2400 Time:  11:30AM Final Selection Meeting Date :  11MAY2400 Time:  08:30AM ************************************************************ Procurement Number : E2O64 Financial Management Number(s): 42830915201 Project Description: ALL BIDS REJECTED The Florida Department of Transportation (Department), District 2 has identified this Federal project for Design Build for pavement milling & resurfacing (approximately 2.2 miles) and other associated work on Fruit Cove Road (CR 13B), St. Johns County, Florida. . Note: The RFP will contain Davis Bacon Wage Rate, FHWA 1273, Buy America and the monthly reporting information required by FHWA. . There will be no stipends for this project. . ACTUAL COMMITMENT AND FINAL EXECUTION OF THIS CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND AVAILABILITY OF FUNDS. . AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 This project is funded through the American Recovery and Reinvestment Act of 2009 (ARRA). Sections 1201 and 1512 of the American Recovery and Reinvestment Act require states to fulfill employment reporting obligations for each ARRA funded project. The Design/Build Firm on each ARRA project will provide the initial employment reporting information within five calendar days after the notice to proceed is issued by the Department. Thereafter, the reporting information will be due on a monthly basis on or before the 10th of each month until completion of the contract. Design/ Build Firms are required to provide the necessary employment information (employees, hours, and payroll wages) for their own workforce as well as the workforce of all subcontractors that are active on their ARRA funded project(s) for the reporting month. FDOT has automated the form which will be used to collect employment information. The prime contractor can access FDOT's ARRA Employment Reporting System from the following website: www2.dot.state.fl.us/ARRAEmploymentReporting. Failure to timely report the required information may be cause for rejection of the monthly invoice for contract payment. Please refer to the informational brochure available at the following link, which provides summary information on the employment reporting requirements for ARRA: http://www.dot.state.fl.us/inspectorgeneral/ARRA/ ARRABrochureFinalVersion.pdf. Additional training information on ARRA employment reporting can also be accessed at: http://www.dot.state.fl.us/inspectorgeneral/ARRA.shtm. Another critical reporting component is a requirement for prime consultants/contractors to have a Dun and Bradstreet (DUNS) number. This is a unique nine-digit firm identification number issued by Dun & Bradstreet. It is not the same as a firm's Tax ID Number. Design/Build Firms who don't already have a DUNS number can register for it thru the following website: http://www.dnb.com/us/ Design/Build Firms who do not already have a DUNS number should begin the application process. According to the D&B website, it takes a minimum of 30 business days for a new D&B DUNS Number to be processed. . DESIGN BUILD TEAM REQUIREMENT LIMITATIONS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . RESPONSE PROCEDURE: Firms interested in being considered for the project should request a project package (Project Criteria and Request for Proposal) by submitting the fax request form found on the District Two District Contracts website located at: http://www.dot.state.fl.us/contractsadministrationdistrict2. Project packages will be e-mailed to those firms that have requested them. . Technical proposals with Bid packages must be submitted by 2:00 pm on the date indicated in the Calendar of Events. . Bid openings and public meetings will be held in district headquarters unless otherwise noted. . PREQUALIFICATION: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . PROTEST RIGHTS: See Design Build Boilerplate on the Procurement Office Home page at: http://www2.dot.state.fl.us/procurement/ads/advdbld.htm . "Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes." . SELECTION PROCEDURE: Firms shall submit a bid proposal and a technical proposal. Bids will be opened and the technical proposal of the lowest bidder shall be evaluated by the FDOT to determine if it is responsive and responsible. If the proposal is deemed non-responsive or non responsible, the technical proposal of the next lowest bidder will be evaluated. The Department shall reserve the right to reject any and all proposals and waive minor proposal irregularities. . The Department shall determine the relative ability of the proposer to perform the services required for this project based on * 14-22 and 14-75 prequalification information, * Technical Proposal with other experience and other documentation of pertinent information requested. . The selection results will be posted on the Department's website (www.dot.state.fl.us/procurement) at the indicated date and time indicated in the advertisement. . A contractor must have a current certificate of qualification in accordance with Rule Chapter 14-22, F.A.C. on the due date of the Technical proposals and the sealed bid. In order for the Department to have the information required to determine a bidder's Current Capacity, it is necessary that the bidder enter his "Work Underway". This certification shall be accomplished electronically by submitting the Certification of Work Underway (Online Web Application) http://www.dot.state.fl.us/cc-admin/PreQual Info/prequalified.shtm. to the Department concurrently with the bid submittal for the first letting in the calendar month that the bidder submits a bid. . Project Manager : Daugharty, Jeff Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Hot Plant Mix . Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design Technical Questions Should Be Addressed To: TECHNICAL QUESTIONS SHOULD BE ADDRESSED TO: Direct questions to: http://www2.dot.state.fl.us/construction/bidquestionmain. asp. Proposers are responsible for viewing the website and shall be familiar with all questions and responses posted on this website up to the due date of the Technical Proposal with the price package and are responsible for making necessary adjustments to the information to be presented. . Bonding Requirements: The Price Package shall contain the Bid Bond. . Bid Bond: At bid time, a Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Bid Bond made payable to the Florida Department of Transportation must accompany each bid. A check or draft in an amount less than five percent (5%) of the actual bid will invalidate the bid proposal. . Performance and Payment Bond: At award time the following is applicable: The legal entity contracting with the Department will be required to provide the Department a performance and payment bond in the amount of the bid before execution of the contract. The successful proposer will be required to maintain in effect throughout the life of the contract a performance and payment bond for 100% of the contract amount The Surety Company must be authorized to do business in the State of Florida. . INSURANCE REQUIREMENTS: . Workers' Compensation Insurance: Provide in accordance with the laws of the State of Florida and in amounts sufficient to secure the benefits of the Workers' Compensation Law for all employees. If subletting any of the work, ensure employees of the subcontractors are covered by similar insurance. Ensure that any equipment rental agreements that include operators who are employees of independent contractors, sole proprietorships or partners are covered by similar insurance. The Engineer will accept equivalent approved protection in lieu of insurance. . Contractors' Public Liability and Property Damage Liability Insurance: Furnish evidence to the Department that, with respect to the operations performed by subcontractors, regular Contractors' Protective Public Liability Insurance providing for a limit of not less than $1,000,000 for all damages arising out of bodily injuries to, or death of, one person and, subject to that limit for each person, a total limit of $5,000,000 for all damages arising out of bodily injuries to, or death of, or more persons in any one occurrence; and regular Contractors' Protective Property Damage Liability Insurance providing for a limit of not less than $50,000 for all damages arising out of injury to, or destruction of, property in any one occurrence and, subject to that limit per occurrence, a total (or aggregate) limit of $100,000 for all damages arising out of injury to, or destruction of, property during the policy period is carried. . Cause the Department to be an additional insured party on the Contractor's Protective Public Liability and Property Damage Liability Insurance policies that insure the Contractor for the described work that it performs under the Contract. . Insurance for Protection of Utility Owners: When work under the Contract involves work on or in the vicinity of utility-owned property or facilities, furnish Department with evidence that, with respect to the operations performed, General Comprehensive Liability Insurance or its equivalent providing for a limit of not less than $1,000,000 for bodily injury or death to person(s) per occurrence and $300,000 property damage each occurrence is carried. . The Department and Utility Company are to be Additional Named Insured, and the policy will be primary to any coverage maintained by the Department or Company. Do not make any material change or cancellation to the policy without providing the Department with ten days prior written notice. . Submission and Approval of Policies; Termination: Certificates of such insurance shall be filed at the time of Contract execution with the District Contracts Administrator. These certificates shall contain a provision that coverages afforded under the policies will not be canceled until at least thirty (30) days after the Department accepts the work. . Professional Liability: The Design Firm shall have and maintain during the period of this Contract, professional liability insurance policy or policies with a company or companies authorized to do business in the State of Florida, affording professional liability coverage for the professional services to be rendered in accordance with this Agreement in the following amounts: Total D-B Contract Price - Up to $30 Million Minimum Coverage Limits - $1 Million coverage . DBE/MBE Requirements: * A DBE Affirmative Action Plan must be approved and on file prior to award of any contract. * The Federal DBE program requires states to maintain a database of all firms that are participating, or attempting to participate on DOT assisted contracts. This list must include both DBE and NON DBE companies. * The Bid Opportunity List form must be submitted with the RFP, (Note: The RFP and price are to be in separate packages.) * The Anticipated DBE Participation Statement shall be submitted with the price proposal. * The Design Build Firm is required to report monthly actual payments to subcontractors and suppliers. * DBEs are encouraged to utilize the DBE Supportive Services Provider. Contact Blackmon Roberts at 863-802-1280 for assistance. * The Department of Transportation has an overall eight point eighteen percent (8.18%) race-neutral DBE goal. This means that the State's goal is to spend at least 8.18% of the highway dollars with certified DBEs as prime Design Build Firms or as subcontractors or sub consultants. Race- neutral means that the Department believes that the 8.18% overall goal can be achieved through the normal competitive procurement process. The Department believes that this percentage can be realistically achieved. * The Florida Department of Transportation (hereinafter referred to as the "Department"), in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and related authorities and Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation issued pursuant to such Act, hereby notifies all bidders that the Department will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises and disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Further, the Department will not discriminate against bidders on the grounds of race, color, national origin, sex, age, or disability/handicap in consideration for an award. No company will be awarded a contract unless they have an approved DBE Affirmative Action Program Plan. Please review the "DBE Bid Package" and the Special Provisions for instructions for submission of a DBE Affirmative Action Plan. . CLICK HERE FOR ADDITIONAL INFORMATION View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 22MAR2400 Bid Opening Date :  27APR2400 Time:  02:00PM Tech. Rev. Cmte Meeting :  04MAY2400 Time:  09:30AM 2nd Tech Rev. Cmte Meeting :  06MAY2400 Time:  09:30AM Final Selection Meeting Date :  11MAY2400 Time:  08:30AM All Bids Rejected. To be relet under contract E2O79. ************************************************************ Procurement Number : E2T10 Financial Management Number(s): 43351925201 Project Description: District Two Systemic Intersection Improvements, Various Counties Project Manager : Bedenbaugh, Nelson Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Roadway Signing AND Hot Plant Mix OR Pavement Markings Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization Technical Questions Should Be Addressed To: https://www3b.dot.state.fl.us/BidQuestionsAndAnswers/Proposa l.aspx/SearchProposal DBE/MBE Requirements: There is a 9.0% DBE availability goal and a 3.0% SBE Aspiration Goal, representing a cumulative 12.0% commitment of total contract costs. Advertisement Status : Shortlisted Date of Advertisement : 17APR2014 Pre-Bid Meeting Date :  28APR2014 Time:  10:00AM Bids Due Date :  26JUN2014 Time:  11:00AM Bid Opening Date :  26JUN2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  07JUL2014 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  09JUL2014 Time:  01:00PM Final Selection Meeting Date :  15JUL2014 Time:  08:30AM Final Selection Date Not Posted ************************************************************ Procurement Number : E2T09 Financial Management Number(s): 42879625201 42879625601 Project Description: SR 116 (Wonderwood) from SR 9A to Intercoastal Waterway Project Manager : SHIMER, ERIC Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading, Flexible Paving, Drainage and Hot Plant-Mixed Bituminous Courses Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 9.1 - Soil Exploration Technical Questions Should Be Addressed To: https://www3b.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchProposal DBE/MBE Requirements: There is a 9.0% DBE availability goal and a 3.0% Non-DBE SBE Aspiration Goal, representing a cumulative 12.0% commitment of total contract costs. Advertisement Status : Shortlisted Date of Advertisement : 04APR2014 Pre-Bid Meeting Date :  10APR2014 Time:  09:00AM Bids Due Date :  12JUN2014 Time:  11:00AM Bid Opening Date :  12JUN2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  24JUN2014 Time:  01:00PM 2nd Tech Rev. Cmte Meeting :  26JUN2014 Time:  01:00PM Final Selection Meeting Date :  01JUL2014 Time:  08:30AM Final Selection Date Not Posted ************************************************************ Procurement Number : E2R81 Financial Management Number(s): 43182025201 43182025203 43182025204 43182035201 43182035203 Project Description: District Wide Safety Push Button Contract Project Manager : THOMAS, KATHY Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading, Drainage, Flexible Paving and Hot Plant Mix Bituminous Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Technical Questions Should Be Addressed To: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: There is a 9% DBE availability goal and a 3% SBE Aspiration goal, representing a cumulative 12% commitment of total contract costs. Advertisement Status : Final Selection Date of Advertisement : 09DEC2013 PhaseI Selection Cmte. Meeting :  17DEC2013 Time:  08:30AM ELOI Scores Notification Date :  17DEC2013 Time:  09:30AM Deadline for Election to Participate in Ph. II :  19DEC2013 Time:  02:00PM Posting of Shortlist :  19DEC2013 Time:  04:15PM PhaseII Tech. Proposal Due Date:  19FEB2014 Time:  02:00PM Price Proposal Due Date :  20MAR2013 Time:  02:00PM Final Selection Meeting Date :  25MAR2014 Time:  08:30AM Posting of Award :  01APR2014 Time:  9:24AM Firms not participating in PhaseII PhaseI Score PETTICOAT-SCHMITT CIVIL CONTRACTORS 17.0 RANGER CONSTRUCTION INDUSTRIES,INC. 16.7 ************************************************************ Procurement Number : E2S01 Financial Management Number(s): 21334575201 21334575601 Project Description: I-295 (SR 9A) from Buckman Bridge to I-95 Managed lanes Project Manager : SHIMER, ERIC Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Drainage, Grading, Flexible Paving AND Hot Plant-Mixed Bituminous Courses Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design Additional Bridge Design Work Types : Must be prequalified in work type 4.1.2(Minor Bridge Design) . NEW FORM MUST BE SUBMITTED FOR THIS PROJECT: Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit a completed and signed Bridge Design Qualification Form (see the link to the "Bridge Qualification Form" above) along with the ELOI by the date/time deadline established for the ELOI. Please refer to this preamble and advertisement for other submittal directions. Technical Questions Should Be Addressed To: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: There is a 9% DBE Availability goal and a 3% SBE (non-DBE) Aspiration goal, representing a cumulative 12% commitment of total contract costs. Advertisement Status : Final Selection Date of Advertisement : 18NOV2013 PhaseI Selection Cmte. Meeting :  10DEC2013 Time:  08:30AM ELOI Scores Notification Date :  10DEC2013 Time:  02:00PM Deadline for Election to Participate in Ph. II :  12DEC2013 Time:  02:00PM Posting of Shortlist :  12DEC2013 Time:  04:15PM Mand. Pre-Proposal Meeting Date:  19DEC2013 Time:  01:30PM PhaseII Tech. Proposal Due Date:  25MAR2014 Time:  02:00PM Price Proposal Due Date :  01MAY2014 Time:  02:00PM Proposal Opening Date :  01MAY2014 Time:  02:00PM Final Selection Meeting Date :  06MAY2014 Time:  08:30AM Posting of Award :  12JUN2014 Time:  5:00PM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 Dragados USA 15.6 69.6 670 $88,950,000 2 SUPERIOR CONSTRUCTION COMPANY 17.0 73.0 850 $99,295,000 3 RANGER CONSTRUCTION INDUSTRIES 18.0 73.6 790 $107,870,000 4 HUBBARD CONSTRUCTION COMPANY 16.0 67.8 670 $103,578,626 ************************************************************ Procurement Number : E2R91 Financial Management Number(s): 41650145201 Project Description: I-95 at JTB Project Manager : SHIMER, ERIC Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Major Bridge - Concrete Segemental Construction or Major Bridge - Curved Steel Girders Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 6.3.1 - Intelligent Trans Sys. Analysis & Design Additional Bridge Design Work Types : Must be prequalified in work type 4.1.2(Minor Bridge Design), OR 4.2.1(Major Bridge Design-Concrete), OR 4.2.2(Major Bridge Design-Steel), OR 4.2.3(Major Bridge Design-Segmental) . NEW FORM MUST BE SUBMITTED FOR THIS PROJECT: Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit a completed and signed Bridge Design Qualification Form (see the link to the "Bridge Qualification Form" above) along with the ELOI by the date/time deadline established for the ELOI. Please refer to this preamble and advertisement for other submittal directions. Technical Questions Should Be Addressed To: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: There is a 9% DBE availability goal and a 3% SBE (Non-DBE) Aspiration goal,representing a cumulative 12% commitment of total contract costs. Advertisement Status : Final Selection Date of Advertisement : 28OCT2013 PhaseI Selection Cmte. Meeting :  12NOV2013 Time:  08:30AM ELOI Scores Notification Date :  12NOV2013 Time:  02:00PM Deadline for Election to Participate in Ph. II :  14NOV2013 Time:  02:00PM Posting of Shortlist :  14NOV2013 Time:  4:15PM PhaseII Tech. Proposal Due Date:  30APR2014 Time:  02:00PM Final Selection Meeting Date :  10JUN2014 Time:  08:30AM Posting of Award :  08JUL2014 Time:  10:01AM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 SEMA CONSTRUCTION, INC. 17.8 75.5 900 $66,725,725 2 SUPERIOR CONSTRUCTION COMPANY 17.8 70.5 900 $67,595,000 3 HUBBARD CONSTRUCTION COMPANY 17.8 68.5 900 $69,116,000 4 ARCHER WESTERN CONTRACTORS,LTD 18.0 71.0 900 $73,989,346 ************************************************************ Procurement Number : E2K95 Financial Management Number(s): 20929415201 20929325201 Project Description: The Florida Department of Transportation is evaluating a series of projects under consideration for Design-Build- Finance across the state. In addition, there is an upcoming Special Session on the State Budget Deficit beginning in mid September. In consideration of these two facts District Two is retracting the RFQ on the SR 9B Design-Build-Finance project. We are early in this process and retracting now will avoid increasing cost to interested parties. We appreciate all the hard work and coordination on the project but did not want teams to continue working on detailed Qualifications. If a determination is made to continue this project as a Design-Build-Finance initiative in the future appropriate notice will be provided. ------------------------------------------------------------ The Department of Transportation, District 2 seeks to enter into a Public Private Partnership with a Concessionaire who will be required to design, build, and finance the State Road 9B, New Road Construction from North of US 1 to State Road (SR) 9A/9B split in Duval County. The Department requests a Letter of Interest along with a Qualification submittal of Interested Teams pursuant to Section 334.30, F. S. The Design Build Concessionaire will perform the services required within the proposed contract time with pay back of the contract amount beginning in 2012, contingent upon Legislative approval of funds. The short- listed teams will receive a detailed description of the forcasted cash flow and payback schedule in the Request for Proposal. An upfront payment of $20 million shall be made by the Concessionaire to the Department of Transportation, District 2 for the Consultant Engineering Inspection (CEI) services. Private Entities experienced in undertaking large transport- ation infrastructure projects under a concession approach that are willing to share risks, that possess the proven ability to arrange and close financing on favorable terms, and that have demonstrated skill in designing and construct- ing on behalf of public sector owners are strongly encour- aged to respond to this Invitation to submit a Letter of Interest with a Qualification submittal. The Project may consist of survey, geotechnical investiga- tion, design, and acquisition of permits, maintenance of traffic, demolition, construction and maintenance of all features within the project until final acceptance. The Concessionaire will coordinate all utility relocations and railroad activities through the proper officials. Project Manager : MOSS, RICHARD Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: ___ Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Major Bridge over Water Grading Drainage Portland Cement Concrete Paving Intermediate Bridge Minor Bridge Flexible Paving Hot Plant-Mix Bituminous The firm, joint venture, or company(s) performing a combined a total of 40% of the estimated value of the construction work shall be pre-qualified in accordance with F. A. C. 14-22 & 14-75 on the due date of the receipt of the Qualifi- cation submittal with the Letter of Interest as well as on the due date of the receipt of the Request for Proposal. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Technical Questions Should Be Addressed To: The deadline for contractual of administrative questions will be the due date of the Letter of Interest along with the Qualification submittal. Questions arising from the Advertisement must be forwarded by email to : jane.jones@dot.state.fl.us Bonding Requirements: Bonding, Liability and Insurance requirements: Surety Letter - Evidence from surety or an insurance company authorized to issue bonds in the State of Florida indicating that the Proposer is capable of obtaining a bid bond as well as a Performance and Payment Bond in the amount of at least $115 million. The evidence reqarding bonding capacity shall take the form of a letter from a surety or insurance company indicating that such capacity exists for the Proposer. Letters indica- ting "unlimited" bonding capability are not acceptable. The surety or insurance company providing such letter must be rated in the top two categories by two nationally recog- nized rating agencies or at least A- or better and Class VII or better by "Best & Company". The letter must specifically state that the surety/insurance has read the RFQ, evaluated the Proposer's backlog and work-in-progress in determining its bonding capacity. If a Proposer is a Joint Venture/Con- sortium, Partnership, Limited Liability Company or other association, separate letters for one or more of the indi- vidual Equity Members or Major Non-Equity Members are ac- ceptable, as is a single letter covering all Proposer team members. FDOT has not yet determined the specific amount or form of payment and performance bond guarantees, or other security that it will require for the Project. Proposers are advised that the Request for Proposal may require a package of bonds and other security in the total amount greater than $115 million. FDOT shall delineate such re- quirements, which will provide Short-listed Proposers with a draft indicating the structure and component parts of the security package during the industry review process that will precede the issuance of the Request for Proposal. DBE/MBE Requirements: It is the policy of FDOT to encurage the participation of the Disadvantaged Business Enterprise, women-owned and Minority Business Enterprises in all facets of the business activities of FDOT, consistent with applicable laws and regulations. Pursuant to the provisions of Chapter 339.0805 F. S., and Chapter 14-78.005 F. A. C., FDOT has adopted rules to provide certified Disadvantaged Business Enter- prises opportunities to participate in the business activities of FDOT as service providers, vendors, contrac- tors, sub-contractors, advisors, and consultants. FDOT has adopted the DBE definition set forth in 49CFR 26.5. The DBE policy of FDOT applies to all FDOT contracts and purchases paid with fund received from the U. S. Department of Transportation through the Federal Highway Administration Therefore, the Concessionaire will be obligated to comply with applicable federal laws and regulations, including those related to DBEs, "Buy America", Davis Bacon Wage Rates Affirmative Action and all other FHWA and State of Florida requirements. Special Notes: The Qualification submittal must be received on the due date along with the Letter of Interest. Entities must be quali- fied on this due date and the due date of the Request for Proposal. These dates are listed in the attachment for the "Calendar of Events" which is with the Request for Qual- ification information. Interested Entities are required to submit one (1) original and nine (9) copies of the Letter of Interest along with the Qualficiation submittal. The submittal shall be formatted with the content requirements as explained in the Request for Qualification. The link will be titiled: "New Proposed Scope", but will be the Request for Qualifica- tion package. Meeting Notes: See the "Calendar of Events" for the notice of all Public meetings associated with this project. They are marked with a double asterik**. Anyone interested in attending, contact FDOT, Procurement, Jane Jones-Redd at 386-758-3798 or email to jane.jones@dot.state.fl.us Websites: A website for general notes on this project will be: http://www.sr9b.com The websites for viewing the advertisement, addendums, and posting information will be: http://www.dot.state.fl.us/contractsadministrationdistrict2 or Department of Management Services, Vendor bid system http://vbs.dms.state.fl.us/vbs/main menu For plans, obtain the fax order form from the District 2 website:www.dot.state.fl.us/contractsadministrationdistrict 2. Fax this form to 386-758-3791. There will be no charge as the plans will be on a CD. and sent by DHL delivery ser- vice. THERE MAY BE FEDERAL PARTICIPATION. When submitting Qualificatios, provide sufficient informa- tion about the requested items to allow the Department to competitively rank for shortlist selection. The submittal shall be in English, with the cost references provided in United State of America dollar demoninations. The Request for Proposals shall be delivered no later than the date and time indicated in the Calendar of Events, which is an attachment. The Enity must be either a Joint Venture/Corconsortium, Partnership, Limited Liability Company or other association View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 09JUL2007 Longlist(Tech. Rev. Cmte.) Date:  14SEP2007 Time:  02:00PM Mand. Pre-Proposal Meeting Date:  15NOV2007 Time:  10:00AM PhaseII Tech. Proposal Due Date:  08FEB2008 Time:  Tech. Rev. Cmte Meeting :  14MAR2008 Time:  09:00AM Price Proposal Due Date :  08FEB2008 Time:  05:00PM Proposal Opening Date :  18MAR2008 Time:  09:00AM Final Selection Date Not Posted Project Pulled 7/26/207 ************************************************************ DISTRICT 3 ************************************************************ Professional Services Consultant Projects Contract Number : 15352 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 21797636201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 30 (US 98) at 23rd Street Intersection Phase I in Bay County Project Manager : CONNOR, WILLIAM C Advertisement Status : Planned Date of Advertisement : 09MAR2015 Shortlst Selection Date :  30MAR2015 Time:  08:30AM Final Selection Meeting Date :  20APR2015 Time:  08:30AM ************************************************************ Contract Number : 15351 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 21790986201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 77 from South of County Road 276 Clayton Road to North of Blue Lake Road in Washington County Project Manager : CONNOR, WILLIAM C Advertisement Status : Planned Date of Advertisement : 23FEB2015 Shortlst Selection Date :  16MAR2015 Time:  08:30AM Final Selection Meeting Date :  06APR2015 Time:  08:30AM ************************************************************ Contract Number : 15348 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22044246201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 87 from Eglin Air Force Base Boundary to 2 miles South of Yellow River Bridge in Santa Rosa County Project Manager : HUNT, STEVE Advertisement Status : Planned Date of Advertisement : 02FEB2015 Shortlst Selection Date :  23FEB2015 Time:  08:30AM Final Selection Meeting Date :  16MAR2015 Time:  08:30AM ************************************************************ Contract Number : 15347 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43000316201 Major Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: County Road 292A Sunset Avenue Bayou Grande Bridge Number 480096 in Escambia County Project Manager : HUNT, STEVE Advertisement Status : Planned Date of Advertisement : 26JAN2015 Shortlst Selection Date :  16FEB2015 Time:  08:30AM Final Selection Meeting Date :  09MAR2015 Time:  08:30AM ************************************************************ Contract Number : 15343 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43090826201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 8 (I-10) from Okaloosa County Line to East of Boy Scout Road in Walton County Project Manager : Brewton, Harvey Advertisement Status : Planned Date of Advertisement : 19JAN2015 Shortlst Selection Date :  09FEB2015 Time:  08:30AM Final Selection Meeting Date :  02MAR2015 Time:  08:30AM ************************************************************ Contract Number : 15337 Major Project Selection Procedure: LOR and Written Technical Proposal Financial Management Number(s): 43078716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 71 from State Road 69 Pear Street to Jackson County Line in Calhoun County Project Manager : CONNOR, WILLIAM C Advertisement Status : Planned Date of Advertisement : 12JAN2015 Shortlst Selection Date :  02FEB2015 Time:  08:30AM Final Selection Meeting Date :  23FEB2015 Time:  08:30AM ************************************************************ Contract Number : 15358 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42583221202 Major Work : 13.3 - Policy Planning 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: Growth Management Consultant Services Project Manager : Kirkland, Ray Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 05JAN2015 Shortlst Selection Date :  02FEB2015 Time:  08:30AM Final Selection Meeting Date :  23MAR2015 Time:  08:30AM ************************************************************ Contract Number : 15370 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 41306236201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 8 (I-10) FROM ESCAMBIA BAY BRIDGE TO EAST OF SR 281 (AVALON BLVD) IN ESCAMBIA COUNTY. This project will be let for construction as design build. Project Manager : Harrison, Jack Advertisement Status : Planned Date of Advertisement : 05JAN2015 Shortlst Selection Date :  26JAN2015 Time:  08:30AM Final Selection Meeting Date :  16FEB2015 Time:  08:30AM ************************************************************ Contract Number : 15371 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42865412202 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Minor Work : 6.1 - Traffic Engineering Studies 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration Project Description: DISTRICTWIDE ETDM CONSULTANT SERVICES Project Manager : Kelley, Peggy Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 29DEC2014 Shortlst Selection Date :  26JAN2015 Time:  08:30AM Final Selection Meeting Date :  16MAR2015 Time:  08:30AM ************************************************************ Contract Number : 15303 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22096023204 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: Districtwide Bridge Design Consultant Project Manager : Shores, Keith Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 15DEC2014 Shortlst Selection Date :  12JAN2015 Time:  08:30AM Final Selection Meeting Date :  02MAR2015 Time:  08:30AM ************************************************************ Contract Number : 15349 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42693016201 42693016202 42693016203 42693026201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Group 15-D; State Road 12 from State Road 10 (US 90) to State Road 63 (US 27) Main Street in Gadsden County Project Manager : Corbin, Gabriella Advertisement Status : Planned Date of Advertisement : 08DEC2014 Shortlst Selection Date :  29DEC2014 Time:  08:30AM Final Selection Meeting Date :  19JAN2015 Time:  08:30AM ************************************************************ Contract Number : 15340 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42429026201 42429126201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: CEI Group 15-B; State Road 85 Five Mile Bayou Bridge Number 570017; State Road 85 Garnier Bayou Bridge Number 570018 in Okaloosa County; Project Manager : HUNT, STEVE Advertisement Status : Planned Date of Advertisement : 01DEC2014 Shortlst Selection Date :  22DEC2014 Time:  08:30AM Final Selection Meeting Date :  12JAN2015 Time:  08:30AM ************************************************************ Contract Number : 15350 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42884516201 42884516202 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 187 (US 331) from State Road 10 (US 90) to Alabama Line in Walton County Project Manager : Brewton, Harvey Advertisement Status : Planned Date of Advertisement : 24NOV2014 Shortlst Selection Date :  15DEC2014 Time:  08:30AM Final Selection Meeting Date :  29DEC2014 Time:  08:30AM ************************************************************ Contract Number : 15324 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43274023201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 8 (I-10) from East of County Road 69A to Gadsden County Line in Jackson County Project Manager : STEPHENS, KIM Advertisement Status : Planned Date of Advertisement : 17NOV2014 Shortlst Selection Date :  15DEC2014 Time:  08:30AM Final Selection Meeting Date :  02FEB2015 Time:  08:30AM ************************************************************ Contract Number : 15353 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43174416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: County Road 368 Arran Road from East School Entrance to West of Towles Road in Wakulla County Project Manager : Corbin, Gabriella Special Notes: It is the Departments Intention to group the projects being let within the described geographical area of Leon, Liberty, Franklin, Jefferson, Gadsden and Wakulla Counties between JUly 2014 and July 2015 in order to achieve economic efficiency through the shard use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects occurring within these limits if warranted. The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. Advertisement Status : Planned Date of Advertisement : 03NOV2014 Shortlst Selection Date :  24NOV2014 Time:  08:30AM Final Selection Meeting Date :  15DEC2015 Time:  08:30AM ************************************************************ Contract Number : 15304 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 40901523201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 12 from Liberty County Line to Yon Creek Bridge in Gadsden County It is the Department's intent to advertise this projects in accordance with the Small Business Development Initiative Guidelines. Project Manager : Rogers, Greg Advertisement Status : Planned Date of Advertisement : 27OCT2014 Shortlst Selection Date :  24NOV2014 Time:  08:30AM Final Selection Meeting Date :  12JAN2015 Time:  08:30AM ************************************************************ Contract Number : 15362 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43078216201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 71 from 5th Avenue to Alabama State Line in Jackson County. It is the Department's intent to advertise this project in accordance with the Small Business Development Initiative Guidelines. Project Manager : Brust, Martin Advertisement Status : Planned Date of Advertisement : 20OCT2014 Shortlst Selection Date :  10NOV2014 Time:  08:30AM Final Selection Meeting Date :  01DEC2014 Time:  08:30AM ************************************************************ Contract Number : 15357 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42074411202 Major Work : 13.4 - Systems Planning Minor Work : 13.3 - Policy Planning Project Description: Systems Planning Consultant Services Project Manager : Kirkland, Ray Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 14OCT2014 Shortlst Selection Date :  10NOV2014 Time:  08:30AM Final Selection Meeting Date :  29DEC2014 Time:  08:30AM ************************************************************ Contract Number : 15344 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42693416201 42693416202 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 289 9th Avenue from State Road 10A (US 90) to State Road 742 Creighton Road in Escambia County Project Manager : HUNT, STEVE Advertisement Status : Planned Date of Advertisement : 13OCT2014 Shortlst Selection Date :  03NOV2014 Time:  08:30AM Final Selection Meeting Date :  24NOV2014 Time:  08:30AM ************************************************************ Contract Number : 15361 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42697216201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 281 Avalon Boulevard from Garcon Pointe Bridge to N of SR 8 (I-10) in Santa Rosa County. It is the Department's intent to advertise this project in accordance with the Small Business Development Initiative Guidelines. Project Manager : Benson, Eric Advertisement Status : Planned Date of Advertisement : 13OCT2014 Shortlst Selection Date :  03NOV2014 Time:  08:30AM Final Selection Meeting Date :  24NOV2014 Time:  08:30AM ************************************************************ Contract Number : 15342 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42902476201 42902486201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 14.0 - Architect Minor Work : Project Description: CEI Group 15-C; Jefferson County Rest Area Repair/Relacement in Jefferson County; Leon County Rest Area Repair/ Replacement in Leon County; Project Manager : Corbin, Gabriella Advertisement Status : Planned Date of Advertisement : 06OCT2014 Shortlst Selection Date :  27OCT2014 Time:  08:30AM Final Selection Meeting Date :  17NOV2014 Time:  08:30AM ************************************************************ Contract Number : 15356 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43403413201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: County Road 375 over Smith Creek (Bridge Number 590020) in Wakulla County Project Manager : HOWELL, BILL Advertisement Status : Planned Date of Advertisement : 06OCT2014 Shortlst Selection Date :  03NOV2014 Time:  08:30AM Final Selection Meeting Date :  22DEC2014 Time:  08:30AM ************************************************************ Contract Number : 15360 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 41694416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 10 (US 90) from W of begin 4L to end 4L in Grandridge in Jackson County It is the Department's intent to advertise this project in accordance with the Small Business Development Initiative Guidelines. Project Manager : Brust, Martin Advertisement Status : Planned Date of Advertisement : 15SEP2014 Shortlst Selection Date :  06OCT2014 Time:  08:30AM Final Selection Meeting Date :  27OCT2014 Time:  08:30AM ************************************************************ Contract Number : 15309 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42820833201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 30 (US 98) from Santa Rosa County Line to State Road 189 Beal Parkway in Okaloosa County Project Manager : STEPHENS, KIM Advertisement Status : Planned Date of Advertisement : 01SEP2014 Shortlst Selection Date :  29SEP2014 Time:  08:30AM Final Selection Meeting Date :  17NOV2014 Time:  08:30AM ************************************************************ Contract Number : 15322 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43256713201 43460613201 43466813201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: Design Group 15-03; State Road 145 (Perry Street) from State Road 30 (US 98) to State ROad 85 Eglin Parkway in Okaloosa County; State Road 296 Brent Lane Frontage Roads at Railroad Bridge/Sycamore Drive in Escambia County; State Road 399 (Pensacola Beach Boulevard) from North end of Bob Sikes Bridge to State Road 30 (US 98) in Santa Rosa County; Project Manager : Hodge, Howard Advertisement Status : Planned Date of Advertisement : 25AUG2014 Shortlst Selection Date :  22SEP2014 Time:  08:30AM Final Selection Meeting Date :  10NOV2014 Time:  08:30AM ************************************************************ Contract Number : 15333 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41547422201 41547442201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : Project Description: State Road 30 (US 98) Brooks Bridge (Bridge Number 570034) in Santa Rosa County and SR 30 (US 98) Brooks Bridge Alternate. Project Manager : Williams, April Advertisement Status : Planned Date of Advertisement : 18AUG2014 Shortlst Selection Date :  15SEP2014 Time:  08:30AM Final Selection Meeting Date :  27OCT2014 Time:  08:30AM ************************************************************ Contract Number : 15372 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22081413213 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 14.0 - Architect Project Description: DISTRICTWIDE LANDSCAPE DESIGN CONSULTANT SERVICES Project Manager : MINER, PAM Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 18AUG2014 Shortlst Selection Date :  15SEP2014 Time:  08:30AM Final Selection Meeting Date :  03NOV2014 Time:  08:30AM ************************************************************ Contract Number : 15329 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43391013201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: Steele Road over Penny Creek (Bridge Number 574013) in Okaloosa County Project Manager : Henry, Hank Advertisement Status : Planned Date of Advertisement : 11AUG2014 Shortlst Selection Date :  08SEP2014 Time:  08:30AM Final Selection Meeting Date :  27OCT2014 Time:  08:30AM ************************************************************ Contract Number : 15346 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42697116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 4 from County Road 87A Market Road to Okaloosa County Line in Santa Rosa County Project Manager : HUNT, STEVE Advertisement Status : Planned Date of Advertisement : 04AUG2014 Shortlst Selection Date :  25AUG2014 Time:  08:30AM Final Selection Meeting Date :  15SEP2015 Time:  08:30AM ************************************************************ Contract Number : 15355 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): VARIOUS Major Work : 13.5 - Subarea/Corridor Planning Minor Work : Project Description: Districtwide for Freight and Mobility Studies It is the Department's intent to advertise this agreement in accordance with the Small Business Development Initiative Guidelines. Project Manager : Kirkland, Ray Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 04AUG2014 Shortlst Selection Date :  01SEP2014 Time:  08:30AM Final Selection Meeting Date :  20OCT2014 Time:  08:30AM ************************************************************ Contract Number : 15331 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43466713201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: Resurfacing, Rehabilitation and Restoration for State Road 77 from South of State Road 8 (I-10) to Fifth Street in Washington County. Project Manager : GLENN, JESS Estimated Contract Amt: $614,615 See Standard Notes Above: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 21JUL2014 Response Deadline : 01AUG2014 Shortlst Selection Date :  18AUG2014 Time:  08:30AM Final Selection Meeting Date :  06OCT2014 Time:  08:30AM Response Deadline : 01AUG2014 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 ************************************************************ Contract Number : 15308 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42580313201 Major Work : 3.2 - Major Highway Design 4.2.2 - Major Bridge Design - Steel Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: State Road 22 Wewa Highway from State Road 30 (US 98B) to County Road 2315 (Star Avenue) in Bay County Project Manager : Lamb, Sandra Estimated Contract Amt: $1,994,850 See Standard Notes Above: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 18JUL2014 Shortlst Selection Date :  04AUG2014 Time:  08:30AM Final Selection Meeting Date :  22SEP2014 Time:  08:30AM Response Deadline : 18JUL2014 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 ************************************************************ Contract Number : 15363 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42696116201 42873916201 42696116202 42873916202 42873916203 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Group 15-E in Leon County; SR 10 (US 90) from SR 265 Magnolia to Capital Circle and SR 261 (US 319) from N of Park Avenue to CR 151 Centerville Road Project Manager : Walters, Anthony Est. Construction Cost: $5,070,600 See Standard Notes Above: 4,9,10 Special Notes: It is the Departments Intention to group the projects being let within the described geographical area of Franklin, Gadsden, Jefferson, Leon, Liberty and Wakulla Counties between September 2014 and September 2015 in order to achieve economic efficiency through the shared use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects occurring within these limits if warranted. The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions; 1. Completed FDOT Expanded Letters of response form shall not exceed 2 MB in size. 2. Completed FDOT Expanded Letters of response form shall not exceed nine (9) 8 1/2 X 11 pages. 3. A minimum font size of 11, with 1/2 inch margins is required for all submittals except the organization chart, staffing chart, forms and certifications. The Department will not consider letters not in conformance with response requirements. Each letter of response shall, at a minimum, address items listed under response procedure. In addition to the letter of response, each responding firm should submit a 1 page organizational chart or staffing chart (8 1/2 X 11 or 11X17) including subconsultants, 2 page resumes for key personnel, a 1 page summary of staff hours (includes prime and Subs),a schedule of a maximum of 2 pages (11" X 17" allowed), and the required forms and certifications attached to the Scope of Services linked to this advertisement. Construction Training and Qualification Program (CTQP) printouts may also be submitted. Resumes, organization/staffing chart and required forms and certifications will not be included in the page count. The letters of response for this project will be evaluated based upon the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 18JUL2014 Shortlst Selection Date :  28JUL2014 Time:  08:30AM Final Selection Meeting Date :  18AUG2014 Time:  08:30AM Response Deadline : 18JUL2014 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 ************************************************************ Contract Number : 15318 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43255013201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 267 from State Road 363 (Woodville Highway) to State Road 30 (US 98) in Wakulla County It is the Department's intent to award this project in accordance with the Small Business Development Initiative Guidelines. Project Manager : WARREN, NOELLE Estimated Contract Amt: $323,469 See Standard Notes Above: 7 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 30JUN2014 Response Deadline : 11JUL2014 Shortlst Selection Date :  28JUL2014 Time:  08:30AM Final Selection Meeting Date :  15SEP2014 Time:  08:30AM Response Deadline : 11JUL2014 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 ************************************************************ Contract Number : 15327 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43390213201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Project Description: Valee Road over Blue Creek (Bridge Number 524107) in Holmes County It is the Department's intent to advertise this project in accordance with the Small Business Development Initiative Guidelines. Project Manager : Mitchell, Dean View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 16JUN2014 Shortlst Selection Date :  14JUL2014 Time:  08:30AM Shortlist Selection Posting :  14JUL2014 Scope Meeting Date :  29JUL2014 Time:  09:00AM Final Selection Meeting Date :  08SEP2014 Time:  08:30AM Shortlisted Firms: AGENOR & CAMPBELL STRUCTURAL ENGINE KENNEDY ENGINEERING & ASSOCIATES GR PATEL, GREENE AND ASSOCIATES, PLLC ************************************************************ Contract Number : 15369 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22086514208 22086514209 VARIOUS Major Work : 22.0 - Acquisition Bus. Damage Estimating & Review Under-Utilized Work Groups: GROUP22 - Acquisition Business Damage Estimating Project Description: DISTRICTWIDE BUSINESS DAMAGE ESTIMATING CONSULTANT It is the Department's intent to award multiple contracts from this advertisement. This advertisement has been extended to enhance competition. Project Manager : Williams, Vicky Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUN2014 Response Deadline : 18JUL2014 Shortlst Selection Date :  29JUL2014 Time:  08:30AM Final Selection Meeting Date :  01SEP2014 Time:  08:30AM Response Deadline : 18JUL2014 Respond To: d3.profserv@dot.state.fl.us Attn.: Richard Norris Phone: (850)330-1334 ************************************************************ Contract Number : 15302 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 21995023201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 12 from State Road 20 to the Gadsden County line in Liberty County. Project Manager : GLENN, JESS View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 09JUN2014 Shortlst Selection Date :  07JUL2014 Time:  08:30AM Shortlist Selection Posting :  07JUL2014 Scope Meeting Date :  16JUL2014 Time:  10:00AM Final Selection Meeting Date :  25AUG2014 Time:  08:30AM Shortlisted Firms: ARCADIS U.S., INC. GRESHAM, SMITH AND PARTNERS RS&H, INC. ************************************************************ Contract Number : 15341 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43077616201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: State Road 75 (US 231) from New Bethel Road to Alabama State Line in Jackson County Project Manager : Harris, Dale Special Notes: It is the Departments Intention to group the projects being let within the described geographical area of Jackson County between September 2014 and September 2015 in order to achieve economic efficiency through the shared use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects occurring within these limits if warranted. The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions; 1. Completed FDOT Expanded Letters of response form shall not exceed 2 MB in size. 2. Completed FDOT Expanded Letters of response form shall not exceed nine (9) 8 1/2 X 11 pages. 3. A minimum font size of 11, with 1/2 inch margins is required for all submittals except the organization chart, staffing chart, forms and certifications. The Department will not consider letters not in conformance with response requirements. Each letter of response shall, at a minimum, address items listed under response procedure. In addition to the letter of response, each responding firm should submit a 1 page organizational chart or staffing chart (8 1/2 X 11 or 11X17) including subconsultants, 2 page resumes for key personnel, a 1 page summary of staff hours (includes prime and Subs),a schedule of a maximum of 2 pages (11" X 17" allowed), and the required forms and certifications attached to the Scope of Services linked to this advertisement. Construction Training and Qualification Program (CTQP) printouts may also be submitted. Resumes, organization/staffing chart and required forms and certifications will not be included in the page count. The letters of response for this project will be evaluated based upon the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09JUN2014 Shortlst Selection Date :  30JUN2014 Time:  08:30AM Shortlist Selection Posting :  30JUN2014 Final Selection Meeting Date :  21JUL2014 Time:  08:30AM Final Selection Posting Date :  21JUL2014 Rank Consultant 1 GREENMAN-PEDERSEN, INC. 2 RS&H, Inc. 3 VOLKERT, INC. ************************************************************ Contract Number : 15330 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43464513201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Project Description: State Road 10 (US 90) from West of Flying J Truck Stop to the Leon County Line in Gadsden County Project Manager : WEBB, ALAINA View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02JUN2014 Shortlst Selection Date :  30JUN2014 Time:  08:30AM Shortlist Selection Posting :  30JUN2014 Scope Meeting Date :  15JUL2014 Time:  09:00AM Final Selection Meeting Date :  25AUG2014 Time:  08:30AM Shortlisted Firms: JACOBS ENGINEERING GROUP, INC. PARSONS TRANSPORTATION GROUP, INC. STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 15315 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43228613201 43228813201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Project Description: Design Group 15-02; Hanks Road Breastworks Creek (Bridge Number 484020); Crary Road over Pritchett Mill Creek (Bridge Number 484048) in Escambia County; Project Manager : Martin, Garrett View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 27MAY2014 Shortlst Selection Date :  23JUN2014 Time:  08:30AM Shortlist Selection Posting :  23JUN2014 Final Selection Meeting Date :  11AUG2014 Time:  08:30AM Shortlisted Firms: PALMER ENGINEERING CO. REGISTE SLIGER ENGINEERING, INC. STV INCORPORATED ************************************************************ Contract Number : 15339 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43090836201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 8 (I-10) from East of Boy Scout Road to East of State Road 83 (US 331) in Walton County Project Manager : Timpner, Bill Special Notes: It is the Departments Intention to group the projects being let within the described geographical area of Walton County between August 2014 and August 2015 in order to achieve economic efficiency throught the shared use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects occurring within these limits if warranted. The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions; 1. Completed FDOT Expanded Letters of response form shall not exceed 2 MB in size. 2. Completed FDOT Expanded Letters of response form shall not exceed nine (9) 8 1/2 X 11 pages. 3. A minimum font size of 11, with 1/2 inch margins is required for all submittals except the organization chart, staffing chart, forms and certifications. The Department will not consider letters not in conformance with response requirements. Each letter of response shall, at a minimum, address items listed under response procedure. In addition to the letter of response, each responding firm should submit a 1 page organizational chart or staffing chart (8 1/2 X 11 or 11X17) including subconsultants, 2 page resumes for key personnel, a 1 page summary of staff hours (includes prime and Subs),a schedule of a maximum of 2 pages (11" X 17" allowed), and the required forms and certifications attached to the Scope of Services linked to this advertisement. Construction Training and Qualification Program (CTQP) printouts may also be submitted. Resumes, organization/staffing chart and required forms and certifications will not be included in the page count. The letters of response for this project will be evaluated based upon the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 27MAY2014 Shortlst Selection Date :  16JUN2014 Time:  08:30AM Shortlist Selection Posting :  16JUN2014 Final Selection Meeting Date :  30JUN2014 Time:  08:30AM Final Selection Posting Date :  30JUN2014 Rank Consultant 1 METRIC ENGINEERING, INC. 2 MEHTA & ASSOCIATES, INC. 3 VOLKERT, INC. ************************************************************ Contract Number : 15305 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41843913219 41843913220 VARIOUS Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: Districtwide BDI Roadway Design It is the Department's intent to award two contracts from this advertisement. It is the Department's intent to award these projects in accordance with the Small Business Development Initiative Guidelines. Project Manager : Corbitt, Ray View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Shortlst Selection Date :  16JUN2014 Time:  08:30AM Shortlist Selection Posting :  16JUN2014 Final Selection Meeting Date :  04AUG2014 Time:  08:30AM Shortlisted Firms: BAYSIDE ENGINEERING, INC. BRINDLEY PIETERS & ASSOC.,INC. PEGASUS ENGINEERING LLC SCALAR CONSULTING GROUP INC. ************************************************************ Contract Number : 15336 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43006116201 42410536201 42987816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: CEI Group 15-A; State Road 83 Cross Drain Replacement at Juniper Creek; State Road 83 (US 331) at Bruce Avenue Intersection; State Road 83 at Institution Road Intersection in Walton County Project Manager : Williams, Jason Special Notes: It is the Departments Intention to group the projects being let within the described geographical area of Walton County between July 2014 and July 2015 in order to achieve economic efficiency through the shard use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects occurring within these limits if warranted. The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions; 1. Completed FDOT Expanded Letters of response form shall not exceed 2 MB in size. 2. Completed FDOT Expanded Letters of response form shall not exceed nine (9) 8 1/2 X 11 pages. 3. A minimum font size of 11, with 1/2 inch margins is required for all submittals except the organization chart, staffing chart, forms and certifications. The Department will not consider letters not in conformance with response requirements. Each letter of response shall, at a minimum, address items listed under response procedure. In addition to the letter of response, each responding firm should submit a 1 page organizational chart or staffing chart (8 1/2 X 11 or 11X17) including subconsultants, 2 page resumes for key personnel, a 1 page summary of staff hours (includes prime and Subs),a schedule of a maximum of 2 pages (11" X 17" allowed), and the required forms and certifications attached to the Scope of Services linked to this advertisement. Construction Training and Qualification Program (CTQP) printouts may also be submitted. Resumes, organization/staffing chart and required forms and certifications will not be included in the page count. The letters of response for this project will be evaluated based upon the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAY2014 Shortlst Selection Date :  16JUN2014 Time:  08:30AM Shortlist Selection Posting :  16JUN2014 Final Selection Meeting Date :  30JUN2014 Time:  08:30AM Final Selection Posting Date :  30JUN2014 Meeting Location Notes: The due date for letters of response for this project has been extended to Monday, June 9, 2014 in an effort to enhance competition. Rank Consultant 1 MEHTA & ASSOCIATES, INC. 2 JACOBS ENGINEERING GROUP, INC. 3 URS CORPORATION SOUTHERN ************************************************************ Contract Number : 15365 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 22247613202 Major Work : 3.3 - Controlled Access Highway Design 4.1.2 - Minor Bridge Design Minor Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.2.2 - Major Bridge Design - Steel 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: SR 8 (I-10) at SR 95 (US 29) Interchange in Escambia County. Project Manager : Saggars, Eric View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Shortlst Selection Date :  16JUN2014 Time:  08:30AM Shortlist Selection Posting :  16JUN2014 Final Selection Meeting Date :  04AUG2014 Time:  08:30AM Shortlisted Firms: DRMP, INC. HDR ENGINEERING, INC. KISINGER CAMPO & ASSOC. CORP. ************************************************************ Contract Number : 15367 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43387513201 VARIOUS Major Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies Minor Work : 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 99.0 - Other Professional Services Project Description: D/W SAFETY CONSULTANT Work Type 99.0 is included for Public Outreach Services Project Manager : Walker, Holly View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Shortlst Selection Date :  16JUN2014 Time:  08:30AM Shortlist Selection Posting :  16JUN2014 Scope Meeting Date :  02JUL2014 Time:  09:00AM Final Selection Meeting Date :  11AUG2014 Time:  08:30AM Shortlisted Firms: CDM SMITH INC. GMB ENGINEERS & PLANNERS, INC. KIMLEY-HORN & ASSOCIATES, INC. ************************************************************ Contract Number : 15368 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 21791022201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Minor Work : 4.2.1 - Major Bridge Design - Concrete 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: State Road 75 (US 231) from South of State Road 30A (US 98), 15th Street in Panama City to State Road 20 in Bay County. Project Manager : Williams, April View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAY2014 Shortlst Selection Date :  09JUN2014 Time:  08:30AM Shortlist Selection Posting :  09JUN2014 Scope Meeting Date :  16JUN2014 Time:  01:30PM Final Selection Meeting Date :  21JUL2014 Time:  08:30AM Final Selection Posting Date :  21JUL2014 Rank Consultant 1 RUMMEL, KLEPPER & KAHL, LLP 2 ATKINS NORTH AMERICA, INC. 3 VOLKERT, INC. ************************************************************ Contract Number : 15319 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43255213201 41344833201 41344843201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 10 (US 90) from Leon County Line to East of Willow Street in Jefferson County; SR 10 (US 90) from East of CR 59 to Jefferson Co. Line Paved Shoulders; SR 10 (US 90) from Leon County Line to Leon County Line Paved Shoulders; Group 15-04 Project Manager : Lamb, Sandra View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Shortlst Selection Date :  09JUN2014 Time:  08:30AM Shortlist Selection Posting :  09JUN2014 Scope Meeting Date :  26JUN2014 Time:  10:00AM Final Selection Meeting Date :  04AUG2014 Time:  08:30AM Shortlisted Firms: BUCHART-HORN, INC. GEORGE & ASSOCIATES, CONSULTING ENG WANTMAN GROUP, INC. ************************************************************ Contract Number : 15335 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42462216201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services at State Road 20 East of State Road 12 to County Road 1641 Dempsey Road in Liberty County. Project Manager : Kietzer, Lori Special Notes: It is the Departments Intention to group the projects being let within the described geographical area of Leon, Liberty, Franklin, Jefferson, Gadsden and Wakulla Counties between July 2014 and July 2015 in order to achieve economic efficiency through the shard use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects occurring within these limits if warranted. The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions; 1. Completed FDOT Expanded Letters of response form shall not exceed 2 MB in size. 2. Completed FDOT Expanded Letters of response form shall not exceed nine (9) 8 1/2 X 11 pages. 3. A minimum font size of 11, with 1/2 inch margins is required for all submittals except the organization chart, staffing chart, forms and certifications. The Department will not consider letters not in conformance with response requirements. Each letter of response shall, at a minimum, address items listed under response procedure. In addition to the letter of response, each responding firm should submit a 1 page organizational chart or staffing chart (8 1/2 X 11 or 11X17) including subconsultants, 2 page resumes for key personnel, a 1 page summary of staff hours (includes prime and Subs),a schedule of a maximum of 2 pages (11" X 17" allowed), and the required forms and certifications attached to the Scope of Services linked to this advertisement. Construction Training and Qualification Program (CTQP) printouts may also be submitted. Resumes, organization/staffing chart and required forms and certifications will not be included in the page count. The letters of response for this project will be evaluated based upon the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 12MAY2014 Shortlst Selection Date :  02JUN2014 Time:  08:30AM Shortlist Selection Posting :  02JUN2014 Final Selection Meeting Date :  23JUN2014 Time:  08:30AM Final Selection Posting Date :  23JUN2014 Rank Consultant 1 URS CORPORATION SOUTHERN 2 JOHNSON, MIRMIRAN & THOMPSON 3 JACOBS ENGINEERING GROUP, INC. ************************************************************ Contract Number : 15338 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42873816201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: State Road 30 (US 98 B) from State Road 75 (US 231) to State Road 30A (US98) in Bay County Project Manager : Mastro, Joe Special Notes: It is the Departments Intention to group the projects being let within the described geographical area of Bay County between August 2014 and August 2015 in order to achieve economic efficiency through the shared use of CEI personnel, equipment, facilities and other resources across multiple projects. The Department may at its sole discretion add projects occurring within these limits or delete projects occurring within these limits if warranted. The information provided in the letter of response will be the basis for selection. It is the responsibility of the firms responding to this advertisement to provide sufficient information to enable the Department to make a selection. The letter of response shall conform to all advertisement requirements established under the Notice to Professional Consultants with the following exceptions; 1. Completed FDOT Expanded Letters of response form shall not exceed 2 MB in size. 2. Completed FDOT Expanded Letters of response form shall not exceed nine (9) 8 1/2 X 11 pages. 3. A minimum font size of 11, with 1/2 inch margins is required for all submittals except the organization chart, staffing chart, forms and certifications. The Department will not consider letters not in conformance with response requirements. Each letter of response shall, at a minimum, address items listed under response procedure. In addition to the letter of response, each responding firm should submit a 1 page organizational chart or staffing chart (8 1/2 X 11 or 11X17) including subconsultants, 2 page resumes for key personnel, a 1 page summary of staff hours (includes prime and Subs),a schedule of a maximum of 2 pages (11" X 17" allowed), and the required forms and certifications attached to the Scope of Services linked to this advertisement. Construction Training and Qualification Program (CTQP) printouts may also be submitted. Resumes, organization/staffing chart and required forms and certifications will not be included in the page count. The letters of response for this project will be evaluated based upon the following: Shortlist Consideration Factors: 1) Past performance grades received by the Consultant on current and previous Departmental projects. 2) The volume of work previously awarded to the Consultant as evidenced by new agreements and supplemental amendments executed between the Department and the Consultant within the past five years. 3) The distribution of work among the competing Consultants and the utilization of new Consultants. 4) The workload of each Consultant, as evidenced by the number of similar projects the Consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the Consultants on active agreements. 5) Balancing the needs of the project to the abilities of the Consultants. 6) The Consultant's working relationship/experience with the Department on previous projects. 7) The general and specific information typically used to longlist the Consultants (i.e., prequalification restrictions, location (where pertinent), Subconsultant relationships, etc.). 8) Proposed Subconsultant Teaming (applicable for projects advertised with DBE under concentrated work types.) Final Selection Evaluation Criteria: Awareness and Understanding of Project Scope: 1) Understanding of Intent and Scope of Construction Project (0-15 points) 2) Understanding of Project Issues (0-20 points) 3) Quality Control (0-10 points) Staffing/Technical Plan: 1) Proposed Staff Quality (i.e. certifications, technical knowledge, etc.) (0-15 points) 2) Proposed Staff Availability (0-15 points) 3) Experience on Similar Projects (0-25 points) View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAY2014 Shortlst Selection Date :  02JUN2014 Time:  08:30AM Shortlist Selection Posting :  02JUN2014 Final Selection Meeting Date :  16JUN2014 Time:  08:30AM Final Selection Posting Date :  16JUN2014 Rank Consultant 1 RS&H, Inc. 2 STANTEC CONSULTING SERVICES INC. 3 URS CORPORATION SOUTHERN ************************************************************ Contract Number : 15366 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42446453201 Major Work : 3.2 - Major Highway Design 4.2.1 - Major Bridge Design - Concrete Minor Work : 4.1.1 - Miscellaneous Structures 5.4 - Bridge Load Rating 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: State Road 388 from State Road 79 to East of North West Florida Beaches Airport in Bay County Project Manager : Crenshaw, Jason View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAY2014 Shortlst Selection Date :  02JUN2014 Time:  08:30AM Shortlist Selection Posting :  03JUN2014 Final Selection Meeting Date :  21JUL2014 Time:  08:30AM Final Selection Posting Date :  21JUL2014 Rank Consultant 1 URS CORPORATION SOUTHERN 2 GGI, LLC 3 VOLKERT, INC. ************************************************************ Contract Number : 15311 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42884413201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Project Description: State Road 30A (US 98/Tyndall Parkway) from East of County Road 2327 (Transmitter Road) to State Road 30 (US 98B) in Bay County Project Manager : Fowler, John View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29APR2014 Shortlst Selection Date :  26MAY2014 Time:  08:30AM Shortlist Selection Posting :  27MAY2014 Scope Meeting Date :  05JUN2014 Time:  09:00AM Final Selection Meeting Date :  21JUL2014 Time:  08:30AM Final Selection Posting Date :  21JUL2014 Rank Consultant 1 METRIC ENGINEERING, INC. 2 CONNELLY & WICKER INC. 3 CHA COMPANIES OF NEW YORK, INC. ************************************************************ Contract Number : 15328 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43390513201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Project Description: Bratt Road over Canoe Creek (Bridge Number 484050) in Escambia County Project Manager : Saggars, Eric View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21APR2014 Shortlst Selection Date :  19MAY2014 Time:  08:30AM Shortlist Selection Posting :  21MAY2014 Scope Meeting Date :  04JUN2014 Time:  09:00AM Final Selection Meeting Date :  07JUL2014 Time:  08:30AM Final Selection Posting Date :  07JUL2014 Rank Consultant 1 GRAEF-USA INC. 2 CIVIL SERVICES INC. 3 TBE GROUP, INC. ************************************************************ Contract Number : 15323 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43274013201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Project Description: State Road 8 (I-10) from East of State Road 71 to East of County Road 69A in Jackson County Project Manager : WEBB, ALAINA View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Shortlst Selection Date :  12MAY2014 Time:  08:30AM Shortlist Selection Posting :  12MAY2014 Scope Meeting Date :  22MAY2014 Time:  09:30AM Final Selection Meeting Date :  30JUN2014 Time:  08:30AM Final Selection Posting Date :  30JUN2014 Rank Consultant 1 COMPREHENSIVE ENGINEERING SERVICES 2 ALDAY-HOWELL ENGINEERING, INC. 3 ENGLAND, THIMS & MILLER, INC. ************************************************************ Contract Number : 15312 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42884713201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 742 (Creighton Road) from East of State Road 291 (Davis Highway) to State Road 10A (US 90) Scenic Highway in Escambia County Project Manager : Johns, Tommy View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Shortlst Selection Date :  05MAY2014 Time:  08:30AM Shortlist Selection Posting :  05MAY2014 Scope Meeting Date :  15MAY2014 Time:  02:00PM Final Selection Meeting Date :  23JUN2014 Time:  08:30AM Final Selection Posting Date :  23JUN2014 Rank Consultant 1 AECOM TECHNICAL SERVICES, INC. 2 PROTEAN DESIGN GROUP, INC. 3 MOFFATT & NICHOL, INC. ************************************************************ Contract Number : 15310 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42862413201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: County Road 159 over Attapulgus Creek (Bridge No. 500033) in Gadsden County Project Manager : Hunter, Clay View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 31MAR2014 Shortlst Selection Date :  28APR2014 Time:  08:30AM Shortlist Selection Posting :  28APR2014 Scope Meeting Date :  14MAR2014 Time:  10:30AM Final Selection Meeting Date :  23JUN2014 Time:  08:30AM Final Selection Posting Date :  23JUN2014 Meeting Location Notes: Interviews will be held in the Emergency Operations Conference Room located at 1074 Hwy 90 in Chipley, Florida 32428 Rank Consultant 1 DEWBERRY ENGINEERS INC. 2 INFRASTRUCTURE ENGINEERS, INC. 3 JOHNSON, MIRMIRAN & THOMPSON ************************************************************ Contract Number : 15320 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43255513201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 4 from State Road 95 (US 29) to Escambia River Bridge in Escambia County It is the Department's intent to award this project in accordance with the Small Business Development Initiative Guidelines. Project Manager : Corbitt, Ray View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24MAR2014 Shortlst Selection Date :  14APR2014 Time:  08:30AM Shortlist Selection Posting :  14APR2014 Scope Meeting Date :  30APR2014 Time:  09:30AM Final Selection Meeting Date :  09JUN2014 Time:  08:30AM Final Selection Posting Date :  09JUN2014 Rank Consultant 1 FLORIDA TRANSPORTATION ENGINEERING, 2 PETERS AND YAFFEE, INC. 3 SIGMA CONSULTING GROUP ************************************************************ Contract Number : 15321 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43255613201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: State Road 2 from County Road 177 to Ten Mile Creek in Holmes County It is the Department's intent to award this project in accordance with the Small Business Development Initiative Guidelines. Project Manager : Smith, Jimmy View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Shortlst Selection Date :  07APR2014 Time:  08:30AM Shortlist Selection Posting :  08APR2014 Scope Meeting Date :  17APR2014 Time:  10:00AM Final Selection Meeting Date :  02JUN2014 Time:  08:30AM Final Selection Posting Date :  02JUN2014 Rank Consultant 1 THE BALMORAL GROUP 2 HORIZON ENGINEERING GROUP, INC. 3 K-F GROUP, INC. ************************************************************ Contract Number : 15359 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22081413212 22081413213 VARIOUS Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 14.0 - Architect Under-Utilized Work Groups: GROUP15 - Landscape Architect Project Description: Districtwide Minor Landscape Design Consultant Services It is the Department's intent to award multiple contracts from this advertisement. Project Manager : MINER, PAM Special Notes: The due date for letters of response for this project has been extended in order to enhance competition. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Shortlst Selection Date :  21APR2014 Time:  08:30AM Shortlist Selection Posting :  21APR2014 Final Selection Meeting Date :  02JUN2014 Time:  08:30AM Final Selection Posting Date :  02JUN2014 Meeting Location Notes: The Interviews will be held in the EOC Conference Room Located at 1074 Hwy 90 in Chipley, Florida 32428 Rank Consultant 1 MILLER, LEGG & ASSOCIATES,INC. 2 GGI, LLC D/B/A GENESIS GROUP 3 POND & COMPANY ************************************************************ Contract Number : 15364 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): VARIOUS Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Debris Monitoring Construction Engineering Inspection This agreement will require field personnel. It is the intent of the Department to compensate the consultant at field office rates. Project Manager : Hodges, Ray Special Notes: The due date for letters of response for this project has been extended in order to enhance competition. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Shortlst Selection Date :  28APR2014 Time:  08:30AM Shortlist Selection Posting :  28APR2014 Final Selection Meeting Date :  02JUN2014 Time:  08:30AM Final Selection Posting Date :  02JUN2014 1st Negotiations Meeting :  30JUN2014 Time:  09:00AM Rank Consultant 1 METRIC ENGINEERING, INC. 2 THOMPSON ENGINEERING, INC. ************************************************************ Contract Number : 14368 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): VARIOUS Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: Continuing Services Construction Engineering and Inspection This will be a continuing services type agreement. The selected consultant will assist with construction engineering inspection services throughout the sixteen county district. This contract will require field office personnel, therefore it is the Department's intent to compensate the consultant at field office rates. This is a re-advertisement. Project Manager : HENDRIX, TIMOTHY A View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10MAR2014 Shortlst Selection Date :  31MAR2014 Time:  08:30AM Shortlist Selection Posting :  31MAR2014 Final Selection Meeting Date :  12MAY2014 Time:  08:30AM Final Selection Posting Date :  12MAY2014 1st Negotiations Meeting :  18JUN2014 Time:  08:00AM Rank Consultant 1 METRIC ENGINEERING, INC. 2 JACOBS ENGINEERING GROUP, INC. 3 URS CORPORATION SOUTHERN ************************************************************ Contract Number : 15325 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43282813201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: State Road 4 over Blackwater River Bridge (Bridge #570033) in Okaloosa County Project Manager : HOWELL, BILL View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10MAR2014 Shortlst Selection Date :  14APR2014 Time:  08:30AM Shortlist Selection Posting :  14APR2014 Final Selection Meeting Date :  09JUN2014 Time:  08:30AM Final Selection Posting Date :  09JUN2014 Rank Consultant 1 FLORIDA BRIDGE AND TRANSPORTATION 2 PALMER ENGINEERING CO. D/B/A PEC, I 3 STV INCORPORATED ************************************************************ Contract Number : 15334 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43359012201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP2 - PD&E Studies GROUP8 - Surveying & Mapping Project Description: State Road 79 from State Road 8 (I-10) to Alabama State line in Holmes County This project is being procured in accordance with an Interlocal Agreement between the Florida Department of Transportation (FDOT) and the Alabama Department of Transportation (ALDOT). This project is for a Project Development and Environmental (PD&E) study of the potential connector between I-10 and US 231, north of Dothan, Alabama. FDOT intends to enter into an agreement with the most qualified firm for the PD&E Study on SR 79 from SR 8 (I-10) to the Alabama State Line. It is ALDOT's intent to enter into a separate agreement with the selected consultant for the Alabama portion of the corridor PD&E Study on the same or substantially the same terms as contained in the agreement executed between FDOT and the selected consultant. This solicitation is intended for FDOT and ALDOT qualified firms interested in both the FDOT project listed in the advertisement detail and the ALDOT project. The Prime Consultant must be qualified in both Florida and Alabama. Subconsultants must be qualified in the state in which they are proposed to perform work. Project Manager : Bruner, Brandon View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 03MAR2014 Shortlst Selection Date :  31MAR2014 Time:  08:30AM Shortlist Selection Posting :  31MAR2014 Scope Meeting Date :  17APR2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  12MAY2014 Time:  02:00PM Final Selection Meeting Date :  09JUN2014 Time:  08:30AM Final Selection Posting Date :  09JUN2014 Meeting Location Notes: The Technical Review Committee meeting will be held in the Environmental Management Conference Room Located at 1074 Highway 90 in Chipley, Florida 32428. Rank Consultant 1 H. W. LOCHNER, INC. 2 HDR ENGINEERING, INC. 3 VOLKERT, INC. ************************************************************ Contract Number : 15314 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43228513201 43390413201 Major Work : 3.1 - Minor Highway Design 4.1.2 - Minor Bridge Design Minor Work : 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies Project Description: Design Group 15-01; County Road 168 over Unnamed Branch (Bridge No. 480099); County Road 182 over Penasula Creek (Bridge No. 480115) in Escambia County Project Manager : Martin, Garrett View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Shortlst Selection Date :  25MAR2014 Time:  08:00AM Shortlist Selection Posting :  25MAR2014 Scope Meeting Date :  03APR2014 Time:  02:00PM Final Selection Meeting Date :  12MAY2014 Time:  08:30AM Final Selection Posting Date :  12MAY2014 Meeting Location Notes: The Interviews scheduled for April 22, 2014 will take place in the Design Conference Room located at 1074 Hwy 90 Chipley, Florida 32428 Rank Consultant 1 AMERICAN CONSULTING ENGINEERS OF FL 2 GRAEF-USA INC. 3 REGISTE SLIGER ENGINEERING, INC. ************************************************************ Design/Build Projects Procurement Number : E3N27 Financial Management Number(s): 41627215201 Project Description: This contract will include two projects. FPID 41527215201 - CR 372 Surf Road Ocholockonee Bay Multi-Use Trail (Phase 2) from west of Shoreline Drive to west to east of the Ulmore Bayou Bridge. The begin limits of the project will connect to the Wakulla County Phase 3 Trail Project (FPID 416272-3) and the end project limit will connect to the end of the existing trail. At the intersection of CR 372 (Surf Road) and SR 30 (US 98), the trail will transition south of the bridge abutment and connect under the north end of the Ocholockonee Bay Bridge and back up to CR 372 (Surf Road). The limits of the Ulmore Bay Bridge will be excepted out of the project. The project will include an 8' wide asphalt multi-use trail. FPID 41403235201 - SR 375 (US 319) Ochlockonee Bay Multi-Use Trail (Phase 5B) from Clermont Avenue to CR 372 (Surf Road). The begin limits of the project will begin at a logical location to support proper continuity with the City of Sopchoppy and the end trail limit will connect to the begin project location of FPID 41403225201 (Phase 5A). The project will include a 10' wide asphalt multi-use trail. Both projects will include all design and construction activities necessary to properly construct the trail within the specified limits. Additional work will include, but not be limited to installing appropriate signage and pavement markings, clearing and grubbing, any required earthwork, sodding, modifying existing drainage structures as necessary, installation of handrail as necessary, relocation and/or construction of mailboxes as necessary, removing/restriping existing conflicting striping, erosion control and any additional items needed to construct the trail within the project limits. The estimated contract time for this project is to be determined. In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans and/or Request for Proposal for this Project and are restricted from participation on a Design- Build Firm team without approval from the District 3 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. ATKINS NORTH AMERICA, INC. Bids and Technical Proposals will be due at 10:00 a.m. (local time) on Monday, March 23, 2015. All bids must be submitted through Bid Express. Technical Proposals should be emailed to d3.designbuild@dot.state.fl.us. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the technical proposal is received by the Department's server by the due date and time. Only one (1) technical/bid proposal per legal entity is acceptable. Receipt of multiple technical/bid proposals from a legal entity will cause Department rejection of all proposals of the legal entity. The Technical Review Committee Members for this project are: Timothy Hendrix, P. E. - Asst. District Construction Eng. Lori Kietzer - Midway Construction Project Manager April Williams, P. E. - Project Development Supervisor Project Manager : HARRELL, KERRIE B Budget Amount : $2,357,461 Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading, Drainage, Flexible Paving, Hot Plant Mix Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design Technical Questions Should Be Addressed To: All technical questions for this project should be addressed to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: The Department has reviewed this project and established a 10% DBE Availability goal. DBE/MBE/SMALL BUSINESS REQUIREMENTS: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non- DBE Small Businesses. Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: https://www3.dot.state.fl.us/EqualOpportunityOffice/biznet/ mainmenu.asp Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: http://www.dot.state.fl.us/EqualOpportunityOffice/size Standards.shtm Firms will submit the DBE and Small Business Participation form as required by the Request for Proposal. Advertisement Status : Planned Date of Advertisement : 20JAN2015 Pre-Bid Meeting Date :  19FEB2015 Time:  01:30PM Bids Due Date :  23MAR2015 Time:  10:00AM Bid Opening Date :  23MAR2015 Time:  10:30AM Tech. Rev. Cmte Meeting :  30MAR2015 Time:  10:00AM Final Selection Meeting Date :  06APR2015 Time:  08:30AM Meeting Location Notes: A Mandatory Pre-Proposal Meeting will be held for this project on Thursday, February 19, 2015 at 1:30 p.m. local time, Florida Department of Transportation, 1074 Highway 90, Chipley, Florida. ************************************************************ Procurement Number : E3N28 Financial Management Number(s): 41306235201 Project Description: This project consists of the widening of SR 8 (I-10) from Escambia Bay Bridge to East of SR 281 (Avalon Blvd) to six (6) lanes. The project will also include correcting substandard geometric curves on SR 8 (I-10) which includes replacing the SR 8 (I-10) bridges over SR 281 (Avalon Blvd) (which also includes correcting existing vertical clearance deficiencies), modifying interchange ramps as necessary to meet current criteria, reconstructing SR 281 (Avalon Blvd) within the interchange area and raising the profile grade, modifying drainage as necessary, modifying high mast lighting as necessary, addressing subsoil geotechnical issues and all other items necessary to complete the multilane of SR 8 (I-10) and the interchange construction. The estimated contract time for this project is to be determined. In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for thisProject and are restricted from participation on a Design-Build Firm without approval from the District 3 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Volkert, Inc. (C-9721) Environmental & Geotechnical Specialists, Inc. (C-9721) HSA Consulting Group, Inc. (C-9721) Miller Legg & Associates, Inc. (C-9721) Southeastern Surveying & Mapping Corp. (C-9721) Faller Davis & Associates, Inc. (C-9721) Technical Review Committee Members for this project are: DJ Barber, P.E. - Structures Design Engineer Jason Crenshaw, P.E. - Design Project Management Supervisor Eric Benson, P.E. - Milton Resident Engineer SPECIAL NOTE: The Department will make ATC meetings available for this project. ATC meetings will be held only upon request and are not mandatory. Any firm wishing to schedule an ATC meeting must do so by the date and time indicated in the Schedule of Events of the RFP document. Bids and Technical Proposals will be due at 10:00 a.m. (local time) on Monday, March 16, 2015. All bids must be submitted through Bid Express. Technical Proposals should be emailed to d3.designbuild@dot.state.fl.us. The Technical Proposal and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB server limit may be rejected by the Department's email server. Is is solely the Design Build Firm's responsiblity to ensure that the Technical Proposal is received by the Department's server by the due date and time. Only (1) Technical Proposal per legal entity is acceptable. Project Manager : HARRELL, KERRIE B Budget Amount : $32,283,812 Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Hot Plant Mix-Bituminous Course, Flexible Paving, Grading, and Drainage Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.2 - Minor Bridge Design Technical Questions Should Be Addressed To: All technical questions for this project should be addressed to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: The Department has reviewed this project and established a 10% DBE Availability goal. DBE/MBE/SMALL BUSINESS REQUIREMENTS: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non- DBE Small Businesses. Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: https://www3.dot.state.fl.us/EqualOpportunityOffice/biznet/ mainmenu.asp Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: http://www.dot.state.fl.us/EqualOpportunityOffice/size Standards.shtm Firms will submit the DBE and Small Business Participation form as required by the Request for Proposal. Advertisement Status : Planned Date of Advertisement : 24NOV2014 Pre-Bid Meeting Date :  18DEC2014 Time:  01:30PM Bids Due Date :  16MAR2015 Time:  10:00AM Bid Opening Date :  16MAR2015 Time:  10:30AM Tech. Rev. Cmte Meeting :  24MAR2015 Time:  10:00AM Final Selection Meeting Date :  30MAR2015 Time:  08:30AM Meeting Location Notes: A Mandatory Pre-Proposal Meeting will be held for this project on Thursday, December 18, 2014 at 1:30 p.m., Florida Department of Transportation, 1074 Highway 90, Chipley, FL 32428. ************************************************************ Procurement Number : E3M30 Financial Management Number(s): 42429025201 42429125201 Project Description: SR 85 Bridge Rehab at Five Mile Bayou Bridge and Garnier Bayou Bridge in Okaloosa County. This project will include replacing deficient bearing pads and repairing pre-stressed post-tensioned beam ends as necessary to correct existing deterioration. Due to the deteriorated condition of the existing steel plates (bearing surfaces cast into the beam ends), concrete spalls at the beam end bearing area and some bearing pedestals will require rehabilitation. These concrete repairs may require the use of Carbon Fiber Reinforced Polymer. Bridge jacking is anticipated to facilitate the necessary rehabilitation requirements. Expanded Letters of Interest Page Limit: 10 page maximum (exclusive of information identified above): Note: Resumes, Organizational Chart and 3 pages of Performance History for Firms having no previous performance history with the Department and/or to firms whose performance history with the Department is no longer current (older than 5 years) are not considered in the 10 page count/limitation. Cover sheets, photos, charts, etc. or other documents not specifically listed as exclusions will be considered in the page count/limitation. The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email.The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only (1) ELOI per legal entity is acceptable. All ELOI files should be sent to d3.designbuild@dot.state.fl.us and must be received by the Department by the Phase I ELOI response deadline shown below. The Department will judge the relative ability of each submitting company/entity to perform the required services based on qualification information and the ELOI. The criteria for evaluating the Phase I submittals will include: Section 1) Design-Build Firm Name and Prequalifications Section 2) Past Performance Evaluations, Design-Build Project Experience, Organization, and Staffing: (Total 7 Points) Contractor Grades Professional Consultant Grades Performance History with other States or Agencies, if none with the Department Design-Build Project Experience of the Contractor and Professional Consultant Similar types of work experience Enviromental Record Contractor Experience Modification Rating (Current Year) Design-Build Firm organization Design-Build Firm staffing plan Design-Build Firm coordination plan Section 3) Design-Build Project Requirements and Critical Issues: (Total 13 Points) Understanding of Design-Build Project Requirements Identification of critical issues Outline for addressing critical issues The Technical Review Committee Members for this project are: Keith Shores, P.E. - District Structures Design Engineer Dallas Boyd, E.I. - Sr. Engineer Trainee - Structures Maint. Steve Hunt, P.E. - Milton Operations Engineer In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 3 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Stantec Consulting Services, Inc. (C-9841) Exempt Documents are available for this project. In order to receive the documents, please download and complete the Exempt Documents Request Form and return along with a copy of a photo ID to Ranae Dodson of the Procurement Office at ranae.dodson@dot.state.fl.us. The documents will be emailed to you upon receipt of the form. Estimated Contract Time for this project has not yet been determined. The stipend amount for this project is $16,000 and will be paid per the guidelines described above. Project Manager : HARRELL, KERRIE B Budget Amount : $5,268,450 Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Repair & Rehabilitate - Major bridge over a water opening of 1,000 feet or more Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 4.2.1 - Major Bridge Design - Concrete Technical Questions Should Be Addressed To: All technical questions for this project should be addressed to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: The Department has reviewed this project and established a 9% DBE Availability goal. DBE/MBE/SMALL BUSINESS REQUIREMENTS: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non- DBE Small Businesses. Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: https://www3.dot.state.fl.us/EqualOpportunityOffice/biznet/ mainmenu.asp Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: http://www.dot.state.fl.us/EqualOpportunityOffice/size Standards.shtm Firms will submit the DBE and Small Business Participation form as required by the Request for Proposal. Advertisement Status : Planned Date of Advertisement : 18AUG2014 PhaseI Selection Cmte. Meeting :  29SEP2014 Time:  08:30AM ELOI Scores Notification Date :  29SEP2014 Time:  10:00AM Deadline for Election to Participate in Ph. II :  01OCT2014 Time:  10:00AM Posting of Shortlist :  01OCT2014 Time:  01:00PM Mand. Pre-Proposal Meeting Date:  20OCT2014 Time:  01:30PM PhaseII Tech. Proposal Due Date:  15JAN2015 Time:  02:00PM Price Proposal Due Date :  26FEB2015 Time:  10:00AM Proposal Opening Date :  26FEB2015 Time:  10:30AM Final Selection Meeting Date :  09MAR2015 Time:  08:30AM Meeting Location Notes: A Mandatory Pre-Proposal Meeting will be held for this project on Monday, October 20, 2014 at 1:30 PM (local time) in the Design Conference Room located in the District Three Design Building at 1074 Highway 90, Chipley, FL. ************************************************************ Procurement Number : E3N16 Financial Management Number(s): 42902475201 42902485201 Project Description: This contract will include SR 8 (I-10) Rest Area Building replacement and sanitary sewer system replacement in Jefferson County and Rest Area Building renovations in Leon County. The facility modifications will be for both eastbound and westbound I-10 building locations. In addition to building construction/renovations, the roadway entrance and exit ramps will be redesigned and constructed to meet current design criteria. The parking areas at all 4 locations will require upgrading to concrete pavement. During construction, one Rest Area Facility (both eastbound and westbound locations) shall remain open at all times while the facility in the other county is closed for construction. Expanded Letters of Interest Page Limit: 10 page maximum (exclusive of information identified above): Note: Resumes, Organizational Chart and 3 pages of Performance History for Firms having no previous performance history with the Department and/or to firms whose performance history with the Department is no longer current (older than 5 years) are not considered in the 10 page count/limitation. Cover sheets, photos, charts, etc. or other documents not specifically listed as exclusions will be considered in the page count/limitation. The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email.The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only (1) ELOI per legal entity is acceptable. All ELOI files should be sent to d3.designbuild@dot.state.fl.us and must be received by the Department by the Phase I ELOI response deadline shown below. The Expanded Letters of Interest will be evaluated based upon the following criteria: 1) Design-Build Firm Name and prequalifications. 2) Past Performance Evaluations, Design-Build Project Experience, Organization, and Staffing: (0-7 Points) Contractor Grades Professional Consultant Grades Performance history with other states or agencies if none with the Department Design-Build Project experience of the Contractor and Professional Consultant Similar types of work experience Environmental Record Contractor Experience Modification Rating (Current Year) Design-Build Firm organization Design-Build Firm staffing plan Design-Build Firm coordination plan 3) Design-Build Project Requirements and Critical Issues: (0-13 points) Understanding of Design-Build Project Requirements Identification of Critical Issues Outline for addressing critical issues In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 3 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Atkins North America, Inc. Stantec Inc. (C9516) Environmental and Geotechnical Specialists, Inc. (C9516) Ecological Resource Consultants (C9516) Quest Corporation of America (C9516) CB&I Government Solutions, Inc. (formerly Shaw Environmental & Infrastructure, Inc.) (BDR32) Estimated Contract Time for this project is 640 calendar days. The stipend amount for this project is $30,200 and will be paid per the guidelines described above. Special Note: Because Volume 2 of the Request for Proposal Document contains exempt information, each firm wishing to obtain a copy of the documents will need to complete an Exempt Document Request Form and return it along with a copy of a photo ID to Ranae Dodson in the Procurement Office at ranae.dodson@dot.state.fl.us. Once the completed form is received, the remaining information will be sent to you via e-mail. The Exempt Documents Request Form can be found on the District Three District Contracts Website at D3 DISTRICT CONTRACTS. Once you navigate to the website, click the "Design Build Projects" link. SPECIAL NOTE: Contractors performing site work shall be prequalified with FDOT in the following work classes: Grading, Flexible Paving, Drainage, Hot Plant-Mixed Bituminous Course, and Portland Cement Concrete Paving Project Manager : HARRELL, KERRIE B Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor Certified by the Florida Construction Industry Board as General Contractor Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 14.0 - Architect Technical Questions Should Be Addressed To: All technical questions for this project should be addressed to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: The Department has reviewed this project and established a 10% DBE Availability Goal. DBE/MBE/SMALL BUSINESS REQUIREMENTS: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non- DBE Small Businesses. Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: https://www3.dot.state.fl.us/EqualOpportunityOffice/biznet/ mainmenu.asp Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: http://www.dot.state.fl.us/EqualOpportunityOffice/size Standards.shtm Firms will submit the DBE and Small Business Participation form as required by the Request for Proposal. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 01JUL2014 Response Deadline : 22JUL2014 PhaseI Selection Cmte. Meeting :  11AUG2014 Time:  08:30AM ELOI Scores Notification Date :  11AUG2014 Time:  10:00AM Deadline for Election to Participate in Ph. II :  13AUG2014 Time:  10:00AM Posting of Shortlist :  13AUG2014 Time:  01:00PM Mand. Pre-Proposal Meeting Date:  27AUG2014 Time:  01:30PM PhaseII Tech. Proposal Due Date:  06NOV2014 Time:  02:00PM Price Proposal Due Date :  19DEC2014 Time:  10:00AM Proposal Opening Date :  19DEC2014 Time:  10:30AM Final Selection Meeting Date :  29DEC2014 Time:  08:30AM Meeting Location Notes: A Mandatory Pre-Proposal Meeting will be held for this project on Wednesday, August 27, 2014 at 1:30 p.m. (local time) 1074 Highway 90, Chipley, Florida 32428. Phase I ELOI Response Deadline : 22JUL2014 04:00PM Respond To: Florida DOT - District 3 1074 Highway 90 Chipley, FL 32428-9990 Attn: Richard Norris Professional Services Phone: (850)330-1334 d3.profserv@dot.state.fl.us ************************************************************ Procurement Number : E3M94 Financial Management Number(s): 41403225201 Project Description: CR 372 Surf Road Ochlockonee Bay Multi-Use Trail from South of Buckhorn Creek to SR 375 (US 319) in Wakulla County. This project will consist of the design and construction of an 8' wide asphalt multi-use trail. The trail will connect to the existing trail located south of Buckhorn Creek Road and provide a continuous path to SR 375 (US 319). Additional work will include, but not be limited to installing appropriate signage and pavement markings, clearing and grubbing, any required earthwork, sodding, modifying existing drainage structures, as necessary, installation of handrail as necessary, relocation and/or construction of mailboxes as necessary, removing/restriping existing conflicting striping, erosion control and any additional items needed to construct the trail within the project limits. The estimated contract time for this project is 120 calendar days. In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following firms participated in the development of the conceptual plans and/or RFP for this Project and are hereby restricted from participation on a Design-Build Team without approval from the District 3 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless and exception is obtained from the Department. ATKINS NORTH AMERICA, INC. Bids and Technical Proposals will be due at 10:00 a.m. (local time) on Friday, June 13, 2014. All bids must be submitted through Bid Express. Technical Proposals should be emailed to d3.designbuild@dot.state.fl.us. The Department has a 10MB limit on email. Emails that exceed this 10MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the technical proposal is received by the Department's server by the due date and time. Only one (1) technical/bid proposal per legal entity is acceptable. Receipt of multiple technical/bid proposals from a legal entity will cause Department rejection of all proposals of the legal entity. The RFP document attached to this ad has been updated as of May 6, 2014. Please download the updated document using the link below. Project Manager : HARRELL, KERRIE B Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading, Drainage, Flexible Paving, Hot Plant Mix Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design Technical Questions Should Be Addressed To: All technical questions for this project should be addressed to: http://www2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: DBE/MBE/SMALL BUSINESS REQUIREMENTS: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non- DBE Small Businesses. Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: https://www3.dot.state.fl.us/EqualOpportunityOffice/biznet/ mainmenu.asp Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: http://www.dot.state.fl.us/EqualOpportunityOffice/size Standards.shtm Firms will submit the DBE and Small Business Participation form as required by the Request for Proposal. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Pre-Bid Meeting Date :  07MAY2014 Time:  10:00AM Bids Due Date :  13JUN2014 Time:  10:00AM Bid Opening Date :  13JUN2014 Time:  10:30AM Final Selection Meeting Date :  30JUN2014 Time:  08:30AM Final Selection Posting Date :  30JUN2014 Meeting Location Notes: A Mandatory Pre-Proposal Meeting will be held for this project on Wednesday, May 7, 2014 at 10:00 a.m. local time, Florida Department of Transportation, 1074 Highway 90, Chipley, Florida. Rank Consultant Bid Amount 1 M OF TALLAHASSEE,INC. $424,850 2 C.W. ROBERTS CONTRACTING,INC. $431,250 ************************************************************ Procurement Number : E3M55 Financial Management Number(s): 42805825201 Project Description: Design and construction of Advanced Traffic Management System Improvements along various existing roadways in Escambia and Santa Rosa Counties. Work Will require existing traffic signal improvements, installation of CCTV cameras, fiber optic cable installations, and various ATMS improvements at designated locations. In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following firms participated in the development of the conceptual plans and/or RFP for this Project and are hereby restricted from participation on a Design-Build Team without approval from the Department's District Three Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. HNTB Corporation Bids and Technical Proposals will be due at 10:00 a.m. (local time) on Friday, January 31, 2014. All bids must be submitted through Bid Express. Technical Proposals should be emailed to d3.designbuild@dot.state.fl.us. The Department has a 10MB limit on email. Emails that exceed this 10MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the technical proposal is received by the Department's server by the due date and time. Only one (1) technical/bid proposal per legal entity is acceptable. Receipt of multiple technical/bid proposals from a legal entity will cause Department rejection of all proposals of the legal entity. The RFP document contains reference to survey files that will be provided as Zip files. In order to obtain the files, please email Ranae Dodson at ranae.dodson@dot.state.fl.us. The files will be sent to you via email. Project Manager : Harrell, Kerrie Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Intelligent Transportation Systems Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.3 - Signalization Technical Questions Should Be Addressed To: Technical Questions are to be directed to the following website: https://www3.dot.state.fl.us/BidQuestionsAndAnswers/Proposal .aspx/Search Proposal DBE/MBE Requirements: The Department has reviewed this project and established a 9.0% DBE Availability Goal. DBE and SMALL BUSINESS ASPIRATION GOAL:It is the policy of FDOT to encourage the participation of small businesses and disadvantaged business enterprises ("DBE") in all facets of the business activities of FDOT, consistent with applicable laws and regulations. FDOT has established an aspiration goal of 9% DBE usage and an additional 3% non- DBE Small Business usage for the subject Project. Firms proposing for this project shall aspire to have nine percent (9%) or more of the total contract costs performed by DBEs, and an additional three percent (3%) or more of the total contract costs performed by non-DBE small businesses. Although not a contract requirement, FDOT believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. FDOT further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, FDOT has adopted rules to provide certified DBEs opportunities to participate in the business activities of FDOT as vendors, contractors, subcontractors, and consultants. FDOT has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: https://www3.dot.state.fl.us/EqualOpportunityOffice/biznet/ mainmenu.asp Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: http://www.dot.state.fl.us/EqualOpportunityOffice/sizeStanda rds.shtm Firms will submit the DBE and Small Business Participation Form as required by the Request for Proposal. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 18NOV2013 Pre-Bid Meeting Date :  07JAN2014 Time:  01:30PM Bids Due Date :  31JAN2014 Time:  10:00AM Bid Opening Date :  31JAN2014 Time:  10:30AM Final Selection Meeting Date :  10FEB2014 Time:  08:30AM Final Selection Date Not Posted Meeting Location Notes: A Pre-Proposal Meeting will be held for this project on Tuesday, January 7, 2014 at 1:30 p.m., Florida Department of Transportation, 1074 Highway 90, Chipley, FL. Rank Consultant Bid Amount 1 INGRAM SIGNALIZATION, INC. $1,540,571 2 WORLD FIBER TECHNOLOGIES, INC. $1,952,014 3 AMERICAN LIGHTING & SIGNALIZATION $2,867,920 ************************************************************ DISTRICT 4 ************************************************************ Professional Services Consultant Projects Contract Number : 15456 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 23144026201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: CEI SERVICES FOR W. MIDWAY ROAD/CR-712 FROM S. 25TH STREET SR-615 TO SR-5/US-1 Project Manager : HARRIS, JEANNETTE Budget Amount : $1,991,662 Advertisement Status : Planned Date of Advertisement : 26JAN2015 Shortlst Selection Date :  06MAR2015 Time:  8:15AM Final Selection Meeting Date :  30MAR2015 Time:  8:15AM ************************************************************ Contract Number : 15422 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42264136201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR-76/Kanner Hwy. from Lost River to Monterrey Road. Project Manager : HARRIS, JEANNETTE Budget Amount : $1,719,831 Advertisement Status : Planned Date of Advertisement : 19JAN2015 Shortlst Selection Date :  02MAR2015 Time:  8:15AM Final Selection Meeting Date :  23MAR2015 Time:  8:15AM ************************************************************ Contract Number : 15453 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43400716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI SERVICES FOR SR-809/MILITARY TRAIL FROM SHILO DR. TO SR-710/BEELINE HIGHWAY =========================================================== Project reserved under the Business Development Initiative Program. =========================================================== Project Manager : HARRIS, JEANNETTE Budget Amount : $155,138 Advertisement Status : Planned Date of Advertisement : 12JAN2015 Shortlst Selection Date :  23FEB2015 Time:  8:15AM Final Selection Meeting Date :  16MAR2015 Time:  8:15AM ************************************************************ Contract Number : 15452 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22939626201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI FOR SR-786/PGA BLVD FROM SR-710 TO WEST OF FLORIDA'S TURNPIKE Project Manager : HARRIS, JEANNETTE Budget Amount : $850,000 Advertisement Status : Planned Date of Advertisement : 29DEC2014 Shortlst Selection Date :  09FEB2015 Time:  8:15AM Final Selection Meeting Date :  03FEB2015 Time:  8:15AM ************************************************************ Contract Number : 15455 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42898416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: CEI SERVICES FOR SR-70 FROM 900' WEST OF JENKINS ROAD TO 2000' EAST OF JENKINS ROAD. =========================================================== PROJECT RESERVED UNDER THE BUSINESS DEVELOPMENT INITIATIVE PROGRAM. =========================================================== Project Manager : HARRIS, JEANNETTE Budget Amount : $394,910 Advertisement Status : Planned Date of Advertisement : 22DEC2014 Shortlst Selection Date :  02FEB2015 Time:  8:15AM Final Selection Meeting Date :  23FEB2015 Time:  8:15AM ************************************************************ Contract Number : 15462 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43551612201 43580312201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: FM 435516-1-22-01, ESTIMATED CONTRACT AMOUNT:$2,000,000.00: PD&E STUDY FOR SR-9/I-95@SR-80/SOUTHERN BLVD INTERCHANGE ULTIM IMPROVEMENT. FM 435803-1-22-01, ESTIMATED CONTRACT AMOUNT:$1,000,000.00: SR-9/I-95@NORTHLAKE BLVD. INTERCHANGE. TWO SEPARATE PD&E CONTRACTS WILL BE SELECTED FROM THIS ADVERTISEMENT (ADVERTISED WITH AD 15463). Project Manager : SONNETT, WILLIAM A Budget Amount : $3,000,000 Advertisement Status : Planned Date of Advertisement : 02DEC2014 Shortlst Selection Date :  05JAN2015 Time:  8:15AM Final Selection Meeting Date :  14FEB2015 Time:  8:15AM ************************************************************ Contract Number : 15464 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43175914201 43175914B01 Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Minor Work : ACQUISITION RELOCATION Project Manager : NEILLY, VAN G Budget Amount : $4,305,370 Advertisement Status : Planned Date of Advertisement : 02DEC2014 Shortlst Selection Date :  05JAN2015 Time:  8:15AM Final Selection Meeting Date :  23FEB2015 Time:  8:15AM ************************************************************ Contract Number : 15465 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 40906144201 42427144B01 Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing 99.0 - Other Professional Services Minor Work : R/W SUPPT CONSULT SVCS Project Manager : NEILLY, VAN G Budget Amount : $5,000,000 Advertisement Status : Planned Date of Advertisement : 02DEC2014 Shortlst Selection Date :  05JAN2015 Time:  8:15AM Final Selection Meeting Date :  23FEB2015 Time:  8:15AM ************************************************************ Contract Number : 15447 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43307016201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services for 23rd Street from Tamarind Avenue to Spruce Avenue. =========================================================== Project reserved under the Business Development Initiative Program. ============================================================ Project Manager : HARRIS, JEANNETTE Budget Amount : $125,000 Advertisement Status : Planned Date of Advertisement : 01DEC2014 Shortlst Selection Date :  12JAN2015 Time:  8:15AM Final Selection Meeting Date :  02FEB2015 Time:  8:15AM ************************************************************ Contract Number : 15446 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43120416201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: CEI Services fpr SR-A1A from SR-816/Oakland Park Blvd to Flamingo Ave. Project Manager : HARRIS, JEANNETTE Budget Amount : $1,597,930 Advertisement Status : Planned Date of Advertisement : 24NOV2014 Shortlst Selection Date :  12JAN2015 Time:  8:15AM Final Selection Meeting Date :  26JAN2015 Time:  8:15AM ************************************************************ Contract Number : 15444 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42800916201 42800926201 43310846201 43472416201 43472516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.5.1 - Major Bridge(CEI) - Concrete 10.5.2 - Major Bridge(CEI) - Steel Minor Work : Project Description: 428009-1-62-01 SR-9/I-95 fr Miami-Dade/Broward CL to Davie Blvd. 428009-2-62-01 SR-9/I-95 fr Broward Blvd. to Atlantic Blvd. 433108-4-62-01 SR-9/I-95 fr S. of Broward Blvd to Atlantic Blvd. 434724-1-62-01 I-95 & Broward Blvd. Interchange Southbound Off-Ramp Terminus. 434725-1-62-01 I-95 & Borward Blvd. Interchange Northbound Off-Ramp & Terminus. Project Manager : HARRIS, JEANNETTE Budget Amount : $24,549,882 Advertisement Status : Planned Date of Advertisement : 17NOV2014 Shortlst Selection Date :  05JAN2015 Time:  8:15AM Final Selection Meeting Date :  09FEB2015 Time:  8:15AM ************************************************************ Contract Number : 15431 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42306633201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: SR-817/University Dr. from Hallandale Beach Boulevard to SR-834/Sample Rd. Project Manager : HOLZWEISS, RAY Budget Amount : $1,000,000 Advertisement Status : Planned Date of Advertisement : 03NOV2014 Shortlst Selection Date :  08DEC2014 Time:  8:15AM Final Selection Meeting Date :  26JAN2015 Time:  8:15AM ************************************************************ Contract Number : 15461 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 23193212201 43580412201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design 4.2.1 - Major Bridge Design - Concrete Under-Utilized Work Groups: GROUP2 - PD&E Studies GROUP4 - Highway Design - Bridge Project Description: PD&E FOR SR-9/I-95@GATEWAY BLVD. INTERCHANGE. SR-9/I-95@ SR-804/BOYNTON BEACH BLVD INTERCHANGE Project Manager : LE, THUC Budget Amount : $2,000,000 Advertisement Status : Planned Date of Advertisement : 03NOV2014 Shortlst Selection Date :  08DEC2014 Time:  8:15AM Final Selection Meeting Date :  19JAN2015 Time:  8:15AM ************************************************************ Contract Number : 15460 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41242043201 Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: DESIGN SERVICES FOR SR-9/I-95@ SR-808/GLADES ROAD Project Manager : Gomez, Fausto Budget Amount : $4,500,000 Advertisement Status : Planned Date of Advertisement : 20OCT2014 Shortlst Selection Date :  24NOV2014 Time:  8:15AM Final Selection Meeting Date :  12JAN2015 Time:  8:15AM Meeting Location Notes: All firms interested in pursuing this project can meet with the project manager on the following dates: * September 9, 2014 from 1:00 p.m. - 4:00 p.m. September 10, 2014 from 1:00 p.m. - 4:00 p.m. September 11, 2014 from 1:00 p.m. - 4:00 p.m. September 12, 2014 from 9:00 a.m. - 11:00 a.m. September 16, 2014 from 1:00 p.m. - 4:00 p.m. September 17, 2014 from 1:00 p.m. - 4:00 p.m. September 18, 2014 from 1:00 p.m. - 4:00 p.m. September 19, 2014 from 9:00 a.m. - 11:00 a.m. * Please contact the project manager to schedule your meeting dates @954-777-4466. ************************************************************ Contract Number : 15432 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43515013201 Major Work : 6.2 - Traffic Signal Timing Minor Work : Project Description: District 4 Signal Retiming Project Manager : Li, Jaimin Budget Amount : $578,400 Advertisement Status : Planned Date of Advertisement : 06OCT2014 Shortlst Selection Date :  10NOV2014 Time:  8:15AM Final Selection Meeting Date :  22DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15445 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41304823201 Major Work : 3.3 - Controlled Access Highway Design Minor Work : I-95/SR-9@OSLO RD INTERCHANGE Project Manager : GLASS, PATRICK Budget Amount : $3,300,000 Advertisement Status : Planned Date of Advertisement : 06OCT2014 Shortlst Selection Date :  10NOV2014 Time:  8:15AM Final Selection Meeting Date :  12JAN2015 Time:  8:15AM ************************************************************ Contract Number : 15441 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42485233201 Major Work : 99.0 - Other Professional Services Minor Work : Project Description: Districtwide Value Engineering Services. Project Manager : Brock, Tim Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Shortlst Selection Date :  03NOV2014 Time:  8:15AM Final Selection Meeting Date :  15DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15459 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41925113201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: DESIGN SERVICES FOR SR-710/BEELINE HIGHWAY FROM NORTHLAKE BLVD. TO SR-708/BLUE HERON BLVD. Project Manager : PESSOA, DONOVAN Budget Amount : $4,500,000 Advertisement Status : Planned Date of Advertisement : 23SEP2014 Shortlst Selection Date :  27OCT2014 Time:  8:15AM Final Selection Meeting Date :  15DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15436 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23144032201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: W. Midway Rd/CR-712 from Glades Cut Off Rd. to Selvitz Rd.- PD&E Services. Project Manager : SAINI, VANITA Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 22SEP2014 Shortlst Selection Date :  27OCT2014 Time:  8:15AM Final Selection Meeting Date :  17DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15440 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 42503773201 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : Project Description: Districtwide Aerial Photogrammetry Services - Production Support. Project Manager : Doll, Paul Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 22SEP2014 Shortlst Selection Date :  27OCT2014 Time:  8:15AM Final Selection Meeting Date :  08DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15439 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42338333201 Major Work : 3.3 - Controlled Access Highway Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 7.1 - Signing, Pavement Marking & Channelization Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Districtwide In House Plans Review Support Services Project Manager : Rodrigues, Nadir Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 15SEP2014 Shortlst Selection Date :  20OCT2014 Time:  8:15AM Final Selection Meeting Date :  01DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15443 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 23316623201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: Design Services for SR-808/Glades Rd. from SR-7 to SR-5 Project Manager : SONNETT, WILLIAM A Budget Amount : $4,150,000 Advertisement Status : Planned Date of Advertisement : 15SEP2014 Shortlst Selection Date :  27OCT2014 Time:  8:15AM Final Selection Meeting Date :  15DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15450 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43177013201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: SR-820/Hollywood Blvd -Pines Blvd from SR-93/I-75 to Young Circle Project Manager : LEE SHUE LING, BRENT Budget Amount : $1,000,000 Advertisement Status : Planned Date of Advertisement : 08SEP2014 Shortlst Selection Date :  13OCT2014 Time:  8:15AM Final Selection Meeting Date :  01DEC2014 Time:  8:15AM ************************************************************ Contract Number : 15423 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42872616201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: SR-5/US-1 From Broward Blvd to NE 17th Way- CEI Services =========================================================== Project Reserved under the Business Development Initiative Program. =========================================================== Project Manager : HARRIS, JEANNETTE Budget Amount : $222,000 Advertisement Status : Planned Date of Advertisement : 01SEP2014 Shortlst Selection Date :  13OCT2014 Time:  8:15AM Final Selection Meeting Date :  03NOV2014 Time:  8:15AM ************************************************************ Contract Number : 15437 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43167813201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: SE 3rd Avenue from SE 17Th Street to SR-842/Las Olas Blvd. Project Manager : WALLACE, RONALD Budget Amount : $200,000 Special Notes: ============================================================ This project is reserved under the Business Development Initiative Program. ============================================================ Advertisement Status : Planned Date of Advertisement : 25AUG2014 Shortlst Selection Date :  29SEP2014 Time:  8:15AM Final Selection Meeting Date :  17NOV2014 Time:  8:15AM ************************************************************ Contract Number : 15434 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 42503783201 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Minor Work : D/W SURVEY SVCS PRODUCTION Project Manager : Doll, Paul Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 18AUG2014 Shortlst Selection Date :  22SEP2014 Time:  8:15AM Final Selection Meeting Date :  03NOV2014 Time:  8:15AM ************************************************************ Contract Number : 15457 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43578112201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: BROWARD COUNTYWIDE MOBILITY HUBS - PD&E SERVICES. This ia a continuing services contract and pending legislative approval. Project Manager : Ffrench, Khalilah Budget Amount : $5,000,000 Advertisement Status : Planned Date of Advertisement : 12AUG2014 Shortlst Selection Date :  15SEP2014 Time:  8:15AM Final Selection Meeting Date :  03NOV2014 Time:  8:15AM ************************************************************ Contract Number : 15435 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23009473201 Major Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing Minor Work : D/W TRAFFIC OPS SAFETY REVIEW Project Manager : DEFRANT, JACQUES Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 11AUG2014 Shortlst Selection Date :  15SEP2014 Time:  8:15AM Final Selection Meeting Date :  27OCT2014 Time:  8:15AM ************************************************************ Contract Number : 15442 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23030092201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: Districtwide Project Development and Environmental (PD&E) Support. Two contracts will be awarded from this advertisement. Each contract will be for a maximum amount of $1,500,000. FM 230030-9-22-01 (Ad15442) and FM 421832-2-22-01(AD15429). Project Manager : Patterson-Brady, Jamie Budget Amount : $1,500,000 Special Notes: All firms interested in persuing this project can contact Project Manager at (954)777-4342 to schedule a half an hour marketing meeting. Currently, Ms. Jamie Patterson-Brady has reserved time from June 16 to June 20. Other times may be available upon request. Advertisement Status : Planned Date of Advertisement : 11AUG2014 Shortlst Selection Date :  15SEP2014 Time:  8:15AM Final Selection Meeting Date :  03NOV2014 Time:  8:15AM ************************************************************ Contract Number : 15449 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43515813201 Major Work : 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 9.1 - Soil Exploration Project Description: SR-80/Southern Boulevard at Sansbury Way/Lyons Road. ============================================================ Add eastbound right turn lane and 2nd westbound left turn lane to SR-80 at Lyons Road. Add receiving lane and traffic separator to Lyons at South approach. Widen low level bridge over C-51 Canal. Project Manager : PESSOA, DONOVAN Budget Amount : $650,000 Advertisement Status : Planned Date of Advertisement : 28JUL2014 Shortlst Selection Date :  01SEP2014 Time:  8:15AM Final Selection Meeting Date :  20OCT2014 Time:  8:15AM ************************************************************ Contract Number : 15426 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43175613202 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: University Drive from NW 40th Street to Sawgrass Expressway * Add lanes and reconstruct Project. University Drive (off-system road) from just south of Cardinal Road/NW 40th Street to the Sawgrass Expressway/ SR-869 in Broward County approximately 1.6 miles. * Section 1 of page A-16 of the Scope of Services was modified to match the advertised minor work types. Project Manager : Gomez, Fausto Estimated Contract Amt: $1,100,000 See Standard Notes Above: 8 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 21JUL2014 Response Deadline : 01AUG2014 Longlist(Tech. Rev. Cmte.) Date:  14AUG2014 Time:  9:00AM Shortlst Selection Date :  25AUG2014 Time:  8:15AM Scope Meeting Date :  03SEP2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  29SEP2014 Time:  9:00AM Final Selection Meeting Date :  13OCT2014 Time:  8:15AM 1st Negotiations Meeting :  20NOV2014 Time:  9:00AM Response Deadline : 01AUG2014 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 15438 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23001763201 Major Work : 6.2 - Traffic Signal Timing Minor Work : Project Description: Districtwide Traffic Operations Signal Retiming Project * Traffic Signal retiming Project for 174 State Roadway intersection in Palm Beach County. Some intersection require the development a full set of optimized timing parameters including cycle length, splits and offset while for some intersection require data collection and or timing evaluation with adjustment to offset. The work to be done per intersection is described in the Scope of Services. Letter of interest listing consultant's project manager, staff and past signal retiming experience. Project Manager : Li, Jaimin Estimated Contract Amt: $300,000 See Standard Notes Above: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 21JUL2014 Response Deadline : 01AUG2014 Shortlst Selection Date :  25AUG2014 Time:  8:15AM Scope Meeting Date :  04SEP2014 Time:  2:30PM Tech. Rev. Cmte Meeting :  26SEP2014 Time:  9:30AM Final Selection Meeting Date :  06OCT2014 Time:  8:15AM 1st Negotiations Meeting :  29OCT2014 Time:  9:00AM Response Deadline : 01AUG2014 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 15410 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42990516201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.5.2 - Major Bridge(CEI) - Steel Minor Work : Project Description: CEI services for Bridge#860920, Dania Beach Blvd. over the ICWW. * Plans are available for your use. Please send an email to deliah.sears@dot.state.fl.us. Project Manager : HARRIS, JEANNETTE Estimated Contract Amt: $770,659 See Standard Notes Above: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 14JUL2014 Response Deadline : 25JUL2014 Longlist(Tech. Rev. Cmte.) Date:  12AUG2014 Time:  9:00AM Shortlst Selection Date :  25AUG2014 Time:  8:15AM Scope Meeting Date :  04SEP2014 Time:  10:30AM Final Selection Meeting Date :  06OCT2014 Time:  8:15AM 1st Negotiations Meeting :  13NOV2014 Time:  9:00AM Response Deadline : 25JUL2014 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 15454 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43175223201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 15.0 - Landscape Architect Project Description: DESIGN SERVICES FOR PORT ST. LUCIE BLVD. FROM PAAR DRIVE TO DARWIN BLVD. * Design services for the reconstruction of Port St. Lucie Blvd. from Paar Drive to Darwin Blvd. * This advertisement is extended until August 1, 2014. All consultants who has submitted a letter of response has the option to resubmit their letter. A revised scope of services with minor changes will be posted on Monday. Project Manager : HOLZWEISS, RAY Estimated Contract Amt: $2,000,000 See Standard Notes Above: 9 Advertisement Status : Advertised Date of Advertisement : 14JUL2014 Response Deadline : 01AUG2014 Longlist(Tech. Rev. Cmte.) Date:  04AUG2014 Time:  9:00AM Shortlst Selection Date :  18AUG2014 Time:  8:15AM Scope Meeting Date :  04SEP2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  22SEP2014 Time:  9:00AM Final Selection Meeting Date :  13OCT2014 Time:  8:15AM 1st Negotiations Meeting :  10NOV2014 Time:  9:00AM Response Deadline : 01AUG2014 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 15416 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 23460667201 23406467201 Major Work : 5.1 - Conventional Bridge Inspection 5.2 - Movable Bridge Inspection 5.3 - Complex Bridge Inspection Minor Work : Project Description: Local Government Bridge Inspection Project Structural inspection of Local Government owned bridges located within the geographical limits of the Florida Department of Transportation District Four not including Indian River Co in compliance with the following Federal and State regulations Section 335.074, Florida Statues, Safety Inspection of Bridges, State of Florida Department of Transportation Rules, Chapter 14-48. Project Manager : O'DONOGHUE, BRIAN Estimated Contract Amt: $1,600,000 See Standard Notes Above: 9 Special Notes: The attached scope was modified to include the inventory. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 23JUN2014 Response Deadline : 07JUL2014 Longlist(Tech. Rev. Cmte.) Date:  22JUL2014 Time:  2:30PM Shortlst Selection Date :  28JUL2014 Time:  8:15AM Scope Meeting Date :  07AUG2014 Time:  2:30PM Tech. Rev. Cmte Meeting :  09SEP2014 Time:  2:30PM Final Selection Meeting Date :  15SEP2014 Time:  8:15AM 1st Negotiations Meeting :  16OCT2014 Time:  9:00AM Response Deadline : 07JUL2014 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 15427 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 43025611201 Major Work : 13.7 - Transportation Statistics Minor Work : Project Description: Districtwide Transportation Statistics Data The main objectives of this contract are to provide professional and technical services in collecting and analyzing traffic and highway data as well as to serve as an extension to the FDOT District 4 Planning and Environmental Office, especially to the Transportation Statics and Systems Planning staff. The activities to be performed by the consultants may include, but are limited to Roadway and Traffic Characteristics Inventory data collection, data reporting, mapping applications, and data analysis as mandated by federal and state regulations policies. In addition the consultants may also be tasked to collect and analyze customer trip characteristics, travel behavior, demographic characteristics and operational and performance measures from the public transit systems in the district to support travel demand modeling, long-range and area wide planning, route planning and scheduling service design marketing and customer communications. Data collection and analysis for freight and multimodal significant corridors are also included in the relevant scope of services. Project Manager : WILSON, NEWTON Estimated Contract Amt: $1,500,000 See Standard Notes Above: 9 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 23JUN2014 Response Deadline : 07JUL2014 Longlist(Tech. Rev. Cmte.) Date:  15JUL2014 Time:  9:30AM Shortlst Selection Date :  28JUL2014 Time:  8:15AM Scope Meeting Date :  06AUG2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  26AUG2014 Time:  10:00AM Final Selection Meeting Date :  08SEP2014 Time:  8:15AM 1st Negotiations Meeting :  02OCT2014 Time:  9:00AM Response Deadline : 07JUL2014 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 15430 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43467913201 Major Work : 3.2 - Major Highway Design Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Project Description: PROJECT RESERVED UNDER THE BUSINESS DEVELOPMENT INITIATIVE PROGRAM. * The intent of the project is to design sidewalks to fill in gaps and replace existing sidewalks that are either damaged or substandard on multiple streets within the Hollywood Gardens area. The area is bounded by Hollywood Blvd. in the south, Johnson Street in the North, SR7/US-441 in the West and 56 Ave. in the East. * East Johnson Street from US-441 to N 56 Avenue/Johnson St. Intersection. Both sides for the following Street: Lincoln Street from US-441 to N 56 Avenue, Buchanan St. from US-441 to N 56 Ave., Pierce St. from US-441 to N 56 Ave., Fillmore St. from US-441 to N 56 Ave., Taylor St. from US-441 to N. 56 Ave, Polk St. from US-441 to N 56 Ave. Tyler St. from US-441 to N 56 Ave., Columbus Parkway from US-441/Hollywood Blvd. intersection to N 56 Ave./Johnson St. intersection. Glenn Parkway from US-441/Johnson Street intersection to N 56 Ave/Hollywood Blvd. intersection. North 59 Ave. from Hollywood Blvd. to Johnson St., N 58 Ave from Hollywood Blvd.to Johnson, N. 57 Ave from Hollywood blvd. to Johnson and Taft Street from N 20 Ave to N 14 Ave. Project Manager : JASMIN, KENZOT Estimated Contract Amt: $350,000 See Standard Notes Above: 7 Special Notes: The Scope of Services has been revised on page A-54 Section 28 Photogrammetry will be optional services. Also work type 8.1, 8.2 and 8.3 have been changed to minor in this advertisement. __ * All letters of response have been rejected and the ad will be re-advertised on Monday, July 21, 2014. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 03JUN2014 Response Deadline : 01AUG2014 Shortlst Selection Date :  25AUG2014 Time:  8:15AM Final Selection Meeting Date :  13OCT2014 Time:  8:15AM Meeting Location Notes: For all consultants interested in pursuing this project can meet with the project manager at the date and time scheduled as follows: The 16th from 10:30 AM to 3:30 PM. The 17th from 9:00 AM to 3:30 PM. The 18th from 2:00 PM to 3:30 PM, and The 19th from 1:45 PM to 3:30 PM * Please call the project manager to schedule your appointment Kenzot Jasmin Phone: 954 777-4462 Response Deadline : 01AUG2014 Respond To: d4.profserv@dot.state.fl.us Attn.: Jessica Rubio Phone: (954)777-4626 ************************************************************ Contract Number : 15425 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23315261201 Major Work : 6.1 - Traffic Engineering Studies 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : Project Description: Districtwide GPC-Planning Support The main objective of this contract is to provide professional transportation planning services to supplement the FDOT District 4 Systems Planing staff, as well as to serve as an extension to the FDOT District 4 Planning and Environmental Management Office. The primary tasks include but are not limited to: Site Impact and Growth Management Reviews, Project Traffic/Travel Demand Forecasting Review and Development, Interchange Access Document Review and Development, Model Application, Multi-Modal Corridor Analysis, Multi-Modal Transportation Studies Review and Development, Transportation Plan Development, On site Services and Support, Public Involvement, Feasibility and Special Studies, Mobility Performances Measures Legislative/Regulation/Policy Analysis and Transportation Data Mining. Project Manager : WONG, CHON View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02JUN2014 Longlist(Tech. Rev. Cmte.) Date:  26JUN2014 Time:  10:00AM Shortlst Selection Date :  07JUL2014 Time:  8:15AM Shortlist Selection Posting :  07JUL2014 Scope Meeting Date :  15JUL2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  04AUG2014 Time:  10:00AM Final Selection Meeting Date :  18AUG2014 Time:  8:15AM 1st Negotiations Meeting :  09SEP2014 Time:  9:00AM Shortlisted Firms: CAMBRIDGE SYSTEMATICS, INC. PARSONS BRINCKERHOFF, INC. THE CORRADINO GROUP, INC. ************************************************************ Contract Number : 15420 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 22802796201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Broward Operations General CEI Consultant Construction Support * SELECTION FROM EXPANDED LETTERS OF RESPONSE. The following items are to be submitted together with the Expanded Letter of Response and will not count towards the page limit: - Organizational Chart (8 1/2x11 or 11x17, 1 page) - Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion (Form # 375-030-32) - Certification for Disclosure of Lobbying (Form#375-030-33) - Aspiration Goal Form for -DBE- and -Non-DBE Small Business- Firms (Form # 375-030-62) - Disclosure of Lobbying Activities (Form 375-030-34) if applicable. - Truth In Negotiations Form (Form 375-030-30) - CEI Staffing Matrix with Availability - Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) - CTQP print-out of all proposed personnel - Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm *All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. * EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issues involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal * APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. * PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. * OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the Department's needs, past performance on similar projects, innovative problem solving techniques. Project Manager : HARRIS, JEANNETTE Special Notes: There were some minor changes to the advertisement the estimate of work effort is no longer needed since this is a General assigned contract. also the 1 page limit on the matrix was removed. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAY2014 Longlist(Tech. Rev. Cmte.) Date:  24JUN2014 Time:  10:30AM Shortlst Selection Date :  30JUN2014 Time:  8:15AM Shortlist Selection Posting :  30JUN2014 Final Selection Meeting Date :  14JUL2014 Time:  8:15AM Final Selection Posting Date :  15JUL2014 1st Negotiations Meeting :  05AUG2014 Time:  9:00AM Rank Consultant 1 CARNAHAN, PROCTOR AND CROSS, INC. 2 METRIC ENGINEERING, INC. 3 R. J. BEHAR AND COMPANY, INC. ************************************************************ Contract Number : 15433 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43510113201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: Lyons Road form Norte Lago to Pine Springs Drive. =========================================================== This project is reserved under the Business Development Initiative program. =========================================================== Project Manager : LE, THUC View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Longlist(Tech. Rev. Cmte.) Date:  09JUN2014 Time:  9:00AM Shortlst Selection Date :  23JUN2014 Time:  8:15AM Shortlist Selection Posting :  23JUN2014 Scope Meeting Date :  03JUL2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  04AUG2014 Time:  11:00AM Final Selection Meeting Date :  11AUG2014 Time:  8:15AM 1st Negotiations Meeting :  17SEP2014 Time:  9:00AM Shortlisted Firms: HSQ GROUP, INC. PROTEAN DESIGN GROUP, INC. THE BALMORAL GROUP ************************************************************ Contract Number : 15415 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43166513201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: NW 19TH Street From SR-7 to Powerline road. ============================================================ THIS PROJECT IS RESERVED UNDER THE SMALL BUSINESS INITIATIVE PROGRAM. ============================================================ Project Manager : WANG, BING View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 05MAY2014 Longlist(Tech. Rev. Cmte.) Date:  27MAY2014 Time:  9:00AM Shortlst Selection Date :  02JUN2014 Time:  8:15AM Shortlist Selection Posting :  02JUN2014 Scope Meeting Date :  24JUN2014 Time:  9:30AM Tech. Rev. Cmte Meeting :  14JUL2014 Time:  11:00AM Final Selection Meeting Date :  28JUL2014 Time:  8:15AM 1st Negotiations Meeting :  03SEP2014 Time:  9:00AM Shortlisted Firms: CTS ENGINEERING, INC. PROTEAN DESIGN GROUP, INC. SCALAR CONSULTING GROUP INC. ************************************************************ Contract Number : 15458 Minor Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 23400877201 Major Work : 5.1 - Conventional Bridge Inspection Minor Work : Project Description: Overhead Sign Inspection Services Overhead sign inspection of state owned signs location within the geographical limits of the Florida Department of Transportation District Four, in compliance with the following Federal and State regulstions. National Bridge Inspection Standard Code of Federal Regulations 23-Highways, Part 650 Subpart T, Commercial Driving Operational Safety and Health Administration (OSHA) Section 335.074 Florida Ststues Safety Inspection of Bridges State of Florida Department of Transportation Rules, Chapter 14-48. Project Manager : O'DONOGHUE, BRIAN View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29APR2014 Longlist(Tech. Rev. Cmte.) Date:  20MAY2014 Time:  3:00PM Shortlst Selection Date :  27MAY2014 Time:  8:15AM Shortlist Selection Posting :  27MAY2014 Scope Meeting Date :  03JUN2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  24JUN2014 Time:  3:00PM Final Selection Meeting Date :  30JUN2014 Time:  8:15AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  30JUL2014 Time:  9:00AM Rank Consultant 1 AYRES ASSOCIATES INC 2 MARLIN ENGINEERING, INC. 3 VOLKERT, INC. ************************************************************ Contract Number : 15418 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22996673201 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design Minor Work : Project Description: Districtwide Drainage Studies & Environmental Permits Consultant Contract Project Manager : Poole, JAMES View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21APR2014 Longlist(Tech. Rev. Cmte.) Date:  02JUN2014 Time:  4:00PM Shortlst Selection Date :  16JUN2014 Time:  8:15AM Shortlist Selection Posting :  16JUN2014 Scope Meeting Date :  23JUN2014 Time:  3:00PM Tech. Rev. Cmte Meeting :  10JUL2014 Time:  4:00PM Final Selection Meeting Date :  28JUL2014 Time:  8:15AM 1st Negotiations Meeting :  13AUG2014 Time:  9:00AM Shortlisted Firms: HDR ENGINEERING, INC. STANLEY CONSULTANTS, INC. STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 15412 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42973716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR-9/I-95 From N of CR-708 to S of High Meadow Rd * SELECTION FROM EXPANDED LETTERS OF RESPONSE. Letters should address the items under the EVALUATION CRITERIA. Use the FDOT form #375-030-23. The following items are to be included in the submittal but, will not be counted towards the page limit: -Estimate of Work Effort (one sheet) -Organizational Chart (can be 8-1/2 x 11 or 11 x 17),1 PAGE -Certification Regarding Debarment, Suspension,Ineligibility and Voluntary Exclusion (Form 375-030-32) -Certification for Disclosure of Lobbying (Form 375-030-33) -Disclosure of Lobbying Activities (Form 375-030-34) -Truth In Negotiations Form (Form 375-030-30) -CEI Staffing Matrix With Availability (1 Page) -DBE Participation Statement (Form 375-030-21) -Vendor Certification Regarding Scrutinized Companies Lists (Form # 375-030-60) -CTQP print-out of all proposed personnel -Resume for all proposed personnel (2 pages max.) FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm * All submittals, except Organizational Chart and the Forms shall adhere to the minimum font size of 11, 1/2 inch margins. The Expanded Letter of Response and the required documents listed above should be submitted electronically in a single e-mail and must be submitted, in pdf format (unzipped). Submit 2 separate files attached to one e-mail: One file with the Expanded Letter of Response, not to exceed 1MB and another file with all other information required in this advertisement. * EVALUATION CRITERIA: The Expanded Letters of Response will be scored based on the following criteria: AWARENESS OF PROJECT ISSUES (20%) The consultant should demonstrate their understanding of the scope of services and of any unique issue involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal * APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. * PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. * OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, commitment to satisfy the department's needs, past performance on similar projects, innovative problem solving techniques. Project Manager : HARRIS, JEANNETTE Special Notes: Refer to Standard Notes 4 and 7 for other submittal requirements. ========================================================= Availability and current work assignment of each proposed staff is required for this project. ========================================================== View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Longlist(Tech. Rev. Cmte.) Date:  21MAY2014 Time:  1:30PM Shortlst Selection Date :  09JUN2014 Time:  8:15AM Final Selection Meeting Date :  09JUN2014 Time:  8:15AM Final Selection Posting Date :  09JUN2014 1st Negotiations Meeting :  10JUL2014 Time:  2:00PM Rank Consultant 1 CARNAHAN, PROCTOR AND CROSS, INC. 2 CREATIVE ENGINEERING GROUP 3 MILESTONE CONSTRUCTION GROUP, INC. 4 CULPEPPER & TERPENING, INC. ************************************************************ Contract Number : 15421 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43538413201 Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: I-95/SR-9 at Linton Blvd Interchange * A DVD containing the following items is available to pick up at FDOT District Four Professional Services Office at 3400 West Commercial Boulevard, Fort Lauderdale 33309: 1.Approved Pavement Designs on I-95 2.As Built Plans 3. Bridge Inspection Reports 4. Interchange Concept Report (including CADD & Synchro file 5. Environmental Documents 6. Geotechnical Documents 7. Intergovernmental Agreements 8. Long Range Estimates 9. Information on Advertisement 10. Right of Way Maps 11. Straight line diagrams 12. Railroad Information 13. Survey Information 14. FDOT Bulletin on Perimeter Walls Project Manager : Delgado, Julio C Special Notes: The traffic analysis and the environmental activities will be done by the Department and will not be part of this contract. It is possible these activities could be added to the contract at later time, if deemed necessary. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Longlist(Tech. Rev. Cmte.) Date:  08MAY2014 Time:  10:00AM Shortlst Selection Date :  19MAY2014 Time:  8:15AM Shortlist Selection Posting :  21MAY2014 Scope Meeting Date :  29MAY2014 Time:  10:30AM Tech. Rev. Cmte Meeting :  07JUL2014 Time:  10:00AM Final Selection Meeting Date :  21JUL2014 Time:  8:15AM Final Selection Posting Date :  21JUL2014 1st Negotiations Meeting :  13AUG2014 Time:  9:00AM Rank Consultant 1 JACOBS ENGINEERING GROUP, INC. 2 EAC CONSULTING, INC. 3 STANTEC CONSULTING SERVICES INC. ************************************************************ Contract Number : 15419 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43060313201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: SR-25/US-27 From Miami-Dade/Broward Countyline to SR-818/ Griffin Rd. - Resurfacing, Restoration and Rehabilitation. ========================================================== PROJECT RESERVED UNDER THE BUSINESS DEVELOPMENT INITIATIVE, see standard note 7. ============================================================ Project Manager : LEE SHUE LING, BRENT View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Longlist(Tech. Rev. Cmte.) Date:  29APR2014 Time:  8:30AM Shortlst Selection Date :  12MAY2014 Time:  8:15AM Shortlist Selection Posting :  12MAY2014 Scope Meeting Date :  20MAY2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  14MAY2014 Time:  3:30PM 2nd Tech Rev. Cmte Meeting :  24JUN2014 Time:  8:30AM Final Selection Meeting Date :  30JUN2014 Time:  8:15AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  29JUL2014 Time:  9:00AM Rank Consultant 1 TRACE CONSULTANTS, INC. 2 MARLIN ENGINEERING, INC. 3 HSQ GROUP, INC. ************************************************************ Contract Number : 15424 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42684013201 Major Work : 4.1.2 - Minor Bridge Design Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: SR-A1A Peter J. Cobb Memorial Bridge Bridge #940094 Rehabilitation scour protection, pile repair, fender system and spalled determination concrete repair. * Attention all consultants: All letters of response has been rejected and the project is re-advertised. * The Scope of services has been revised and the work types as well. Project Manager : MORALES, FERNANDO View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 31MAR2014 Longlist(Tech. Rev. Cmte.) Date:  21MAY2014 Time:  9:00AM Shortlst Selection Date :  05MAY2014 Time:  8:15AM Shortlist Selection Posting :  05MAY2014 Scope Meeting Date :  15MAY2014 Time:  9:00AM Tech. Rev. Cmte Meeting :  21MAY2014 Time:  9:00AM 2nd Tech Rev. Cmte Meeting :  02JUN2014 Time:  9:00AM Final Selection Meeting Date :  23JUN2014 Time:  8:15AM Final Selection Posting Date :  23JUN2014 1st Negotiations Meeting :  29JUL2014 Time:  9:00AM Rank Consultant 1 TRANSYSTEMS CORPORATION 2 KISINGER CAMPO & ASSOC. CORP. 3 AYRES ASSOCIATES INC ************************************************************ Contract Number : 15413 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42605316201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR-812/Hooker Highway from SR-715 to SR-15/US-441 THIS PROJECT IS RESERVED AS BDI PROJECT. SELECTION FROM EXPANDED LETTERS OF RESPONSE. Letters should address the items under the EVALUATION CRITERIA. Use the standard DOT form #375-030-23. The following items are to be included in the submittal but, will not be counted towards the page limit. -ESTIMATE OF WORK EFFORT (8 1/2x 11x17, 1 page) -ORGANIZATIONAL CHART (can be 8-1/2 x 11 or 11 x 17, 1 page) -FEDERAL AID FORMS, -DBE SMALL BUSINESS PARTICIPATION FORM, -TRUTH IN NEGOTIATIONS FORM, (Form 375-030-30) -CEI STAFFING MATRIX WITH AVAILABILITY(1 page) -SCRUTINIZED COMPANIES LIST FORM(Form # 375-030-60) -CTQP PRINT-OUT OF ALL POSITION PROPOSED - 2 PAGE RESUMES IS REQUIRED FOR EACH POSITION FDOT forms are available in the FDOT website: http://www.dot.state.fl.us/proceduraldocuments/forms.shtm * *All submittals except organization chart or staffing chart shall adhere to minimum font size of 11, 1/2 inch margins. The letter of response & the required documents listed above should be submitted electronically in a single e-mail. The total e-mail size CANNOT EXCEED FOUR (4) MB IN SIZE, AND MUST BE SUBMITTED IN PDF FORMAT (UNZIPPED). Please submit 2 separate files: One file with the ELOR not to exceed 1MB and the other file with the resumes, forms etc as listed in the advertisement. * EVALUATION CRITERIA: The letters of response will be graded on the following: AWARENESS OF PROJECT ISSUES (20%): The consultant should demonstrate their understanding of the scope of services and of any unique issue involved in the project. A key component used in accessing a consultant's ability to provide services for this project will be their ability to identify and resolve problems with projects that might lead to cost overruns and time delays. The consultant should familiarize themselves with any areas that could lead to such problem and propose how they would resolve them. This does not mean that the consultant shall perform any survey or design work in the preparation for this submittal * APPROACH TO THE PROJECT (35%): The consultant should present the proposed approach for completing the desired work. This will include a brief synopsis of the critical management activities involved with a construction project, and a discussion of project issues. These issues could include technical or managerial issues that are unique to this project or are particularly challenging. The consultant's approach to dealing with these issues should be described. * PROJECT STAFFING (35%): The consultant should submit a staffing plan which clearly shows the key elements of the organizational structure that is proposed to accomplish the work. The plan should address the administrative and technical aspects of the project. Key personnel by discipline must be identified. Past work experience of the key personnel should be discussed as they relate to this particular project. * OTHER CONSIDERATIONS (10%): Other data demonstrating communication ability, use of specified equipment, proximity to the project, commitment to satisfy the department's needs, past performance on similar projects, innovative problem solving techniques. Project Manager : HARRIS, JEANNETTE Special Notes: Please note changes to the evaluation criteria scoring percentages. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24MAR2014 Longlist(Tech. Rev. Cmte.) Date:  29APR2014 Time:  10:00AM Shortlst Selection Date :  27MAY2014 Time:  8:15AM Tech. Rev. Cmte Meeting :  16MAY2014 Time:  9:00AM Final Selection Meeting Date :  27MAY2014 Time:  8:15AM Final Selection Posting Date :  27MAY2014 1st Negotiations Meeting :  12JUN2014 Time:  1:00PM Rank Consultant 1 AE ENGINEERING, INC. 2 CIMA ENGINEERING CORP. 3 HIGHSPANS ENGINEERING, INC. 4 MILESTONE CONSTRUCTION GROUP, INC. 5 TALLY ENGINEERING, INC. ************************************************************ Contract Number : 15417 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42993622201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 4.2.1 - Major Bridge Design - Concrete 4.4 - Movable Span Bridge Design 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge GROUP2 - PD&E Studies Project Description: SR-A1A North Bridge Over ICWW Bridge #9440045 The following information will be provided by the FDOT-D4: All survey services including initial seagrass, initial traffic counts and initial traffic modeling. This information will assist in determining the number of lanes and will be provided the selected firm. * PD&E to replace the existing movable bascule bridge with a new bascule bridge or high-level fixed bridge. Project Manager : PESSOA, DONOVAN Special Notes: the following documents are available: Bridge Inspection Report Feasibility Study EDTM 14052 Summary Report Consultants interested in obtaining a copy of these documents can email their request to: d4.profserv@dot.state.fl.us View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24MAR2014 Longlist(Tech. Rev. Cmte.) Date:  28APR2014 Time:  9:30AM Shortlst Selection Date :  05MAY2014 Time:  8:15AM Shortlist Selection Posting :  05MAY2014 Scope Meeting Date :  14MAY2014 Time:  9:00AM Tech. Rev. Cmte Meeting :  23MAY2014 Time:  11:30AM Final Selection Meeting Date :  16JUN2014 Time:  8:15AM Final Selection Posting Date :  16JUN2014 1st Negotiations Meeting :  24JUL2014 Time:  9:00AM Rank Consultant 1 KIMLEY-HORN & ASSOCIATES, INC. 2 URS CORPORATION SOUTHERN 3 KEITH AND SCHNARS, P.A. ************************************************************ Contract Number : 15414 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 43025711201 Major Work : 13.7 - Transportation Statistics Minor Work : Project Description: Districtwide Traffic Statistics Data Collection & Analysis The main ojjectives of this contract are to provide professional and technical services in collecting and analyzing traffic and highway data, as well as to serve as an extension to the FDOT District 4 Planning and Environ- mental Management Office, especially to the Transportation Statistics and System Planning staff. The activities to be performed by the consultants may include, but are not limited to, Traffic Characteristics Inventory data collection data reporting, mapping applications and data analysis as mandated by federal and state regulations and policies. In addition, the consultants may also be asked to collect and analyze customer trip characteristics, travel behavior, demographic characteristics and operational and performance measures from the public transit systems in the district to support travel demand modeling, long-range and area wide planning, route planning and scheduling, service design, marketing, and customer communications. Data collection and analysis for freight and multimodal significiant corridors are also included in the relevant scope of services. Project Manager : SCHWARTZ, KARA View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  09APR2014 Time:  2:30PM Shortlst Selection Date :  21APR2014 Time:  8:15AM Shortlist Selection Posting :  21APR2014 Scope Meeting Date :  01MAY2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  27MAY2014 Time:  10:00AM Final Selection Meeting Date :  02JUN2014 Time:  8:15AM Final Selection Posting Date :  02JUN2014 1st Negotiations Meeting :  24JUN2014 Time:  9:00AM Rank Consultant 1 F.R. ALEMAN & ASSOCIATES, INC. 2 CALTRAN ENGINEERING GROUP, INC. 3 C.H. PEREZ & ASSOCIATES CONSULTING ************************************************************ Contract Number : 15409 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43452411201 Major Work : 13.3 - Policy Planning Minor Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Project Description: Districtwide General Consultant Technical Assistance & Coordination Provision of professional services on a task work order basis, to assist the Office of Modal Development in FDOT District Four in multiple task areas; visioning, planning and coordination performance management/measurement data technical assistance and outreach transportation/mobility studies extreme weather resiliency context sensitive solutions/complete streets transportation demand management and legislation regulation policy analysis. Project Manager : Bush, Lois Special Notes: This contract will be executed up to the maximum amount of $1,500,000. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17FEB2014 Longlist(Tech. Rev. Cmte.) Date:  17MAR2014 Time:  9:00AM Shortlst Selection Date :  10MAR2014 Time:  8:15AM Shortlist Selection Posting :  10MAR2014 Scope Meeting Date :  03APR2014 Time:  2:30PM Tech. Rev. Cmte Meeting :  16APR2014 Time:  2:00PM Final Selection Meeting Date :  05MAY2014 Time:  8:15AM Final Selection Posting Date :  05MAY2014 1st Negotiations Meeting :  29MAY2014 Time:  9:00AM Rank Consultant 1 RENAISSANCE PLANNING GROUP, INC. 2 TRANSYSTEMS CORPORATION 3 WHITEHOUSE GROUP, INC. ************************************************************ Contract Number : 15411 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42827021201 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: Districtwide Multimodal Modeling Support Technical and Review Services supporting multi-model corridor projects including multi-resolution modeling model development and validation, data driven analysis data collection transit service assessment and planning FTA technical requirements. Project Manager : SEEBURGER, SCOTT Special Notes: This is to inform you that due to a low number of letters of interest received for the project, the Department has extended this advertisement through Friday, March 7, 2014 at 5:00pm. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17FEB2014 Longlist(Tech. Rev. Cmte.) Date:  18MAR2014 Time:  2:30PM Shortlst Selection Date :  17MAR2014 Time:  8:15AM Shortlist Selection Posting :  17MAR2014 Scope Meeting Date :  03APR2014 Time:  10:30AM Tech. Rev. Cmte Meeting :  06MAY2014 Time:  10:30AM Final Selection Meeting Date :  12MAY2014 Time:  8:15AM Final Selection Posting Date :  12MAY2014 1st Negotiations Meeting :  06JUN2014 Time:  9:00AM Rank Consultant 1 AECOM TECHNICAL SERVICES, INC. 2 WHITEHOUSE GROUP, INC. ************************************************************ Contract Number : 15408 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43533713201 Major Work : 4.1.2 - Minor Bridge Design Minor Work : Project Description: SR-9/I-95 at St. Lucie West interchange improvements Proposed new 3 lane bridge over I-95. Project Manager : JEFFERS, BETSY View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10FEB2014 Longlist(Tech. Rev. Cmte.) Date:  10MAR2014 Time:  10:00AM Shortlst Selection Date :  17MAR2014 Time:  8:15AM Shortlist Selection Posting :  17MAR2014 Scope Meeting Date :  20MAR2014 Time:  3:00PM Tech. Rev. Cmte Meeting :  24APR2014 Time:  9:00AM 2nd Tech Rev. Cmte Meeting :  02APR2014 Time:  10:00AM 3rd Tech Rev. Cmte Meeting :  21APR2014 Time:  10:00AM Final Selection Meeting Date :  05MAY2014 Time:  8:15AM Final Selection Posting Date :  05MAY2014 1st Negotiations Meeting :  18JUN2014 Time:  9:00AM Rank Consultant 1 HDR ENGINEERING, INC. 2 KIMLEY-HORN & ASSOCIATES, INC. 3 URS CORPORATION SOUTHERN ************************************************************ Contract Number : 15402 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23009553201 Major Work : 6.1 - Traffic Engineering Studies Minor Work : Project Description: DISTRICTWIDE TRAFFIC ACCESS MANAGEMENT CONSULTANT Project Manager : OVERTON, JONATHAN Special Notes: Please use the updated form#375-030-22 dated 2/14. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 27JAN2014 Longlist(Tech. Rev. Cmte.) Date:  14FEB2014 Time:  9:00AM Shortlst Selection Date :  24FEB2014 Time:  8:15AM Shortlist Selection Posting :  24FEB2014 Scope Meeting Date :  05MAR2014 Time:  9:00AM Tech. Rev. Cmte Meeting :  21MAR2014 Time:  9:30AM Final Selection Meeting Date :  07APR2014 Time:  8:15AM Final Selection Posting Date :  07APR2014 1st Negotiations Meeting :  06MAY2014 Time:  9:00AM Rank Consultant 1 MARLIN ENGINEERING, INC. 2 HNTB CORPORATION 3 R. J. BEHAR AND COMPANY, INC. ************************************************************ Contract Number : 15404 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42362973201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 14.0 - Architect 15.0 - Landscape Architect D/W MINOR PROJECTS Project Manager : LEE SHUE LING, BRENT Special Notes: Selected together with 15403 Advertisement Status : Final Selection Date of Advertisement : 27JAN2014 Shortlst Selection Date :  03MAR2014 Time:  8:15AM Final Selection Meeting Date :  31MAR2014 Time:  8:15AM Final Selection Posting Date :  31MAR2014 1st Negotiations Meeting :  22MAY2014 Time:  9:00AM Rank Consultant 1 H. W. LOCHNER, INC. ************************************************************ Contract Number : 15405 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43534613201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 14.0 - Architect 15.0 - Landscape Architect D/W MINOR PROJEC DESIGN Project Manager : LEE SHUE LING, BRENT Special Notes: This was advertised with AD 15403 (select 4 contracts) Advertisement Status : Final Selection Date of Advertisement : 27JAN2014 Shortlst Selection Date :  03MAR2014 Time:  8:15AM Final Selection Meeting Date :  31MAR2014 Time:  8:15AM Final Selection Posting Date :  31MAR2014 1st Negotiations Meeting :  21MAY2014 Time:  9:00AM Rank Consultant 1 WANTMAN GROUP, INC. ************************************************************ Contract Number : 15406 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43534623201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 14.0 - Architect 15.0 - Landscape Architect D/W MINOR PROJECTS Project Manager : LEE SHUE LING, BRENT Special Notes: selected with 15403 Advertisement Status : Final Selection Date of Advertisement : 27JAN2014 Shortlst Selection Date :  03MAR2014 Time:  8:15AM Final Selection Meeting Date :  31MAR2014 Time:  8:15AM Final Selection Posting Date :  31MAR2014 1st Negotiations Meeting :  27MAY2014 Time:  9:00AM Rank Consultant 1 HDR ENGINEERING, INC. ************************************************************ Contract Number : 15407 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 22976563201 Major Work : 6.1 - Traffic Engineering Studies 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation Minor Work : 6.2 - Traffic Signal Timing 6.3.4 - Intelligent Trans Sys. Software Development Project Description: D/W TRAFFIC OPERATIONS TRANSPORTATION SYSTEM MANAGEMENT SUPPORT This project is to provide technical development and support to the District's Transportation System Management and Operation (TSM&O) program. The TSM&O program is based on measuring performance, activity Project Manager : VELASCO, VLADIMIR Special Notes: Please use the updated form#375-030-22 dated 2/14. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 27JAN2014 Longlist(Tech. Rev. Cmte.) Date:  18FEB2014 Time:  3:00PM Shortlst Selection Date :  24FEB2014 Time:  8:15AM Shortlist Selection Posting :  24FEB2014 Scope Meeting Date :  13MAR2014 Time:  9:00AM Tech. Rev. Cmte Meeting :  25MAR2014 Time:  9:00AM Final Selection Meeting Date :  21APR2014 Time:  8:15AM Final Selection Date Not Posted 1st Negotiations Meeting :  15MAY2014 Time:  9:00AM Rank Consultant 1 KITTELSON & ASSOCIATES, INC. 2 METRIC ENGINEERING, INC. 3 ATKINS NORTH AMERICA, INC. ************************************************************ Contract Number : 15401 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43257423201 Major Work : 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization Minor Work : 7.2 - Lighting 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Project Description: Design Services for Pedestrian overpass from West of I-95 to North of County Park. =========================================================== Located within City of Fellsmere and Sebastian, in Indian River County. The proposed pedestrian bridge and the trail is located within the Central Railroad corridor just north of County Road 512, about 1600 feet from the I-95/CR-512 Interchange and limits are West of I-95 to North County Park. =========================================================== Project Manager : SAINI, VANITA Special Notes: IMPORTANT-ADDITIONAL INFORMATION: The following documents (CD) are available for pick up: Pedestrian Bridge Concept, Environmental Features Inventory 40006294 Trans FL Trail, 2012 H 490 64 as built plans 2012 H 490 64 app forms complete TransFL-RR-FINAL-CRAS-report PLEASE E-MAIL REQUEST TO: D4.PROFSERV@DOT.STATE.FL.US *********************************************************** View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 13JAN2014 Longlist(Tech. Rev. Cmte.) Date:  03FEB2014 Time:  8:00AM Shortlst Selection Date :  17FEB2014 Time:  8:15AM Shortlist Selection Posting :  17FEB2014 Scope Meeting Date :  26FEB2014 Time:  9:00AM Final Selection Meeting Date :  07APR2014 Time:  8:15AM Final Selection Posting Date :  07APR2014 1st Negotiations Meeting :  15MAY2014 Time:  1:00PM 2nd Negotiations Meeting :  16MAY2014 Time:  9:00AM Rank Consultant 1 TRANSYSTEMS CORPORATION 2 KEITH AND SCHNARS, P.A. 3 NETWORK ENGINEERING SERVICES, INC. ************************************************************ Design/Build Projects Procurement Number : E4Q16 Financial Management Number(s): 42170795201 42170775201 Project Description: Design and construction of corridor-wide Intelligent Transportation System (ITS)/Tolling Integration for the I-75 Express Lanes Project which extends from just north of NW 170th Street in Miami-Dade County at milepost 3.485 (Section 87075) to I-595 in Broward County for a total distance of approximately 15 miles. An adjacent District Six I-75 / SR 826 Express Lanes Design-Build Project will extend from SR 836 (Dolphin Expressway) to just north of NW 170th Street in Miami-Dade County. . The overall I-75 Express Lanes Project consists of the individual projects: 1. Segments A&B (FPID Nos. 421707-3-52-01, 421707-8-52-01, 421707-2-52-01) from north of NW 170th Street in Miami-Dade County to south of Miramar Parkway. 2. Segment C (FPID No. 421707-4-52-01) from south of Miramar Parkway to south of Sheridan Street. 3. Segment D (FPID No. 421707-5-52-01)from south of Sheridan Street to north of Griffin Road. 4. Segment E (FPID No. 421707-6-1-52-01) from north of Griffin Road to I-595. 5. District Six I-75 / SR 826 Express Lanes Project (FPID No. 432687-1-52-01) from SR 836 (Dolphin Expressway) to north of NW 170th Street in Miami-Dade County. . The majority of the corridor ITS infrastructure will be implemented with each individual D-B Project segment. The Segments A&B D-B contract includes a new communications backbone and integration within the limits of that segment. This corridor-wide ITS/Tolls Integrator contract will provide switches, backbone, and lateral fiber cables within the limits of Segments C, D and E and provide connectivity of all segments (A through E) to the Department's SunGuideSM and Express Lanes Tolling System at the Broward County Traffic Management Center (TMC) and to the Florida's Turnpike Enterprise (FTE) Tolls Data Center to deliver a complete fully operational Managed Lane System with dynamic tolling. This corridor-wide ITS/Tolls Integrator contract also includes the integration of the District Six communications hub located at the I-75 / SR 826 Interchange and selected devices between the I-75 / SR 826 Interchange and NW 170th Street. The Design-Build Firm shall coordinate their activities and schedule with the adjacent Design-Build projects as well as FTE's Toll Equipment and ITS Integrator contractors. . ESTIMATED CONTRACT TIME: 1,620 Days . BUDGET AMOUNT: $6,295,000 Note: Estimated budget amount per Financial project numbers: 42170775201-$5,755,000;42170795201-$540,000 Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. . COUNTY: MIAMI-DADE & BROWARD . Note that ALL components included in the Project Description shall be considered as part of the Department's evaluation of the ELOI-s. . Technical Review Committee Member's are: David Moore, Dan Smith, Anthony Mendoza,and Aaron Watt. Budget Amount : $6,295,000 Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Contractor must be pre-qualified in: Intelligent Transportation Systems Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development Technical Questions Should Be Addressed To: All questions must be submitted on the Department's Bid Question and Answer website at: . http://www2.dot.state.fl.us/construction/bidquestionmain.asp When submitting questions reference contract # E4Q16 FM 42170795201;42170775201.Proposers are responsible for monitoring this site for answers and any updates in accordance with Section 2-4 of the Specifications and with the Request for Proposal document. DBE/MBE Requirements: See preamble. Special Notes: AN ITS/TOLLING INFORMATION MEETING IS SCHEDULED FOR WED., AUGUST 6, 2014 AT 2:00 PM TO BE HELD AT THE BROWARD COUNTY TMC AUDITORIUM LOCATED AT 2300 WEST COMMERCIAL BLVD, FORT LAUDERDALE, FL 33309 FOR FDOT TO PRESENT THE CONTRACT RFP AND SCOPE OF SERVICES. . Release of the RFP to the short listed firms and award of this contact are contingent upon legislative and federal approval of funds. . PREAMBLE: The notice to contractor/consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof. You are responsible for reading it. . SHORT LISTED FIRMS: The list of short listed firms will be posted on the Procurement website: http://www2.dot.state.fl.us/procurement/ProfessionalServices /advertise/desreslt.shtml Click on Shortlist and Final Selection Results. . STIPEND: There will be a stipend in the amount of $18,000. The Department will pay stipends to the short listed firms based on the guidelines noted in the preamble of this advertisement. . DRAFT RFP: To request DVDs containing the Draft RFP attach ments and reference documents,please email your request to norma.corredor@dot.state.fl.us. . REQUEST FOR CONTRACT RELATED INFORMATION: For information request other than the RFP send a public records request to cynthia.lynch@dot.state.fl.us . EXPANDED LETTERS OF INTEREST: The Department will not consider expanded letters of interest (ELOI) not in conformance with response requirements. Read the preamble for ELOI requirements. . RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only one (1) ELOI per legal entity is acceptable. All ELOI files should be sent to: d4.designbuild@dot.state.fl.us and must be received by the response deadline shown below: ELOI's shall be submitted by close of business (5:00 PM) Eastern Time on Friday, August 29, 2014. . RESUMES: Provide a one page resume for each of the six (6) key staff positions as applicable: a.Construction Project Manager, b.Design-Build Coordinator, c.Construction Superitendent-Specialty (ITS),d.Design Project Manager, e.Design Engineer of Record-Specialty (ITS) f.Communications Specialist / ITS Integrator No changes to the proposed key staff identified on the ELOI in Phase I shall be permitted in the D-B Firm's Technical Proposal (Phase II) without written approval by the Depart- ment. . RESTRICTIONS ON CONSULTANTS: In accordance with Restrictions on Consultants' Eligibility to Compete for Department Contracts (Topic 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the District 4 Secretary. Prime Consultant: Reynolds, Smith and Hills, Inc.(contract C8S79). Subconsultants: HDR Engineering, Inc., GCME, Inc. Keith and Associates, Inc., Media Relations Groups, LLC. Eland Engineering, Inc. Other Firms: Miller-Legg (Contract C8U03). . FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue on to Phase II by notifying the Department Office in writing no later than Wednesday, October 22, 2014 by close of business (5:00 pm) eastern time. Submit notification by email to d4.designbuild@dot.state.fl.us View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 11AUG2014 PhaseI Selection Cmte. Meeting :  20OCT2014 Time:  08:15AM ELOI Scores Notification Date :  20OCT2014 Time:  11:00AM Deadline for Election to Participate in Ph. II :  22OCT2014 Time:  05:00PM Posting of Shortlist :  23OCT2014 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  06NOV2014 Time:  11:00AM PhaseII Tech. Proposal Due Date:  22JAN2015 Time:  12:00PM Price Proposal Due Date :  11MAR2015 Time:  11:00AM Proposal Opening Date :  11MAR2015 Time:  11:00AM Final Selection Meeting Date :  16MAR2015 Time:  08:15AM ************************************************************ Procurement Number : E4Q32 Financial Management Number(s): 43310845201 42800915201 42800925201 43472415201 43472515201 42859315201 Project Description: Broward County adjusted score design build contract. Phase "3A" represents the first of several separate I-95 Express Lanes Design Build projects that will ultimately extend 95 Express from Stirling Road in Broward County to Linton Boulevard in Palm Beach County. The Phase 3A limits are from south of Broward Blvd. to Atlantic Blvd. The Project includes converting the existing High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) lanes, as well as one lane widening each direction, resulting in two tolled Express Lanes in each direction. The number of existing General Use and Auxiliary Lanes will remain the same. Access to the Express Lanes will be limited to designated Entry and Exit Point locations: between Broward Boulevard and Sunrise Boulevard; between Oakland Park Boulevard and Commercial Boulevard; and between Cypress Creek Road and Atlantic Boulevard. The Express Lanes will implement congestion based toll pricing. The facility will employ Electronic Toll Collection (ETC) via the Florida Turnpike Enterprises (FTE) SunPass system. . Other project improvements include: milling, resurfacing, and ovebuilding of the I-95 General Use Lanes; guardrail; barrier wall; attenuators; shoulder gutters; drainage; bridge widenings; temporary and permanent retaining walls; sound barrier walls; sign structures; portable traffic monitoring sites; tolling gantries and associated infrastructure including equipment buildings; Intelligent Transportation System (ITS); signing and pavement markings; flexible tubular delineators; signalization; lighting; ramp (metering) signals; utility relocation; landscaping ; and any additional items required to provide a complete highway system in accordance with all standard Department policies, procedures, and guidelines. . The Technical Review Committee Members for this project are: Donovan Pessoa - Design Project Manager Scott Thurman - Design Project Manager Paul Lampley - I-595 Construction Project Manager Kris Kehres - Treasure Coast Construction Project Manager Project Manager : BOSTIAN, ROBERT Budget Amount : $169,000,000 Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Contractor must be prequalified by FDOT in Grading, Drainage, Flexible Paving and Hot Plant Mix Bituminous Courses. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 13.7 - Transportation Statistics 14.0 - Architect Additional Bridge Design Work Types : NEW FORM MUST BE SUBMITTED FOR BRIDGE DESIGN: Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualifications must submit a completed and signed Bridge Qualification form along with the Expanded Letter of Interest (ELOI) by the date/time deadline established for the ELOI. Please refer to the preamble for the link to the form. . Must be prequalified in work type 4.1.2 (Minor Bridge Design), OR 4.2.1 (Major Bridge Design-Concrete), OR 4.2.2 (Major Bridge Design-Steel) Technical Questions Should Be Addressed To: INDUSTRY FORUM: Prospective firms should access the 95 Express Phase 3 Industry Forum website to register and to obtain information about the forum and the project at: http://www.95express.com/pages/related-info/95-express- phase-3 . BID QUESTIONS: Bid questions must be submitted on the Department's Bid Question and Answer website at http://www2.dot.state.fl.us/construction/bidquestionmain.asp Please reference contract number E4Q32 and FM 43310845201. You are responsible for monitoring this site for questions and answers up to 1 day before the price opening. . ONE ON ONE MEETINGS WITH DISTRICT MANAGEMENT: Prior to the formal advertisement Design Build Firms may schedule one-on-one meetings with the District Management and/or the Technical Review Committee by contacting Robert Bostian at 954-777-4427. . RELEASE OF RFP: A Draft RFP is available for download at the link in this advertisement. Release of the RFP to the Short Listed firms and award of this contract are contingent upon Legislative and Federal approval of funds. . PRE-AMBLE: The Notice to Contractor/Consultant Pre-amble at the top of this web page is applicable to this advertisement and made a part hereof. You are responsible for reading it. DBE/MBE Requirements: For this project, the Department has established an aspiration goal of 9.0% DBE (Disadvantaged Business Enterprise) usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this Project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract cost performed by Non-DBE Small Businesses. Special Notes: SHORT LISTED FIRMS: The list of short listed firms will be posted on the Procurement website www.dot.state.fl.us/procurement/procurementadvertisements. shtm, click on Shortlist and Final Selection Results. . STIPEND: There will be a stipend in the amount of $169,000. The Department will pay stipends to the short listed firms based on the guidelines noted in the preamble of this advertisement. . DRAFT RFP: attached to the link in this advertisement . REQUEST FOR CONTRACT RELATED INFORMATION: For information request other than the RFP send a public records request to cynthia.lynch@dot.state.fl.us . EXPANDED LETTERS OF INTEREST: The Department will not consider expanded letters of interest (ELOI) not in conformance with response requirements. Read the preamble for ELOI requirements. . RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only one (1) ELOI per legal entity is acceptable. All ELOI files should be sent to: d4.designbuild@dot.state.fl.us and must be received by the response deadline shown below: ELOI's shall be submitted by close of business (5:00 PM) Eastern Time on Friday, August 29, 2014. . RESUMES: Provide a one page resume for each of the 9 key positions noted in the preamble. For this project the Department has established project specific requirements for Construction ITS Superintendent and Design ITS Engineer of Record resumes. . RESTRICTIONS ON CONSULTANTS: In accordance with Restrictions on Consultants' Eligibility to Compete for Department Contracts (Topic 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the District 4 Secretary. Prime Consultant: HDR Engineering, Inc. (Contract C8S79). Subconsultants: The Corradino Group, Cotleur and Hearing, C2S Engineering, CTS Engineering, Eland Engineering, Inc., HR Engineering, Inc., IBI Group, Keith and Associates, Inc., Media Relations Groups, LLC. RS&H, Inc., and Stantec. . FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue on to Phase II by notifying the Department Office in writing no later than Wednesday, October 8, 2014 by close of business (5:00 pm) eastern time. Submit notification by email to d4.designbuild@dot.state.fl.us View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Planned Date of Advertisement : 11AUG2014 PhaseI Selection Cmte. Meeting :  06OCT2014 Time:  08:15AM ELOI Scores Notification Date :  06OCT2014 Time:  11:00AM Deadline for Election to Participate in Ph. II :  08OCT2014 Time:  05:00PM Posting of Shortlist :  09OCT2014 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  14OCT2014 Time:  09:30AM PhaseII Tech. Proposal Due Date:  09FEB2015 Time:  11:00AM Price Proposal Due Date :  01APR2015 Time:  02:00PM Proposal Opening Date :  01APR2015 Time:  02:00PM Final Selection Meeting Date :  06APR2015 Time:  08:15AM ************************************************************ Procurement Number : E4N95 Financial Management Number(s): 43316515201 Project Description: PROJECT DESCRIPTION:Broward Mobility Project; Low bid design build Contract E4N95, FM 43316515201 Broward County add sidewalks and bike lanes at 48 locations.Estimated contract time 1,339 days. Federal project number 8886-455-A PREAMBLE: The notice to contractors/consultants preamble included on the top of this web page is applicable to this advertisement and made a part hereof unless otherwise noted in this advertisement. You are responsible for reading it. STIPEND: No stipends will be paid on this project. REQUEST FOR RFP: To request the RFP and Attachments email esther.brandt@dot.state.fl.us and copy margaret.simpkins@dot.state.fl.us COMMUNICATIONS BETWEEN DESIGN-BUILD FIRMS AND DEPARTMENT: In order to ensure a fair, competitive and open process, once a project is advertised under Current Advertisements, all communications between interested firms and the Department must be directed to the Department's Pre-Bid Question and Answer website at https://www3.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchProposal or to the appropriate Procurement Office as provided in the advertisement. When submitting questions reference Contract Number E4N95, FM 43316515201. You are responsible for monitoring this site up to one day prior to the opening of price proposals. BUDGET: Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. SPECIAL NOTES: in accordance with Restrictions on Consultants' Eligibility to Compete for Derpartment Contracts (Topic 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. The firm restricted for this project is A&P Consulting Transportation Engineers. Project Manager : AUBERY, SABRINA Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Contractor must be prequalified by FDOT in grading, drainage, flexible paving and hot plant mix bituminous courses. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization Technical Questions Should Be Addressed To: TECHNICAL QUESTIONS: submit to: https://www3.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchProposal DBE/MBE Requirements: DBE/MBE/SMALL BUSINESS REQUIREMENTS: For this project the Department has established an aspiration goal of 9.0% DBE (Disadvantaged Business Enterprise) usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this Project shall aspire to have a 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non-DBE Small Businesses. Special Notes: To request the RFP send an email to esther.brandt@dot.state.fl.us and copy margaret.simpkins@dot.state.fl.us ******************************************************* A public meeting has been scheduled for May 12, 2014 at 2:30 pm local time in the Florida Department of Transportation Second floor Everglades conference room. The purpose of the meeting is for the Technical Review Committee members to review the low bidder's technical proposal. Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Pre-Bid Meeting Date :  12MAR2014 Time:  08:30AM Bids Due Date :  28APR2014 Time:  11:00AM Bid Opening Date :  28APR2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  12MAY2014 Time:  02:30PM Final Selection Meeting Date :  02JUN2014 Time:  08:15AM Final Selection Posting Date :  02JUN2014 Award Committee Meeting Date :  02JUN2014 Time:  08:15AM Rank Consultant Bid Amount 1 Construct Group Corp. $15,085,307 2 WEEKLEY ASPHALT PAVING,INC. $15,578,224 3 CONALVIAS USA, LLC. $16,777,050 4 Halley Engineering Contractors, Inc $16,986,000 5 RANGER CONSTRUCTION INDUSTRIES,INC. $18,656,000 6 STATE CONTRACTING & ENG. CORP. $19,899,486 7 COMMUNITY ASPHALT CORP. $20,960,192 ************************************************************ Procurement Number : E4P09 Financial Management Number(s): 42776315201 42965515201 Project Description: Low Bid Design Build Contract to design, fabricate, and construct up to 15 bus shelters and concrete shelter pads along University Drive, Oakland Park Boulevard, and NW 56 Avenue at various locations within the City of Lauderhill in Broward County. Each Design-Build Firm is to develop, design and construct approaches that maximize the amount of scope in the RFP that can be designed and built for the least amount of cost. The competition is on Project scope and costs. For this contract, the Department has established alternate scopes of work. These alternates have been established in consideration of possible budget constraints. The Department has assigned Contract award priority for the scope alternatives as follows: First Priority-Alternative A: Build all elements of scope defined in the RFP without any exceptions. Second Priority-Alternative B: Build all elements of scope defined in the RFP except for the following: Do not remove any existing trash receptacles, shelters, benches or bike racks at any of the bus stops proposed for new shelters. Any existing trash receptacles, bike racks or shelters will be removed by the City or others prior to construction of each shelter. Third Priority-Alternative C: Build all elements of scope defined in the RFP except for the following: 1. Do not remove any existing trash receptacles, shelters, benches or bike racks at any of the bus stops proposed for new shelters. Any existing trash receptacles, bike racks or shelters will be removed by the City or others prior to construction of each shelter. 2. The medium bus shelter at Bus Stop ID # 2076, Eastbound just east of University Drive. (Do not construct this bus shelter. THE PROJECT: The project consists of designing, manufacturing and construction of up to 15 transit shelters and concrete shelter pads as shown in the conceptual design plans previously approved by the City of Lauderhill and Broward County Transit. The work covers two projects: 42776315201 (Bus Shelters along SR 816/Oakland Park Blvd. from the Lauderhill City limits to west of the intersection with NW 68th Avenue and along NW 56th Avenue from Sunrise Blvd., to Oakland Park Blvd.) and 42965515201 (Bus shelters along SR 817/University Drive from NW 44th Street to south of Commercial Blvd.). The conceptual bus shelter design plans are attached to the RFP as a reference document. A preliminary investigation of all sites has been completed to verify the selected sites are suitable for the proposed shelters. The Design-Build Firm will be responsible for verifying the information provided and developing a site specific plan for each location in order to address impacts or other site specific design needs. Gravity wall, handle rail, lighting, trash receptacles and bike racks are to be provided at certain locations. A complete list of shelter locations, showing sizes, additional amenities and other information, is included in Appendix A. Work includes providing American Disabilities Act (ADA) compliant sidewalk connecting new shelter pad to existing sidewalk, as well as, around the shelter itself. The Design-Build Firm shall restore any disturbed areas by grading and placing new sod. For medium shelters solar panels for supplying electric for integrated LED lighting in shelter are to be installed on the backside of roof away from view of traffic. For medium shelters along north side of Oakland Park Blvd., facing south, if solar panels cannot be installed to function properly on backside of roof, provide electrical service instead of solar panels. All costs for supplying electrical service or solar panels is included in the cost of the shelter. CONTRACT TIME: 276 calendar days. BUDGET AMOUNT: Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. The Department anticipates that additional funding will become available during the procurement period to potentially enable the construction of all project components included under the Project Description. PREAMBLE: The notice to contractors/consultants preamble included at the top of this web page is applicable to this advertisement for Low Bid Design Build projects and is made a part hereof unless otherwise noted in this advertisement. You are responsible for reading it. STIPEND: No stipend will be paid on this project. Project Manager : FORD, JAMES Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor Certified by the Florida Construction Industry Board as General Contractor Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 7.2 - Lighting 9.4.1 - Standard Foundation Studies 14.0 - Architect DBE/MBE Requirements: For this project the Department has established and aspiration goal of 9.0 % Disadvantaged Business Enterprise (DBE) usage and an additional 3.0 % Non-DBE Small Business usage, representing a cumulative 12.0 % commitment of total contract costs. Firms proposing for this Project shall aspire to have 9.0 % or more of the total contract costs peformed by DBE's and an additional 3.0 % or more of the total contract costs performed by Non-DBE Small Businesses. Special Notes: REQUEST FOR RFP: requests for the RFP and attachments shall be emailed to esther.brandt@dot.state.fl.us and copy margaret.simpkins@dot.state.fl.us. COMMUNICATIONS BETWEEN DESIGN-BUILD FIRMS AND DEPARTMENT: In order to ensure a fair, competitive and open process, once a project is advertised under Current Advertisements, all communications between interested firms and the Department must be directed to the Department's Pre-bid Question and Answer website at: https://www3.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchProposal or the appropriate Procurement Office as provided in the advertisement. When submitting questions reference the Contract number E4P09, and FM numbers 42776315201 & 42965515201. You are responsible for monitoring the site for answers up to one day prior to the opening of price proposals. Advertisement Status : Final Selection Date of Advertisement : 13JAN2014 Pre-Bid Meeting Date :  03FEB2014 Time:  09:00AM Bids Due Date :  07MAY2014 Time:  11:00AM Bid Opening Date :  07MAY2014 Time:  11:00AM Tech. Rev. Cmte Meeting :  13MAY2014 Time:  01:00PM Final Selection Meeting Date :  09JUN2014 Time:  08:15AM Final Selection Posting Date :  09JUN2014 Award Committee Meeting Date :  09JUN2014 Time:  08:15AM Rank Consultant Bid Amount 1 STATE CONTRACTING & ENG. CORP. $922,045 2 Enco, LLC. $1,013,325 ************************************************************ Procurement Number : E4P38 Financial Management Number(s): 43270415201 43270615201 Project Description: This project includes reconstruction of SR 710 from Martin/ Palm Beach County Line to Pratt & Whitney Entrance, a total distance of approximately 5.6 miles. SR 710 is part of Florida's Strategic Intermodal System (FSIS) and is part of the overall SR 710 Project Development and Environmental (PD&E) Study. SR 710 is an east-west (or southwest/north west) rural principal arterial. The proposed typical section includes a design speed of 65 mph, four 12-foot general purpose lanes, varying 12-foot turn/auxiliary lanes, 12-foot (5-foot paved) outside shoulders and 8-foot (2-foot paved) inside shoulders. * County: Palm Beach * ESTIMATED BUDGET AMOUNT: $33,684,028 * ESTIMATED TIME: 826 Calendar Days * STIPENDS: There will be a stipend in the amount of $80,000. The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. * PREAMBLE: The notice to contractor/consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof. You are responsible for reading it. Project Manager : PESSOA, DONOVAN Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Drainage, Flexible Paving, Grading and Hot Plant-Mixed Bitum. Course Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 13.7 - Transportation Statistics Technical Questions Should Be Addressed To: All questions should be addressed on the Department's Bid Question and Answer Website at: http://www2.dot.state.fl.us/construction/bidquestionmain.asp * When submitting questions reference contract number E4P38. You are responsible for monitoring this site for answers up to one day prior to the price opening. * A draft RFP is available via the link below in this advertisement. Other documents such as attachments and reference documents may be obtained by emailing margaret.simpkins@dot.state.fl.us and copying esther.brandt@dot.state.fl.us DBE/MBE Requirements: For this project, the Department has established an aspiration goal of 9.0% Disadvantaged Business Enterprise (DBE) usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12.0% commitment of the total contract costs. More information on DBE/MBE/Small Business requirements can be read in the preamble at the top of this webpage. Special Notes: In accordance with RESTRICTIONS ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (Topic 375-030-006 B), the following Firms participated participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless and exception obtained from the Department: Contract #C8J97 Transystems Corporation Cyriacks Environmental Consulting Svcs Terracon Consulting, Inc. Keith & Associates, Inc. * ELOI EVALUATION CRITERIA: The Department will not consider Expanded Letters of Interest that are not in conformance with the response requirements. The criteria for evaluating the Phase I submittals will include: 1. Past Performance Evaluations, Contractor Grades, Design Consultant grades, Performance history with other states or agencies if none with the Department (Maximum 4 points). 2. Project Experience and Resources, Design- Build experience of the Contractor and Design Consultant, Similar types of work experience, Contractor experience modification rating - current year, Firm organization, staffing plan, resources, location, Environmental record (Maximum 7 points). 3. Project Approach and Understanding of Critical Issues, Outline plan for completing the work, Approach and understanding, Coordination Plan (Maximum 9 points). 4. Other content in the Expanded Letter of Interest ( 0 points). * RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only 1 ELOI per legal entity is acceptable. All ELOI files should be sent to d4.designbuild@dot.state.fl.us and must be received by the Department by the Phase I ELOI response deadline shown below. * EXPANDED LETTERS OF INTEREST: 10 page maximum (exclusive of information identified above). Note: Resumes, Organizational Chart and 3 pages of Performance History for Firms having no previous performance history with the Department and/or Firms whose performance history with the Department is no longer current (older than 5 years) are not considered in the 10 page count/limitation. Cover sheets, photos, charts, etc. or other documents not specifically listed as exclusions will be considered in the page count / limitation. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 23DEC2013 PhaseI Selection Cmte. Meeting :  13FEB2014 Time:  8:15AM ELOI Scores Notification Date :  13FEB2014 Time:  11:00AM Deadline for Election to Participate in Ph. II :  17FEB2014 Time:  5:00PM Posting of Shortlist :  18FEB2014 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  27FEB2014 Time:  10:30AM PhaseII Tech. Proposal Due Date:  18APR2014 Time:  12:00PM Price Proposal Due Date :  28MAY2014 Time:  11:00AM Proposal Opening Date :  28MAY2014 Time:  11:00AM Final Selection Meeting Date :  02JUN2014 Time:  8:15AM Posting of Award :  02JUN2014 Time:  11:01AM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 RANGER CONSTRUCTION INDUSTRIES 17.8 70.5 688 $21,920,100 2 COMMUNITY ASPHALT CORP. 17.3 69.8 687 $22,720,100 3 PRINCE CONTRACTING, LLC. 16.3 64.8 688 $24,246,000 Firms not participating in PhaseII PhaseI Score BERGERON LAND DEVELOPMENT, INC. 15.8 HUBBARD CONSTRUCTION COMPANY 14.5 J.W. Cheatham, LLC. 13.5 ************************************************************ Procurement Number : E4N82 Financial Management Number(s): 22777515201 22777515601 Project Description: PROJECT DESCRIPTION: FM 22777515201; Widen and reconstruct State Road 7 from a 4 lane roadway (with shared center left turn lane) to a 6 lane roadway with a raised center median. The project begins approximately at Fillmore Street (MP 2.843) and ends south of Stirling Road (MP 4.926). The project also includes sidewalks, a closed drainage system, dry retentions swales and wet ponds, lighting, signals, ATMS features, and management and/or cleanup of contaminated areas. FM 22777515601; This project is to complete all work associated with the installation of new water and sewer lines on behalf of the City of Hollywood. The Department has entered into a Utility Work by Highway Contractor Agreement with the City of Hollywood to perform this work in conjunction with the roadway project in nearly the same limits. Proposed installations are a sanitary sewer, two water mains, lateral connections, and all other associated features, such as valves, meters, etc. CONTRACT TIME: Estimated contract time is 1,436 days. COMMUNICATION BETWEEN DESIGN-BUILD FIRMS AND DEPARTMENT: Respondents to this solicitation or persons acting on their behalf may not contact any employee or officer of the executive or legislative branch, between the release of the solicitation and the end of the 72-hour period following the agency posting the notice of intended award, excluding Saturdays, Sundays, and State Holidays, concerning any aspect of this solicitation, except in writing to the procurement officer or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response. SPECIAL NOTES: In accordance with RESTRICTIONS ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (Topic 375-030-006 B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless and exception is obtained from the Department: Cotleur & Hearing, Contract # C9277; Atkins, Contract # C8202; and Metric Engineering, Contract # C9371. RESUMES: Project specific specialty resumes shall be submitted for the following: Construction Superintendent -Specialty Contaminated Materials Manager; Design Engineer of Record - Specialty Contaminated Materials Manager. No resume is required for the Design Structures Engineer of Record OR the Construction Structures Superintendent. ELOI EVALUATION CRITERIA: The Department will not consider Expanded Letters of Interest that are not in conformance with the response requirements. The criteria for evaluating the Phase I submittals will include: 1. Past Performance Evaluations, Contractor Grades, Design Consultant grades, Performance history with other states or agencies if none with the Department (Maximum 4 points). 2. Project Experience and Resources, Design- Build experience of the Contractor and Design Consultant, Similar types of work experience, Contractor experience modification rating - current year, Firm organization, staffing plan, resources, location, Environmental record (Maximum 7 points). 3. Project Approach and Understanding of Critical Issues, Outline plan for completing the work, Approach and understanding, Coordination Plan (Maximum 9 points). 4. Other content in the Expanded Letter of Interest ( 0 points). STIPEND: The Department will pay stipends in the amount of $46,000 in accordance with the criteria outlined in the preamble of this advertisement at the top of this web page. EXPANDED LETTERS OF INTEREST: 10 page maximum (exclusive of information identified above). Note: Resumes, Organizational Chart and 3 pages of Performance History for Firms having no previous performance history with the Department and / or Firms whose performance history with the Department is no longer current (older than 5 years) are not considered in the 10 page count/limitation. Cover sheets, photos, charts, etc. or other documents not specifically listed as exclusions will be considered in the page count / limitation. RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only 1 ELOI per legal entity is acceptable. All ELOI files should be sent to d4.designbuild@dot.state.fl.us and must be received by the Department by the Phase I ELOI response deadline shown below. Project Manager : PETERSON, SCOTT Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Contractor must be prequalified by FDOT in Drainage, Grading, Flexible Paving and Hot Plant Mix Bituminous Course Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: TECHNICAL QUESTIONS: Address technical questions to http://www2.dot.state.fl.us/construction/bidquestionmain.asp REQUEST FOR DOCUMENTS: A draft RFP is available via the link in this advertisement. Other documents such as attachments and reference documents may be obtained by email to Esther.brandt@dot.state.fl.us and copy margaret.simpkins@dot.state.fl.us DBE/MBE Requirements: For this project, the Department has established an aspiration goal of 9.0% Disadvantaged Business Enterprise (DBE) usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12.0% commitment of the total contract costs. More information on DBE/MBE/Small Business requirements can be read in the preamble at the top of this webpage. Special Notes: FUNDING: Release of the RFP to the short listed firms and award of this contract are contingent upon authorization of funds and legislative budget approval of funds. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 27NOV2013 PhaseI Selection Cmte. Meeting :  13JAN2014 Time:  08:15AM ELOI Scores Notification Date :  13JAN2014 Time:  11:00AM Deadline for Election to Participate in Ph. II :  15JAN2014 Time:  05:00PM Posting of Shortlist :  16JAN2014 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  24JAN2014 Time:  01:00PM PhaseII Tech. Proposal Due Date:  14APR2014 Time:  11:00AM Price Proposal Due Date :  20MAY2014 Time:  11:00AM Proposal Opening Date :  20MAY2014 Time:  11:00AM Final Selection Meeting Date :  27MAY2014 Time:  08:15AM Posting of Award :  27MAY2014 Time:  11:01AM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 0 BERGERON LAND DEVELOPMENT, INC 17.0 73.0 1403 $29,142,095 0 PRINCE CONTRACTING, LLC. 17.3 69.3 1403 $35,637,950 1 COMMUNITY ASPHALT CORP. 18.7 74.0 1403 $29,568,100 ************************************************************ Procurement Number : E4N84 Financial Management Number(s): 42170725201 42170735201 42170785201 Project Description: NOTICE TO CONTRACTORS/CONSULTANTS: Below is the readvertise- ment of E4N84 which includes Segment A and Segment B. The Design Build Firms who submitted in the first advertisement will need to resubmit their ELOIs to meet the requirements of this advertisement. * PREAMBLE: The notice to contractors/consultants preamble included on the top of this web page is applicable to this advertisement and made a part hereof unless otherwise noted in this advertisement. You are responsible for reading it. * I-75 EXPRESS LANES-SEGMENTS A&B FROM NW 170TH STREET TO SOUTH OF MIRAMAR PARKWAY: Segments A&B represent one of the four separate I-75 Express Lanes Design Build projects that extend from NW 170th Street in Miami-Dade County to I-595 in Broward County. Segments A&B extend from NW 170th Street in Miami Dade County to approximately 2,400 feet south of Miramar Parkway in Broward County, for a total distance of approximately 3.1 miles. . The I-75 Express Lanes improvements to be constructed within the existing 166-foot wide median generally consists of a barrier wall divided 2-lane (one 15-foot travel lane in each direction) to 4-lane (two 12-foot travel lanes in each direction) tolled roadway, with 6-foot paved inside shoulders, and 12-foot (10-feet paved) outside shoulders. The I-75 / HEFT interchange improvements accommodate the future I-75 / HEFT Express Lanes median to median direct connection and include the new ramp connections listed below. IT SHOULD BE NOTED THAT THE DEPARTMENT IS CURRENTLY EVALUATING THE ADVANCED CONSTRUCTION OF THE I-75 / HEFT EXPRESS LANES MEDIAN TO MEDIAN DIRECT CONNECTION AND INTENDS TO INCLUDE THIS IMPROVEMENT AS PART OF THE SEGMENTS A&B PROJECT AS ADDITIONAL FUNDING IS SECURED. . I-75 NORTHBOUND: 1) Ramp H-8 Southbound HEFT to Ramp H-13 2) Ramp H-13 Northbound and Southbound HEFT to Northbound I-75 Express Lanes 3) Ramp H-11 Northbound and Southbound HEFT to Northbound I-75 General Purpose Lanes and Miramar Parkway 4) Ramp H-5 Northbound I-75 to Northbound HEFT and Miami Gardens Drive (*ANTICIPATED BID ALTERNATIVE) . I-75 SOUTHBOUND: 1) Ramp H-4 Southbound I-75 Express Lanes to Ramp H-12 2) Ramp H-12 Southbound I-75 General Purpose and Express Lanes to Northbound HEFT 3) Ramp HBD-12 Southbound I-75 General Purpose and Express Lanes to Southbound HEFT 4) Ramp H-7 Southbound HEFT to Southbound I-75 (*ANTICIPATED BID ALTERNATIVE) . Other project improvements include: reconstruction of the eastern quadrants of the I-75/Miami Gardens Drive interchange, including replacement of the existing Miami Gardens Drive overpass bridges (*ANTICIPATED BID ALTERNATIVE); I-75 Express Lanes bridges over the HEFT; I-75 Express Lanes and Ramp H-13 over the Snake Creek (C-9) Canal; lengthening of the existing Bass Creek Road overpass bridge; reconstruction of the northbound and southbound I-75 General Purpose Lanes as required to accommodate the Ramp H-4 and Ramp H-13 Express Lane median connections and the future I-75/HEFT Express Lanes median to median connection; milling and resurfacing of the I-75 General Purpose Lanes adjacent to the proposed ingress/egress lanes connecting to the Express Lanes; temporary and permanent retaining walls; culvert crossing beneath Ramps H-7 and H-8; drainage; sound barrier walls; permanent and telemetered traffic monitoring sites; two (2) tolling gantries; Intelligent Transportation System (ITS); signing and pavement markings; signalization, lighting and landscaping. . The Tolling and ITS components of the corridor will be implemented with each individual project segment. The Department will utilize an integration contract to provide a new communication backbone and connectivity to the Broward FDOT Regional Transportation Management Center(RTMC) and the Turnpike's Tolling Operation Center. The Design Build Firm will be required to coordinate their activities and schedule with the adjacent Design Build projects as well as the Toll and ITS Integrator Contractor and the Tolling Equipment Contractor. * SELECTION PROCEDURE: Adjusted Score Design Build with Bid Alternatives Anticipated Bid Alternatives are denoted with an asterisk (*) in the Project Description. Please refer to Section VIII.-Bid Proposal Requirements of the Draft RFP for additional information regarding the bid alternatives, priorities and process. * COUNTIES: Broward and Miami-Dade. * ESTIMATED CONTRACT TIME: 1,350 days * ESTIMATED BUDGET AMOUNT: $194,000,000 Note: Actual commitment and final execution of this contract is contingent upon an approved legislative budget and avail- ability of funds. The Department anticipates that additional funding will become available during the procurement period to potentially enable the construction of all project components included under the Project Description. Project Manager : BOSTIAN, ROBERT Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): The contractor must be prequalified by FDOT in Major Bridge- Concrete Segmental Construction OR Major Bridge Curved- Steel Girders based on the contractor's submittal. . The contractor only needs to be prequalified in the specific type of structure which is being proposed. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 4.2.3 - Major Bridge Design - Segmental 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Additional Bridge Design Work Types : 4.2.1 Major Bridge Design-Concrete OR 4.2.2 Major Bridge Design-Steel OR 4.2.3 Major Bridge Design Segmental NEW FORM MUST BE SUBMITTED WITH THE EXPANDED LETTER OF INTEREST FOR THIS PROJECT: Design Build Firms responding to this advertisement must submit a completed and signed Bridge Design Qualification Form with the ELOI. Please refer to the preamble and advertisement for other submittal directions. Technical Questions Should Be Addressed To: ALL communications between interested firms and the Department must be directed to the Department's Pre-Bid Question and Answer website at: http://www2.dot.state.fl.us/construction/bidquestionmain.asp When submitting questions, reference Contract Number E4N84, FM Number 42170735201. You are responsible for monitoring this site up to one day prior to the price opening. Requests for contract related information other than the RFP: Firms may make public records requests by email to cynthia.lynch@dot.state.fl.us. DBE/MBE Requirements: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12% commitment of total contract costs. Firms proposing for this Project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non-DBE Small Businesses. Special Notes: DRAFT RFP: The Draft RFP is attached to the link in this advertisement. To request DVDs containing the Draft RFP attachments and reference documents, please email your request to margaret.simpkins@dot.state.fl.us * RESTRICTION ON CONSULTANTS' ELIGIBILTY TO COMPETE FOR DEPARTMENT CONTRACTS: (TOPIC 375-030-006-B): The following Firms participated in the development of the conceptual plans or Request for Proposal for this project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Prime Consultant: Reynolds, Smith and Hills, Inc. (Contract C8S79) Subconsultants: HDR, Inc. GCME, Inc. Keith and Associates, Inc. Media Relations Groups, LLC. Other Firms: Miller-Legg (Contract C8U03) * STIPENDS: There will be a stipend in the amount of $270,000. The Department will pay stipends to the Short-listed firms based on the guidelines noted in the preamble. * EXPANDED LETTERS OF INTEREST: Read the preamble for instructions on the expanded letters of interest requirements. The expanded letters of interest and attach- ments shall be submitted electronically to email address: d4.designbuild@dot.state.fl.us The Department will not consider letters not in conformance with response requirements. * PHASE I SCORING CRITERIA: 1. Past Performance Evaluations: (4 points maximum) Contractor grades Design Consultant grades Performance history with other states or agencies if none with the Department. 2. Project Experience and Resources:(7 points maximum) Design-Build experience of the Contractor and Design Consultant Similar types of work experience Contractor Experience Modification Rating (current year) Firm organization, staffing plan, resources, location Environmental Record 3. Project Approach and Understanding of Critical Issues: (9 points maximum) Outline plan for completing the work Approach and understanding Coordination Plan 4. Other content in the Expanded Letter of interest-0 points NOTE that all components included in the Project Description shall be considered as part of the Department's evaluation of the ELOI's. * RESUMES: Please provide one page resumes for each of the following nine (9) key positions- a. Construction Project Manager b. Construction Design-Build Coordinator c. Construction Roadway Superintendent d. Construction Structures Superintendent e. Construction ITS Superintendent f. Design Project Manager g. Design Roadway Engineer of Record h. Design Structures Engineer of Record i. Design ITS Engineer of Record * RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI Due date and time. Only (1) ELOI per legal entityy is acceptable. All ELOI files should be sent to d4.designbuild@dot.state.fl.us and must be received on Friday, November 15, 2013 by 5 pm EST. FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue on to Phase II by notifying the Department office in writing no later than 5:00 pm Eastern Time on Thursday, December 26, 2013. Please submit your notification by email to: d4.designbuild@dot.state.fl.us SHORTLISTED FIRMS: The list of short listed firms will be posted on the Procurement website under Design Build Selection results at: http://www2.dot.state.fl.us/procurement/ProfessionalServices /advertise/desresult.htm Release of the RFP to the short listed firms and award of the contract are contingent upon legislative and federal funds approval. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 28OCT2013 PhaseI Selection Cmte. Meeting :  19DEC2013 Time:  8:15AM ELOI Scores Notification Date :  19DEC2013 Time:  11:00AM Deadline for Election to Participate in Ph. II :  23DEC2013 Time:  5:00PM Posting of Shortlist :  26DEC2013 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  28JAN2014 Time:  10:00AM PhaseII Tech. Proposal Due Date:  07MAY2014 Time:  12:00PM Price Proposal Due Date :  30JUN2014 Time:  11:00AM Proposal Opening Date :  30JUN2014 Time:  11:00AM Final Selection Meeting Date :  28JUL2014 Time:  8:15AM Shortlisted Firms PhaseI Score BERGERON/JOHNSON/PRINCE/JOINT VENTU 17.8 COMMUNITY ASPHALT CORP. 18.5 CONDOTTE AMERICA, INC. 16.8 Dragados USA 15.3 THE DE MOYA GROUP, INC. 17.5 Firms not participating in PhaseII PhaseI Score ARCHER WESTERN CONTRACTORS,LTD. 16.3 ASTALDI CONSTRUCTION CORP 15.5 ODEBRECHT CONSTRUCTION, INC. 15.0 ************************************************************ Procurement Number : E4P11 Financial Management Number(s): 43159015201 43159115201 43288315201 43330115201 43394715201 Project Description: The Department of Transportation, Broward County Traffic Engineering Division and Palm Beach County Traffic Engineering Division have partnered to develop the Request for Proposal(RFP) and supporting technical documents for the Design Build of the following projects, which are to be considered as one job. PROJECT 43159015201: The advance Transportation Management System (ATMS) for three corridors- SR 817, SR 818 and SR 7 in Broward County includes the design, furnishing and installation of ATMS field elements including, a Closed Circuit Television (CCTV) camera system, an Arterial Dynamic Message System (ADMS), Arterial Travel Time System (ATTS), a Microwave Vehicle Detection System (MVDS) and fiber optic communication network along University Drive (SR 817) from Miramar Parkway to Broward Boulevard, Griffin Road (SR 818) from University Drive to SR 7 and SR 7 from south of Stirling Road to Broward Boulevard. The project also includes the integration of the ATMS field devices into the Regional Traffic Management Center located at 2300 West Commercial Boulevard, Fort Lauderdale, Florida 33309. Once complete the ATMS will be used by the arterial RTMC operators to coordinate with emergency responders on incidents, make real time performance based decisions on signal timing with the County and disseminate traveler information in order to reduce travel time and incident response time. PROJECT 43159115201: The Arterial Dynamic Message Signs and Data Collection Sites along SR 80/Southern Blvd from Royal Beach Boulevard to Dixie Highway in Palm Beach County, includes the design, furnishing and installation of the following ATMS field elements and systems; ADMS, ATTS and MVDS. This project includes the integration of the ATMS field devices into the Palm Beach County TMC Vista Center Traffic Management Center, located at 2300 North Jog Road, West Palm Beach, Florida 33411. Once complete the ATMS will be used by the Palm Beach County operators to coordinate with emergency responders on incidents, make real time performance based decisions on signal timing and disseminate traveler information in order to reduce travel time and incident response time. PROJECT 43288315201: The Adaptive Traffic Control System (ATCS) along Northlake Boulevard from Military Trail to Federal Highway in Palm Beach County project includes the design, procurement and installation of an ATCS in Palm Beach County along Northlake Boulevard from east of Military Trail to Federal Highway. The project work includes the design, furnishing, installing, integrating and testing of the ATCS hardware/software needed at each signal controller and at the Palm Beach County Vista Center TMC located at 2300 North Jog Road, West Palm Beach, Florida 33411, as well as enhancements to the vehicle detection to support the new ATCS. Once complete it must be able to adjust in real-time to fluctuations in traffic demand and coordinate such information with adjacent signals in the corridor to optimize progression and reduce recovery time. PROJECT 43330115201: The ADMS on Blue Heron Boulevard (east/west approaches to I-95) and 45th Street (east/west approaches to I-95) in the project includes the design, procurement and installation of four (4) ADMS in Palm Beach County. The project also includes the integration of the ADMS field devices into the Regional Traffic Management Center located at 2300 West Commercial Boulevard, Fort Lauderdale, Florida 33309. Once complete the ADMS device will be used to disseminate traveler information in order to reduce travel time and incident response time. PROJECT 43394715201: The ATCS along Okeechobee Boulevard to Flagler Drive in Palm Beach County project includes the design, procurement and installation of an ATCS in Palm Beach County along Okeechobee Blvd. The project work includes the design, furnishing, installing, integrating and testing of the ATCS hardware/software needed at each controller and at the Palm Beach County Vista Center TMC located at 2300 North Jog Road, West Palm Beach, Florida 33411, as well as enhancements to the vehicle detection to support the new ATCS. Once complete it must be able to adjust in realtime to fluctuations in traffic demand and coordinate such information with adjacent signals in the corridor to optimize progression and reduce recovery time. * COUNTIES: Broward and Palm Beach * ESTIMATED BUDGET AMOUNT: $9,000,000.00 * PREAMBLE: The notice to contractor/consultants preamble at the top of this webpage is applicable to this advertise- ment and made a part hereof. You are responsible for reading it. * STIPEND: There will be a stipend in the amount of $20,000.00 The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. Project Manager : SAINI, VANITA Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): The prime contractor must be prequalified by FDOT in Intelligent Transportation Systems. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.3 - Signalization 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: Bid Question and Answer Website at: http://www2.dot.state.fl.us/construction/bidquestionmain.asp . When submitting questions reference contract number E4P11. You are responsible for monitoring this site for answers up to one day prior to the price opening. DBE/MBE Requirements: For this project, the Department has established an aspirational goal of 9% DBE usage and an additional 3% Non-DBE Small Business usage, representing a cumulative 12% commitment of total contract costs. Firms proposing for this Project shall aspire to have a 9% or more of the total contract costs performed by DBE's and an additional 3% or more of the total contract costs performed by Non-DBE Small Businesses. * Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statues, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. * Firms will submit the DBE and Small Business Participation form as required by the Request for Proposal. Special Notes: The Department has prepared DVD's of the RFP attachments and reference document files available for Design Build Firms preparing an ELOI for this project. To place your request and obtain the Exempt Documents Request form please contact Margaret Simpkins via email at margaret.simpkins@dot.state.fl.us * PHASE 1 ASSIGNED SCORING POINTS: 1. Past Performance Evaluations (2 maximum points) Contractor and design consultant grades, performance his- tory with other state agencies if none with the Department 2. Project Experience and Resources (8 maximum points) Design Build Experience of the contractor and Designer, Similar types of work experience, Contractor experience modification rating (CURRENT YEAR), Firm organization, staffing plan, resources, location, environmental record. 3. Project Approach and Understanding of Critical Issues (10 maximum points) Outline plan for completing the work, approach and under- standing, coordination plan. 4. Other content in the letter of interest(0 points) * RESTRICTIONS ON CONSULTANTS: In accordance with Restrictions on Consultants' Eligibility to Compete for Department Contracts (Topic 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District Four Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Consultant: Metric Engineering, Inc. - Contract No. C9813 * EXPANDED LETTERS OF INTEREST: The Department will not consider expanded letters of interest (ELOI) not in conformance with response requirements. Read the preamble of this ad for ELOI requirements. * THE DESIGN BUILD FIRM SHALL PROVIDE AT LEAST THREE (3) REFERENCES (PROJECT NAME, PROJECT MANAGER'S NAMES, PHONE NUMBERS and EMAIL ADRESSES) for projects that included FDOT ITS design and construction and/or work types 3.1, 6.2, 6.3.1, 6.3.2, 6.3.3, 7.3, 9.1 and 9.4.1. One additional page shall be included for all references, this additional page is not part of the 10 page limit. * RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the ELOI due date and time. Only one (1) ELOI per legal entity is acceptable. All ELOI files should be sent to: d4.designbuild@dot.state.fl.us and must be received by the response deadline shown below. ELOI's shall be submitted by close of business (5 pm) Eastern Standard Time on FRIDAY, NOVEMBER 8, 2013 * FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue on to Phase II by notifying the Department Office in writing no later than Wednesday, December 18, 2013 by 5pm EST. Submit notification by email to: d4.designbuild@dot.state.fl.us * Note: The Department reserves the right to reject all Proposals and/or to waive minor Proposal irregularities. * The Contractor or Lead Design Professional shall not team with other Proposers to submit more than one proposal per project. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21OCT2013 PhaseI Selection Cmte. Meeting :  16DEC2013 Time:  8:15AM ELOI Scores Notification Date :  16DEC2013 Time:  11:00AM Deadline for Election to Participate in Ph. II :  18DEC2013 Time:  5:00PM Posting of Shortlist :  19DEC2013 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  07JAN2014 Time:  1:30PM PhaseII Tech. Proposal Due Date:  11MAR2014 Time:  12:00PM Price Proposal Due Date :  07MAY2014 Time:  11:00AM Proposal Opening Date :  07MAY2014 Time:  11:00AM Final Selection Meeting Date :  12MAY2014 Time:  8:15AM Posting of Award :  12MAY2014 Time:  2:01PM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 SICE, inc. 13.8 64.3 646 $7,982,486 2 WORLD FIBER TECHNOLOGIES, INC. 16.5 70.3 646 $15,064,024 3 MILLER ELECTRIC COMPANY 17.3 50.3 556 $15,098,877 Firms not participating in PhaseII PhaseI Score TRAFFIC CONTROL DEVICES,INC. 15.8 ************************************************************ Procurement Number : E4P15 Financial Management Number(s): 43270715201 Project Description: Adjusted Score Design Build Contract E4P15, FM 43270715201 Martin County add lanes on Beeline Highway. Two 1.5 mile passing lanes will be constructed in locations to be determined extending from MP 2.00 to MP 12.00 in Martin County. The total distance will include the two 1.5 mile passing lanes plus necessary transitions. Other improvements include: widening, milling and resurfacing of SR 710, extension of existing culverts, new headwalls, passing lanes; gravity walls, guardrail; signing and pavement marking. Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. Estimated contract calendar days is 550. . PREAMBLE: The notice to contractor/consultant preamble at the top of this web page is applicable to this advertisement unless stated otherwise and is made a part hereof. You are responsible for reading it. . SHORT LISTED FIRMS: The list of short listed firms will be posted on the Procurement web site at: www.dot.state.fl.us/procurement/procurementadvertisements. shtm, click on Shortlist and Final Selection results. . STIPEND: There will be a stipend in the amount of $18,450. The Department will pay stipends to the short listed firms based on the guidelines in the preamble of this advertisement. . DRAFT RFP: A draft RFP is available and attached to the link in this advertisement. To request a CD with additional RFP attachments please email your request to esther.brandt@dot.state.fl.us and copy margaret.simpkins@dot.state.fl.us. . EXPANDED LETTERS OF INTEREST: The Department will not consider expanded letters of interest (ELOI's) not in conformance with response requirements. Read the preamble for ELOI requirements. . RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5 MB limit on email. Emails that exceed this 5 MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only one (1) ELOI per legal entity is acceptable. All ELOI files should be sent to: d4.designbuild@dot.state.fl.us and must be received by the response deadline shown below. ELOI's shall be submitted by close of business (5:00 pm) Eastern time on Friday, November 8, 2013. Resumes, Organization Charts and 3 pages of Performance History for firms having no previous performance history with the Department and/or to firms whose performance history with the Department is no longer current (older than 5 years) are not considered in the 10 page count/limitation. . RESUMES: Provide a one page resume for each of the 9 key positions noted in the preamble. For this project there are no specialty requirements identified for the Construction Superintendent or the Design Engineer of Record. . PHASE I ASSIGNED SCORING POINTS: 1. Past performance evaluations (4 points maximum); contractor grades, design consultant grades, performance history with other state agencies if none with the Department. 2. Project Experience and Resources (7 points maximum) design build experience of the contractor and designer, similar type of work experience, contractor experience modification rating (current year), firm organization, staffing plan, resources, location, environmental record. 3. Project Approach and Understanding of Critical Issues (9 points maximum) outline plan for completing the work, approach and understanding, coordination plan. 4. Other content in the expanded letter of interest ( 0 points maximum) . RESTRICTIONS ON CONSULTANTS: In accordance with Restrictions on Consultants' Eligibility to Compete for Department Contracts (Topic375-030-006-B), the following firms participated in the development of the conceptual plans or Request for Proposal for this project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this project are subject to restriction unless an exception is obtained from the Department. Prime Consultants:R. J. Behar and Company, Inc. . FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue on to Phase II by notifying the Department Office in writing no later than 5:00 pm Eastern time on Wednesday, December 11, 2013. Submit notification by email to d4.designbuild@dot.state.fl.us Project Manager : MORALES, FERNANDO Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Contractor must be prequalified by FDOT in Grading, Drainage, Flexible Paving, and Hot Plant Mix Bituminous Course Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: All questions must be submitted on the Department's Bid Question and Answer website at: http://www2dot.state.fl.us/construction/bidquestionmain.asp When submitting questions reference the contract number E4P15 and FM 43270715201. You are responsible for monitoring this site up to one day prior to the price opening. DBE/MBE Requirements: For this project the Department has set an aspiration goal of 9% Disadvantaged Business Enterprise (DBE) usage and an additional 3% Non-DBE Small Business usage, representing a cumulative 12% commitment of total contract costs. Firms proposing for this Project shall aspire to have 9% or more of the total contract costs performed by DBE's and an additional 3% or more of the total contract costs performed by Non-DBE Small Businesses. Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBE's and Small Businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBE's opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. Advertisement Status : Final Selection Date of Advertisement : 21OCT2013 PhaseI Selection Cmte. Meeting :  09DEC2013 Time:  08:15AM ELOI Scores Notification Date :  09DEC2013 Time:  08:15AM Deadline for Election to Participate in Ph. II :  11DEC2013 Time:  05:00PM Posting of Shortlist :  12DEC2013 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  20DEC2013 Time:  01:00PM PhaseII Tech. Proposal Due Date:  10MAR2014 Time:  11:00AM Price Proposal Due Date :  30APR2014 Time:  11:00AM Proposal Opening Date :  30APR2014 Time:  11:00AM Final Selection Meeting Date :  05MAY2014 Time:  08:15AM Posting of Award :  05MAY2014 Time:  12:02PM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 HUBBARD CONSTRUCTION COMPANY 15.8 63.3 550 $6,920,878 2 RANGER CONSTRUCTION INDUSTRIES 17.8 73.3 440 $8,909,114 3 COMMUNITY ASPHALT CORP. 17.0 72.3 440 $9,689,114 Firms not participating in PhaseII PhaseI Score CONALVIAS USA, LLC. 14.5 GIBBS & REGISTER,INC. 12.8 ************************************************************ Procurement Number : E4P04 Financial Management Number(s): 23193225201 41273325201 41325725201 42978515201 43093215201 Project Description: The design and construction of operational improvements to the following interchanges: I-95 at Woolbright Road in the City of Boynton Beach I-95 at 10th Avenue N. in the City of Lake Worth I-95 at Hypoluxo Road in Town of Lantana I-95 at Donald Ross Road in City of Jupiter I-95 at SW 10th Street in the City of Deerfield Bch, Broward County. * Financial Project Numbers: 23193225201(Woolbright Road), 41273325201(10th Avenue North), 41325725201(Hypoluxo Road), 42978515201(Donald Ross Road) and 43093215201(SW 10th St.) * COUNTIES: Broward and Palm Beach * ESTIMATED BUDGET: $29 million * PREAMBLE: The notice to contractor/consultants preamble at the top of this webpage is applicable to this advertise- ment and made a part hereof. You are responsible for reading it. * STIPEND: There will be a stipend in the amount of $85,605.00 The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. Project Manager : Delgado, Julio C Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): The contractor must be qualified in Intermediate Bridges. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: All questions should be addressed to on the Department's Bid Question and Answer Website at: http://www2.dot.state.fl.us/construction/bidquestionmain.asp . When submitting questions reference contract number E4P04. You are responsible for monitoring this site for answers up to one day prior to the price opening. DBE/MBE Requirements: For this project, the Department has established an aspirational goal of 9% DBE usage and an additional 3% Non-DBE Small Business usage, representing a cumulative 12% commitment of total contract costs. Firms proposing for this Project shall aspire to have a 9% or more of the total contract costs performed by DBE's and an additional 3% or more of the total contract costs performed by Non-DBE Small Businesses. * Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statues, and rule 14.78.005, Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors, subcontractors, and consultants. The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. Special Notes: PHASE 1 ASSIGNED SCORING POINTS: 1. Past Performance Evaluations (4 maximum points) Contractor and design consultant grades, performance his- tory with other state agencies if none with the Department. 2. Project Experience and Resources (7 maximum points) Design Build Experience of the contractor and Designer, Similar type of work experience, Contractor experience modification rating (CURRENT YEAR), Firm organization, staffing plan, resources, location, environmental record. 3. Project Approach and Understanding of Critical Issues (9 maximum points) Outline plan for completing the work, approach and under- standing, coordination plan. 4. Other content in the letter of interest(0 point) . RESTRICTIONS ON CONSULTANTS: In accordance with Restrictions on Consultants' Eligibility to Compete for Department Contracts (Topic 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Prime Consultant: 1. Hardesty & Hanover-Contract C8Z50 2. Kimley-Horn and Associates C9812 3. RJ Behar & Company C9295 4. Erdman Anthony C8W48 5. If Rooks C8S25 6. Inframap Corporations C9161 7. Stantec, Inc. Contract with Palm Beach County * EXPANDED LETTERS OF INTEREST: The Department will not consider expanded letters of interest (ELOI) not in conformance with response requirements. Read the preamble of this ad for ELOI requirements. . RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the ELOI due date and time. Only one (1) ELOI per legal entity is acceptable. All ELOI files should be sent to: d4.designbuild@dot.state.fl.us and must be received by the response deadline shown below. ELOI's shall be submitted by close of business (5 pm) Eastern Standard Time on MONDAY, OCTOBER 7, 2013. * FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue on to Phase II by notifying the Department Office in writing no later than Wednesday, November 20, 2013 by 5pm EST. Submit notification by email to: d4.designbuild@dot.state.fl.us * Note: The Department reserves the right to reject all Proposals and/or to waive minor Proposal irregularities. * The Contractor or Lead Design Professional shall not team with other Proposers to submit more than one proposal per project. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 16SEP2013 PhaseI Selection Cmte. Meeting :  18NOV2013 Time:  8:15AM ELOI Scores Notification Date :  18NOV2013 Time:  11:00AM Deadline for Election to Participate in Ph. II :  20NOV2013 Time:  5:00PM Posting of Shortlist :  21NOV2013 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  03DEC2013 Time:  10:00AM PhaseII Tech. Proposal Due Date:  13FEB2014 Time:  12:00PM Price Proposal Due Date :  16APR2014 Time:  1:00PM Proposal Opening Date :  16APR2014 Time:  1:00PM Final Selection Meeting Date :  21APR2014 Time:  8:15AM Posting of Award :  21APR2014 Time:  11:00AM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 COMMUNITY ASPHALT CORP. 18.3 69.3 979 $32,540,300 2 CONE & GRAHAM INC 18.3 71.0 978 $35,999,300 3 ASTALDI CONSTRUCTION CORP 16.7 68.0 979 $40,802,910 Firms not participating in PhaseII PhaseI Score HUBBARD CONSTRUCTION COMPANY 15.3 Munilla Construction Management LLC 16.3 PRINCE CONTRACTING, LLC. 12.7 ************************************************************ Procurement Number : E4P08 Financial Management Number(s): 42170755201 Project Description: PROJECT NAME: SR 93/I-75 MANAGED LANES FROM SOUTH OF SHERIDAN STREET TO NORTH OF GRIFFIN ROAD Segment D represents one of the five separate I-75 Express Lanes Design Build projects that extend from NW 170th Street in Miami-Dade County to I-595 in Broward County. Segment D starts south of Sheridan Street and ends north of Griffin Road in Broward County, for a total distance of approxi- mately 3.7 miles. The I-75 Express Lanes improvements to be constructed within the existing 166-foot wide median generally consist of a barrier wall divided 4-lane tolled roadway (two 12-foot travel lanes in each direction), with 6-foot paved inside shoulders, and 12-foot (10 feet paved) outside shoulders. The project also includes the reconstruction of the Sheridan Street Interchange. Other improvements include: new I-75 Express Lanes bridge over C-11 Canal; widening and lengthening of the existing Sheridan Street Overpass Bridge including complete deck replacement; milling and resurfacing of the I-75 general purpose lanes adjacent to the proposed ingress/egress lanes connecting to the Express Lanes; temporary and permanent retaining walls; drainage; sound barrier walls; permanent traffic monitoring site; Intelligent Transportation System (ITS); two (2) tolling gantries; signing and pavement marking; lighting; signalization and landscaping. The Tolling and ITS components of the corridor will be implemented with each individual Project segment. The Department will utilize an integration contract to provide a new communication backbone and connectivity to the Broward FDOT Regional Transportation Management Center (RTMC) and the Turnpike's Tolling Operation Center. The Design Build Firm will be required to coordinate their activities and schedule with the adjacent Design-Build segment contractors as well as the Toll and ITS Integrator Contractor and the Tolling Equipment Contractor. * ESTIMATED BUDGET AMOUNT: $107,000,000 * ESTIMATED CONSTRUCTION TIME: 1,000 days * COUNTY: Broward Project Manager : BOSTIAN, ROBERT Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): The contractor must be prequalified in Grading, Drainage, Flexible Paving and Hot Plant-Mixed Bituminous. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Technical Questions Should Be Addressed To: ALL questions must be submitted on the Department's Bid Question and Answer Website at: http://www2.dot.state.fl.us/construction/bidquestionmain.asp When submitting questions, please reference contract number E4P08, FM 42170755201. You are responsible for monitoring this site up to one day prior to the price opening. DBE/MBE Requirements: For this project, the Department has set a 9.0% DBE goal and a 3.0 % Small Business Aspiration Goal, representing a cumulative 12.0% commitment of total contract costs. Special Notes: The Department has prepared DVD's with the associated RFP attachments and reference files available for the Design Build Firms preparing an ELOI for Segment D. To place your request and obtain the Exempt Documents Request Form please contact Margaret Simpkins at: margaret.simpkins@dot.state.fl.us * In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following firms participated in the development of the conceptual plans or Request for Proposals for this project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this project are subject to restriction unless an exception is obtained from the Department. Prime Consultant: Reynolds, Smith and Hills, Inc. (C8S79) Subconsultants: HDR, Inc.; GCME, Inc.; Keith and associates, Inc.; Media Relations Groups, LLC Other Firms: Miller Legg (C8U03) * PREAMBLE: The notice to contractors/consultants preamble included on the top of this webpage is applicable to this advertisement and made a part hereof unless otherwise noted in this advertisement. You are responsible for reading it. * STIPEND: There will be a stipend in the amount of $125,000. The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. * EXPANDED LETTERS OF INTEREST: Read the preamble for instructions on the expanded letters of interest require- ments. The expanded letters of interest and attachments shall be submitted electronically to email address: d4.designbuild@dot.state.fl.us. The Department will not consider letters not in conformance with response requirements. * RESUMES: Please provide one (1) page resumes for each of the following nine (9) key staff positions: a. Construction Project Manager b. Construction Design-Build Coordinator c. Construction Roadway Superintendent d. Construction Structures Superintendent e. Construction Superintendent- Specialty (ITS) f. Design Project Manager g. Design Roadway Engineer of Record h. Design Structures Engineer of Record i. Design Engineer of Record- Specialty (ITS) * Phase I SCORING CRITERIA: 1. Past Performance Evaluations: 4 points maximum Contractor Grades, Design Consultant Grades, Performance history with other states or agencies if none with FDOT 2. Project Experience and Resources: 7 points maximum Design-Build experience of the Contractor and Design Consultant; Similar types of work experience; Contractor Experience Modification Rating (Current Year); Firm organization, staffing plan, resources, location; Environmental Record 3. Project Approach and Understanding of Critical Issues: 9 points maximum Outline plan for completing the work; Approach and under- standing; Coordination Plan 4. Other content in the Expanded Letter of Interest: 0 pt * RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only (1) ELOI per legal entity is acceptable. All ELOI files should be sent to d4.designbuild@dot.state.fl.us and must be received by the Department by the Phase I ELOI response deadline shown below. Expanded letters of Interest must be received on Monday, September 16, 2013 by 5:00 pm Eastern time. * SHORTLISTED FIRMS: The list of shortlisted firms will be posted on the Procurement website under Design Build Selection Results at: http://www2.dot.state.fl.us/ procurement/ProfessionalServices/advertise/desreslt.htm Release of the RFP to the shortlisted firms and award of the contract are contingent upon legislative and federal funds. * DRAFT RFP: A draft RFP is attached to the link in this advertisement. * REQUEST FOR CONTRACT RELATED INFORMATION OTHER THAN THE RFP: Firms may make public records requests by email to cynthia.lynch@dot.state.fl.us * FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue to Phase II by notifying the Department office in writing no later than 5:00 pm Eastern Time on Wednesday, October 30, 2013. Please submit your notification by email to: d4.designbuild@dot.state.fl.us View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 26AUG2013 PhaseI Selection Cmte. Meeting :  28OCT2013 Time:  8:15AM ELOI Scores Notification Date :  28OCT2013 Time:  11:00AM Deadline for Election to Participate in Ph. II :  30OCT2013 Time:  5:00PM Posting of Shortlist :  31OCT2013 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  13NOV2013 Time:  10:30AM PhaseII Tech. Proposal Due Date:  10FEB2014 Time:  12:00PM Price Proposal Due Date :  25MAR2014 Time:  3:00PM Proposal Opening Date :  25MAR2014 Time:  3:00PM Final Selection Meeting Date :  31MAR2014 Time:  8:15AM Posting of Award :  31MAR2014 Time:  11:01AM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 RANGER CONSTRUCTION INDUSTRIES 17.0 65.5 850 $80,437,734 2 Dragados USA 16.0 72.0 849 $96,450,000 3 COMMUNITY ASPHALT CORP. 18.0 66.3 850 $93,740,000 4 Bergeron Land Devel. & Johnson 17.3 59.8 850 $105,101,234 Firms not participating in PhaseII PhaseI Score CONDOTTE AMERICA, INC. 14.5 HUBBARD CONSTRUCTION COMPANY 15.8 PRINCE CONTRACTING, LLC. 15.3 THE DE MOYA GROUP, INC. 15.0 ************************************************************ Procurement Number : E4N98 Financial Management Number(s): 42170745201 Project Description: Broward County adjusted score design build contract. Segment "C" represents one of the five separate I-75 Express Lanes Design Build projects that extend from NW 170 Street in Miami-Dade County to I-595 in Broward County. Segment "C" extends from approximately 2,400 feet south of Miramar Parkway at milepost 1.080 to approximately 4,000 feet south of Sheridan Street at milepost 4.645 in Broward County, for a total distance of approximately 3.6 miles. The I-75 Express Lanes improvements to be constructed within the existing 166 foot wide median generally consists of a barrier wall divided 4 lane tolled roadway (two 12 foot travel lanes in each direction), with 6 foot paved inside shoulders, and 12 foot (10 feet paved) outside shoulders. Construction of the Pembroke Road overpass (bridge only) and reconstruction of the Miramar Parkway interchange is included with the Segment "C" project. Other improvements include: new I-75 express lanes bridge over the C-4; inside widening and deck replacement of existing SB and NB I-75 bridges over C-4 Canal; milling and resurfacing of the I-75 general purpose lanes adjacent to the proposed ingress/egress lanes connecting to the express lanes; temporary and permanent retaining walls; drainage improvements; sound barrier walls; telemetered and permanent traffic monitoring sites; ITS; two (2) tolling gantries; signing and pavement marking; lighting; signalization and landscaping. The tolling and ITS components of the corridor will be implemented with each individual project segment. The Department will also utilize an integration contract to provide a new communication backbone and connectivity to the Broward County Traffic Management Center (TMC) and the Turnpike's Tolling Operation Center. The Design-Build Firm will be required to coordinate their activities and schedule with the adjacent Design-Build segment contractor as well as the Toll and ITS integrator contractor and the Tolling Equipment Contractor. Project Manager : BOSTIAN, ROBERT Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Contractor must be prequalified by FDOT in Flexible Paving, Grading, Drainage and Hot Plant-Mix Bituminous Courses Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect Additional Bridge Design Work Types : For the bridge structural elements, the Design Build Firm must be prequalified in either work type 4.2.1 (Major Bridge Design Concrete) OR 4.2.2 (Major Bridge Design-Steel) OR 4.2.3 (Major Bridge Design - Segmental). The qualifications of the Design Build Firm MUST be consistent with the structure type which will be proposed in the Design Build Firms Expanded Letter of Interest and Technical Proposal. Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit a completed and signed Bridge Design Qualification Form No. 375-030-55 along with the Expanded Letter of Interst by the date and time deadline established for the Expanded Letter of Interest. Please refer to the preamble at the top of this webpage to obtain the form. Technical Questions Should Be Addressed To: All questions must be submitted on the Department's Bid Question and Answer website at: http://www2.dot.state.fl.us/construction/bidquestionmain.asp When submitting questions reference contract # E4N98, FM 42170745201. You are responsible for monitoring this site for answers up to one day prior to price opening. DBE/MBE Requirements: For this project, the Department has set goals of 9% DBE and 3% SBE usage, representing a cumulative 12% commitment of total contract costs. Special Notes: Release of the RFP to the short listed firms and award of this contact are contingent upon legislative and federal approval of funds. . PREAMBLE: The notice to contractor/consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof. You are responsible for reading it. . SHORT LISTED FIRMS: The list of short listed firms will be posted on the Procurement website www.dot.state.fl.us/procurement/procurementadvertisements. shtm, click on Shortlist and Final Selection Results. . STIPEND: There will be a stipend in the amount of $127,000. The Department will pay stipends to the short listed firms based on the guidelines noted in the preamble of this advertisement. . DRAFT RFP: A draft RFP is available and attached to the link in this advertisement To request a CD with the additional RFP attachments please email request to esther.brandt@dot.state.fl.us . REQUEST FOR CONTRACT RELATED INFORMATION: For information request other than the RFP send a public records request to cynthia.lynch@dot.state.fl.us . EXPANDED LETTERS OF INTEREST: The Department will not consider expanded letters of interest (ELOI) not in conformance with response requirements. Read the preamble for ELOI requirements. . RESPONSE PROCEDURE: The ELOI and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the ELOI is received by the Department's server by the ELOI due date and time. Only one (1) ELOI per legal entity is acceptable. All ELOI files should be sent to: d4.designbuild@dot.state.fl.us and must be received by the response deadline shown below: ELOI's shall be submitted by close of business (5:00 PM) Eastern Time on Friday, July 19, 2013. Resumes, Organizational Charts and 3 pages of Performance History for Firms having no previous performance history with the Department and/or to firms whose performance history with the Department is no longer current (older than 5 years) are not considered in the 10 page count/limitation. . RESUMES: Provide a one page resume for each of the 9 key positions noted in the preamble. For this project the Department has established project specific requirements for Construction ITS Superintendent and Design ITS Engineer of Record resumes. . PHASE I ASSIGNED SCORING POINTS: 1. Past performance evaluations (4 points maximum) Contractor grades, Design Consultant grades, Performance history with other state agencies if none with the Department. 2. Project Experience and Resources (7 points maximum) Design-Build experience of the Contractor and Designer, Similar type of work experience, Contractor experience modification rating (current year), Firm organization, staffing plan, resources, location, Environmental Record. 3. Project Approach and Understanding of Critical Issues (9 points maximum): Outline plan for completing the work, Approach and Understanding, Coordination Plan. 4. Other content in the letter of interest (0 maximum points) . RESTRICTIONS ON CONSULTANTS: In accordance with Restrictions on Consultants' Eligibility to Compete for Department Contracts (Topic 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 4 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. Prime Consultant: Reynolds, Smith & Hills, Inc. (Contract C8S79). Subconsultants: HDR, Inc., GCME, Inc., Keith and Associates, Inc., Media Relations Groups, LLC. Other firms: Miller-Legg (Contract C8U03) . FIRMS DECLARATION TO CONTINUE TO PHASE II: All responsive firms must declare their intent to continue on to Phase II by notifying the Department Office in writing no later than Wednesday, August 21, 2013 by close of business (5:00 pm) eastern time. Submit notification by email to d4.designbuild@dot.state.fl.us View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 01JUL2013 PhaseI Selection Cmte. Meeting :  26AUG2013 Time:  08:15AM ELOI Scores Notification Date :  26AUG2013 Time:  11:00AM Deadline for Election to Participate in Ph. II :  28AUG2013 Time:  05:00PM Posting of Shortlist :  29AUG2013 Time:  11:00AM Mand. Pre-Proposal Meeting Date:  16SEP2013 Time:  08:30AM PhaseII Tech. Proposal Due Date:  25NOV2013 Time:  11:00AM Price Proposal Due Date :  17JAN2014 Time:  11:00AM Proposal Opening Date :  17JAN2014 Time:  11:00AM Final Selection Meeting Date :  23JAN2014 Time:  08:30AM Posting of Award :  23JAN2014 Time:  9:01AM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 0 COMMUNITY ASPHALT CORP. 18.5 71.0 911 $86,146,800 0 THE DE MOYA GROUP, INC. 17.3 69.0 930 $123,796,800 1 RANGER CONSTRUCTION INDUSTRIES 18.8 73.8 930 $85,270,000 Firms not participating in PhaseII PhaseI Score ASTALDI CONSTRUCTION CORP 16.3 M.C.M. CORP. 15.5 ODEBRECHT CONSTRUCTION, INC. 15.0 PRINCE CONTRACTING, LLC. 16.3 ************************************************************ DISTRICT 5 ************************************************************ Professional Services Consultant Projects Contract Number : 15526 Major Project Selection Procedure: LOR, Technical Proposal & Interview Financial Management Number(s): 43609413201 Major Work : 11.0 - Eng Contract Admin and Management Minor Work : Project Description: General Engineering Consultant Services. Provide Districtwide General Engineering Consultant (GEC) Services to the Florida Department of Transportation District 5. Project Manager : ZORNAN, DENNISSE Advertisement Status : Planned Date of Advertisement : 04AUG2014 Shortlst Selection Date :  08SEP2014 Time:  08:15AM Final Selection Meeting Date :  10NOV2014 Time:  08:15AM ************************************************************ Contract Number : 15525 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43244313201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Project Description: SR 520 from Tucker Lane to Aurora Road Project Manager : Trivett, Heidi Special Notes: Small Business Set Aside Advertisement Status : Planned Date of Advertisement : 28JUL2014 Shortlst Selection Date :  02SEP2014 Time:  08:15AM Final Selection Meeting Date :  20OCT2014 Time:  08:15AM ************************************************************ Contract Number : 15554 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43067813201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Project Description: SR 5 (US1) from South Street to Magnolia Project Manager : johnstone, heather See Standard Notes Above: 9 Special Notes: Please note the following changes to the advertised scope as of 5:00 pm on July 9, 2014: *Minor work group 4.1.2 has been added *Section 2.5 Structures Misc. to include "Concrete box culvert extension. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 18JUL2014 Shortlst Selection Date :  11AUG2014 Time:  08:15AM Final Selection Meeting Date :  29SEP2014 Time:  08:15AM Response Deadline : 18JUL2014 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan Phone: (386)943-5528 ************************************************************ Contract Number : 15524 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43360716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: CEI Group 139 SR 50 Bridges over Econolockhatchee River Design Build CEI Project Manager : Oakes, Jeff See Standard Notes Above: 4,9,10 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 30JUN2014 Response Deadline : 11JUL2014 Shortlst Selection Date :  11AUG2014 Time:  08:15AM Final Selection Meeting Date :  11AUG2014 Time:  08:15AM Response Deadline : 11JUL2014 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan Phone: (386)943-5528 ************************************************************ Contract Number : 15516 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43360512201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.5 - Geotechnical Speciality Lab Testing Project Description: SR 501 from Michigan Ave to Industry Road Project Manager : Stanger, Brian View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 23JUN2014 Shortlst Selection Date :  21JUL2014 Time:  08:15AM Shortlist Selection Posting :  21JUL2014 Final Selection Meeting Date :  02SEP2014 Time:  08:15AM Shortlisted Firms: GMB ENGINEERS & PLANNERS, INC. OSIRIS 9 CONSULTING, LLC SCALAR CONSULTING GROUP INC. ************************************************************ Contract Number : 15521 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42823813202 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Minor Work : Project Description: I-95 Interchange at Viera Blvd Project Manager : LaCorte, Thomas View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02JUN2014 Shortlst Selection Date :  07JUL2014 Time:  08:15AM Shortlist Selection Posting :  07JUL2014 Final Selection Meeting Date :  25AUG2014 Time:  08:15AM Shortlisted Firms: DRMP, INC. JONES, WOOD & GENTRY, INC. LOCHRANE ENGINEERING INCORPORATED ************************************************************ Contract Number : 15522 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43240223201 43442413201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Project Description: SR 500/US 441 from CR 437 (Orange Ave) to N of Junction/ Wesley Rd US 441 from S of Taft Vineland to S of Beach Line Expressway Project Manager : Isaac, Naziru Special Notes: Small Business Set Aside View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02JUN2014 Longlist(Tech. Rev. Cmte.) Date:  17JUL2014 Time:  01:15PM Shortlst Selection Date :  21JUL2014 Time:  08:15AM Shortlist Selection Posting :  21JUL2014 Final Selection Meeting Date :  25AUG2014 Time:  08:15AM Shortlisted Firms: CONNELLY & WICKER INC. GHYABI & ASSOCIATES, INC. ICON CONSULTANT GROUP, INC. ************************************************************ Contract Number : 15518 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43505513201 43505413201 43505813201 Major Work : 7.2 - Lighting Minor Work : Project Description: I-95 (SR 9) Lighting Project Manager : Bauknecht, Brad View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Longlist(Tech. Rev. Cmte.) Date:  18JUN2014 Time:  09:00AM Shortlst Selection Date :  23JUN2014 Time:  08:15AM Shortlist Selection Posting :  23JUN2014 Final Selection Meeting Date :  11AUG2014 Time:  08:15AM Shortlisted Firms: COMPREHENSIVE ENGINEERING SERVICES DRMP, INC. SRD, INC. ************************************************************ Contract Number : 15523 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 43487116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : Project Description: CEI Group 140 US 92 International Speedway Blvd Pedestrian Bridges Design Build CEI Project Manager : Wabi, Paul View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 19MAY2014 Longlist(Tech. Rev. Cmte.) Date:  16JUN2014 Time:  01:00PM Shortlst Selection Date :  30JUN2014 Time:  08:15AM Tech. Rev. Cmte Meeting :  08JUL2014 Time:  09:00AM Final Selection Meeting Date :  30JUN2014 Time:  08:15AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  17JUL2014 Time:  09:00AM Rank Consultant 1 REYNOLDS, SMITH AND HILLS CS,INC. 2 CDM SMITH INC. 3 ENGLAND, THIMS & MILLER, INC. ************************************************************ Contract Number : 15549 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43585911201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.5 - Subarea/Corridor Planning Minor Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: West SR 50 Corridor Planning Study from US 301 to CR 33 Project Manager : MOORE, JOHN P Special Notes: No Scope of Services meeting will be held. The Interview Sessions will be held at our FDOT Kepler Road office at 1650 N. Kepler Road, DeLand. The following meetings will also be held at 1650 N. Kepler Kepler Road in DeLand: Technical Review Committee will meet 9:30 am July 28, 2014 Technical Review Committee will meet 11:30 am July 28, 2014 Technical Review Committee will meet 2:30 pm July 28, 2014 View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Shortlst Selection Date :  23JUN2014 Time:  08:15 Shortlist Selection Posting :  23JUN2014 Tech. Rev. Cmte Meeting :  16JUL2014 Time:  08:30AM 2nd Tech Rev. Cmte Meeting :  16JUL2014 Time:  10:30AM 3rd Tech Rev. Cmte Meeting :  16JUL2014 Time:  01:30PM 4th Tech Rev. Cmte Meeting :  30JUN2014 Time:  01:00PM Final Selection Meeting Date :  11AUG2014 Time:  08:15AM Shortlisted Firms: ATKINS NORTH AMERICA, INC. KITTELSON & ASSOCIATES, INC. RUMMEL, KLEPPER & KAHL, LLP ************************************************************ Contract Number : 15550 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41662013204 Major Work : 99.0 - Other Professional Services Minor Work : Project Description: Districtwide Value Engineering Project Manager : Nester, Staci View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Shortlst Selection Date :  23JUN2014 Time:  08:15AM Shortlist Selection Posting :  23JUN2014 Scope Meeting Date :  30JUN2014 Time:  09:00AM Final Selection Meeting Date :  11AUG2014 Time:  08:15AM Shortlisted Firms: AMEC ENVIRONMENT & INFRASTRUCTURE, CIVIL SERVICES INC. TBE GROUP, INC. ************************************************************ Contract Number : 15514 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43442513201 43469413201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: SR 436 from N of SR 50 to N of Old Cheney Highway SR 552 at SR 436 Project Manager : Shams, Taleb View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Shortlst Selection Date :  23JUN2014 Time:  08:15AM Shortlist Selection Posting :  23JUN2014 Final Selection Meeting Date :  04AUG2014 Time:  08:15AM Shortlisted Firms: COMPREHENSIVE ENGINEERING SERVICES DRMP, INC. LOCHRANE ENGINEERING INCORPORATED ************************************************************ Contract Number : 15515 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41706913203 Major Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design Minor Work : 3.1 - Minor Highway Design 5.4 - Bridge Load Rating 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: Districtwide Consultant Engineering Service Structures Design Project Manager : skofronick, gary View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Shortlst Selection Date :  16JUN2014 Time:  08:15AM Shortlist Selection Posting :  17JUN2014 Final Selection Meeting Date :  04AUG2014 Time:  08:15AM Shortlisted Firms: JOHNSON, MIRMIRAN & THOMPSON SAI CONSULTING ENGINEERS, INC. URS CONSTRUCTION SERVICES, INC. ************************************************************ Contract Number : 15513 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 23798426212 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) Project Description: CEI Group 136 Deland Operations Hybrid Contract Project Manager : Schmitt, Alida J View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21APR2014 Longlist(Tech. Rev. Cmte.) Date:  15MAY2014 Time:  09:00AM Shortlst Selection Date :  02JUN2014 Time:  08:15AM Final Selection Meeting Date :  02JUN2014 Time:  08:15AM Final Selection Posting Date :  05JUN2014 1st Negotiations Meeting :  17JUN2014 Time:  09:00AM Rank Consultant 1 PI CONSULTING SERVICES, LLC 2 RUMMEL, KLEPPER & KAHL, LLP 3 REYNOLDS, SMITH AND HILLS CS,INC. ************************************************************ Contract Number : 15547 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42344696202 42344616201 Major Work : 10.1 - Rdwy Construction Engineering Inspection 10.4 - Minor Bridge & Misc. Structures(CEI) Minor Work : 10.5.1 - Major Bridge(CEI) - Concrete 10.5.2 - Major Bridge(CEI) - Steel Project Description: Consultant CEI Group 135-Sunrail Phase II FPID No. 423446-9-62-02 CEI Services for Central Florida Communter Rail Transit System Phase II South from Sand Lake Road in Orange County to Poinciana Blvd in Osceola County. FPID No. 423446-1-62-01 CEI Services for Central Florida Commuter Rail Transit (CRT) - Phase II (Optional Services) North from Debary to Deland. It is the Department's intention to group projects to achieve economic efficiency through shared use of CEI personnel, facilities, equipment and other resources across multiple projects. If additional projects not listed under the "FM numbers" are let within Orange, Osceola, Volusia, Seminole counties between July 2014 and June 2017, the Department may, at its sole discretion assign required CEI services for those projects to the contract resulting from the advertisement. The Department encourages the utilization of subconsultants to accomplish this work effort. PLEASE NOTE: Consultant teaming will be a consideration factor in selection. Project Manager : Patel, Shailesh View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21APR2014 Shortlst Selection Date :  30JUN2014 Time:  08:15AM Shortlist Selection Posting :  30JUN2014 Final Selection Meeting Date :  21JUL2014 Time:  08:15AM Final Selection Date Not Posted Shortlisted Firms: HNTB CORPORATION JACOBS ENGINEERING GROUP, INC. URS CORPORATION SOUTHERN ************************************************************ Contract Number : 15512 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43065713201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Project Description: SR 5 (US 1) from Law Street to Post Road, Brevard County Project Manager : Marks, Jerald Special Notes: Small Business Set Aside View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Longlist(Tech. Rev. Cmte.) Date:  09MAY2014 Time:  10:00AM Shortlst Selection Date :  19MAY2014 Time:  08:15AM Shortlist Selection Posting :  21MAY2014 Tech. Rev. Cmte Meeting :  14AUG2014 Time:  09:00AM 2nd Tech Rev. Cmte Meeting :  09JUN2014 Time:  09:20AM 3rd Tech Rev. Cmte Meeting :  09JUN2014 Time:  11:20AM 4th Tech Rev. Cmte Meeting :  09JUN2014 Time:  02:20PM Final Selection Meeting Date :  07JUL2014 Time:  08:15AM Final Selection Posting Date :  07JUL2014 1st Negotiations Meeting :  24JUL2014 Time:  09:00AM 2nd Negotiations Meeting :  14AUG2014 Time:  09:00AM 3rd Negotiations Meeting :  20AUG2014 Time:  09:00AM Rank Consultant 1 MCCRANIE & ASSOCIATES, INC. 2 SCALAR CONSULTING GROUP INC. 3 BRINDLEY PIETERS & ASSOC.,INC. ************************************************************ Contract Number : 15507 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43243713201 43441713201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Project Description: SR 5/US-1 from North of Golden Knights Blvd (MP 32.504) to South of SR 50 (Cheney Highway)(MP 35.500),Brevard County Contract is associated with FM# 434417-1-32-01 Project Desc. SR A1A from South of George King Boulevard Overpass (MP 3.149) to SR 528 (MP 4.114), Brevard County Both projects are advertised under this contract. Project Manager : Isaac, Naziru Special Notes: There are two FM #'s associated with this advertisement/ contract. The scope for both FM # have been combined. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Shortlst Selection Date :  05MAY2014 Time:  08:15AM Shortlist Selection Posting :  05MAY2014 Scope Meeting Date :  14MAY2014 Time:  09:00AM Final Selection Meeting Date :  30JUN2014 Time:  08:15AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  14AUG2014 Time:  09:30AM Rank Consultant 1 MOFFATT & NICHOL, INC. 2 STANTEC CONSULTING SERVICES INC. 3 COMPREHENSIVE ENGINEERING SERVICES ************************************************************ Contract Number : 15510 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41376113201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Project Description: SR 514 from Weber Road to Corey Road Project Manager : Marks, Jerald View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Shortlst Selection Date :  12MAY2014 Time:  08:15AM Shortlist Selection Posting :  12MAY2014 Tech. Rev. Cmte Meeting :  05JUN2014 Time:  09:45AM 2nd Tech Rev. Cmte Meeting :  05JUN2014 Time:  11:45AM 3rd Tech Rev. Cmte Meeting :  05JUN2014 Time:  02:45PM Final Selection Meeting Date :  30JUN2014 Time:  08:15AM Final Selection Posting Date :  30JUN2014 Rank Consultant 1 MOFFATT & NICHOL, INC. 2 COMPREHENSIVE ENGINEERING SERVICES 3 INFRASTRUCTURE ENGINEERS, INC. ************************************************************ Contract Number : 15511 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 24108423211 24108426211 Major Work : 9.1 - Soil Exploration 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 10.1 - Rdwy Construction Engineering Inspection 10.3 - Construction Materials Inspection Minor Work : 9.2 - Geotechnical Classification Lab Testing 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: Materials and Research Continuing Services Contract Project Manager : Davis, Jack Special Notes: Small Business Set Aside View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Shortlst Selection Date :  12MAY2014 Time:  08:15AM Shortlist Selection Posting :  12MAY2014 Final Selection Meeting Date :  30JUN2014 Time:  08:15AM Final Selection Posting Date :  30JUN2014 Rank Consultant 1 PAGE ONE CONSULTANTS, INC. 2 ELLIS & ASSOCIATES, INC. 3 RADISE INTERNATIONAL, L.C. ************************************************************ Contract Number : 15505 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41707413203 Major Work : 3.1 - Minor Highway Design 3.2 - Major Highway Design 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge Project Description: Districtwide Quality Assurance/Plans Review Project Manager : BELL, RICHARD View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 31MAR2014 Longlist(Tech. Rev. Cmte.) Date:  01MAY2014 Time:  09:00AM Shortlst Selection Date :  05MAY2014 Time:  08:15AM Shortlist Selection Posting :  05MAY2014 Final Selection Meeting Date :  23JUN2014 Time:  08:15AM Final Selection Posting Date :  23JUN2014 1st Negotiations Meeting :  07JUL2014 Time:  02:30PM 2nd Negotiations Meeting :  08JUL2014 Time:  01:30PM Rank Consultant 1 MOFFATT & NICHOL, INC. 2 AECOM TECHNICAL SERVICES, INC. 3 ENGLAND, THIMS & MILLER, INC. ************************************************************ Contract Number : 15508 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 23797413215 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 3.1 - Minor Highway Design 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP8 - Surveying & Mapping Project Description: Continuing Services Contract for Traffic Operations Project Manager : Michalos, Jacqueline Special Notes: Contract 15509 is associated with this advertisement. A firm will be selected for both contracts under this advertisement View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24MAR2014 Longlist(Tech. Rev. Cmte.) Date:  28APR2014 Time:  01:30PM Shortlst Selection Date :  05MAY2014 Time:  08:15AM Shortlist Selection Posting :  05MAY2014 Tech. Rev. Cmte Meeting :  05JUN2014 Time:  09:15AM 2nd Tech Rev. Cmte Meeting :  05JUN2014 Time:  10:45AM 3rd Tech Rev. Cmte Meeting :  05JUN2014 Time:  12:15PM 4th Tech Rev. Cmte Meeting :  05JUN2014 Time:  02:30PM Final Selection Meeting Date :  30JUN2014 Time:  08:15AM Final Selection Posting Date :  30JUN2014 1st Negotiations Meeting :  24JUL2014 Time:  09:00AM 2nd Negotiations Meeting :  29JUL2014 Time:  09:00AM Rank Consultant 1 TRAFFIC ENGINEERING DATA SOLUTIONS, 2 FALLER, DAVIS & ASSOCIATES, INC. 3 GMB ENGINEERS & PLANNERS, INC. 4 GRIMAIL CRAWFORD, INC. 5 GHYABI & ASSOCIATES, INC. ************************************************************ Contract Number : 15503 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43442613201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Project Description: SR 482 (Sand Lake Road) from E of Goldensky Lane to E of Lake Gloria Blvd . Please include your financial project numbers and your firm name in the subject line of your E-mail response to this advertisement. . All meetings will be held at the DeLand District Office located at 719 South Woodland Boulevard, DeLand, Florida 32720. Any additional and subsequent public meetings notices will be posted in the lobby of the District Office, 719 S. Woodland Boulevard, DeLand, Florida 32720. Project Manager : Kazmierczak, Storm Special Notes: Small Business Set Aside View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  16APR2014 Time:  09:00AM Shortlst Selection Date :  21APR2014 Time:  08:15AM Shortlist Selection Posting :  21APR2014 Final Selection Meeting Date :  09JUN2014 Time:  08:15AM Final Selection Posting Date :  09JUN2014 Rank Consultant 1 CONNELLY & WICKER INC. 2 SUNCOAST DESIGN SERVICES, INC. 3 E & E ENGINEERS, INC. ************************************************************ Contract Number : 15506 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 41199813212 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Under-Utilized Work Groups: GROUP8 - Surveying & Mapping Project Description: Districtwide Survey and Mapping Project Manager : LaCorte, Thomas View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Shortlst Selection Date :  21APR2014 Time:  08:15AM Shortlist Selection Posting :  21APR2014 Final Selection Meeting Date :  16JUN2014 Time:  08:15AM Final Selection Posting Date :  16JUN2014 Rank Consultant 1 AMEC ENVIRONMENT & INFRASTRUCTURE, 2 TBE GROUP, INC. 3 LOCHRANE ENGINEERING INCORPORATED ************************************************************ Contract Number : 15504 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43465813201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP8 - Surveying & Mapping Project Description: SR 50 from N Bay Lake Ave to Fiske Ave Project Manager : Kazmierczak, Storm View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10MAR2014 Longlist(Tech. Rev. Cmte.) Date:  15APR2014 Time:  09:30AM Shortlst Selection Date :  21APR2014 Time:  08:15AM Shortlist Selection Posting :  21APR2014 Final Selection Meeting Date :  09JUN2014 Time:  08:15AM Final Selection Posting Date :  09JUN2014 1st Negotiations Meeting :  19JUN2014 Time:  08:15AM 2nd Negotiations Meeting :  15JUL2014 Time:  09:00AM 3rd Negotiations Meeting :  18JUL2014 Time:  09:00PM 4th Negotiations Meeting :  21JUL2014 Time:  09:00AM Rank Consultant 1 POND & COMPANY 2 ICON CONSULTANT GROUP, INC. 3 FISHER & ARNOLD, INC. ************************************************************ Contract Number : 15501 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Under-Utilized Work Groups: GROUP21 - Acquisition, Negot, Closing & Order of Taking GROUP24 - Acquisition Relocation Assistance GROUP25 - Right of Way Clearing and Leasing Project Description: Right of Way Consultant Services Continuing Services Contract Project Manager : ADKINS, JACK Special Notes: It is the Department's intent to select two consultants from one advertisement. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 03MAR2014 Shortlst Selection Date :  07APR2014 Time:  08:15AM Shortlist Selection Posting :  07APR2014 Final Selection Meeting Date :  12MAY2014 Time:  08:15AM Final Selection Posting Date :  12MAY2014 Rank Consultant 1 HDR ENGINEERING, INC. 2 G-A-I CONSULTANTS, INC. 3 AMERICAN ACQUISITION GROUP, LLC 4 FLORIDA ACQUISITION & APPRAISAL,INC 5 RTD GROUP, LLC ************************************************************ Contract Number : 14544 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Project Description: Districtwide Design 119 Project Manager : Broxton, Yvonne Special Notes: This contract is reserved for Small Businesses. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17FEB2014 Shortlst Selection Date :  17MAR2014 Time:  08:15AM Shortlist Selection Posting :  17MAR2014 Final Selection Meeting Date :  05MAY2014 Time:  08:15AM Final Selection Posting Date :  05MAY2014 Rank Consultant 1 SRD, INC. 2 LOCHRANE ENGINEERING INCORPORATED 2 PATEL, GREENE & ASSOCIATES, PLLC ************************************************************ Contract Number : 14545 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP8 - Surveying & Mapping GROUP9 - Soil Exploration, Materials Testing Project Description: Districtwide Miscellaneous Design No. 120 . Please include your financial project numbers and your firm name in the subject line of your E-mail response to this advertisement. . All meetings will be held at the DeLand District Office located at 719 South Woodland Boulevard, DeLand, Florida 32720. Any additional and subsequent public meeting notices will be posted in the lobby of the District Office, 719 S. Woodland Boulevard, DeLand, Florida 32720. Project Manager : Broxton, Yvonne View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17FEB2014 Longlist(Tech. Rev. Cmte.) Date:  13MAR2014 Time:  08:30AM Shortlst Selection Date :  17MAR2014 Time:  08:15AM Shortlist Selection Posting :  17MAR2014 Final Selection Meeting Date :  28APR2014 Time:  08:15AM Final Selection Posting Date :  28APR2014 Rank Consultant 1 PROTEAN DESIGN GROUP, INC. 2 INFRASTRUCTURE ENGINEERS, INC. 3 INWOOD CONSULTING ENGINEERS, INC. ************************************************************ Contract Number : 14513 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43242113201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Project Description: SR 40 from NE 25th St to W of NE 10th St Project Manager : VAN GUNDY, SARAH Special Notes: This project is set aside for Small Business Enterprises. The Scope of services was modified on 1/7/2014. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 06JAN2014 Longlist(Tech. Rev. Cmte.) Date:  04FEB2014 Time:  09:00AM Shortlst Selection Date :  10FEB2014 Time:  08:15AM Shortlist Selection Posting :  10FEB2014 Final Selection Meeting Date :  31MAR2014 Time:  08:15AM Final Selection Posting Date :  31MAR2014 1st Negotiations Meeting :  12MAY2014 Time:  09:90AM Rank Consultant 1 PETERS AND YAFFEE, INC. 2 MCCRANIE & ASSOCIATES, INC. 3 E & E ENGINEERS, INC. ************************************************************ Contract Number : 14534 Major Project Selection Procedure: LOR and Written Technical Proposal Financial Management Number(s): 41245517202 Major Work : 5.1 - Conventional Bridge Inspection Minor Work : 4.1.1 - Miscellaneous Structures Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: DISTRICTWIDE TRAFFIC SIGNAL MAST ARM INSPECTION Project Manager : Kneale, Ronnie Special Notes: The Scope of services was modified on 1/7/2014. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 06JAN2014 Longlist(Tech. Rev. Cmte.) Date:  30JAN2014 Time:  09:00AM Shortlst Selection Date :  04FEB2014 Time:  08:15AM Shortlist Selection Posting :  07FEB2014 Final Selection Meeting Date :  17MAR2014 Time:  08:15AM Final Selection Posting Date :  17MAR2014 1st Negotiations Meeting :  03APR2014 Time:  09:00AM Rank Consultant 1 AYRES ASSOCIATES INC 2 KISINGER CAMPO & ASSOC. CORP. 3 VOLKERT CONSTRUCTION SERVICES, INC. 4 BURGESS & NIPLE, INC. 5 OM ENGINEERING SERVICES, INC. ************************************************************ Contract Number : 14548 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 4337181 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP8 - Surveying & Mapping Project Description: Volusia Connector Systems Planning Study Project Manager : ACOSTA-ANDERSON, LIBERTAD Special Notes: The project will evaluate the feasibility of providing enhanced transit service between Orange City, Florida and Daytona Beach International Airport in Daytona Beach, Florida. In addition, a high level evaluation will be developed for transit service to the Seminole County line. This study is being conducted in coordination and consultatation with, including but not limited to, Volusia Transportation Planning Organization (TPO); the cities of Debary, Orange City, DeLand, and Daytona Beach; Volusia County; Votran; and the Daytona Beach International Airport. EXECUTION OF THIS CONTRACT IS CONTIGENT UPON RECEIPT OF LOCAL FUNDS Please include the financial project number and your firm name in the subject line of your e-mail response to this a All meetings will be held at the District 5 Office located at 719 South Woodland Boulevard, DeLand, Florida 32720. A additional and subsequent public meeting notices will be posted in the lobby of the District 5 Office. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 30DEC2013 Longlist(Tech. Rev. Cmte.) Date:  04FEB2014 Time:  09:00AM Shortlst Selection Date :  10FEB2014 Time:  08:15AM Shortlist Selection Posting :  10FEB2014 Scope Meeting Date :  17FEB2014 Time:  10:00PM Final Selection Meeting Date :  31MAR2014 Time:  08:15AM Final Selection Posting Date :  31MAR2014 Rank Consultant 1 PARSONS BRINCKERHOFF, INC. 2 JACOBS ENGINEERING GROUP, INC. 3 STV INCORPORATED ************************************************************ Contract Number : 14539 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42821323201 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP8 - Surveying & Mapping Project Description: I-75 (SR 93) from North of US 27 to Alachua County Line. . Please include the financial project numbers and your firm name in the subject line of your e-mail response to this advertisement. . All meetings will be held at the DeLand District Office located at 719 South Woodland Boulevard, DeLand, Florida 32720. Any additional and subsequent public meeting notices will be posted in the lobby of the District Office, 719 S. Woodland Blvd., DeLand, FL 32720. Project Manager : Miller, James View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 09DEC2013 Longlist(Tech. Rev. Cmte.) Date:  14JAN2014 Time:  01:00PM Shortlst Selection Date :  21JAN2014 Time:  08:15AM Shortlist Selection Posting :  21JAN2014 Scope Meeting Date :  27JAN2014 Time:  09:30AM Final Selection Meeting Date :  24FEB2014 Time:  08:15AM Final Selection Posting Date :  24FEB2014 Rank Consultant 1 METRIC ENGINEERING, INC. 2 URS CORPORATION SOUTHERN 3 ATKINS NORTH AMERICA, INC. ************************************************************ Contract Number : 14546 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 24271526201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) 10.5.1 - Major Bridge(CEI) - Concrete 10.5.2 - Major Bridge(CEI) - Steel Project Description: I-95 Design Build CEI 24271526201 Project Manager : Grube, Dwight View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 02DEC2013 Shortlst Selection Date :  23DEC2013 Time:  08:15AM Shortlist Selection Posting :  23DEC2013 Final Selection Meeting Date :  04FEB2014 Time:  08:15AM Final Selection Posting Date :  04FEB2014 1st Negotiations Meeting :  21FEB2014 Time:  08:30AM Rank Consultant 1 JACOBS ENGINEERING GROUP, INC. 2 RUMMEL, KLEPPER & KAHL, LLP 3 PARSONS BRINCKERHOFF, INC. 4 RS&H, INC. ************************************************************ Contract Number : 13506 Major Project Financial Management Number(s): 43180712201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 13.5 - Subarea/Corridor Planning Project Description: Sanford Amtrak Autotrain Gateway Improvements Project Manager : McGehee, Mary Special Notes: THE DEPARTMENT IS TERMINATING THIS SOLICITATION REJECTING ALL SUBMITTALS WITH THE INTENT TO REISSUE A SOLICITATIION FOR THE WORK REQUIRED AT A LATER DATE. SEE AD NUMBER 13535 Advertisement Status : Advertised Date of Advertisement : 26MAR2012 Response Deadline : 06APR2012 Shortlist Selection Date Not Available Final Selection Date Not Posted Response Deadline : 06APR2012 Respond To: d5.profserv@dot.state.fl.us Attn.: Michelle Sloan Phone: (386)943-5528 ************************************************************ Design/Build Projects Procurement Number : E5W11 Financial Management Number(s): 24262635201 Project Description: Interstate 75 (SR 93) Improvements from South of CR 470 to South of FLorida's Turnpike (7.6 Miles) FM NO. 242626-3-52-01 FAN.0751-185-I, Sumter County The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit and construction of Interstate 75 (SR-93) six lane improvements in Sumter County, Florida from south of CR 470 to south of the Florida's Turnpike interchange. The project includes the widening of I-75 from four to six lanes within the project limits and a complete interchange reconstruction at CR 470, including improvements on CR 470 from CR 490 to CR 527, and improvements to CR 475 from south of the I-75 off-ramp to CR 470. Improvements include roadway, drainage, bridges, walls, miscellaneous structure, signing and pavement marking, signalization, intelligent transportation systems, lighting, geotechnical, utilities, subsurface utility engineering, public involvement and environmental permitting. The southern project limit shall provide six lanes at approximately MP 13.219 and tie to the on-going project to the south (FIN 242646-2-52-01). The northern project limit interface to the on-going widening project to the north The Project work includes new pavement, drainage system, bridge construction, box culvert extensions, median barrier, signing and pavement markings, traffic signals and lighting at the CR 470 interchange, an at-grade railroad crossing, sidewalk and driveways, and milling and resurfacing with SPECIAL NOTE: Design Build firms that would like to receive documents must attend the Mandatory Pre-Proposal meeting. After the Pre-proposal meeting the Department will make the Request for Proposal, Attachments, and other bid documents available through the Contract Proposal Processing (CPP) Online ordering system to the firms that were present at the Pre-Proposal meeting. The Contract Proposal Processing eordering/ Attendance at the pre-proposal meeting is mandatory. Any proposer failing to attend will be deemed non-responsive and automatically disqualified from further consideration. The purpose of this meeting is to provide a forum for the Department to discuss with all concerned parties the proposed Project, the design and construction criteria, CPM schedule, and method of compensation, instructions for submitting proposals, design exceptions/variances, and other relevant issues. In the event that any discussions at the pre-proposal meeting require, in the Department's opinion, offical additions, deletions, or clarifications of the Request for Proposal, the Design and Construction Criteria, or any other document, the Department will issue a written addendum to the Request for Proposal as the or discussions, which take place at the pre-proposal meeting will be binding on the Department. FHWA will be invited on oversight Projects, in order to discuss the Project in detail and to clarify any concerns. Proposers shall direct all questions to the Departments Question and Answer website https://www3b.dot.state.fl.us/BidQuestionsAndAnswers/ Bids and Technical Proposals will be due at the time shown on the Request for Proposal Schedule. All bids must be submitted through Bid Express. Technical Proposals shall be The Technical Proposal and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the Technical and Price Proposals are received by the Department's server by the due date and time. Only (1) Technical Proposal per legal entity Incentinve- Disincentivefor A+B are described in detail in The following summarizes the elements that are included in the Incentive-Disincentive for the Project. Project Completion: The project includes an Incentive-Disincentive provision for the completion and final acceptance of all construction in Incentive-Disincentive as defined in Section 8-13.1 of the Design Build Division I Specifications for the project. restriction unless an exception is obtained: URS Corp. C8K36 ALTERNATIVE TECHNICAL CONCEPTS: Description:Contract No. E5W11 competitive Bids and Proposals from Proposers for the design shall provide six lanes at approximately MP 20.814 and (FPN 406110-2-52-01). the Request for Proposal, Attachments, and other bid Online Ordering System can be accessed at: Department determines is appropriate. No oral representation submitted by e-mail to: d5.designbuild@dot.state.fl.us. required cross slope correction. https://www3.dot.state.fl.us/ContractProposalProcessingOnlin the Design Build Division I Specifications for the project. Specifications for the project. This milestone involves an retained to perform services on this Project are subject to A+B pertaining to the completion of the full project. The accordance with Section 5-11 of the Design-Build Division I The Department will make one ATC meeting available to each proposing Design Build Firm for this project. ATC meetings will be held only upon request and are not mandatory. Any Request for Proposal document. NOT TO EXCEED BUDGET AMOUNT OR MAXIMUM BUDGET AMOUNT OR accompany each Bid/Price Proposal in excess of $150,000. A Extimated Contract Time: 1000 days Proposal.aspx/SearchProposal is acceptable.The Contractor or Lead Design firm shall not In accoradance with RESTRICTION ON CONSULTANTS' ELIGIBILITY firm wishing to schedule an ATC meeting must do so by the BUDGET AMOUNT* $48,957,302.00 *Actual Commitment and final execution of thiscontract is availability of funds.The Department reserves the right to check or draft in any amount less than five percent (5%) Of the actual Bid/Proposal will invalidate the Bid/Price Proposal. Bid Bonds shall conform to DOT Form No. 375-020-34 furnished with the Bid/Price Proposal. team with other Proposers to submit more than one proposal. Special Note: This project involves Incentive-Disincentive provision for TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this project and are restricted from participation on a Design-Build Firm without approval from the D5 Secretary. The Firms identified below may not represet a comprehensive list. Firms not listed below who performed services or who are later date and time indicated in the Schedule of Events of the contingent upon an approved legislative budget and A proposal Guarantee of not less than 5% of the total actual Bid/Price Proposal in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Bid Bond made payable to the Florida Department of Transportation must Notice to Contractor/Consultants: Advertisement: The Requirements, Terms and Conditions contained in the Notice to Contractors/Consultants at the top of this webpage are applicable to this advertisement and made a part hereof. Design Build Firms, Contractors and Consultants are responsible for reading and complying with those Requirements, Terms and Conditions. reject all proposals and/or to waive minor irregularities. Project Manager : Shams, Taleb Budget Amount : $48,957,302 Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): 1. Grading 2. Drainage 3. Flexible Paving 4. Hot Plant-Mixed Bituminous Courses Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing 13.7 - Transportation Statistics Technical Questions Should Be Addressed To: www.2.dot.state.fl.us/construction/bidquestionmain.asp DBE/MBE Requirements: DBE/MBE/SMALL BUSINESS REQUIREMENTS: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this Project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non-DBE Small Businesses. Additional DBE/MBE requirements can be found in the Notice to Contractors/Consultants at the top of this webpage. Special Notes: Technical Review Committee Members: John Tyler, P.E. Mark Robinson, P.E. Phillip Maggio, P.E. Advertisement Status : Planned Date of Advertisement : 04AUG2014 Pre-Bid Meeting Date :  11AUG2014 Time:  02:00PM Bids Due Date :  21NOV2014 Time:  02:30PM Bid Opening Date :  21NOV2014 Time:  02:30PM Tech. Rev. Cmte Meeting :  24NOV2014 Time:  02:00PM Final Selection Meeting Date :  01DEC2014 Time:  Award Committee Meeting Date :  01DEC2014 Time:  08:15AM ************************************************************ Procurement Number : E5W64 Financial Management Number(s): 42821315201 Project Description: The Department of Transpotation will issue a Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for ITS elements such as colored Dynamic Message Signs (DMS), Close Circuit Television Cameras (CCTV Cameras) and Microwave Vehicle Detector Stations (MVDS) to be installed, replaced or maintained on I-75 as specified in the RFP. The project limits are approximately 1 mile South of SR 44 to 1/2 mile north of US 27 on Interstate 75. A new 96 SM fiber optic cable shall be installed as FDOT's ITS Infrastructure Communication Network. The new backbone fiber shall be installed throughout the length of the project. The existing ITS infrastructure and sites to include CCTV, MVDS, and DMS's shall be installed to meet the RFP requirements. Colored DMS's will be installed within the project limits to include High Definition CCTVs and MVDS. The fiber tie-in point on the south side shall remain the same with the Turnpike. The fiber tie-in point on the north side shall remain in a splice vault with enclosure for future projects. Another tie-in point with the City of Ocala shall take place within the project limits with the city's recommendation. Project Manager : Miller, James Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Intelligent Transportation Systems Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies CLICK HERE FOR ADDITIONAL INFORMATION Advertisement Status : Shortlisted Date of Advertisement : 01MAY2014 Bids Due Date :  09JUN2014 Time:  02:00PM Bid Opening Date :  09JUN2014 Time:  02:00PM Final Selection Meeting Date :  16JUN2014 Time:  08:15AM Final Selection Date Not Posted Award Committee Meeting Date :  16JUN2014 Time:  08:15AM ************************************************************ Procurement Number : E5W31 Financial Management Number(s): 43360715201 Project Description: SR 50 over Econlockhatchee River . Replacement of the existing two-lane SR 50 bridges over the Econlockhatchee River with a bridge or bridges providing adequate width for three travel lanes, bicycle lanes, and pedestrian accomodations in each direction. The bridge or bridges will be striped appropriately to provide two travel lanes in each direction at this time, with the ability to re-stripe the bridge in the future to provide three travel lanes when the adjacent SR 50 is widened to three lanes in each direction. The project also includes resurfacing existing SR 50 from west of Avalon Park Blvd. to Masood Lane to accomidate restriping for bike lanes, and lighting the entire length of the project, including the new bridges. . * Not to execeed budget amount or maximum amount or $12,150,000.00.* Actual commitment and final execution of this contract is contingent upon an approved legislation budget and availability of funds. . County: Orange. . Preamble: the notivce to contractor/consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof. You are responsible for reading it. . Stipend Amount: There will be a stipend in the amount of $37,000.00. The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. Project Manager : Alexander, Todd Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Prequalification Requirements: 1) Contractor - Work Class Requirements: Intermediate Bridge Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: www.2.dot.state.fl.us/construction/bidquestionmain.asp Advertisement Status : Shortlisted Date of Advertisement : 10FEB2014 PhaseI Selection Cmte. Meeting :  10MAR2014 Time:  08:15AM ELOI Scores Notification Date :  10MAR2014 Time:  12:00PM Deadline for Election to Participate in Ph. II :  12MAR2014 Time:  02:00PM Posting of Shortlist :  12MAR2014 Time:  04:00PM PhaseII Tech. Proposal Due Date:  04AUG2014 Time:  02:30PM Final Selection Meeting Date :  11AUG2014 Time:  10:00AM ************************************************************ Procurement Number : E5W26 Financial Management Number(s): 24271525201 Project Description: Interstate I-95 from north of SR 44 to north of US 92 including the reconstruction of the I-4/US 92 Systems Interchange Work Mix: Add Lanes and Reconstruct Widening of I-95 from four to six lanes, complete construction of the I-4/SR 400 interchange, complete reconstruction of the US 92 interchange and improvements to SR 400, US 92, Bellevue Rd, and Tomoka Farms Rd. NOT TO EXCEED BUDGET AMOUNT OF MAXIMUM BUDGET AMOUNT OR BUDGET AMOUNT: $227,374,393.00 *Actual commitment and final execution of this contract contingent upon an approved legislative budget and availability of funds. ESTIMATED MAXIMUM CONTRACT TIME: 1200 Days cOUNTY: Volusia Federal Project Number: 0945-140-I Preamble: The notice to contractor/consultant preamble at the top of this webpage is applicable to this advertisement and made a part herof. You are responsible for reading it. Stipend Amount: There will be a stipend in the amount of $275,000.00. The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. Project Manager : Bauknecht, Brad Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading Drainage Flexible Paving Hot Plant-Mixed Bituminous Courses Major Bridge - Multi-Level Roadways Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 6.3.4 - Intelligent Trans Sys. Software Development 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 13.7 - Transportation Statistics Technical Questions Should Be Addressed To: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Advertisement Status : Shortlisted Date of Advertisement : 27JAN2014 PhaseI Selection Cmte. Meeting :  17MAR2014 Time:  08:15AM ELOI Scores Notification Date :  17MAR2014 Time:  12:00PM Deadline for Election to Participate in Ph. II :  19MAR2014 Time:  12:00PM Posting of Shortlist :  19MAR2014 Time:  05:00PM Mand. Pre-Proposal Meeting Date:  31MAR2014 Time:  09:00AM PhaseII Tech. Proposal Due Date:  24JUN2014 Time:  02:30PM Price Proposal Due Date :  22AUG2014 Time:  02:30PM Proposal Opening Date :  22AUG2014 Time:  02:30PM Final Selection Meeting Date :  08SEP2014 Time:  08:15AM ************************************************************ Procurement Number : E5W32 Financial Management Number(s): 43487115201 Project Description: SR 600/US 92 Pedestrian Improvements Work Mix: 9956 - Pedestrian Safety Improvements The scope of work includes all design and construction for pedestrian improvements and related items along SR 600 in the City of Daytona Beach, Volusia County (Highway Section #79060). The project begins at the Williamson Boulevard intersection (approx. MP 16.71) and also includes upgrading the Williamson Blvd. intersection with new mast arms and other intersection upgrades. The project ends west of the Midway Avenue intersection (approx. MP 18.09). The project is approximately 1.38 miles and includes both the north and south sides of SR 600. The project consists of several proposed elements intended to improve pedestrian safety and mobility along and across the SR 600 corridor, especially during special events where large crowds are present. The project will include replacement of existing sidewalks and ditches with 12' wide sidewalks and a closed drainage system. A pedestrian bridge is to be constructed over SR 600 approximately 750' west of Bill France Boulevard which will closely resemble the existing pedestrian bridge. Additional information shall be provided in the RFP package as an attachment. Aesthetic features will include landscaping, lighting, fencing, and bridge treatments. Other work includes driveway modifications and utility coordination (including modifications and relocations if necessary). NOT TO EXCEED BUDGET AMOUNT OF MAXIMUM BUDGET AMOUNT OR BUDGET AMOUNT: $16,058,284.00. *Actual commitment and final execution of this contract is contigent upon an approved legislative budget and availability of funds. ESTIMATED MAXIMUM CONTRACT TIME: 365 Days County: Volusia Federal Project Number: N/A Preamble: The notice to contractor/consultant preamble at the top of this webpage is applicable to this advertisement and made a part herof. You are responsible for reading it. Stipend Amount: There will be a stipend in the amount of $40,000.00. The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. Project Manager : Bauknecht, Brad Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): 1. Minor Bridge Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 9.1 - Soil Exploration 9.4.1 - Standard Foundation Studies 13.7 - Transportation Statistics 14.0 - Architect 15.0 - Landscape Architect Additional Bridge Design Work Types : ADDITIONAL BRIDGE DESIGN WORK TYPES: Must be prequalified in work type 4.1.2 Minor Bridge Design OR 4.2.1 Major Bridge Design - Concrete OR Major Bridge Design - Steel Technical Questions Should Be Addressed To: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Advertisement Status : Final Selection Date of Advertisement : 27JAN2014 PhaseI Selection Cmte. Meeting :  03MAR2014 Time:  08:15AM ELOI Scores Notification Date :  03MAR2014 Time:  12:00PM Deadline for Election to Participate in Ph. II :  05MAR2014 Time:  12:00PM Posting of Shortlist :  05MAR2014 Time:  05:00PM Mand. Pre-Proposal Meeting Date:  17MAR2014 Time:  09:00AM PhaseII Tech. Proposal Due Date:  28MAY2014 Time:  02:30PM Price Proposal Due Date :  10JUL2014 Time:  02:30PM Proposal Opening Date :  10JUL2014 Time:  02:30PM Final Selection Meeting Date :  14JUL2014 Time:  08:15AM Posting of Award :  14JUL2014 Time:  11:01AM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 P & S PAVING,INC. 17.0 70.0 467 $17,212,700 2 SOUTHLAND CONSTRUCTION,INC. 16.3 72.7 467 $18,375,000 3 CONE & GRAHAM INC 17.0 71.3 467 $19,280,000 Firms not participating in PhaseII PhaseI Score GIBBS & REGISTER,INC. 11.7 SEMA CONSTRUCTION, INC. 12.3 ************************************************************ Procurement Number : E5W30 Financial Management Number(s): 43214919201 Project Description: The Department of Transportation will issue a Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the replacement of sixteen (16) Dynamic Message Signs (DMS) to include structures and foundations, along with associated equipment located on Interstate 4, Interstate 95, and SR 528 at various locations in Osceola, Orange, Seminole, Volusia, and Brevard Counties. DMS replacements shall have new communication cables from DMS enclosure to new DMS maintenance cabinet and to existing local hub cabinet, but shall utilize existing power. This project requires furnishing and installing all the necessary components for fully functional Dynamic Message Signs (DMS). Existing DMS enclosures, DMS cabinets (when applicable) and ancillary cabinet equipment, structures and foundations will be removed and replaced. No ground mounted cabinet shall be removed or replaced within this project. The replacement DMS's shall be integrated into the District 5 Intellignet Transportation System (ITS) and operational at the Regional Traffic Management Center (RTMC) via the Sunguide Software. The locations of the existing DMS's are: DMS No. 1: Interstate 4 East of SR 532 Westbound (WB) DMS No. 2: Interstate 4 West of World Drive Eastbound (EB) DMS No. 3: Interstate 4 West of SR 417 Eastbound (EB) DMS No. 4: Interstate 4 East of US 192 Eastbound (EB) DMS No. 5: Interstate 4 West of SR 536 Westbound (WB) DMS No. 6: Interstate 4 East of SR 535 Wastbound (WB) DMS No. 7: Interstate 4 East of SR 535 Eastbound (EB) DMS No. 8: Interstate 95 at Mile Marker 206 Southbound (SB) DMS No. 9: Interstate 95 at Mile Marker 203.5 Southbound (SB DMS No. 10: Interstate 95 at Mile Marker 203.5 Southbound SB DMS No. 11: Interstate 95 at Mile Marker 199.3 Northbound NB DMS No. 12: Interstate 95 at Mile Marker 172 Northbound (NB) DMS No. 13: Interstate 95 at Mile Marker 270.4 Nouthbound NB DMS No. 14: Interstate 4 West of SR 44 Westbound (WB) DMS No. 15: SR 528 at I-95 Eastbound (EB) DMS No. 16: SR 528 at I-95 Westbound (WB) Option (1): DMS No. 1 thru DMS No. 16 (Full Project) Option (2): DMS No. 1 thru DMS No. 15 Option (3): DMS No. 1 thru DMS No. 14 With the maximum bid price and the use of Options, the Department's goal is to maximize the construction within the available funding. The goal of the Department is to construct as much of the scope as possible, specifically the construction of Option One (1). To accomplish this goal, the evaluation criteria for this project are different than other Design/Build projects. The Design/Build Firm that proposes the most work under the Maximum Bid Price will be selected. If two Design/Build Firms propose the same scope items, then the Technical Proposal scores as outlined in the Final Selection Formula in this RFP will be used. The selection process is contained in Section VII of this RFP. Sections VII.C, VII.D, and VII.E of this RFP detail the evaluation, scoring, and selection. Project Manager : Grant, Edward Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Intelligent Transportation System Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 9.1 - Soil Exploration 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying DBE/MBE Requirements: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12.0% commitment of total contract costs. Firms proposing for this Project shall aspire to have 9.0% or more of the total contract costs performed by DBE's and an additional 3.0% or more of the total contract costs performed by Non-DBE Small Businesses. Advertisement Status : Shortlisted Date of Advertisement : 18DEC2013 Pre-Bid Meeting Date :  17JAN2014 Time:  02:00PM Bids Due Date :  18FEB2014 Time:  02:00PM Bid Opening Date :  18FEB2014 Time:  02:00PM Tech. Rev. Cmte Meeting :  25FEB2014 Time:  02:00PM 2nd Tech Rev. Cmte Meeting :  04MAR2014 Time:  02:00PM 3rd Tech Rev. Cmte Meeting :  11MAR2014 Time:  02:00PM Final Selection Meeting Date :  10MAR2014 Time:  08:15AM Final Selection Date Not Posted ************************************************************ Procurement Number : E5W10 Financial Management Number(s): 24262625201 Project Description: Interstate 75 (SR 93) Improvements from North of Hernando County Line to South of CR 470 (13.1 Miles). Work Mix: 0213-Add lanes and reconstruct. Widening of I-75 from four to six lanes, complete reconstruction of the SR 48 interchange, and ramp reconstruction with milling and resurfacing improvements at the CR 476B/CR 673 interchange. *NOT TO EXCEED BUDGET AMOUNT OR MIXIMUM BUDGET AMOUNT OR BUDGET AMOUNT $74,122,581.* Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. **ESTIMATED CONTRACT TIME: 1350 DAYS** County: Sumter Federal Project Number(s): 0751-184-1 Preamble: The notice to contractor/consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof. You are responsible for reading it. Stipend:Amount: There will be a stipend in the amount of $90,000.00. The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. Project Manager : Shams, Taleb Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Flexible Paving Hot Plant-Mixed Bituminous Course Grading Drainage Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Technical Questions Should Be Addressed To: http://www2.dot.state.fl.us/construction/bidquestionmain.asp Advertisement Status : Final Selection Date of Advertisement : 30SEP2013 PhaseI Selection Cmte. Meeting :  25NOV2013 Time:  08:15AM ELOI Scores Notification Date :  25NOV2013 Time:  12:00PM Deadline for Election to Participate in Ph. II :  27NOV2013 Time:  12:00PM Posting of Shortlist :  27NOV2013 Time:  04:00PM Mand. Pre-Proposal Meeting Date:  09DEC2013 Time:  09:00AM PhaseII Tech. Proposal Due Date:  12MAR2014 Time:  02:30PM Price Proposal Due Date :  23APR2014 Time:  02:30PM Proposal Opening Date :  23APR2014 Time:  02:30PM Final Selection Meeting Date :  30APR2014 Time:  08:15AM Posting of Award :  08JUL2014 Time:  12:02PM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 THE MIDDLESEX CORPORATION 17.0 77.3 $76,960,400 2 COMMUNITY ASPHALT CORP. 15.3 71.7 $80,800,000 Firms not participating in PhaseII PhaseI Score ANDERSON COLUMBIA CO. INC. 12.3 D.A.B. CONSTRUCTORS, INC. 10.7 GRANITE CONSTRUCTION COMPANY 14.3 HUBBARD CONSTRUCTION COMPANY 12.3 LANE CONSTRUCTION CORPORATION 15.0 PRINCE CONTRACTING, LLC. 14.7 RANGER CONSTRUCTION INDUSTRIES,INC. 13.7 SOUTHLAND CONSTRUCTION,INC. 13.3 ************************************************************ DISTRICT 6 ************************************************************ Professional Services Consultant Projects Contract Number : 15653 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 41056817205 Major Work : 5.1 - Conventional Bridge Inspection Minor Work : SIGN INSPECTIONS DISTRICTWIDE Project Manager : FERNANDEZ, DENNIS Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 05JAN2015 Shortlst Selection Date :  23FEB2015 Time:  10:00AM Final Selection Meeting Date :  06APR2015 Time:  10:00AM ************************************************************ Contract Number : 15656 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25068633201 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping DISTRICTWIDE MISC. LOCATION Project Manager : CLARK, CHARLES (ED) Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 05JAN2015 Shortlst Selection Date :  23FEB2015 Time:  10:00AM Final Selection Meeting Date :  06APR2015 Time:  10:00AM ************************************************************ Contract Number : 15642 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25207111209 Major Work : 13.7 - Transportation Statistics Minor Work : Project Description: Transportation Statistics Support #1 Project Manager : Lyn, Neil Budget Amount : $1,500,000 Special Notes: Two (2) contracts may be awarded from advertisement. Advertisement Status : Planned Date of Advertisement : 01DEC2014 Shortlst Selection Date :  26JAN2015 Time:  10:00AM Final Selection Meeting Date :  23MAR2015 Time:  10:00AM ************************************************************ Contract Number : 15643 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 40819911201 Major Work : 13.7 - Transportation Statistics Minor Work : Project Description: Transportation Statistics Support #3 Project Manager : Lyn, Neil Budget Amount : $1,500,000 Special Notes: This project is being advertised under #15642. Advertisement Status : Planned Date of Advertisement : 01DEC2014 Shortlst Selection Date :  26JAN2015 Time:  10:00AM Final Selection Meeting Date :  23MAR2015 Time:  10:00AM ************************************************************ Contract Number : 15655 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25068623203 Major Work : 8.1 - Control Surveying Minor Work : Project Description: Districtwide Misc. Location Survey Consultant Project Manager : ARATA, WILLIAM Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 01DEC2014 Shortlst Selection Date :  26JAN2015 Time:  10:00AM Final Selection Meeting Date :  09MAR2015 Time:  10:00AM ************************************************************ Contract Number : 15641 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43476913201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 953/LeJeune Road from SW 2 Street to SR 836 Project Manager : ARVELO, ANA Budget Amount : $200,000 Advertisement Status : Planned Date of Advertisement : 10NOV2014 Shortlst Selection Date :  26JAN2015 Time:  10:00AM Final Selection Meeting Date :  09MAR2015 Time:  10:00AM ************************************************************ Contract Number : 15620 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42597923201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 25/Okeechobee Rd. from W of SE 7 Avenue to N of NW 36 Street Project Manager : WANG, BAOYING Budget Amount : $400,000 Advertisement Status : Planned Date of Advertisement : 03NOV2014 Longlist(Tech. Rev. Cmte.) Date:  18DEC2014 Time:  10:00AM Shortlst Selection Date :  12JAN2015 Time:  10:00AM Final Selection Meeting Date :  09MAR2015 Time:  10:00AM 1st Negotiations Meeting :  07APR2015 Time:  02:00PM ************************************************************ Contract Number : 15635 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 7 Grouping Project Manager : SHOTTON, AMANDA Budget Amount : $0 Advertisement Status : Planned Date of Advertisement : 03NOV2014 Shortlst Selection Date :  15DEC2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  02DEC2014 Time:  10:00AM Final Selection Meeting Date :  15DEC2014 Time:  10:00AM ************************************************************ Contract Number : 15645 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25069663201 Major Work : 8.4 - Right of Way Mapping Minor Work : Project Description: Districtwide ROW Mapping & Survey Project Manager : KINMAN, CRISTINA Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 27OCT2014 Shortlst Selection Date :  15DEC2014 Time:  10:00AM Final Selection Meeting Date :  09FEB2015 Time:  10:00AM ************************************************************ Contract Number : 15640 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43477813201 Major Work : 3.2 - Major Highway Design Minor Work : Project Description: SR 112/Arthur Godfry from Alton Road to West of Pine Tree Project Manager : ARVELO, ANA Budget Amount : $314,295 Advertisement Status : Planned Date of Advertisement : 20OCT2014 Shortlst Selection Date :  15DEC2014 Time:  10:00AM Final Selection Meeting Date :  09FEB2015 Time:  10:00AM ************************************************************ Contract Number : 15629 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43514011201 Major Work : 99.0 - Other Professional Services Minor Work : Project Description: Districtwide Freight Logistics & Pax Consultant Services Project Manager : HENRY, DIONNE G Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 13OCT2014 Longlist(Tech. Rev. Cmte.) Date:  13NOV2014 Time:  10:00AM Shortlst Selection Date :  01DEC2014 Time:  10:00AM Final Selection Meeting Date :  26JAN2015 Time:  10:00AM ************************************************************ Contract Number : 15636 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42848723201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 5/S. Dixie from N of SW 184 Street to S of SW 168 Street Project Manager : Benitez, Hong Budget Amount : $250,000 Advertisement Status : Planned Date of Advertisement : 13OCT2014 Shortlst Selection Date :  01DEC2014 Time:  10:00AM Final Selection Meeting Date :  26JAN2015 Time:  10:00AM ************************************************************ Contract Number : 15646 Major Project Selection Procedure: LOR, Technical Proposal & Interview Financial Management Number(s): 42514423201 Major Work : 99.0 - Other Professional Services Minor Work : Project Description: General Engineering Consultant Services Contract Project Manager : ALBURY, TIM Budget Amount : $5,000,000 Advertisement Status : Planned Date of Advertisement : 13OCT2014 Shortlst Selection Date :  01DEC2014 Time:  10:00AM Final Selection Meeting Date :  23FEB2015 Time:  10:00AM ************************************************************ Contract Number : 15647 Major Project Selection Procedure: LOR, Technical Proposal & Interview Financial Management Number(s): 42514433201 Major Work : 99.0 - Other Professional Services Minor Work : Project Description: General Engineering Consultant Services Contract Project Manager : ALBURY, TIM Budget Amount : $5,000,000 Advertisement Status : Planned Date of Advertisement : 13OCT2014 Shortlst Selection Date :  01DEC2014 Time:  10:00AM Final Selection Meeting Date :  23FEB2015 Time:  10:00AM ************************************************************ Contract Number : 15654 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42835883201 Major Work : 3.3 - Controlled Access Highway Design Minor Work : Project Description: SR 826 Connector at Golden Glades Interchg and Various Ramps Project Manager : TOGHIANI, ALI Budget Amount : $2,900,000 Advertisement Status : Planned Date of Advertisement : 13OCT2014 Shortlst Selection Date :  01DEC2014 Time:  10:00AM Final Selection Meeting Date :  09FEB2015 Time:  10:00AM ************************************************************ Contract Number : 15657 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42928333201 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 6.2 - Traffic Signal Timing Project Description: Traffic Engineering Support Services Consultant Project Manager : LEGCEVIC, EVELIN Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 13OCT2014 Shortlst Selection Date :  01DEC2014 Time:  10:00AM Final Selection Meeting Date :  26JAN2015 Time:  10:00AM ************************************************************ Contract Number : 15621 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: 015 CEI Support Consultant Contract Project Manager : DUBROVSKY, MIKHAIL Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Shortlst Selection Date :  10NOV2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  31OCT2014 Time:  10:00AM Final Selection Meeting Date :  10NOV2014 Time:  10:00AM ************************************************************ Contract Number : 15639 Minor Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: 015 Krome Avenue South Group #1 Project Manager : SEQUEIRA, JACQUELINE D Budget Amount : $0 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Shortlst Selection Date :  10NOV2014 Time:  10:00AM Final Selection Meeting Date :  10NOV2014 Time:  10:00AM ************************************************************ Contract Number : 15637 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43477313201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR A1A/Collins Ave. from 4700 Block to 5800 Block Project Manager : ARVELO, ANA Budget Amount : $472,405 Advertisement Status : Planned Date of Advertisement : 22SEP2014 Shortlst Selection Date :  10NOV2014 Time:  10:00AM Final Selection Meeting Date :  12JAN2015 Time:  10:00AM ************************************************************ Contract Number : 15638 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43477613201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: SR 94/Kendall Drive at SW 107 Avenue Project Manager : BARRERA, JOSE Budget Amount : $375,172 Advertisement Status : Planned Date of Advertisement : 22SEP2014 Shortlst Selection Date :  10NOV2014 Time:  10:00AM Final Selection Meeting Date :  12JAN2015 Time:  10:00AM ************************************************************ Contract Number : 15634 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25060823201 Major Work : 8.3 - Photogrammetric Mapping Minor Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Project Description: Districtwide Aerial Photography Project Manager : PERKINS, SCOTT Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 15SEP2014 Shortlst Selection Date :  10NOV2014 Time:  10:00AM Final Selection Meeting Date :  15DEC2014 Time:  10:00AM 1st Negotiations Meeting :  18DEC2014 Time:  11:30AM ************************************************************ Contract Number : 15632 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43477113201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 976/Bird Road from SW 57th Avenue to Alhambra Circle Project Manager : IGLESIAS, DANNY Budget Amount : $300,000 Advertisement Status : Planned Date of Advertisement : 25AUG2014 Shortlst Selection Date :  20OCT2014 Time:  10:00AM Final Selection Meeting Date :  15DEC2014 Time:  10:00AM ************************************************************ Contract Number : 15633 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43274813201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 933/NW 12 Avenue from NW 1500 Block to NW 20th Street Project Manager : MANZANARES, ADRIANA Budget Amount : $150,000 Advertisement Status : Planned Date of Advertisement : 18AUG2014 Shortlst Selection Date :  06OCT2014 Time:  10:00AM Final Selection Meeting Date :  01DEC2014 Time:  10:00AM ************************************************************ Contract Number : 15627 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43305611201 Major Work : 99.0 - Other Professional Services Minor Work : 6.1 - Traffic Engineering Studies 6.2 - Traffic Signal Timing 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 11.0 - Eng Contract Admin and Management 13.5 - Subarea/Corridor Planning Project Description: Districtwide Freight Logistics & Pax Consultant Services Project Manager : HENRY, DIONNE G Budget Amount : $1,500,000 Special Notes: Professional Consultants page for the minimum required information. . Since the major type of work for this project does not fall within the Standard Types of Work defined in Department Rule 14-75 FAC, validation of the following qualifications requirements. . QUALIFICATION REQUIREMENTS FOR TOW 99.0: At least one (1) member on each consultant team must be with the Florida State Board as a licensed Professional Engineer (PE), and/or American Institute Certified Planner (AICP), and prequalified in the minor types of work. Proof of professional registration/certification must also be included as part of the non-standard major type of work (99.0). The consultant team will be required to provide services, as directed by the Department's Project Manager, including: 1. Support the Aviation, Freight, Intermodal, Rail, Seaport and Transit programs with administration and monitoring activities. 2. Provide transit system safety audit services. 3. Provide Maintenance of Traffic 4. Provide project management, production and coordination for all tasks and work activites assigned. 5. Develop scope of services, level of effort estimates and provisions for various studies and activities. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15627%20%26%2015628%20-%20433056-1-12 -01%20%26%20433056-2-12-01/Advertisement/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Refer to the "RESPONSE PROCEDURE" of the Notice to Project Manager: Dionne Richardson Advertisement Status : Planned Date of Advertisement : 28JUL2014 Shortlst Selection Date :  22SEP2014 Time:  10:00AM Final Selection Meeting Date :  10NOV2014 Time:  10:00AM 1st Negotiations Meeting :  12NOV2014 Time:  09:00AM ************************************************************ Contract Number : 15628 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43305621201 Major Work : 99.0 - Other Professional Services Minor Work : Project Description: Districtwide Freight Logistics & Pax Consultant Services Project Manager : HENRY, DIONNE G Budget Amount : $1,500,000 Special Notes: This project is being advertised under #15627. Advertisement Status : Planned Date of Advertisement : 28JUL2014 Shortlst Selection Date :  22SEP2014 Time:  10:00AM Final Selection Meeting Date :  10NOV2014 Time:  10:00AM ************************************************************ Contract Number : 15631 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25063323201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: Districtwide Constructability Review Consultant Project Manager : DUBROVSKY, MIKHAIL Maximum Contract Amount: $300,000 See Standard Notes Above: 9 Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services /Fiscal%20Year%202014-2015/15631%20-%20250633-2-32-01/Advert isement/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Mikhail Dubrovsky View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 21JUL2014 Response Deadline : 01AUG2014 Shortlst Selection Date :  08SEP2014 Time:  10:00AM Final Selection Meeting Date :  10NOV2014 Time:  10:00AM Response Deadline : 01AUG2014 Respond To: d6.profserv@dot.state.fl.us Attn.: Michelle Rapaport Phone: (305)470-5112 ************************************************************ Contract Number : 15630 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43362712201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Minor Work : 3.3 - Controlled Access Highway Design 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: SR 90/SW 8 Street at SR 973/SW 87 Avenue Project Manager : GONZALEZ, FABIANA Estimated Contract Amt: $1,500,000 See Standard Notes Above: 8 Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the Proposed Consultants for DBE & Small Business Under-Utilized Work Groups form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/ Fiscal%20Year%202014-2015/15630%20-% 20433627-1-22-01/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager:Fabiana Gonzalez View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 18JUL2014 Shortlst Selection Date :  08SEP2014 Time:  10:00AM Scope Meeting Date :  22SEP2014 Time:  02:00PM Final Selection Meeting Date :  10NOV2014 Time:  10:00AM 1st Negotiations Meeting :  08DEC2014 Time:  09:00AM Response Deadline : 18JUL2014 Respond To: d6.profserv@dot.state.fl.us Attn.: Michelle Rapaport Phone: (305)470-5112 ************************************************************ Contract Number : 15626 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42835813201 423373232 Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration Project Description: SR 826/Palmetto Expy - SR 826 Eastbound Ramp to SR 9A/I-95 Northbound Golden Glades Intch. Improvements (Mainline Spur MP 0X) Project Manager : TOGHIANI, ALI Estimated Contract Amt: $9,817,000 See Standard Notes Above: 9 Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services /Fiscal%20Year%202014-2015/15626%20-% 20428358-1-32-01/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Additional information for this project can be found at: http://www.fdotmiamidade.com/goldengladesstudy.html . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Ali Toghiani View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 30JUN2014 Response Deadline : 11JUL2014 Shortlst Selection Date :  25AUG2014 Time:  10:00AM Scope Meeting Date :  09SEP2014 Time:  02:00PM Final Selection Meeting Date :  20OCT2014 Time:  10:00AM 1st Negotiations Meeting :  01DEC2014 Time:  09:00AM Response Deadline : 11JUL2014 Respond To: d6.profserv@dot.state.fl.us Attn.: Michelle Rapaport Phone: (305)470-5112 ************************************************************ Contract Number : 15624 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42827823201 42827833201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: SR 944/NW/NE 54th St from E of NW 7 Avenue to Biscayne Boulevard SR 944/NW 54 Street from NW 6th Avenue to NW 1st Avenue Project Manager : Benitez, Hong Estimated Contract Amt: $510,000 See Standard Notes Above: 9 Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services /Fiscal%20Year%202014-2015/15624%20-% 20428278-2-32-01%20%26%20428278-3-32-01 /Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Hong Benitez View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUN2014 Response Deadline : 27JUN2014 Longlist(Tech. Rev. Cmte.) Date:  22JUL2014 Time:  01:30PM Shortlst Selection Date :  11AUG2014 Time:  10:00AM Scope Meeting Date :  08AUG2014 Time:  10:00AM Final Selection Meeting Date :  06OCT2014 Time:  10:00AM 1st Negotiations Meeting :  03NOV2014 Time:  09:00AM Response Deadline : 27JUN2014 Respond To: d6.profserv@dot.state.fl.us Attn.: Michelle Rapaport Phone: (305)470-5112 ************************************************************ Contract Number : 15625 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43305923201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 9.1 - Soil Exploration Project Description: SR 5/Biscayne Blvd. from NE 32nd Street to NE 38th Street Project Manager : GONZALEZ, FABIANA Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the Scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services /Fiscal%20Year%202014-2015/15625%20-% 20433059-2-32-01/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Fabiana Gonzalez View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02JUN2014 Longlist(Tech. Rev. Cmte.) Date:  03JUL2014 Time:  03:00PM Shortlst Selection Date :  21JUL2014 Time:  10:00AM Shortlist Selection Posting :  21JUL2014 Scope Meeting Date :  04AUG2014 Time:  11:00AM Final Selection Meeting Date :  22SEP2014 Time:  10:00AM 1st Negotiations Meeting :  27OCT2014 Time:  09:00AM Shortlisted Firms: AMMANN & WHITNEY, INC. RIBBECK ENGINEERING, INC. TRANSYSTEMS CORPORATION D/B/A TRANS ************************************************************ Contract Number : 15650 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42736923205 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Project Description: SR 997/Krome Avenue from SW 232 Street to SW 184th Street/ Eureka Dr. Project Manager : WANG, BAOYING Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the Scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/ Fiscal%20Year%202014-2015/15650%20-% 20427369-2-32-05/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Bao-Ying Wang View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02JUN2014 Shortlst Selection Date :  21JUL2014 Time:  10:00AM Shortlist Selection Posting :  21JUL2014 Scope Meeting Date :  05AUG2014 Time:  02:00PM Final Selection Meeting Date :  22SEP2014 Time:  10:00AM 1st Negotiations Meeting :  20OCT2014 Time:  09:00AM Shortlisted Firms: A & P CONSULTING TRANSPORTATION ENG BCC ENGINEERING, INC. THE CORRADINO GROUP, INC. ************************************************************ Contract Number : 15644 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43163523201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration Project Description: Districtwide Safety Pushbutton Projects Pilot Program Project Manager : GONZALEZ, FABIANA Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the Scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services /Fiscal%20Year%202014-2015/15644%20-% 20431635-2-32-01/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Fabiana Gonzalez View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Shortlst Selection Date :  07JUL2014 Time:  09:30AM Shortlist Selection Posting :  07JUL2014 Final Selection Meeting Date :  25AUG2014 Time:  10:00AM Shortlisted Firms: C.H. PEREZ & ASSOCIATES CONSULTING CTS ENGINEERING, INC. TRACE CONSULTANTS, INC. ************************************************************ Contract Number : 15622 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43476913201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: SR 932/NW 103 Street frpm SR 826 to West 12th Avenue Project Manager : BARRERA, JOSE Special Notes: This project has been reserved for competition among only small businesses, in accordance with the Department's Business Development Initiative Program. Letters of Response for this project will only be accepted from firms who qualify as a small business as defined by the Department The prime consultant submitting a Letter of Response must meet the small business eligibility criteria below. All subconsultants utilized on the project must also meet the small business eligibility criteria. Only subconsultants who are also themselves small businesses may be utilized on small business reserved projects. . SMALL BUSINESS ELIGIBILITY CRITERIA: 1. Meet the small business definition as defined by the Department. 2. Submit a Notarized BDI Affidavit & Profile Form(s) (FDOT form 275-000-03) attesting to meeting the definition of a small business. All Letters of Response to an advertisement for a small business reserved project must be accompanied by a Notarized BDI Affidavit & Profile form(s submitted by the date/time deadline established for the Letter of Response. Notarized BDI Affidavit & Profile forms are required for the prime consultant and each subconsultants utilized on the contract, who must also meet small business criteria. The notarized BDI Affidavit & Profi form(s) must be submitted with the Letter of Response. Pleas refer to the advertisement for other submittal requirements. 3. Submitting firms that are small businesses must completely comply with the professional services prequalification process as described in Florida Administrative Code Chapter 14-75. http://www.dot.state.fl.us/procurement/pubs/Rule%2014-75new. . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/ Fiscal%20Year%202014-2015/15622%20-% 20434798-1-32-01/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Jose Barrera View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Shortlst Selection Date :  07JUL2014 Time:  09:30AM Shortlist Selection Posting :  07JUL2014 Scope Meeting Date :  24JUL2014 Time:  11:00AM Final Selection Meeting Date :  08SEP2014 Time:  10:00AM 1st Negotiations Meeting :  07OCT2014 Time:  09:30AM Shortlisted Firms: BMA CONSULTING ENGINEERING, INC. PE CONSULTING ENGINEERING D/B/A PE SNUBBS CONSULTING INC. ************************************************************ Contract Number : 15649 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42736913205 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 9.1 - Soil Exploration Project Description: SR 997/Krome Avenue from SW 296 Street to SW 232 Street Project Manager : CROFT, VILMA Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the scope of services). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/ Fiscal%20Year%202014-2015/15649%20-% 20427369-1-32-05/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager:Vilma Croft View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 12MAY2014 Longlist(Tech. Rev. Cmte.) Date:  18JUN2014 Time:  01:00PM Shortlst Selection Date :  07JUL2014 Time:  09:30AM Shortlist Selection Posting :  07JUL2014 Scope Meeting Date :  21JUL2014 Time:  02:00PM Final Selection Meeting Date :  08SEP2014 Time:  10:00AM Shortlisted Firms: BCC ENGINEERING, INC. HDR ENGINEERING, INC. KIMLEY-HORN AND ASSOCIATES, INC. ************************************************************ Contract Number : 15623 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41099313204 Major Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design Minor Work : 4.2.1 - Major Bridge Design - Concrete 4.2.2 - Major Bridge Design - Steel Project Description: Districtwide Structures Design and Review Consultant Project Manager : RODRIGUEZ, JORGE A Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the Scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services /Fiscal%20Year%202014-2015/15623%20-% 20140993-1-32-04/Advertisement/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Jorge A. Rodriguez View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 05MAY2014 Longlist(Tech. Rev. Cmte.) Date:  05JUN2014 Time:  02:15PM Shortlst Selection Date :  23JUN2014 Time:  10:00AM Shortlist Selection Posting :  23JUN2014 Final Selection Meeting Date :  25AUG2014 Time:  10:00AM Shortlisted Firms: AECOM TECHNICAL SERVICES, INC. EAC CONSULTING, INC. KEITH AND SCHNARS, P.A. ************************************************************ Contract Number : 15618 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43328623201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Project Description: SR 992/SW 152 Street from SR 821 HEFT NB Ramp to SR 5/US-1 Project Manager : Benitez, Hong Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15618%20-%20433286-2-32-01/Advertisem ent/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Additional Documents are available on the below link: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15618%20-%20433286-2-32-01/Advertisem ent/ . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Hong Benitez View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 29APR2014 Shortlst Selection Date :  23JUN2014 Time:  10:00AM Shortlist Selection Posting :  23JUN2014 Scope Meeting Date :  03JUL2014 Time:  01:00PM Final Selection Meeting Date :  11AUG2014 Time:  10:00AM Shortlisted Firms: AES ENGINEERING, INC. CIVIL WORKS, INC. TRACE CONSULTANTS, INC. ************************************************************ Contract Number : 15616 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25060513220 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Project Description: Districtwide Miscellaneous PE Design Consultant Project Manager : MANZANARES, ADRIANA Special Notes: Two (2) contracts may be awarded from advertisement. . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15616%20%26%2017%20-%20250605-1-32-20 %20%26%20250605-1-32-21/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Adriana Manzanares View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21APR2014 Longlist(Tech. Rev. Cmte.) Date:  27MAY2014 Time:  11:00AM Shortlst Selection Date :  09JUN2014 Time:  10:00AM Shortlist Selection Posting :  09JUN2014 Final Selection Meeting Date :  11AUG2014 Time:  10:00AM 1st Negotiations Meeting :  15AUG2014 Time:  02:00PM Shortlisted Firms: AES ENGINEERING, INC. ALVAREZ ENGINEERS, INC. CIVIL WORKS, INC. DAVID PLUMMER & ASSOCIATES, INC ************************************************************ Contract Number : 15619 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42262923201 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 8.2 - Design, Right of Way, & Const. Surveying Project Description: SR 5/Overseas Hwy. from S. Pine Chnel/MM 28.75 to Spanish Hrbr/MM 32.98 Project Manager : HOOSAC, KIRK Special Notes: This project has been reserved for competition among only small businesses, in accordance with the Department's Business Development Initiative Program. Letters of Response for this project will only be accepted from firms who qualify as a small business as defined by the Department The prime consultant submitting a Letter of Response must meet the small business eligibility criteria below. All subconsultants utilized on the project must also meet the small business eligibility criteria. Only subconsultants who are also themselves small businesses may be utilized on small business reserved projects. . SMALL BUSINESS ELIGIBILITY CRITERIA: 1. Meet the small business definition as defined by the Department. 2. Submit a Notarized BDI Affidavit & Profile Form(s) (FDOT form 275-000-03) attesting to meeting the definition of a small business. All Letters of Response to an advertisement for a small business reserved project must be accompanied by a Notarized BDI Affidavit & Profile form(s submitted by the date/time deadline established for the Letter of Response. Notarized BDI Affidavit & Profile forms are required for the prime consultant and each subconsultants utilized on the contract, who must also meet small business criteria. The notarized BDI Affidavit & Profi form(s) must be submitted with the Letter of Response. Pleas refer to the advertisement for other submittal requirements. 3. Submitting firms that are small businesses must completely comply with the professional services prequalification process as described in Florida Administrative Code Chapter 14-75. http://www.dot.state.fl.us/procurement/pubs/Rule%2014-75new. pdf . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15619%20-%20422629-2-32-01/Advertisem ent/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Kirk Hoosac View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 21APR2014 Shortlst Selection Date :  09JUN2014 Time:  10:00AM Shortlist Selection Posting :  09JUN2014 Scope Meeting Date :  24JUN2014 Time:  03:00PM Tech. Rev. Cmte Meeting :  02JUL2014 Time:  01:30PM Final Selection Meeting Date :  11AUG2014 Time:  10:00AM Shortlisted Firms: CURTIS + ROGERS DESIGN STUDIO INC. KEITH & ASSOCIATES, INC. PROSSER HALLOCK, INC. ************************************************************ Contract Number : 15611 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBA Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 10.4 - Minor Bridge & Misc. Structures(CEI) 014 KEYS RESIDENCY Project Manager : DIAFERIA, CLAUDIO Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . Final Selection will be made from Letters of Response. The Letter of Response (LOR) may not exceed five (5) pages in length. In addition to the minimum information required in the "Notice to Professional Consultants" page, the LOR should also address the following items in order to assess each firm's potential to satisfactorily accomplish this project: Awareness of Scope - Demonstrate their knowledge of the scope of services required to provide a quality product. (0-15 points). - Explanation of how they intend to coordinate with the FDOT PM (0-5 points). Approach - Demonstrate their approach and planning to complete the task work orders assigned and overall contract (0-10 point). - Demonstrate how they intend to use their resources to complete each assignment (0- 5 points). - Demonstrate their approach to each of the service listed in the scope of services(0-5 points). Staffing -The Consultant should present a PM that has experience to complete these types of project (0-15 points). -The Consultant should present a team that is capable of providing the services required for this project (0-20 points). -The Consultant should demonstrate that team members have provided similar services requested on this contract on other contracts (0-10 points). - The inter-relationship between the Consultant and the Sub-Consultants should be clearly presented (0-5 points). Other Considerations - The Consultant should present a QC plan that demonstrates their ability to provide a quality service/product (0-3 points). - The Consultant should provide any innovative ideas that would be cost effective for the department (0-2 points) - The consultant shall demonstrate their awareness of the potential public information issues in Monroe County (0-5 points). . Not included in the page limitation of LOR, responses should include a two (2) page Professional Resume for key staff team members, as well as, a one (1) page organizational chart on either 11"x17" or 8-1/2"x11" in length. Construction Training & Qualification Program (CTQP) printouts may also be submitted. Two (2) page schedule 11"x17" allowed. One (1) page staff hour summary sheet (showing the hours of the prime and all Subconsultants). Required forms and certifications (found at the end of the scope of services file). . Since Final Selection will be made from Letters of Response, teams must be prequalified for all identified types of work, both Major and Minor. . The above referenced items are to be submitted as a single attachment to a single e-mail and may not exceed the 5.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadlin will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15611%20-%20TBA/Advertisement/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Officeat 305-470-5457. . Registration in MyFloridaMarketPlace is required for primes and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below f this project. . Project Manager: Claudio Diaferia View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 14APR2014 Longlist(Tech. Rev. Cmte.) Date:  31MAY2014 Time:  10:00AM Shortlst Selection Date :  09JUN2014 Time:  10:00AM Final Selection Meeting Date :  09JUN2014 Time:  10:00AM Final Selection Posting Date :  09JUN2014 Rank Consultant 1 REYNOLDS, SMITH AND HILLS CS,INC. 2 AMEC ENVIRONMENT & INFRASTRUCTURE, 3 KCCS, INC. ************************************************************ Contract Number : 15605 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41057317208 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: M.E.I. Maint/Permit Inspections Project Manager : TRUJILLO, MARTHA Special Notes: This project is being re-advertised due to the selection method change from Expanded LORs to Interviews. Firms that submitted by the previous deadline, need not submit again. . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15605%20-%20410573-1-72-08/Advertisem ent/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Martha Trujillo View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Longlist(Tech. Rev. Cmte.) Date:  02MAY2014 Time:  10:00AM Shortlst Selection Date :  20MAY2014 Time:  01:00PM Shortlist Selection Posting :  21MAY2014 Tech. Rev. Cmte Meeting :  13JUN2014 Time:  08:30AM Final Selection Meeting Date :  07JUL2014 Time:  09:30AM Final Selection Posting Date :  09JUL2014 1st Negotiations Meeting :  30JUL2014 Time:  02:00PM Rank Consultant 1 AMMANN & WHITNEY, INC. 2 TARGET ENGINEERING GROUP, INC. 3 C.A.P. ENGINEERING, INC. ************************************************************ Contract Number : 15612 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43338113201 Major Work : 4.2.3 - Major Bridge Design - Segmental Minor Work : Project Description: SR 5/Overseas Hwy. Seven Mile Bridge #900101 Over Moser Channel Project Manager : OROZCO, PABLO Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (found at the end of the s . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15612%20-%20433381-1-32-01/Advertisem ent/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Yaroslav Concepcion View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24MAR2014 Longlist(Tech. Rev. Cmte.) Date:  24APR2014 Time:  11:00AM Shortlst Selection Date :  20MAY2014 Time:  01:00PM Shortlist Selection Posting :  21MAY2014 Final Selection Meeting Date :  07JUL2014 Time:  09:30AM Final Selection Posting Date :  07JUL2014 1st Negotiations Meeting :  14AUG2014 Time:  09:00AM Rank Consultant 1 URS CORPORATION SOUTHERN 2 STANTEC CONSULTING SERVICES INC. 3 HARDESTY & HANOVER, LLC 4 HNTB CORPORATION ************************************************************ Contract Number : 15613 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43263912201 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : Project Description: SR 826/Palmetto Expy from US-1/S. Dixie Hwy to SR 836/Dolphin Xway Project Manager : JEFFRIES, KENNETH Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (provided at the end of the scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15613%20-%20432639-1-22-01/Advertisem ent/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Ken Jeffries View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  17APR2014 Time:  11:00AM Shortlst Selection Date :  05MAY2014 Time:  10:00AM Shortlist Selection Posting :  05MAY2014 Final Selection Meeting Date :  23JUN2014 Time:  10:00AM Final Selection Posting Date :  23JUN2014 1st Negotiations Meeting :  21JUL2014 Time:  09:00AM Rank Consultant 1 THE CORRADINO GROUP, INC. 2 BCC ENGINEERING, INC. 3 REYNOLDS, SMITH AND HILLS CS,INC. ************************************************************ Contract Number : 15614 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42521623201 Major Work : 3.1 - Minor Highway Design Minor Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: SR 9/I-95 Ramps at SR 860/Miami Gardens Drive Project Manager : HUYNH, DAT Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form (provided at the end of the scope). . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15614%20-%20425216-2-32-01/Advertisem ent/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Dat Huynh View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  17APR2014 Time:  03:30PM Shortlst Selection Date :  05MAY2014 Time:  10:00AM Shortlist Selection Posting :  06MAY2014 Final Selection Meeting Date :  07JUL2014 Time:  09:30AM Final Selection Posting Date :  07JUL2014 1st Negotiations Meeting :  04AUG2014 Time:  09:00AM Rank Consultant 1 AES ENGINEERING, INC. 2 C.H. PEREZ & ASSOCIATES CONSULTING 3 AMMANN & WHITNEY, INC. ************************************************************ Contract Number : 15615 Minor Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43081723201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Project Description: SR 7/NW 7 Avenue from N of NW 79 Street to Little River Drive Project Manager : IGLESIAS, DANNY Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15615%20-%20430814-2-32-01/Advertisem ent/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Danny Iglesias View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10MAR2014 Longlist(Tech. Rev. Cmte.) Date:  10APR2014 Time:  11:00AM Shortlst Selection Date :  05MAY2014 Time:  10:00AM Shortlist Selection Posting :  06MAY2014 Final Selection Meeting Date :  23JUN2014 Time:  10:00AM Final Selection Posting Date :  23JUN2014 Rank Consultant 1 CTS ENGINEERING, INC. 2 PE CONSULTING ENGINEERING 3 BMA CONSULTING ENGINEERING, INC. ************************************************************ Contract Number : 15608 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41523923201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 6.1 - Traffic Engineering Studies 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Project Description: Districtwide Plan Review Consultant and Support Services Project Manager : LEGCEVIC, EVELIN Special Notes: This project has been reserved for competition among only small businesses, in accordance with the Department's Business Development Initiative Program. Letters of Response for this project will only be accepted from firms who qualify as a small business as defined by the Department The prime consultant submitting a Letter of Response must meet the small business eligibility criteria below. All subconsultants utilized on the project must also meet the small business eligibility criteria. Only subconsultants who are also themselves small businesses may be utilized on small business reserved projects. . SMALL BUSINESS ELIGIBILITY CRITERIA: 1. Meet the small business definition as defined by the Department. 2. Submit a Notarized BDI Affidavit & Profile Form(s) (FDOT form 275-000-01) attesting to meeting the definition of a small business. All Letters of Response to an advertisement for a small business reserved project must be accompanied by a Notarized BDI Affidavit & Profile form(s) submitted by the date/time deadline established for the Letter of Response. Notarized BDI Affidavit & Profile forms are required for the prime consultant and each subconsultan- ts utilized on the contract, who must also meet small busin- ess criteria. The notarized BDI Affidavit & Profile forms(s) must be submitted with the Letter of Response. Please refer to the advertisement for other submittal requirements. 3. Submitting firms that are small businesses must completely comply with the professional services prequalification process as described in Florida Administrative Code Chapter 14-75. http://www.dot.state.fl.us/procurement/pubs/Rule%2014-75new. pdf . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15608%20-%20415239-2-32-01/Advertisem ent/. Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Evelin Legceciv View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 03MAR2014 Longlist(Tech. Rev. Cmte.) Date:  03APR2014 Time:  03:00PM Shortlst Selection Date :  21APR2014 Time:  10:00AM Shortlist Selection Posting :  21APR2014 Final Selection Meeting Date :  09JUN2014 Time:  10:00AM Final Selection Posting Date :  16JUN2014 Rank Consultant 1 BMA CONSULTING ENGINEERING, INC. 2 HBC ENGINEERING COMPANY 3 TRIDENT ENGINEERING, LLC ************************************************************ Contract Number : 15609 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43337813201 Major Work : 4.2.2 - Major Bridge Design - Steel Minor Work : Project Description: SR A1A/Collins Ave. at Baker Haulover Cut Channel-Baker Haulover Bridge Project Manager : OROZCO, PABLO Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15609%20-%20433378-1-32-01/Advertisem ent/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Additional Documents are available on request and completion of the Exempt Documents/Security System Plan Distribution Form located on: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15609%20-%20433378-1-32-01/Advertisem ent/ Please ensure the completed form and a copy of requestor's license is sent to the d6.profserv@dot.state.fl.us so documents may be released. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Yaroslav "Yaro" Concepcion View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17FEB2014 Longlist(Tech. Rev. Cmte.) Date:  20MAR2014 Time:  02:30PM Shortlst Selection Date :  07APR2014 Time:  10:00AM Shortlist Selection Posting :  08APR2014 Final Selection Meeting Date :  09JUN2014 Time:  10:00AM Final Selection Posting Date :  09JUN2014 1st Negotiations Meeting :  08JUL2014 Time:  09:00AM 2nd Negotiations Meeting :  11JUL2014 Time:  09:00AM Rank Consultant 1 TRANSYSTEMS CORPORATION 2 LAKES ENGINEERING, INC. 3 PARSONS TRANSPORTATION GROUP, INC. ************************************************************ Contract Number : 15606 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 24972643201 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 6.2 - Traffic Signal Timing Project Description: Districtwide Traffic Operations Studies Project Manager : ESPINAL, ESTEBAN Special Notes: Two (2) contracts may be awarded from advertisement. . Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15606%20%26%2007%20-%20249726-4-32-01 %20%26%20250093-3-32-01/Advertisement/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Esteban Espinal View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10FEB2014 Longlist(Tech. Rev. Cmte.) Date:  13MAR2014 Time:  11:30AM Shortlst Selection Date :  07APR2014 Time:  10:00AM Shortlist Selection Posting :  07APR2014 Final Selection Meeting Date :  20MAY2014 Time:  01:00PM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  17JUN2014 Time:  01:00PM 2nd Negotiations Meeting :  10JUL2014 Time:  09:00AM Rank Consultant 1 KIMLEY-HORN & ASSOCIATES, INC. 2 CTS ENGINEERING, INC. 3 MARLIN ENGINEERING, INC. 4 CALTRAN ENGINEERING GROUP, INC. ************************************************************ Contract Number : 15602 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41496462201 Major Work : 13.5 - Subarea/Corridor Planning Minor Work : Project Description: SR 9A/I-95 from US 1 to Dade/Broward Line Project Manager : JEFFRIES, KENNETH Special Notes: Refer to the "RESPONSE PROCEDURE" of the Notice to Professional Consultants page for the minimum required information. . The Letter of Response (LOR) may not exceed the 1.0 MB file size. Multiple e-mails will NOT be accepted. Attachment must be submitted in .pdf format (unzipped) ONLY. Along with the LOR submittal, firms will submit the DBE and Small Business Participation form. . Direct all questions to the Department by e-mailing d6.profserv@dot.state.fl.us . Questions posed before 5PM (EST) on the seventh calendar day prior to submittal deadline will be responded to by the Department on the File Transfer Protocol (FTP) site located at: ftp://ftp.dot.state.fl.us/LTS/D6/Professional%20Services/Fis cal%20Year%202014-2015/15602%20-%20414964-6-22-01/Advertisem ent/ Take responsibility to review and be familiar with all questions and responses posted to this website and to make any necessary adjustments in the LOR accordingly. If the Department website cannot be accessed contact the Professional Services Office at 305-470-5457. . Registration in MyFloridaMarketPlace is required for prime and sub-consultants prior to contracting. . The District 6 Selection Committee routinely meets every other Monday in the Procurement Conference Room, located at 1000 NW 111 Avenue, Miami, Florida 33172. See dates below for this project. . Project Manager: Ken Jeffries View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 03FEB2014 Longlist(Tech. Rev. Cmte.) Date:  06MAR2014 Time:  10:00AM Shortlst Selection Date :  24MAR2014 Time:  10:00AM Shortlist Selection Posting :  24MAR2014 Final Selection Meeting Date :  19MAY2014 Time:  10:00AM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  30JUN2014 Time:  01:00PM 2nd Negotiations Meeting :  16JUL2014 Time:  09:00AM Rank Consultant 1 KIMLEY-HORN & ASSOCIATES, INC. 2 PARSONS BRINCKERHOFF, INC. 3 KITTELSON & ASSOCIATES, INC. 4 STANTEC CONSULTING SERVICES INC. ************************************************************ Design/Build Projects Procurement Number : E6I85 Financial Management Number(s): 41774079201 Project Description: The Florida Department of Transportation (Department) has issued this Request for Proposal (RFP) to solicit competitive Bids and Proposals from Proposers for the replacement of three (3) arterial Dynamic Message Signs (DMS) and associated DMS cabinets located on Ives Dairy Road (west of I-95 along the eastbound travel direction) and Miami Gardens Drive (east of I-95 along the westbound and west of I-95 along the eastbound travel direction) in Miami-Dade County. The Project requires reuse of two (2) existing DMS structures and installation of one (1) new DMS structure. All DMS installed as part of this Project shall be integrated, tested and operated from the SunGuide Transportation Management Center (TMC). . Other Design-Build Firm Minimum Qualifications Include: . - Within the past five (5) years, the Design-Build Firm has successfully installed and made operational at least five (5) Dynamic Message Signs using full matrix LED technology. - Within the past five (5) years, the Design-Build Firm has successfully designed,retrofitted and/or erected at least one (1) DMS Structure. . In accordance with RESTRICTION ON CONSULTANTS- ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design- Build Firm without approval from the District 6 Secretary. The Firms identified below may not represent a comprehensive list.Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. . HNTB Corporation C9A01 . TECHNICAL PROPOSAL PAGE LIMIT: 2 page maximum. Note: single- sided, typed pages including text,graphics, tables, charts, and photographs. Double-sided 8Ľ" x 11" sheets will be counted as 2 pages. Larger sheets are prohibited. Cover sheets, photos, charts, etc. or other documents not specifically listed as exclusions will be considered in the page count/limitation. . RESPONSE PROCEDURE: The technical proposal and required attachments shall be submitted electronically in adobe.pdf format (unzipped) and attached to a single email. The Department has a 5MB limit on email. Emails that exceed this 5MB email server limit may be rejected by the Department's email server. It is solely the Design Build Firm's responsibility to ensure that the technical proposal and required attachments are received by the Department's server by the due date and time. Only (1) technical proposal per legal entity is acceptable. All files should be sent to: d6.designbuild@dot.state.fl.us and must be received by the Department by response deadline shown below. Project Manager : BRAVO, SERGIO Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): INTELLIGENT TRANSPORTATION SYSTEMS Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 6.3.2 - Intelligent Trans Systems Implementation 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: http://www2.dot.state.fl.us/construction/bidquestionmain.asp . NON-TECHNICAL ADMINISTRATIVE QUESTIONS: . FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT VI 1000 NORTHWEST 111TH AVENUE ROOM 6203 MIAMI, FLORIDA 33172 ATTENTION: HARRY ORVIL PHONE: 305-470-5404 . D6.designbuild@dot.state.fl.us DBE/MBE Requirements: For this project, the Department has established an aspiration goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small Business usage, representing a cumulative 12.0% commitment of total contract costs.Firms proposing for this Project shall aspire to have 9.0% or more of the total contract costs performed by DBE-s and an additional 3.0% or more of the total contract costs performed by Non-DBE Small Businesses. Although not a contract requirement, the Department believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. The Department further believes that the 12% overall goal can be achieved through race neutral means,using standard competitive procurement processes.Pursuant to the provisions of Section 339.0805, Florida Statutes, and rule 14.78.005,Florida Administrative Code, the Department has adopted rules to provide certified DBEs opportunities to participate in the business activities of the Department as vendors, contractors,subcontractors, and consultants.The Department has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. . The Department's DBE directory may be found at the following website: www3.dot.state.fl.us/EqualOpportunityOffice/biznet/mainmenu. asp . Firms agree to apply their best efforts to utilize qualified non-DBE small businesses as vendors,contractors, subcontract and consultants for the Project.Qualifications for small businesses may be found at the following website: www.dot.state.fl.us/EqualOpportunityOffice/sizeStandards .shtm . Firms will submit the DBE and Small Business Participation form as required by the Request for Proposal. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 21JAN2014 Response Deadline : 27MAR2014 Pre-Bid Meeting Date :  06FEB2014 Time:  10:00AM Bids Due Date :  27MAR2014 Time:  11:00AM Bid Opening Date :  27MAR2014 Time:  11:00AM Final Selection Meeting Date :  10APR2014 Time:  T.B.A Final Selection Date Not Posted Award Committee Meeting Date :  07APR2014 Time:  10:00AM Response Deadline : 27MAR2014 Respond To: Florida DOT - District 6 1000 NW 111th Avenue Miami, FL 33172 Attn: Harry Orvil Phone: (305)470-5112 d6.designbuild@dot.state.fl.us ************************************************************ DISTRICT 7 ************************************************************ Professional Services Consultant Projects Contract Number : 15732 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41673323201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: SR 50/SR 50A from Cobb Road to Broad Street. Project Manager : Schneider, Henry J Budget Amount : $2,367,000 Advertisement Status : Planned Date of Advertisement : 19JAN2015 Longlist(Tech. Rev. Cmte.) Date:  25FEB2015 Time:  9:00 AM Shortlst Selection Date :  27FEB2015 Time:  10:00AM Final Selection Meeting Date :  10APR2015 Time:  10:00AM 1st Negotiations Meeting :  23APR2015 Time:  9:00 AM ************************************************************ Contract Number : 15726 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43269713201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying Project Description: SR 50/700/US 98/Cortez from E of SR 50/Cortez Blvd to W of Live Oak Dr. Project Manager : OBrien, Tim R Budget Amount : $367,000 Advertisement Status : Planned Date of Advertisement : 12JAN2015 Longlist(Tech. Rev. Cmte.) Date:  10FEB2015 Time:  10:00AM Shortlst Selection Date :  13FEB2015 Time:  10:00AM Final Selection Meeting Date :  27MAR2015 Time:  10:00AM 1st Negotiations Meeting :  07APR2015 Time:  9:00 AM ************************************************************ Contract Number : 15722 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25917311211 Major Work : 13.4 - Systems Planning Minor Work : 13.3 - Policy Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: Tampa Bay Regional Transportation Analysis (RTA) Contract 1 Project Manager : LAMB, DANNY R Budget Amount : $2,000,000 Advertisement Status : Planned Date of Advertisement : 29DEC2014 Longlist(Tech. Rev. Cmte.) Date:  27JAN2015 Time:  2:00 PM Shortlst Selection Date :  30JAN2015 Time:  10:00AM Final Selection Meeting Date :  13MAR2015 Time:  10:00AM ************************************************************ Contract Number : 15723 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25917311212 Major Work : 13.4 - Systems Planning Minor Work : 13.3 - Policy Planning 13.5 - Subarea/Corridor Planning 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics (RTA) CONTRACT 2 Project Manager : LAMB, DANNY R Budget Amount : $2,000,000 Advertisement Status : Planned Date of Advertisement : 29DEC2014 Longlist(Tech. Rev. Cmte.) Date:  27JAN2015 Time:  8:30 AM Shortlst Selection Date :  30JAN2015 Time:  10:00AM Final Selection Meeting Date :  13MAR2015 Time:  10:00AM ************************************************************ Contract Number : 15724 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42895613201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Project Description: I-75 (SR 93A) from S of Selmon Exp Overpass to N of SR 60 Project Manager : Neidringhaus, Amy Budget Amount : $1,368,000 Advertisement Status : Planned Date of Advertisement : 29DEC2014 Longlist(Tech. Rev. Cmte.) Date:  28JAN2015 Time:  9:00 AM Shortlst Selection Date :  30JAN2015 Time:  10:00AM Final Selection Meeting Date :  13MAR2015 Time:  10:00AM 1st Negotiations Meeting :  26MAR2015 Time:  9:00 AM ************************************************************ Contract Number : 15742 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25449413224 Major Work : 3.1 - Minor Highway Design 6.1 - Traffic Engineering Studies 7.3 - Signalization Minor Work : 7.1 - Signing, Pavement Marking & Channelization 8.2 - Design, Right of Way, & Const. Surveying Project Description: District Wide Traffic Operational Studies and Design Project Manager : Riha, William Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 10NOV2014 Shortlst Selection Date :  12DEC2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  26JAN2015 Time:  9:00 AM Final Selection Meeting Date :  30JAN2015 Time:  10:00AM ************************************************************ Contract Number : 15733 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43575013201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: SR 60 from Valrico Road to Dover Road Project Manager : Shroyer, Brian Budget Amount : $2,391,000 Advertisement Status : Planned Date of Advertisement : 03NOV2014 Longlist(Tech. Rev. Cmte.) Date:  10DEC2014 Time:  3:30 PM Shortlst Selection Date :  12DEC2014 Time:  10:00AM Final Selection Meeting Date :  13FEB2015 Time:  10:00AM 1st Negotiations Meeting :  26FEB2015 Time:  9:00 AM ************************************************************ Contract Number : 15734 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43575023201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: SR 60 from Dover Road to SR 39 Project Manager : GODFREY, MARY LOU Budget Amount : $4,061,000 Advertisement Status : Planned Date of Advertisement : 03NOV2014 Longlist(Tech. Rev. Cmte.) Date:  10DEC2014 Time:  10:00AM Shortlst Selection Date :  12DEC2014 Time:  10:00AM Final Selection Meeting Date :  13FEB2015 Time:  10:00AM 1st Negotiations Meeting :  03MAR2015 Time:  9:00 AM ************************************************************ Contract Number : 15735 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 25579612201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: PD&E US 301 from Fowler Ave. to SR 56 Project Manager : Pierce, Stephanie Budget Amount : $2,000,000 Advertisement Status : Planned Date of Advertisement : 03NOV2014 Longlist(Tech. Rev. Cmte.) Date:  09DEC2014 Time:  2:30 PM Shortlst Selection Date :  12DEC2014 Time:  10:00AM Final Selection Meeting Date :  13FEB2015 Time:  10:00AM 1st Negotiations Meeting :  02MAR2015 Time:  9:00 AM ************************************************************ Contract Number : 15718 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 42895713201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Project Description: I-75 (SR 93A) SB Off-Ramp from S of ByPass Canal to EB/WB I-4 Project Manager : Neidringhaus, Amy Budget Amount : $1,482,000 Advertisement Status : Planned Date of Advertisement : 06OCT2014 Longlist(Tech. Rev. Cmte.) Date:  10NOV2014 Time:  3:00 PM Shortlst Selection Date :  14NOV2014 Time:  10:00AM Final Selection Meeting Date :  09JAN2015 Time:  10:00AM 1st Negotiations Meeting :  27JAN2015 Time:  9:00 AM ************************************************************ Contract Number : 15729 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 41673513201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: SR 50/SR 50A Bypass from Broad Street to Jefferson Street. Project Manager : SANTOS, MANUEL Budget Amount : $3,403,000 Advertisement Status : Planned Date of Advertisement : 06OCT2014 Longlist(Tech. Rev. Cmte.) Date:  10NOV2014 Time:  9:00 AM Shortlst Selection Date :  14NOV2014 Time:  10:00AM Final Selection Meeting Date :  09JAN2015 Time:  10:00AM 1st Negotiations Meeting :  22JAN2015 Time:  9:00 AM ************************************************************ Contract Number : 15719 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43473813201 Major Work : 3.1 - Minor Highway Design Minor Work : Project Description: SR 60/Adamo Dr from E of Falkenburg Rd to W of Lake Kathy Entrance Project Manager : GODFREY, MARY LOU Budget Amount : $603,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Longlist(Tech. Rev. Cmte.) Date:  28OCT2014 Time:  3:00 PM Shortlst Selection Date :  31OCT2014 Time:  10:00AM Final Selection Meeting Date :  12DEC2014 Time:  10:00AM 1st Negotiations Meeting :  23DEC2014 Time:  9:00 AM ************************************************************ Contract Number : 15727 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43339123201 Major Work : 6.2 - Traffic Signal Timing Minor Work : Project Description: District Wide Traffic Signal Retiming Project Manager : Napora, Richard Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Longlist(Tech. Rev. Cmte.) Date:  28OCT2014 Time:  2:00 PM Shortlst Selection Date :  31OCT2014 Time:  10:00PM Final Selection Meeting Date :  12DEC2014 Time:  10:00AM ************************************************************ Contract Number : 15730 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43005123201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: SR 50 from Lockhart Road to East of Remington Road. Project Manager : Boulnois, Christina F Budget Amount : $920,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Longlist(Tech. Rev. Cmte.) Date:  28OCT2014 Time:  9:00 AM Shortlst Selection Date :  31OCT2014 Time:  10:00AM Final Selection Meeting Date :  12DEC2014 Time:  10:00AM 1st Negotiations Meeting :  22DEC2014 Time:  9:30 AM ************************************************************ Contract Number : 15731 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 43382112201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: I-275 @ I-4; I-275 from Rome to MLK, I-4 from I-275 to Connector Project Manager : Theung, David O Budget Amount : $3,000,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Longlist(Tech. Rev. Cmte.) Date:  29OCT2014 Time:  10:00AM Shortlst Selection Date :  31OCT2014 Time:  10:00AM Final Selection Meeting Date :  12DEC2014 Time:  10:00AM 1st Negotiations Meeting :  29DEC2014 Time:  9:00 AM ************************************************************ Contract Number : 15738 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41146111207 Major Work : 13.3 - Policy Planning Minor Work : 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP13 - Planning Project Description: District Wide Public Transportation Operations (PTO) Support Project Manager : LAMB, DANNY R Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Shortlst Selection Date :  31OCT2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  23OCT2014 Time:  2:00 PM Final Selection Meeting Date :  12DEC2014 Time:  10:00AM ************************************************************ Contract Number : 15741 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 40458016212 Major Work : 9.3 - Highway Materials Testing Minor Work : 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing 10.3 - Construction Materials Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: District 7 Materials Testing Project Manager : Koloc, Angela L Budget Amount : $3,000,000 Advertisement Status : Planned Date of Advertisement : 29SEP2014 Longlist(Tech. Rev. Cmte.) Date:  27OCT2014 Time:  10:00AM Shortlst Selection Date :  31OCT2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  09DEC2014 Time:  9:00 AM Final Selection Meeting Date :  12DEC2014 Time:  10:00AM ************************************************************ Contract Number : 15705 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 41101146201 41101226201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: 411011 4 62 01, I-75 (SR 93) from S. of US 98/SR 50/Cortez to N of US 98/SR 50/Cortez. (AND) 411012 2 62 01, I-75 (SR 93) from N. of SR 50 to Hernando/Sumter Co/L Project Manager : LAY, TOM Budget Amount : $2,156,284 Advertisement Status : Planned Date of Advertisement : 08SEP2014 Longlist(Tech. Rev. Cmte.) Date:  08OCT2014 Time:  9:00 AM Shortlst Selection Date :  10OCT2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  12NOV2014 Time:  9:00 AM Final Selection Meeting Date :  14NOV2014 Time:  10:00AM 1st Negotiations Meeting :  02DEC2014 Time:  9:00 AM ************************************************************ Contract Number : 15736 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43574812201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: Hillsborough Ave. Corridor Evaluation from Memorial Hwy to I-275 Project Manager : LAMB, DANNY R Budget Amount : $1,000,000 Advertisement Status : Planned Date of Advertisement : 25AUG2014 Longlist(Tech. Rev. Cmte.) Date:  23SEP2014 Time:  3:00PM Shortlst Selection Date :  26SEP2014 Time:  10:00AM Final Selection Meeting Date :  14NOV2014 Time:  10:00AM ************************************************************ Contract Number : 15717 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 40582253201 Major Work : 3.2 - Major Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization Project Description: US 19 from Cardinal St to Green Acres St. Project Manager : SANTOS, MANUEL Budget Amount : $1,944,000 Advertisement Status : Planned Date of Advertisement : 18AUG2014 Longlist(Tech. Rev. Cmte.) Date:  16SEP2014 Time:  9:00 AM Shortlst Selection Date :  26SEP2014 Time:  10:00AM Final Selection Meeting Date :  14NOV2014 Time:  10:00AM 1st Negotiations Meeting :  03DEC2014 Time:  9:00 AM ************************************************************ Contract Number : 15720 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43480713201 Major Work : 3.1 - Minor Highway Design Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: US 19 (SR 55) from S of Live Oak St to N of Brittany Pary Blvd Project Manager : Schneider, Henry J Budget Amount : $613,000 Advertisement Status : Planned Date of Advertisement : 18AUG2014 Longlist(Tech. Rev. Cmte.) Date:  16SEP2014 Time:  9:00 AM Shortlst Selection Date :  26SEP2014 Time:  10:00AM Final Selection Meeting Date :  14NOV2014 Time:  10:00AM 1st Negotiations Meeting :  02DEC2014 Time:  10:00AM ************************************************************ Contract Number : 15710 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41101443201 41101173201 41101253201 Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design Project Description: 411014 4; I-75 (SR 93) from N of SR 52 to Pasco/Hernado Co/L 411011 7; I-75 from Pasco/Hernando Co/L to S of US98/SR 50/ Cortez. 411012 5; I-75 from N of SR 50 to Hernando/Sumter Co/L Project Manager : Chandler, Rob w Budget Amount : $762,000 Special Notes: Project information can be found at the following address: ftp://ftp.dot.state.fl.us/fdot/d7/Planning Production/produc tion/ProjectManagement/Tim%20F/ Copy and paste this address into your web browser. Please delete any spaces or other information that appears on your address site that is not listed in the above address.You will also need to place an underscore between "Planning" and "Production". These spaces and other added characters will cause an error in searching for this site. Advertisement Status : Planned Date of Advertisement : 11AUG2014 Longlist(Tech. Rev. Cmte.) Date:  09SEP2014 Time:  9:00 AM Shortlst Selection Date :  09SEP2014 Time:  10:00AM Final Selection Meeting Date :  31OCT2014 Time:  10:00AM 1st Negotiations Meeting :  18NOV2014 Time:  10:00AM ************************************************************ Contract Number : 15721 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25910911223 Major Work : 13.3 - Policy Planning 13.4 - Systems Planning 13.5 - Subarea/Corridor Planning Minor Work : 13.6 - Land Planning/Engineering 13.7 - Transportation Statistics Project Description: Corridor Sub-Area and Special Transportation Studies. Project Manager : LAMB, DANNY R Budget Amount : $2,000,000 Advertisement Status : Planned Date of Advertisement : 11AUG2014 Shortlst Selection Date :  12SEP2014 Time:  10:00PM Tech. Rev. Cmte Meeting :  10SEP2014 Time:  2:00 PM Final Selection Meeting Date :  31OCT2014 Time:  10:00AM ************************************************************ Contract Number : 15737 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43574912201 Major Work : 2.0 - Proj. Dev. & Environ. (PD&E) Studies Under-Utilized Work Groups: GROUP2 - PD&E Studies Project Description: PD&E US 92 from I-4 to County Line Road Project Manager : Pierce, Stephanie Budget Amount : $1,500,000 Advertisement Status : Planned Date of Advertisement : 11AUG2014 Longlist(Tech. Rev. Cmte.) Date:  10SEP2014 Time:  9:00 AM Shortlst Selection Date :  12SEP2014 Time:  10:00AM Final Selection Meeting Date :  31OCT2014 Time:  10:00AM 1st Negotiations Meeting :  17NOV2014 Time:  9:00 AM ************************************************************ Contract Number : 15716 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43473613201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization Project Description: SR 574/W Reynolds St from E of Turkey Creek Rd to Thonotosassa Rd. Project Manager : Shroyer, Brian Budget Amount : $659,000 Advertisement Status : Planned Date of Advertisement : 28JUL2014 Longlist(Tech. Rev. Cmte.) Date:  25AUG2014 Time:  2:00 PM Shortlst Selection Date :  29AUG2014 Time:  10:00AM Final Selection Meeting Date :  10OCT2014 Time:  10:00AM 1st Negotiations Meeting :  23OCT2014 Time:  9:00 AM ************************************************************ Contract Number : 15725 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43227013201 Major Work : 4.2.3 - Major Bridge Design - Segmental Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: Skyway Bridge Corridor Engineering Services Project Manager : Pye, Bronoris Budget Amount : $346,000 Advertisement Status : Planned Date of Advertisement : 28JUL2014 Longlist(Tech. Rev. Cmte.) Date:  26AUG2014 Time:  10:00AM Shortlst Selection Date :  29AUG2014 Time:  10:00AM Scope Meeting Date :  09SEP2014 Time:  1:30PM Final Selection Meeting Date :  10OCT2014 Time:  10:00AM ************************************************************ Contract Number : 15704 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 25842226202 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: Interstate Construction Manager Project Manager : CAMPBELL, CONRAD Maximum Contract Amount: $5,000,000 See Standard Notes Above: 4,8 Special Notes: *THIS PROJECT IS BEING ADVERTISED WITH EXPANDED LOR's***** ************************************************************ This project is being advertised utilizing special notes 8 under the Notice to Professional Consultants (DBE Under- Utilization). ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, including this project's scope of services, must be directed to the Professional Services Unit staff, preferably the Contract Administrator, Jose Vazquez, at 813-975-6453. The Technical Review Committee Members for the project will be: Conrad Campbell, Terry Jennings, Mike Kopotic. Technical Review Committee Members are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 08JUL2014 Response Deadline : 21JUL2014 Shortlst Selection Date :  08AUG2014 Time:  10:00AM Tech. Rev. Cmte Meeting :  06AUG2014 Time:  2:00 PM Final Selection Meeting Date :  08AUG2014 Time:  10:00AM Response Deadline : 21JUL2014 Respond To: d7.profserv@dot.state.fl.us Attn.: Jose Vazquez Phone: 813-975-6453 ************************************************************ Contract Number : 15713 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42895413201 Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.2.1 - Major Bridge Design - Concrete 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP6 - Traffic Engineering & Operations Studies GROUP8 - Surveying & Mapping Project Description: I-75/SR 93 NB On-Ramp from EB/WB I-4 to South of ByPass Canal. Project Manager : SANTOS, MANUEL Estimated Contract Amt: $2,303,000 See Standard Notes Above: 8 Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Rayesha Cotton at 813-975-6656. The Design Cost estimate is $2,303,000. The Construction Cost estimate is $15,323,000. ************************************************************ The Technical Review Committee for this project will be: Manuel Santos, Amy Neidringhaus, David Pelham, and Kirk Bogen (ALT). The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 18JUL2014 Shortlst Selection Date :  08AUG2014 Time:  10:00AM Scope Meeting Date :  21AUG2014 Time:  1:30 PM Tech. Rev. Cmte Meeting :  05AUG2014 Time:  9:00 AM Final Selection Meeting Date :  26SEP2014 Time:  10:00AM 1st Negotiations Meeting :  09OCT2014 Time:  9:00 AM Response Deadline : 18JUL2014 Respond To: d7.profserv@dot.state.fl.us Attn.: Rayesha Cotton Phone: 813-975-6656 ************************************************************ Contract Number : 15740 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25464613291 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: District Wide Community Traffic Safety Team Consultant Study/Design Project Manager : Boulnois, Christina F Maximum Contract Amount: $1,500,000 See Standard Notes Above: 8 Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Toni Loyd at 813-975-6414. ************************************************************ The Design Cost estimate is $1,500,000. ************************************************************ The Technical Review Committee for this project will be: Christina Boulnois, Dave Skrelunas, Kevin Dunn, (ALT) - Stephen Benson. The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 30JUN2014 Response Deadline : 11JUL2014 Longlist(Tech. Rev. Cmte.) Date:  05AUG2014 Time:  2:00 PM Shortlst Selection Date :  08AUG2014 Time:  10:00AM Scope Meeting Date :  19AUG2014 Time:  1:00 PM Final Selection Meeting Date :  12SEP2014 Time:  10:00AM Response Deadline : 11JUL2014 Respond To: d7.profserv@dot.state.fl.us Attn.: Toni Loyd Phone: 813-975-6414 ************************************************************ Contract Number : 15714 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43431713201 Major Work : 4.1.2 - Minor Bridge Design Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: CR 582/Knights Griffin Rd. from Itchepackesassa Ck to BR# 100265 Project Manager : Schneider, Henry J Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Alundra Gibbs at 813-975-6469. ************************************************************ The Design Cost estimate is $618,452. The Construction Cost estimate is $1,509,779. ************************************************************ The Technical Review Committee for this project will be: Hank Schneider, Scott Arnold, Daniel Lauricello, Elisha Masseus (Alternate). The Technical Review Committee Members are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 16JUN2014 Longlist(Tech. Rev. Cmte.) Date:  17JUL2014 Time:  10:00AM Shortlst Selection Date :  25JUL2014 Time:  10:00AM Shortlist Selection Posting :  25JUL2014 Scope Meeting Date :  07AUG2014 Time:  1:30 PM Final Selection Meeting Date :  12SEP2014 Time:  10:00AM 1st Negotiations Meeting :  23SEP2014 Time:  9:00 AM Shortlisted Firms: AGENOR & CAMPBELL STRUCTURAL ENGINE FLORIDA BRIDGE AND TRANSPORTATION PATEL, GREENE AND ASSOCIATES, PLLC ************************************************************ Contract Number : 15715 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43472913201 Major Work : 3.1 - Minor Highway Design Minor Work : 7.1 - Signing, Pavement Marking & Channelization 7.3 - Signalization 8.2 - Design, Right of Way, & Const. Surveying Project Description: USB 41/SR 685/N Florida from S of Sligh Ave to S of River Shore Dr. Project Manager : Schneider, Henry J Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Rayesha Cotton at 813-975-6656. ************************************************************ The Design Cost estimate is $659,000. The Construction Cost estimate is $900,100. ************************************************************ The Technical Review Committee for this project will be: Hank Schneider, Rochelle Garrett, Michael Ojo. Richard Griffin (Alternate). The Technical Review Committee Members are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 09JUN2014 Longlist(Tech. Rev. Cmte.) Date:  08JUL2014 Time:  2:00 PM Shortlst Selection Date :  15JUL2014 Time:  10:00AM Shortlist Selection Posting :  15JUL2014 Scope Meeting Date :  28JUL2014 Time:  11:30AM Final Selection Meeting Date :  29AUG2014 Time:  10:00AM 1st Negotiations Meeting :  10SEP2014 Time:  9:00 AM Shortlisted Firms: AMERICAN INFRASTRUCTURE DEVELOPMENT BAYSIDE ENGINEERING, INC. CUMBEY & FAIR, INC. ************************************************************ Contract Number : 15712 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 41685613201 Major Work : 7.3 - Signalization Minor Work : 3.1 - Minor Highway Design 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.4 - Right of Way Mapping Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: SR 60/Kennedy Blvd from Armenia Ave to Brevard Ave. Project Manager : Chianese, Mark Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Dave Bouffard at 813-975-6628. ************************************************************ The Design Cost estimate is $903,000. The Construction Cost estimate is $1,370,400. ************************************************************ The Technical Review Committee for this project will be: Mark Chianese, Rochelle Garrett, Sandra Gonzalez. The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 02JUN2014 Longlist(Tech. Rev. Cmte.) Date:  08JUL2014 Time:  2:00 PM Shortlst Selection Date :  11JUL2014 Time:  10:00AM Shortlist Selection Posting :  11JUL2014 Scope Meeting Date :  23JUL2014 Time:  1:30 PM Final Selection Meeting Date :  29AUG2014 Time:  10:00AM 1st Negotiations Meeting :  10SEP2014 Time:  9:00 AM Shortlisted Firms: BASLEE ENGINEERING SOLUTIONS, INC. COMPREHENSIVE ENGINEERING SERVICES, KISINGER CAMPO & ASSOCIATES, CORP. ************************************************************ Contract Number : 15739 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25455313293 Major Work : 6.1 - Traffic Engineering Studies Minor Work : 3.1 - Minor Highway Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway Project Description: District Wide Safety Studies and Minor Design Project Manager : Skrelunas, David Special Notes: The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, including this project's scope of services, should be addressed to the Contract Administrator, Jose Vazquez at 813-975-6453. ************************************************************ The Technical Review Committee for this project will be: Dave Skrelunas, Sandra Gonzalez, Kevin Dunn, Stephen Benson (Alt 1), William Riha (Alt 2). The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Longlist(Tech. Rev. Cmte.) Date:  24JUN2014 Time:  10:00AM Shortlst Selection Date :  27JUN2014 Time:  10:00AM Shortlist Selection Posting :  27JUN2014 Scope Meeting Date :  08JUL2014 Time:  1:30 PM Tech. Rev. Cmte Meeting :  05AUG2014 Time:  11:00AM Final Selection Meeting Date :  08AUG2014 Time:  10:00AM Shortlisted Firms: DKS ASSOCIATES, INC. ICON CONSULTANT GROUP, INC. TBE GROUP, INC. ************************************************************ Contract Number : 15728 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 40582226201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Under-Utilized Work Groups: GROUP10 - Rdwy Construction Engineering Inspection Project Description: US 19 (SR 55) from W Green Acres St to W Jump Ct. Project Manager : Hoover, Dave Special Notes: The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Dave Bouffard at 813-975-6628. ************************************************************ The Technical Review Committee Members for the project will be Dave Hoover, Terry Jennings and Conrad Campbell. Technical Review Committee Members are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 05MAY2014 Longlist(Tech. Rev. Cmte.) Date:  10JUN2014 Time:  10:00AM Shortlst Selection Date :  13JUN2014 Time:  10:00AM Shortlist Selection Posting :  13JUN2014 Tech. Rev. Cmte Meeting :  01JUL2014 Time:  9:00 AM Final Selection Meeting Date :  11JUL2014 Time:  10:00AM Final Selection Posting Date :  11JUL2014 1st Negotiations Meeting :  23JUL2014 Time:  9:00 AM Rank Consultant 1 AIM ENGINEERING AND SURVEYING 2 JACOBS ENGINEERING GROUP, INC. 3 KCCS, INC. ************************************************************ Contract Number : 15701 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 25633926201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : Project Description: SR 54 from E of Suncoast Pkwy to W of US 41 Project Manager : Liddle, Bob Special Notes: The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Dave Bouffard at 813-975-6628. ************************************************************ The Technical Review Committee Members for the project will be Dave Hoover, Terry Jennings and Conrad Campbell. Technical Review Committee Members are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29APR2014 Longlist(Tech. Rev. Cmte.) Date:  27MAY2014 Time:  9:00 AM Shortlst Selection Date :  30MAY2014 Time:  10:00AM Shortlist Selection Posting :  30MAY2014 Tech. Rev. Cmte Meeting :  24JUN2014 Time:  9:00 AM Final Selection Meeting Date :  27JUN2014 Time:  10:00AM Final Selection Posting Date :  27JUN2014 Rank Consultant 1 JOHNSON-ADAMS & ASSOCIATES, LLC 2 JBS ENGINEERING TECHNICAL SERVICES 3 Roberts Consulting Services, Inc. 4 OM ENGINEERING SERVICES, INC. ************************************************************ Contract Number : 15706 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42895313201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 9.4.2 - Non-Redundant Bridge Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Under-Utilized Work Groups: GROUP4 - Highway Design - Bridge Project Description: I-75 /SR 93A from WB SR 60 Entrance Ramp to S of CSX RR / CR 574 Project Manager : Shroyer, Brian Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Alundra Gibbs at 813-975-6469. The Design Cost estimate is $2,489,387. The Construction Cost estimate is $11,391,117. The Technical Review Committee for this project will be: Brian Shroyer, Kirk Bogen and Daniel Carnley. Technical Review Committee Members are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 29APR2014 Longlist(Tech. Rev. Cmte.) Date:  28MAY2014 Time:  3:00PM Shortlst Selection Date :  30MAY2014 Time:  10:00AM Shortlist Selection Posting :  30MAY2014 Scope Meeting Date :  06JUN2014 Time:  9:30 AM Final Selection Meeting Date :  11JUL2014 Time:  10:00AM Final Selection Posting Date :  11JUL2014 1st Negotiations Meeting :  08JUL2014 Time:  9:00 AM Rank Consultant 1 AIM ENGINEERING AND SURVEYING 2 WANTMAN GROUP, INC. 3 RUMMEL, KLEPPER & KAHL, LLP ************************************************************ Contract Number : 15703 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 25452813225 Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Project Description: District Wide Survey Support Project Manager : Parnes, Alex Special Notes: The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm and Subconsultant. involved in preparation of this project's specification package. ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. All questions of any nature regarding this advertisement, including this project's scope of services, must be directed to the Professional Services Unit staff, preferably the Contract Administrator, Toni Loyd, at 813-975-6414. The estimated fee for this contract is $1,500,000. The Technical Review Committee for this project will be: Alex Parnes, Jerry Long, Katasha Cornwell. Technical Review Committee Members are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 07APR2014 Longlist(Tech. Rev. Cmte.) Date:  05MAY2014 Time:  10:00AM Shortlst Selection Date :  09MAY2014 Time:  10:00AM Shortlist Selection Posting :  09MAY2014 Scope Meeting Date :  21MAY2014 Time:  1:30 PM Final Selection Meeting Date :  27JUN2014 Time:  10:00AM Final Selection Posting Date :  27JUN2014 Rank Consultant 1 ELEMENT ENGINEERING GROUP,LLC 2 AERIAL CARTOGRAPHICS OF AMERICA, IN 3 CIVILSURV DESIGN GROUP, INC. 4 ECHEZABAL & ASSOCIATES, INC. ************************************************************ Contract Number : 15709 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43272013201 Major Work : 3.1 - Minor Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP7 - Traffic Operations Design Project Description: US 19 (SR 55) from S of Toucan Trail to Cortez Blvd Project Manager : Chandler, Rob w Special Notes: This project is being advertised utilizing special notes 8 under the Notice to Professional Consultants (DBE Under- Utilization). The following work types that are Under- Utilized for this advertisement are: 3.1, 4.1.1, 7.1, 7.2, 7.3, ************************************************************ The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. All questions of any nature regarding this advertisement, including this project's scope of services, should be addressed to the Contract Administrator, Alundra Gibbs at 813-975-6469. The Design cost estimate is $1,442,000. ************************************************************ The Technical Review Committee for this project will be: Daniel Lauricello, Edgar Munoz, Mark Chianese and Rob Chandler (Observer). The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 10MAR2014 Longlist(Tech. Rev. Cmte.) Date:  07APR2014 Time:  2:00 PM Shortlst Selection Date :  11APR2014 Time:  10:00AM Shortlist Selection Posting :  11APR2014 Scope Meeting Date :  24APR2014 Time:  1:30 PM Final Selection Meeting Date :  30MAY2014 Time:  10:00AM Final Selection Posting Date :  30MAY2014 1st Negotiations Meeting :  11JUN2014 Time:  9:00 AM Rank Consultant 1 HORIZON ENGINEERING GROUP, INC. 2 BURGESS & NIPLE, INC. 3 DRMP, INC. ************************************************************ Contract Number : 15702 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): 25911711225 Major Work : 13.7 - Transportation Statistics Under-Utilized Work Groups: GROUP13 - Planning Project Description: District Wide Highway Statistic Data Project Manager : SCOTT, JIM F Special Notes: The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ The purpose of this contract is to provide the Department with professional services for collecting and documenting highway statistics data. ************************************************************ All questions of any nature regarding this advertisement, including this project's scope of services, should be addressed to the Contract Administrator, Toni Loyd at 813-975-6414. The Technical Review Committee for this project will be: Jim Scott, Van Black, Danny Lamb. The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Longlist(Tech. Rev. Cmte.) Date:  25MAR2014 Time:  9:00 AM Shortlst Selection Date :  28MAR2014 Time:  10:00AM Shortlist Selection Posting :  28MAR2014 Scope Meeting Date :  15APR2014 Time:  10:30AM Tech. Rev. Cmte Meeting :  06MAY2014 Time:  10:00AM Final Selection Meeting Date :  09MAY2014 Time:  10:00AM Final Selection Posting Date :  09MAY2014 1st Negotiations Meeting :  21MAY2014 Time:  9:00 AM Rank Consultant 1 FLORIDA TRANSPORTATION ENGINEERING, 2 MARLIN ENGINEERING, INC. 3 CALTRAN ENGINEERING GROUP, INC. ************************************************************ Contract Number : 15707 Major Project Selection Procedure: Letter of Response and Oral Presentation Financial Management Number(s): 42925113201 Major Work : 3.2 - Major Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP6 - Traffic Engineering & Operations Studies GROUP7 - Traffic Operations Design Project Description: I-75 (SR 93A) from S of CSX/Broadway Ave to EB/WB I-4 Exit Ramp Project Manager : Neidringhaus, Amy Special Notes: This project is being advertised utilizing special notes 8 under the Notice to Professional Consultants (DBE Under- Utilization). The following work types that are Under- Utilized for this advertisement are: 3.2, 4.1.1, 4.1.2,7.1, 7.2 ************************************************************ The letter of response must include the name and experience level of the individual(s) that will perform the construct- ability and bidability reviews. Also include the name, experience level, and training of each individual (prime firm, subconsultant, office preparing/signing/sealing) involved in preparation of this project's specification package. The Department reserves the right to add or delete projects within District 7 on similar type of work at any time during this contract. ************************************************************ All questions of any nature regarding this advertisement, to the Professional Services Unit staff, preferably the Contract Administrator, Rayesha Cotton at 813-975-6656. The Design Cost estimate is $2,801,000. The Construction Cost estimate is $41,474,200. The Technical Review Committee for this project will be: Amy Neidringhaus, Steve Nolan, Kirk Bogen. The Technical Review Committee Member are subject to change, according to availability. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Longlist(Tech. Rev. Cmte.) Date:  25MAR2014 Time:  3:00 PM Shortlst Selection Date :  28MAR2014 Time:  10:00AM Shortlist Selection Posting :  28MAR2014 Scope Meeting Date :  09APR2014 Time:  11:00AM Final Selection Meeting Date :  09MAY2014 Time:  10:00AM Final Selection Posting Date :  09MAY2014 1st Negotiations Meeting :  21MAY2014 Time:  9:00 AM Rank Consultant 1 AMERICAN CONSULTING ENGINEERS OF FL 2 HNTB CORPORATION 3 JACOBS ENGINEERING GROUP, INC. ************************************************************ Design/Build Projects Procurement Number : E7I42 Financial Management Number(s): 41101145201 41101225201 41101145603 Project Description: I-75 from S of SR50 to N of SR50 & from N of SR50 to the Sumter-Hernando County Line Work Mix: Improvements will include roadway, drainage, bridges, walls, miscellaneous structures, signing and pavement marking, signalization, intelligent transportation systems, lighting, geotechnical, landscaping, utilities, subsurface utility engineering, public involvement and environmental permitting. Project Description: Design and construction of added lanes on I-75 (SR 93) in Hernando County from south of US 98/SR 50/Cortez Blvd to north of US 98/SR 50/Cortez Blvd (411011-4-52-01), and from north of US 98/SR 50/Cortez Blvd to the Hernando/Sumter County Line (411012-2-52-01), as well as reconstruction/ rehabilitation of the existing I-75 lanes, replacement of the bridges over US 98/SR 50, various improvements to the interchange and its ramps, added lanes and resurfacing on a portion of US 98/SR 50, HernandoCounty Utility Work By Highway Contractor (411011-4-56-03), and other work. Improvements include, but are not limited to, location surveys, roadway, earthwork, drainage, bridges, miscellaneous structures, guardrail, retaining walls, geotechnical investigations, traffic control, utility coordination, utility construction, removal of existing utility infrastructure, subsurface utility engineering, signing and pavement markings, signalization, lighting, Intelligent Transportation Systems (ITS), landscaping concepts, public involvement, and environmental permitting. I-75/SR 93 is currently a four-lane divided, rural principal arterial interstate highway with a 64-foot grassed median, and design and posted speeds of 70 miles per hour. I-75 is part of the National Highway System, the Florida Intrastate Highway System (FIHS) and the Florida's Strategic Intermodal System (SIS), and is a designated hurricane evacuation route with an Access Management Classification of "1" (Freeway). SR 50 is currently a four-lane divided, rural principal arterial (other) highway with design and posted speeds of 45 miles per hour (approved Design Speed Exception, dated February 28, 2013). SR 50 is a designated hurricane evacuation route, and west of I-75, is part of the Florida's Strategic Intermodal System (SIS). The Withlacoochee State Forest borders most of the I-75 right-of-way north of SR 50, including stormwater treatment in natural depressions. Project Manager : Neidringhaus, Amy Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading Drainage Flexible Paving Hot Plant Mixed Bituminous Courses Portland Cement Concrete Roadway Paving Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 5.4 - Bridge Load Rating 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Additional Bridge Design Work Types : Must be prequalified in work type 4.1.2 : Minor Bridge Design OR 4.2.1 : Major Bridge Design Concrete OR 4.2.2 : Major Bridge Design Steel NEW FORM MUST BE SUBMITTED FOR THIS PROJECT: Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit a completed and signed Bridge Design Qualification Form (see the link to the "Bridge Qualification Form" above) along with the ELOI by the date/time deadline established for the ELOI. Technical Questions Should Be Addressed To: Technical Questions should be addressed to: www3b.dot.state.fl.us/BidQuestionsAndAnswers/ Proposal.aspx/SearchProposal DBE/MBE Requirements: See Preamble. Special Notes: STIPEND AMOUNT: $162,000 RESTRICTED CONSULTANTS: In accordance with RESTRICTION ON CONSULTANTS' ELIGIBILITY TO COMPETE FOR DEPARTMENT CONTRACTS (TOPIC 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 7 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. KCA C8N04 Tierra, Inc. C8N04 & C8O63 American Consulting Engineers C8O63 Cumby & Fair C8O63 Atkins C8Z94 CLICK HERE FOR ADDITIONAL INFORMATION View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 07JUL2014 Response Deadline : 01AUG2014 PhaseI Selection Cmte. Meeting :  25AUG2014 Time:  10:00AM ELOI Scores Notification Date :  29AUG2014 Time:  05:00PM Deadline for Election to Participate in Ph. II :  01SEP2014 Time:  05:00PM Posting of Shortlist :  02SEP2014 Time:  12:00PM PhaseII Tech. Proposal Due Date:  08DEC2014 Time:  02:30PM Final Selection Meeting Date :  30JAN2015 Time:  10:00AM Phase I ELOI Response Deadline : 01AUG2014 05:00PM Respond To: Florida DOT - District 7 11201 N. McKinley Drive, MS 7-830 Tampa, FL 33612-6456 Attn: Rahnee Oliver Procurement Services/District Contracts Phone: 813-975-6463 d7.designbuild@dot.state.fl.us ************************************************************ Procurement Number : E7I46 Financial Management Number(s): 25633925201 Project Description: SR 54 from E of Suncoast Parkway to W of US 41 (SR 45). The proposed construction shall involve widening from four lanes to six lanes throughout the project limits. The exist- ingpavement and shoulder adjacent to the widening shall be milled and resurfaced. A 5 foot sidewalk will be constructed at the back of the right-of-way (sidewalk can meander through, keeping in mind utility adjustments/relocations should be avoided or minimized to the greatest extent practicable while remaining within FDOT criteria) in lieu of extended 6-foot shoulder for pedestrians shown in the Final Design Plans and the final SEIR. Improvements will include roadway, drainage, walls, miscellaneous structures, signing & pavement marking signalization, lighting, conceptual landscaping, geotechnical, and subsurface utility engineering. Other associated efforts will include Public Involvement, Utility Coordination and Environmental Permitting. Project Manager : Boulnois, Christina F Selection Procedure : LOW BID TYPE Response Requested : BID PROPOSAL Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Contractors will require prequalification in Grading, Drainage, Flexible Paving, Hot Plant-Mixed Bituminous Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 6.2 - Traffic Signal Timing 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 2.0 - Proj. Dev. & Environ. (PD&E) Studies 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 15.0 - Landscape Architect CLICK HERE FOR ADDITIONAL INFORMATION View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 17JUN2014 Response Deadline : 14AUG2014 Pre-Bid Meeting Date :  17JUN2014 Time:  01:30 P Bids Due Date :  14AUG2014 Time:  02:30 P Bid Opening Date :  14AUG2014 Time:  02:30 P Final Selection Meeting Date :  29AUG2014 Time:  10:00 A Response Deadline : 14AUG2014 Respond To: Florida DOT - District 7 11201 N. McKinley Drive, MS 7-830 Tampa, FL 33612-6456 Attn: Rahnee Oliver Procurement Services/District Contracts Phone: 813-975-6463 d7.designbuild@dot.state.fl.us ************************************************************ Procurement Number : E7J19 Financial Management Number(s): 40582225201 40582225601 40582225602 Project Description: Design and construction of improvements to US 19 from West Green Acres Street to West Jump Court in Citrus County. This section of US 19 is the primary north/south rural principal arterial which follows the west coast of Florida. The project is part of the National Highway System and the Florida Intrastate Highway System. This facility serves Citrus County as the major evacuation route. The scope of work includes all investigations, design, permitting, coordination, final approved construction documents, and construction activities necessary for complete six-laning and additional improvements specified herein. The project limits extend along US 19/SR 55 (02-030-000) from West Green Acres Street (MP 6.811) to West Jump Court (MP 8.880). * County: Citrus * STIPENDS: $45,000.00 The Department will pay stipends to the shortlisted firms based on the guidelines noted in the preamble of this advertisement. * PREAMBLE: The notice to contractor/consultants preamble at the top of this webpage is applicable to this advertisement and made a part hereof. You are responsible for reading it. Project Manager : SHEETS, MARY Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading Drainage Flexible Paving Hot Plant-Mixed Bitum. Courses Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.2 - Major Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Additional Bridge Design Work Types : Must be prequalified in work type 4.1.2(Minor Bridge Design) or 4.2.1(Major Bridge Design-Concrete), or 4.2.2(Major Bridge Design-Steel), or 4.2.3(Major Bridge Design- Segmental) NEW FORM MUST BE SUBMITTED FOR THIS PROJECT: Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit a completed and signed Bridge Design Qualification Form (see the link to the "Bridge Qualification Form" above) along with the ELOI by the date/time deadline established for the ELOI. Please refer to this preamble and advertisement for other submittal directions. Technical Questions Should Be Addressed To: All questions should be addressed on the Department's Bid Question and Answer Website at: http://www2.dot.state.fl.us/construction/bidquestionmain.asp * When submitting questions reference contract number E7J19. You are responsible for monitoring this site for answers up to one day prior to the price opening. * DBE/MBE Requirements: For this project, the Department has established an aspirational goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small Business usage, representing the a cumulative 12.0% committment of total contract costs. Firms proposing this project shall aspire to have 9.0% or more of the total contract costs performed by Non-DBE Small Businesses. Special Notes: Proposal Evaluators: Katherine Kehres Donald Rogers Jeremy Fletcher Advertisement Status : Shortlisted Date of Advertisement : 03MAR2014 PhaseI Selection Cmte. Meeting :  25APR2014 Time:  10:00AM ELOI Scores Notification Date :  25APR2014 Time:  05:00PM Deadline for Election to Participate in Ph. II :  28APR2014 Time:  05:00PM Posting of Shortlist :  29APR2014 Time:  12:00PM Mand. Pre-Proposal Meeting Date:  13MAY2014 Time:  10:00AM PhaseII Tech. Proposal Due Date:  04AUG2014 Time:  02:30PM Price Proposal Due Date :  18SEP2014 Time:  02:30PM Proposal Opening Date :  18SEP2014 Time:  02:30PM Final Selection Meeting Date :  26SEP2014 Time:  10:00AM Shortlisted Firms PhaseI Score AJAX PAVING INDUSTRIES OF FL, LLC 16.3 CONE & GRAHAM INC 17.3 D.A.B. CONSTRUCTORS, INC. 14.3 SOUTHLAND CONSTRUCTION,INC. 14.7 ************************************************************ Procurement Number : E7I34 Financial Management Number(s): 41101135201 Project Description: Improvements to I-75 (SR 93) from the Pasco/Hernando County County Line to South of US 98/SR 50/Cortez. Improvements will include public involvement, roadway, structures, drainage, geotechnical, traffic control, utilities, subsurface utility engineering, right-of-way, environmental intelligent transportation systems and signing and pavement marking. The intent of the project is to widen I-75 from four lanes to six lanes, including all other construction necessary to accomodate the widening. Project Manager : Neidringhaus, Amy Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading Drainage Flexible Paving Hot Plant-Mix Bituminous Courses Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 7.1 - Signing, Pavement Marking & Channelization 9.4.1 - Standard Foundation Studies Advertisement Status : Final Selection Date of Advertisement : 03SEP2013 PhaseI Selection Cmte. Meeting :  11OCT2013 Time:  10:00AM ELOI Scores Notification Date :  14OCT2013 Time:  05:00PM Deadline for Election to Participate in Ph. II :  17OCT2013 Time:  05:00PM Posting of Shortlist :  09DEC2013 Time:  12:00PM Mand. Pre-Proposal Meeting Date:  31OCT2013 Time:  10:00AM PhaseII Tech. Proposal Due Date:  19DEC2013 Time:  02:30PM Price Proposal Due Date :  23JAN2014 Time:  02:30PM Proposal Opening Date :  23JAN2014 Time:  02:30PM Final Selection Meeting Date :  30JAN2014 Time:  10:00AM Posting of Award :  12MAY2014 Time:  5:02PM PhaseI PhaseII Prop Bid Price Rank Consultant Score Score Time Proposal 1 MIDDLESEX CORPORATION 17.3 75.0 $35,188,969 2 LANE CONSTRUCTION CORPORATION 17.3 66.0 $31,962,380 3 GRANITE CONSTRUCTION COMPANY 17.5 64.0 $33,680,424 ************************************************************ Procurement Number : E7F49 Financial Management Number(s): 41636125201 41636135201 Project Description: -416361-3 (Option A) Selmon Crosstown Expressway(SR 618) Widening the existing bridges from Morgan St to 19th St., providing 3-12 foot lanes and 10 foot outside shoulders, Deck Replacement. Project also consists of replacement of composite precast prestressed deck panel /cast-in-place deck with full section cast-in-place concrete decks, barrier walls, drainage elements, expansion joints, lighting, and miscellaneous work for the following bridges on the Lee Roy Selmon Crosstown Expressway: 100332 (WB) from West of Morgan Street to 19th St. 100333 (EB) from West of Morgan Street to 19th St. -416361-2 (Option B) Lee Roy Selmon Crosstown Expressway SR 618) Deck Panel Replacement consisting of replacement of composite precast prestressed deck panel/cast-in-place concrete bridge deck with full section cast-in-place concret deck, barrier walls, drainage elements, expansion joints, lighting, andmiscellaneous work for the following bridges on the Lee Roy Selmon Crosstown Expressway: 100332 (WB) from West of Morgan Street to 12th St. 100333 (EB) from West of Morgan Street to 12th St. - The purpose of the forum is to inform potential Design Build teams, both contractors and design consultants, of the important elements and considerations of the projects. Utility owners within the project limits will also be in attendance to stress thecoordination of utility related issues. Attendance is notmandatory but recommended to learn more about the projects. Both projects are to be advertised but only one will be let. Both projects are advertised because final approval of the financing of 416361-3 is pending. The decision regarding which project is to be let will be made prior to shortlisting. - Click on the "Link for Additional Information" below and select the "Design Build" section the left hand side to download a complete copy of the Request for Letter of Interest document. Project Manager : CRESCENTINI, LYNDA Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 5 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): The Prime Construction Contractor must be Pre-Qualified in Major Bridges (Bridges which include Curved Steel Girders) The Prime Construction Contractor must also be pre-qualified or provide a subcontrator who is pre-qualified in Grading, Drainage, Flexible Paving, and Bridge Painting. Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 4.1.2 - Minor Bridge Design 4.2.2 - Major Bridge Design - Steel 2.0 - Proj. Dev. & Environ. (PD&E) Studies 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies Technical Questions Should Be Addressed To: - Special Notes: New Dates will be announced CLICK HERE FOR ADDITIONAL INFORMATION Advertisement Status : Shortlisted Date of Advertisement : 19JAN2010 Longlist(Tech. Rev. Cmte.) Date:  23FEB2010 Time:  0800AM PhaseI Selection Cmte. Meeting :  12MAR2010 Time:  0830AM Posting of Shortlist :  12MAR2010 Time:  Final Selection Date Not Posted ************************************************************ TURNPIKE ************************************************************ Professional Services Consultant Projects Contract Number : 15812 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): TBD Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Project Description: Miscellaneous CEI Services for Florida's Turnpike System of Toll Roads Project Manager : Akers, Karen Budget Amount : $1,500,000 Special Notes: This project advertisement has been reserved for competition among small business firms only (BDI). The projects that will be assigned to this contract will be issued by means of Task Work Orders and as designated by the Turnpike Enterprise's Consultant CEI Manager. Florida's Turnpike Enterprise will be holding Consultant Marketing Sessions for this project advertisement on Wednesday, July 30, 2014. The Marketing Sessions will be held at the Turnpike's Pompano Operations Center, Milepost 65 of Florida's Turnpike, in Room 1176, Pompano Beach, Florida and via video conference from the Turnpike Enterprise's Headquarters, Milepost 263, Building 5315, Turkey Lake Service Plaza, Ocoee, Florida, in Room 2130. Firms interested in scheduling a 30 minute marketing session should contact Judi Fernandez at 407-264-3040 or email her at judith.fernandez@dot.state.fl.us to reserve your firm's 30 minute session. Attendance by firms at an individual marketing session is not mandatory to submit an expanded letter of response for this advertisement. Advertisement Status : Planned Date of Advertisement : 02SEP2014 Longlist(Tech. Rev. Cmte.) Date:  23SEP2014 Time:  10:00AM Shortlst Selection Date :  02OCT2014 Time:  01:30PM Final Selection Meeting Date :  03NOV2014 Time:  01:00PM ************************************************************ Contract Number : 15810 Minor Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): TBD Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Project Description: Miscellaneous Survey Services for Florida's Turnpike Northern System, including utility designates, for Florida's Turnpike facilities that are concentrated in, but not limited to, those facilities of the Turnpike System south of the line between Township 32 South and Township 33 South being the southerly boundary of Hillsborough, Polk and Osceola Counties. Project Manager : SHANNON, MICHAEL Budget Amount : $350,000 Special Notes: THIS PROJECT IS RESERVED FOR COMPETITION AMONG SMALL BUSINESSES ONLY (BDI). The FDOT Project Manager for this project is Mike Joiner. The estimated contract value is $350,000 over three years. Florida's Turnpike will be holding Marketing Sessions for those firms interested in pursuing this project advertisement. The Consultant Marketing Session will be limited to 30 minutes for each individual firm/team and are scheduled for Friday, July 18, 2014, from 8:00AM-4:00PM, in the Turnpike's Headquarters Building located at Milepost 263 Building 5315, Turkey Lake Service Plaza, Ocoee, Florida. Please contact Judi Fernandez at 407-264-3040 or email her at judith.fernandez@dot.state.fl.us to schedule your firm's 30 minute session. Attendance at a marketing session is not mandatory to submit a Letter of Response. Advertisement Status : Planned Date of Advertisement : 28JUL2014 Longlist(Tech. Rev. Cmte.) Date:  15AUG2014 Time:  10:00AM Shortlst Selection Date :  27AUG2014 Time:  01:00PM Final Selection Meeting Date :  27OCT2014 Time:  01:00PM ************************************************************ Contract Number : 15805 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): 43282613201 Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 7.1 - Signing, Pavement Marking & Channelization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing Project Description: This contract has been reserved for competition among small businesses only. The project will include milling, resurfacing and safety improvements for the Turnpike Mainline (State Road 91) from Milepost 216.706 to Milepost 227.017 in Osceola County. The proposed work includes review of previously developed Existing Roadway Conditions Assessment Report (ERCAR) and recommendations. Development of variations, exceptions and/or Design Technical Memorandums. Milling and Resurfacing the existing northbound and southbound travel lanes, including inside and outside shoulders, and roadway median openings. Design criteria upgrades including, but not limited to, guardrail repairs and/or improvements, shoulder drop-off improvement, and cross slope evaluation. Project Manager : SHANNON, MICHAEL Estimated Contract Amt: See Standard Notes Above: 7 Special Notes: Florida's Turnpike Enterprise held 30 minute Technical Panel Sessions for interested firms as scheduled on June 24, 2014. Technical Review Committee Meetings and Shortlist and Final Selection Committee meetings will be held at Florida's Turnpike Enterprise Headquarters, Building 5315, Milepost 263 of Florida's Turnpike, Turkey Lake Service Plaza, Ocoee, Florida. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 14JUL2014 Response Deadline : 25JUL2014 Longlist(Tech. Rev. Cmte.) Date:  04AUG2014 Time:  03:00PM Shortlst Selection Date :  22AUG2014 Time:  02:30PM Final Selection Meeting Date :  20OCT2014 Time:  03:00PM Response Deadline : 25JUL2014 Respond To: tp.profserv@dot.state.fl.us Attn.: Judith Fernandez Phone: 407-264-3040 ************************************************************ Contract Number : 15809 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42815426201 42815436201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Project Description: Construction Engineering and Inspection Services for the Sawgrass Canal Revetment Wall 3 and Wall 6, Broward County. The Estimated Construction Amount for this project is $14,800,000. Project Manager : Akers, Karen Estimated Contract Amt: See Standard Notes Above: 4,9,10 Special Notes: The Construction Project Manager for this Project is Ken Hudson. The services associated with this CEI project includes Canal Revetment along the Sawgrass Expressway to address the overall stability of the embankment slopes throughout the reaches of the canals. These improvements are critical to protecting both the adjacent sound walls and roadway, and to provide a safe environment for maintenance operations. The project consists of repair of the canal slopes that have suffered severe erosion along some of the sections. Florida's Turnpike Enterprise held Consultant Marketing Sessions as scheduled onMonday, June 30, 2014. Consultant's interested in responding to this Advertisement should adhere to the Department's Response Procedure shown above and the Letters of Response shall include, at a minimum, Items a-k of the Department's Response Procedure. Final Selection for this project will be based on the Expanded Letter of Response submitted for this advertisement which must be submitted on the Department's most recent version of the Department's Standard Form. The Standard Form page count does not include resumes, organizational or staffing chart, or required forms and certifications. Resumes should be arranged alphabetically regardless of firm name. Resumes should include a TIN number, a brief description of experience, previous project start and finish dates with reference contact names and phone numbers. A listing, by firm, of the proposed key staff for this project shouls be provided. The list should include the name of staff, the TIN (Technician Identification Number), position, and years of experience. Required forms: Truth in Negotiation Certification; Aspiration Goal Form for "DBE" and "Non-DBE Small Business" firms; Vendor Certification Regarding Scrutinized Companies Lists. All consultants responding to this advertisement must complete the online Bid Opportunity List form located on the Department's Equal Opportunity Office (EOO) website. A Shortlist Selection will be held for this project and factors to be considered by the Selection Committee will include, but are not limited to, performance grades received by the consultant on current or previous Department projects, the volume of work previously awarded to the consultant, the distribution of work among the competing consultants and utilization of new consultants, the workload of each consultant as evidenced by the number of similar projects the consultant is shortlisted on which have not had final selection, as well as the residual fees remaining to be paid to the consultants on active agreements and balancing the needs of the project to the abilities of the consultants, the consultant's past working relationship with the Department on previous projects, and the general and specific information typically used to longlist the consultants. FINAL SELECTION EVALUATION CRITERIA: The Expanded Letters of Response for the shortlisted firms will be evaluated by a Technical Review Committee based upon the following: AWARENESS AND UNDERSTANDING OF THE PROJECT SCOPE: 1) Approach to accomplishing the technical, management, and coordination aspects of the project; approach to quality control (0-15 points); 2) Understanding of the Scope, constructability comments (0-15 points) STAFFING: 1) Proposed staff quality (certifications, training, etc.) (0-25 points); 2) Proposed staff availability and organizational chart (0-10 points), 3) Proposed staff experience (0-25 points); 4) Proposed team's similar project experience, consultant's past performance (0-10 points). RESPONSE PROCEDURES: Consultants responding to this advertisement must comply with all requirements as set forth in the Department's Response Procedure listed in the standard language above. The Expanded Letters of Response must be submitted on the Department's most current version of the Standard Form. Resumes must adhere to the minimum font size of 11, with 1/2 inch margins and are limited to 2 pages in length. The Expanded Letter of Response may not exceed 1MB; however, resumes and other required forms and documents may be submitted separately with a maximum file size of 2MB; or together with the Expanded Letter of Response with a maximum file size of 3MB. The Technical Review Committee Meeting for this project will be held at the Pompano Operations Building, Milepost 65 of Florida's Turnpike, Pompano Beach, Florida 33069. The Shortlist and Final Selection Meetings will be held at the Turkey Lake Headquarters Building, Milepost 263, Florida's Turnpike, Ocoee, Florida 34761. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUL2014 Response Deadline : 18JUL2014 Longlist(Tech. Rev. Cmte.) Date:  11AUG2014 Time:  01:00PM Shortlst Selection Date :  27AUG2014 Time:  01:30PM Final Selection Meeting Date :  08SEP2014 Time:  01:00PM Response Deadline : 18JUL2014 Respond To: tp.profserv@dot.state.fl.us Attn.: Judith Fernandez Phone: 407-264-3040 ************************************************************ Contract Number : 15802 Major Project Selection Procedure: LOR, Technical Proposal & Oral Presentation Financial Management Number(s): 19066633201 19076633201 19289237201 19263147401 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.3 - Intelligent Trans Traffic Eng. Communications 11.0 - Eng Contract Admin and Management Minor Work : 6.1 - Traffic Engineering Studies 6.3.2 - Intelligent Trans Systems Implementation Project Description: General Consultant Services relating to Florida's Turnpike Enterprise Maintenance and Traffic Operations programs for roads, bridges and facilities. These services include road and bridge contract management including management of its bridge inspection contracts, maintenance contract development, maintenance condition survey management, landscape management, toll facilities maintenance management, traffic operations management, intelligent transportation systems operations, bridge quality control management, permits, and transportation safety program. The selected consultant will be required to provide sufficient staff to support each activity and associated program area for a period of five years. A consultant submitting a Letter of Response as a prime shall not appear on another consultant's Letter of Response as a subconsultant. A consultant submitting a Letter of Response as a prime may include subconsultants which appear on a competitor's Letter of Response. Project Manager : ALVAREZ, SANTIAGO S Estimated Contract Amt: See Standard Notes Above: 9 Special Notes: Please note that the Scope of Services for this advertisement has been revised. Please download the Scope now attached to review revised Conflict of Interest Section. PLEASE NOTE THAT THE LETTER OF RESPONSE DUE DATE HAS BEEN EXTENDED TO AUGUST 1, 2014. At the time of this advertisement, Florida's Turnpike Enterprise held, as scheduled, an Industry Forum on June 16, 2014. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 30JUN2014 Response Deadline : 01AUG2014 Longlist(Tech. Rev. Cmte.) Date:  12AUG2014 Time:  11:00AM Shortlst Selection Date :  02SEP2014 Time:  01:00PM Scope Meeting Date :  22SEP2014 Time:  01:30PM Tech. Rev. Cmte Meeting :  20NOV2014 Time:  10:30AM 2nd Tech Rev. Cmte Meeting :  07JAN2015 Time:  04:00PM Final Selection Meeting Date :  16JAN2015 Time:  11:30AM Response Deadline : 01AUG2014 Respond To: tp.profserv@dot.state.fl.us Attn.: Judith Fernandez Phone: 407-264-3040 ************************************************************ Contract Number : 15807 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): TBD Major Work : 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing Minor Work : 9.4.1 - Standard Foundation Studies 9.5 - Geotechnical Speciality Lab Testing Project Description: Miscellaneous Geotechnical and Materials Testing and Inspection Services Turnpike-wide. IT IS THE DEPARTMENT'S INTENT TO AWARD TWO CONTRACTS FROM THIS ADVERTISEMENT. Project Manager : Wai, Paul Maximum Contract Amount: $1,500,000 See Standard Notes Above: 9 Special Notes: The services to be acquired will include supporting Florida's Turnpike Enterprise in the field of soil exploration, geotechnical exploration testing, highway materials testing, foundation studies, construction materials sampling, testing and reporting, pavement evaluation and reporting for any project or plant. The selected consultants shall provide all transportation, manpower, equipment, and materials to perform the appropriate services according to applicable specifications. The Consultant Marketing Sessions were held as scheduled on Wednesday, June 4, 2014. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 16JUN2014 Response Deadline : 27JUN2014 Longlist(Tech. Rev. Cmte.) Date:  14JUL2014 Time:  03:00PM Shortlst Selection Date :  30JUL2014 Time:  01:00PM Final Selection Meeting Date :  10OCT2014 Time:  01:00PM Response Deadline : 27JUN2014 Respond To: tp.profserv@dot.state.fl.us Attn.: Judith Fernandez Phone: 407-264-3040 ************************************************************ Contract Number : 15808 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 24301716201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Project Description: Construction Engineering and Inspection Services for the State Road 417/Turnpike Interchange. Florida's Turnpike Enterprise requires CEI Services for the improvements to SR 417/Turnpike Interchange that include constructing three concrete pavement ramps and one bridge. Project Manager : CHINELLY, JOSEPH Special Notes: Consultant's interested in responding to this advertisement should adhere to the Department's Response Procedure shown above and the Expanded Letters of Response shall include, at a minimum, Items a-k of the Department's Response Procedure. Final Selection for this project will be based on the Expanded Letters of Response submitted for this advertisement and must be submitted on the Department's most recent version of the Standard Form for Expanded Letters of Response. The Standard Form page count does not include resumes, organizational or staffing chart, or other required forms and certifications, and staff hours on summary sheet (one sheet showing the hours of prime and all subconsultants), where applicable. Resumes should be arranged alphabetically regardless of firm name. Resumes are limited to two (2) pages each and must comply with the Department's minimum font size of 11, with 1/2 inch margins, and should include a TIN number, a brief description of experience, previous project start and end dates with reference contact names and phone numbers. A listing, by firm, of proposed key staff for this project should also be included. The list should include the name of staff, the TIN (Technician Identification Number), position, and years of experience. REQUIRED FORMS THAT MUST BE SUBMITTED WITH THE ELOR: Truth in Negotiation Certification (form 375-030-30); Vendor Certification Regarding Scrutinized Companies Lists (form 375-030-60); Aspiration Goal Form (form 375-030-62). All consultants responding to this advertisement must complete the online Bid Opportunity List form located on the Department's Equal Opportunity Office (EOO) website. FINAL SELECTION EVALUATION CRITERIA: The Expanded Letters of Response will be evaluated by a Technical Review Committee based upon the following: AWARENESS AND UNDERSTANDING OF THE PROJECT SCOPE: 1) Approach to accomplishing the technical, management, and coordination aspects of the project, approach to quality control (0-15 points); 2) Understanding of the Scope, constructability comments (0-15 points) STAFFING: 1) Proposed staff quality (certifications, training, etc.) (0-25 points); 2) Proposed staff availability and organizational chart (0-10 points); 3) Proposed staff experience (0-25 points); 4) Proposed team's similar project experience, consultant's past performance (0-10 points). RESPONSE PROCEDURE: Consultants responding to this advertisement must comply with all requirements as set forth in the Department's Response Procedure listed in the standard language above. The Expanded Letters of Response must be submitted on the Department's standard form, with a file size not to exceed 1MB,resumes and other required documents and certifications may be submitted in a separate file not to exceed 2MB, or as one file with a maximum file size of 3MB. The Technical Review Committee Meeting for this project will be held at the Pompano Operations Center, Milepost 65, of Florida's Turnpike, Pompano Beach, Florida, in Room 1176 with connection to the Turkey Lake Headquarters, Room 3163, via video conference. The Final Selection Committee Meeting for this project will be held in the Turnpike's Turkey Lake Headquarters Building, Milepost 263 of Florida's Turnpike, in the Executive Conference Room. A teleconference number has been reserved for the Final Selection Committee Meeting (850-414-4974). View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 16JUN2014 Shortlst Selection Date :  24JUL2014 Time:  02:30PM Tech. Rev. Cmte Meeting :  10JUL2014 Time:  01:00PM 2nd Tech Rev. Cmte Meeting :  14JUL2014 Time:  08:30AM Final Selection Meeting Date :  24JUL2014 Time:  02:30PM Final Selection Posting Date :  25JUL2014 Rank Consultant 1 RS&H, INC. 2 RUMMEL, KLEPPER & KAHL, LLP 3 JBS ENGINEERING TECHNICAL SERVICES, 4 METRIC ENGINEERING, INC. 5 TARGET ENGINEERING GROUP, INC. 6 AMERICAN CONSULTING ENGINEERS OF FL 6 BERGMANN ASSOCIATES, ARCHITECTS, EN ************************************************************ Contract Number : 15806 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42935046201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Project Description: Construction Engineering and Inspection Services for Widening Veteran's Expressway from Sugarwood Mainline Toll Plaza to South of Van Dyke Road, Hillsbourough County, Design-Build Project Project Manager : Akers, Karen Estimated Contract Amt: See Standard Notes Above: 4,9,10 Special Notes: The services associated with this CEI project include the widening, reconstruction and resurfacing of the Veteran's Expressway (SR 589) from the Sugarwood Mainline Toll Plaza (Milepost 10.727) to south of Van Dyke Road (Milepost 14.204). These improvements are to accommodate the future needs for capacity, and to provide operational and safety improvements by widening the existing facility from a divided four-lane to a divided eight-lane section. This project includes ramp and local street improvements, and requires coordination with local jurisdictions and utility companies. Additional coordination will be necessary with the Turnpike's adjacent construction projects, FPID Number 406151-4-52-01 to the south (similar mainline widening and AET toll conversion) and 429025-1-52-01 to the north milling and resurfacing of existing pavement, as well as Design- Build Project 429350-1-52-01 to the south (similar mainline widening from Gunn Highway to the Sugarwood Mainline Toll Plaza). The CEI will be provided a field office and will be required to utilize CEI Field Office Rates (see Standard Note 10). Consultant Marketing Sessions were held as scheduled on June 2, 2014. Consultant's interested in responding to this advertisement should adhere to the Department's Response Procedure shown above. The Expanded Letters of Response shall include, at a minimum, Items A-K of the Department's Response Procedure. Final Selection for this project will be based on the Expanded Letter of Response submitted for this advertisement which must be submitted on the Department's most recent version of the Standard Form. The Standard Form page count does not include resumes, organizational or staffing chart, or required forms and certifications,and staff hours on summary sheet (one sheet showing the hours of prime and all subconsultants) where applicable. Resumes should be arranged alphabetically regardless of firm name. Resumes are limited to two (2) pages each and must comply with the Department's minimum font size of 11, with 1/2 inch margins, and should include a TIN number, a brief description of experience, previous project start and end dates with reference contact names and phone numbers. A listing, by firm, of proposed key staff for this project should also be included. The list should include the name of staff, the TIN (Technician Identification Number), position, and years of experience. Required forms: Truth in Negotiation Certification (form 375-030-30); Vendor Certification Regarding Scrutinized Companies Lists (form 375-030-60); Aspiration Goal Form (form 375-030-62). All consultants responding to this advertisement must complete the online Bid Opportunity List form located on the Department's Equal Opportunity Office (EEO) website. A Shortlist Selection will be held for this project and factors to be considered by the Selection Committee will include, but are not limited to, performance grades received by the consultant on current or previous Department projects and the volume of work previously awarded to the consultant, the distribution of the work among competing consultants and utilization of new consultants, the workload of each consultant as evidenced by the number of similar projects the consultant has been shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the consultants on active agreements and balancing the needs of the project to the abilities of the consultants, the consultant's past working relationship with the Department on previous projects, and the general and specific information typically used to longlist the consultants. The Shortlist Selection Committee meeting will be held at the Turnpike Enterprise's Headquarters Building in Ocoee, Florida, in the Executive Conference Room, with a teleconference number reserved (850-414-4974) for this Selection Committee Meeting. FINAL SELECTION EVALUATION CRITERIA: The Expanded Letters of Response for the shortlisted firms will be evaluated by a Technical Review Committee based upon the following: AWARENESS AND UNDERSTANDING OF THE PROJECT SCOPE: 1) Approach to accomplishing the technical, management, and coordination aspects of the project, approach to quality control(0-15 points) 2) Understanding of the Scope, constructability comments (0-15 points) STAFFING: 1) Proposed staff quality (certifications, train- ing, etc.) (0-25 points), 2) Proposed Staff availability and organizational chart (0-10 points), 3) Proposed staff experience (0-25 points), 4) Proposed team's similar project experience, consultant's past performance (0-10 points). Final Selection for this project will be held in the Turnpike Enterprise's Headquarters Building in Ocoee, in the Executive Conference Room, a teleconference number has been reserved for this public meeting (850-414-4974). The Technical Review Committee Meeting for Longlist Selection will be held in the Turnpike Enterprise's Pompano Operations Center, Milepost 65, Room 1103. RESPONSE PROCEDURES: All firms responding to this advertisement shall adhere to the Department's Repsonse Procudures as shown in the Department's Standard Language above. The Expanded Letters of Response shall not exceed a file size of 1MB. Resumes and Other Required forms may be submitted separately from the ELOR with a file size not to exceed 2 MB. If submitted with ELOR, file size shall not exceed 3MB. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Advertised Date of Advertisement : 09JUN2014 Response Deadline : 20JUN2014 Longlist(Tech. Rev. Cmte.) Date:  22JUL2014 Time:  01:00PM Shortlst Selection Date :  11AUG2014 Time:  11:00AM Final Selection Meeting Date :  29AUG2014 Time:  01:00PM Response Deadline : 20JUN2014 Respond To: tp.profserv@dot.state.fl.us Attn.: Judith Fernandez Phone: 407-264-3040 ************************************************************ Contract Number : 15804 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): TBD Major Work : 15.0 - Landscape Architect Minor Work : 3.1 - Minor Highway Design 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Project Description: Turnpike-Wide Miscellaneous Landscape Architectural Services Project Manager : SHANNON, MICHAEL Special Notes: This is a general services contract for professional Landscape Architecture Services covering multiple areas within Florida's Turnpike System of Toll Roads, either existing or proposed. Florida's Turnpike Enterprise has scheduled Technical Panel Sessions for those firm's interested in pursuing this advertised project. These sessions are scheduled for May 5, 2014 from 12:00-5:00PM and May 9, 2014 from 8:30AM-12:00PM. Each interested firm will be allowed one thirty minute session on either of the two days that have been scheduled. Please email Judith.Fernandez@dot.state.fl.us or call her at 407-264-3040 to reserve your firm's 30 minute session. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 19MAY2014 Longlist(Tech. Rev. Cmte.) Date:  11JUN2014 Time:  08:30AM Shortlst Selection Date :  20JUN2014 Time:  11:30AM Shortlist Selection Posting :  20JUN2014 Final Selection Meeting Date :  11AUG2014 Time:  10:30AM Shortlisted Firms: G-A-I CONSULTANTS, INC. KEITH AND SCHNARS, P.A. POND & COMPANY URS CORPORATION SOUTHERN ************************************************************ Contract Number : 14812 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42935016201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP8 - Surveying & Mapping Project Description: CONSTRUCTION ENGINEERING AND INSPECTION SERVICES FOR WIDENING VETERANS EXPRESSWAY FROM SOUTH OF GUNN HIGHWAY TO SUGARWOOD MAINLINE TOLL PLAZA, HILLSBOROUGH COUNTY, DESIGN BUILD PROJECT. THE PROJECT MANAGER FOR THIS PROJECT IS FERNANDO GOMEZ. Project Manager : Akers, Karen Special Notes: The improvements for this project are to accommodate the future needs for capacity and to provide operational and safety improvements by widening the existing facility from a divided four-lane to a divided eight-lane section. This project will not involve tolling work and requires that the new tolling system be preserved and not be adversely impacted by construction. This project includes ramp and local street improvements, and will require coordination with local jurisdictions and utility companies. Coordination with adjacent construction projects will also be necessary. This project will require field office personnel. Consultant Marketing Sessions were held as scheduled on Monday, March 10, 2014. Consultant's interested in responding to this advertisement should adhere to the Department's Response Procedure shown above and the Letters of Response shall include, at a minimum, Items a-k of the Department's Response Procedure. Final Selection for this project will be based on the Expanded Letter of Response submitted for this advertisement which must be submitted on the Department's Standard Form. The Standard Form page count does not include resumes, organizational or staffing chart, or required forms and certifications. Resumes should be arranged alphabetically regardless of firm name. Resumes should include a TIN number, a brief description of experience, previous project start and finish dates with reference contact names and phone numbers. Resumes are limited to two pages each and must adhere to the Department's font size (11 point minimum) and margin size requirements (1/2 inch margins). A listing, by firm, of the proposed key staff for this project should be provided. The list shall include the name of staff, the TIN (Technician Identification Number), position, and years of experience. Required forms: DBE participation statement , Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies List, and Proposed consultants for DBE Under-Utilized Work Types. The Under- Utilized work type for this project advertisement is 8.2. Please refer to Standard Note 8 for additional information. All consultants responding to this advertisement must complete the online Bid Opportunity List form located on the Equal Opportunity Office (EOO) website. A Shortlist Selection will be held for this project and factors to be considered by the Selection Committee will include, but are not limited to, performance grades received by the consultant on current or previous Department projects , the volume of work previously awarded to the consultant, the distribution of work among the competing consultants and utilization of new consultants, the workload of each consultant as evidenced by the number of similar projects the consultant shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the consultants on active agreements and balancing the needs of the project to the abilities of the consultants, the consultant's past working relationship with the Department on previous projects, and the general and specific information typically used to longlist the consultants. FINAL SELECTION EVALUATION CRITERIA: The Expanded Letters of Response for the shortlisted firms will be evaluated by a Technical Review Committee based upon the following: AWARENESS AND UNDERSTANDING OF THE PROJECT SCOPE: 1)Approach to accomplishing the technical, management, and coordination aspects of the project, approach to quality control (0-15 points) 2) Understanding of the Scope, constructability comments (0-15 points); STAFFING: 1) Proposed Staff Quality (certificcations, training, etc.) (0-25 points), 2) Proposed staff availability and organizational chart (0-10 points), 3) Proposed Staff Experience (0-25 points), 4) Proposed team's similar project experience, Consultant's past performance (0-10 points). RESPONSE PROCEDURES: Consultants responding to this advertisement must comply with all requirements as set forth in the Department's Response Procedure listed in the standard language above. The Expanded Letters of Response must be submitted on the Department's Standard Form and resumes and other required forms may be submitted with the Expanded Letter of Response, with a file size not to exceed 3MB; or two files, one for the Expanded Letter of Response and one for the resumes and required forms, not to exceed 1.5MB each. All letters and or documents must be submitted in pdf format. The Technical Review Committee Meetings for this project will be held at the Pompano Operations Building, Milepost 65 of Florida's Turnpike, Pompano Beach, Florida 33069. The Shortlist and Final Selection Committee Meetings will be held at the Turkey Lake Headquarters Building, Milepost 263, Florida's Turnpike, Ocoee, Florida 34761. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  18APR2014 Time:  01:00PM Shortlst Selection Date :  25APR2014 Time:  01:30PM Shortlist Selection Posting :  25APR2014 Final Selection Meeting Date :  09MAY2014 Time:  03:00PM Final Selection Posting Date :  09MAY2014 1st Negotiations Meeting :  29MAY2014 Time:  10:00AM Rank Consultant 1 ICA Engineering, Inc. 2 AIM ENGINEERING AND SURVEYING 3 JACOBS ENGINEERING GROUP, INC. 3 METRIC ENGINEERING, INC. ************************************************************ Contract Number : 14813 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 41546266201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Under-Utilized Work Groups: GROUP8 - Surveying & Mapping Project Description: Construction Engineering and Inspection Services for All Electronic Tolling, Phase 4B, Milepost 40 to Milepost 54 in Broward and Miami-Dade Counties. Project Manager : Akers, Karen Special Notes: This construction engineering and inspection contract will include Milling and Resurfacing Dolphin Center Ramps, Hollywood Boulevard install tri-chord gantry and building with work in SE quadrant and NW quadrant, Griffin Road Ramps cantilever gantry northbound, and a truss span southbound, demo existing buildings and tunnel and install new building. Signalization, lighting, ITS, utilities, and building structures are included in the project limits. Plans for this project are available upon request. Florida's Turnpike Enterprise held Consultant Marketing Sessions for this project as scheduled on Friday, March 7, 2014. The Project Manager for this Project is William Sears. This project will require the establishment of a CEI field office. Consultant's interested in responding to this advertisement shall adhere to the Department's Response Procedure listed in the Standard Language above and the Letters of Response shall include, at a minimum, Items a-k of the Department's Response Procedure. The Expanded Letters of Response must be submitted on the Department's standard form for Expanded Letters of Response. A minimum font size of 11, with 1/2 inch margins must be adhered to, which includes resumes. Resumes are limited to two pages each. The Standard Form page count does not include resumes, organizational chart or staffing chart, or required forms and certifications. Resumes should be arranged alphabetically regardless of firm name. Resumes should include a TIN number, a brief description of experience, previous projecct start and finish dates with reference contact names and phone numbers. A listing, by firm, of the proposed key staff for this project should be provided. The list should include the name of staff, the TIN (Technician Identification Number), position, and years of experience. REQUIRED FORMS: DBE participation Statement, Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies List, and proposed consultants for DBE Under-Utilized Work Types. The Under-Utilized work type for this project advertisement is Work Type 8.2. Please refer to Standard Note 8 for additional information. All consultants responding to this advertisement must complete the online Bid Opportunity List form located on the Equal Opportunity Office (EOO) website. A Shortlist Selection will be held or this project and factors to be considered by the Selection Committee will include those factors as set forth in the Department's Procedure 375-030-002, Acquisition of Professional Services, Section 3.4 Shortlist Consideration Factors. FINAL SELECITON EVALUATION CRITERIA: The Expanded Letters of Response for the shortlisted firms will be evaluated by a Technical Review Committee based upon the following: AWARENESS AND UNDERSTANDING OF THE PROJECT SCOPE: 1) Approach to accomplishing the technical, management, and coordination aspects of the project, approach to quality control (0-15 points) 2) Understanding of the Scope, Constructability Comments (0-15 points) STAFFING: 1) Proposed Staff Quality (certifications, training, etc.) (0-25 points) 2) Proposed Staff Availability and Organizational Chart (0-10 points) 3) Proposed Staff Experience (0-25 points) 4) Proposed Team's Similar Project Experience, Consultant's past performance (0-10 points) The Technical Review Committee Meetings for this project will be held at the Pompano Operations Building, Milepost 65 of Florida's Turnpike, Pompano Beach, Florida 33069. The Shortlist and Final Selection Committee Meetings for this project will be held at the Turkey Lake Headquarters Building, Milepost 263 of Florida's Turnpike, Ocoee, Florida 34761. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  15APR2014 Time:  02:30PM Shortlst Selection Date :  25APR2014 Time:  02:00PM Shortlist Selection Posting :  25APR2014 Tech. Rev. Cmte Meeting :  28APR2014 Time:  08:30AM Final Selection Meeting Date :  09MAY2014 Time:  03:30PM Final Selection Posting Date :  09MAY2014 1st Negotiations Meeting :  03JUN2014 Time:  01:30PM 2nd Negotiations Meeting :  09JUN2014 Time:  11:00AM 3rd Negotiations Meeting :  10JUN2014 Time:  03:30PM 4th Negotiations Meeting :  12JUN2014 Time:  12:30PM Rank Consultant 1 CIMA ENGINEERING CORPORATION 2 CSA CENTRAL, INC. 3 MICHAEL BAKER JR., INC. ************************************************************ Contract Number : 14814 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Major Work : 21.0 - Acquisition, Negot, Closing & Order of Taking Minor Work : 24.0 - Acquisition Relocation Assistance 25.0 - Right of Way Clearing and Leasing Project Description: Miscellaneous Land Acquisition Services Project Manager : SHANNON, MICHAEL Special Notes: Miscellaneous Land Acquisition Services for Florida's Turnpike System of Toll Roads to include property acquisition, property management services, review of survey and right-of-way maps, and title and closing services. The Turnpike Enterprise held Technical Panel Sessions as scheduled on Wednesday, March 12, 2014. All Letters of Response must be submitted on the Department's Standard Form for a two page letter of response and font size and margin size requirements of a minimum of 11 point font and 1/2 inch margins must be adhered to. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 17MAR2014 Longlist(Tech. Rev. Cmte.) Date:  17APR2014 Time:  10:00AM Shortlst Selection Date :  25APR2014 Time:  02:30PM Shortlist Selection Posting :  25APR2014 Final Selection Meeting Date :  19MAY2014 Time:  11:30AM Final Selection Posting Date :  21MAY2014 1st Negotiations Meeting :  31JUL2014 Time:  09:00AM Rank Consultant 1 AMERICAN ACQUISITION GROUP, LLC 2 HDR ENGINEERING, INC. 3 G-A-I CONSULTANTS, INC. ************************************************************ Contract Number : 14810 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 42714616201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP8 - Surveying & Mapping Project Description: Construction Engineering and Inspection Services for the Design-Build HEFT Widening from North of 72nd Street to North of Bird Road. The Construction Project Manager for this CEI Project will be Pacifico Castillo. Project Manager : Akers, Karen Special Notes: CEI Services for Design-Build HEFT Widening from North of 72nd Street to North of Bird Road. Florida's Turnpike Enterprise requires improvements to the Homestead Extension of Florida's Turnpike (HEFT) from north of SW 72nd Street to North of Bird Road. Florida's Turnpike as part of FPID 427146-1-52-01 requires the Design, Widening and Reconstruction of the HEFT (SR 821) to accommodate the future needs for capacity, operational and safety improvements. The widening is ten (10) future travel lanes with four (4) interior lanes being express lanes. The current tolling point will be relocated to the south and the alignments north and south of the existing toll plaza will be straightened. Interchange modifications are required at the Bird Road Interchange. Relocation of the northbound exit ramp requires widening and access modifications of SW 117th Avenue. Improvements on Bird Road include additional widening westbound and access modifications. Florida's Turnpike Enteprise held Consultant Marketing Meetings for this project on Wednesday, February 19, 2014. Consultant's interested in responding to this advertisement should adhere to the Department's Reponse Procedure shown above and Letters of Response shall include, at a minimum, items a-k of the Department's Response Procedure. REQUIRED FORMS: DBE Participation Statement, Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies List, and Proposed Consultants for DBE Under-Utilized Work Types. The Under-Utilized work type for this project is 8.2. All consultants reponding to this advertisement ust complete the online Bid Opportunity List form located on the Equal Opportunity Office (EOO) website. A Shortlist Selection will be held for this project and factors to be considered by the Selection Committee will include, but are not limited to: Performance Grades received by the Consultant on previous and current Department projects, the volume of work previously awarded to the consultant, distribution of work among competing consultants and utilization of new consultants, the workload of each consultant as evidenced by the number of similar projects the consultant is shortlisted on that have not had final selection, as well as the residual fees remaining to be paid to the consultants on active agreements, and balancing the needs of the project to the abilities of the consultants, the consultant's working relationship with the Department on previous projects, and the general and specific information typically used to Longlist the consultants. TECHNICAL REVIEW COMMITTEE EVALUATION AND SCORING CRITERIA: The Expanded Letters of Response for the shortlisted firms will be evaluated by a Technical Review Committee based upon the following: I. Awareness and understanding of the project scope A) Approach to accomplishing the technical, management, and coordination aspects of the project, approach to quality control (0-15 points) B) Understanding of the Scope, Constructability Comments (0-15 points) II. STAFFING: A) Proposed Staff Quality (Certifications, Training, etc.) (0-25 points) B) Proposed Staff Availability and Organizational Chart (0-10 points) C) Proposed Staff Experience (0-25 points) D) Proposed team's similar project experience, consultant's past performance (0-10 points) RESPONSE PROCEDURES: Consultant's responding to this advertisement must comply with all requirements set forth in the Department's Response Procedure listed in the Standard Language above. If the Department considers the performance of the selected consultant to be satisfactory and if additional unanticipated projects not having the financial management number listed in this advertisement are let within the general corridor area and time period that will achieve economic efficiency through the shared use of CEI personnel and other resources, the Department may, at its sole discretion, assign any required CEI services for those projects to the contract resulting from this advertisement. The Technical Review Committee Meeting for this project will be held at the Pompano Operations Building, Milepost 65 of Florida's Turnpike, Pompano Beach, Florida 33069. The Shortlist and Final Selection Committee Meetings for this project will be held at the Turkey Lake Headquarters Building, Milepost 263, Florida's Turnpike, Ocoee, Florida 34761. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 03MAR2014 Longlist(Tech. Rev. Cmte.) Date:  27MAR2014 Time:  10:30AM Shortlst Selection Date :  11APR2014 Time:  01:30PM Shortlist Selection Posting :  14APR2014 Tech. Rev. Cmte Meeting :  03APR2014 Time:  01:00PM Final Selection Meeting Date :  25APR2014 Time:  11:00AM Final Selection Posting Date :  25APR2014 1st Negotiations Meeting :  29MAY2014 Time:  01:30PM 2nd Negotiations Meeting :  10JUN2014 Time:  02:00PM Rank Consultant 1 BCC ENGINEERING, INC. 2 CREATIVE ENGINEERING GROUP 3 NEW MILLENNIUM ENGINEERING, INC. 4 CIMA ENGINEERING CORPORATION 5 CARNAHAN, PROCTOR AND CROSS, INC. ************************************************************ Contract Number : 15801 Major Project Selection Procedure: LOR, Technical Proposal & Oral Presentation Financial Management Number(s): 19066556201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying Project Description: Florida's Turnpike Enterprise Construction and Materials Engineering Management Consultant. Project Manager : Wai, Paul Special Notes: The Major Work Type for this advertisement has been changed and the Response Deadline has been extended to April 11, 2014. Firms interested in pursuing this project that did not attend the Industry Forum held on February 26, 2014 may request a copy of the powerpoint presentation from the Industry Forum by submitting a request to Judi Fernandez at email address judith.fernandez@dot.state.fl.us.

Florida's Turnpike Enterprise requires professional services of a Construction and Materials Engineering Management Consultant. The services to be provided will include a wide range of construction and materials engineering management services, architectural, environmental services, registered land surveying, management of consultant construction and materials assurance contracts, public information, and administrative services to assist the Turnpike in efficiently bringing to completion numerous construction projects within the work program for Florida's Turnpike Enterprise. These services will be required to be performed out of the Turnpike's Pompano Operations Center as well as the Turkey Lake Operations Office. Florida's Turnpike Enterprise held an Industry Forum on February 26, 2014.Attendance at the Industry Forum was not mandatory for submittal of a Letter of Response to this advertisement. Responding firms will be required to submit a two-page letter of response on the Department's standard form. A minimum font size of 11, with 1/2 inch margins will be utilized in each firm's Letter of Response. Shortlisted firms will be required to submit a written technical proposal and participate in an oral presentation. The details for the requirements for the written technical proposal and oral presentation will be set forth in the Request for Proposal (RFP) submitted to the shortlisted firms. The scoring of the written technical proposal and oral presentation will consist of a weighted average, with a maximum of 100 points for both the written technical proposal and oral presentation (65% weighting on written technical proposal and 35% weighting for the oral presenta- tion). The Shortlist, Oral Presentations and Final Selection Committee meetings will be held at the Florida's Turnpike Enterprise Headquaters Building, Building 5315, Milepost 263, Florida's Turnpike, Ocoee, Florida 34761. Technical Review Committee Meetings will be held at both the Turnpike Headquarters Building and Pompano Operations Building, Pompano Beach, Florida. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Shortlisted Date of Advertisement : 03MAR2014 Shortlst Selection Date :  12MAY2014 Time:  04:00PM Shortlist Selection Posting :  12MAY2014 Scope Meeting Date :  19MAY2014 Time:  03:00PM Tech. Rev. Cmte Meeting :  21JUL2014 Time:  10:00AM 2nd Tech Rev. Cmte Meeting :  10SEP2014 Time:  4:30PM Final Selection Meeting Date :  14OCT2014 Time:  01:00PM 1st Negotiations Meeting :  03NOV2014 Time:  08:30AM Shortlisted Firms: PARSONS BRINCKERHOFF, INC. THE LOUIS BERGER GROUP, INC. ************************************************************ Contract Number : 14811 Major Project Selection Procedure: LOR and Abbreviated Technical Proposal Financial Management Number(s): TBD Major Work : 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying Minor Work : 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping Project Description: MISCELLANEOUS SURVEY SERVICES FOR FLORIDA'S TURNPIKE WEST SYSTEM, INCLUDING UTILITY DESIGNATES FOR POLK COUNTY PARKWAY, VETERAN'S EXPRESSWAY AND SUNCOAST PARKWAY. Project Manager : SHANNON, MICHAEL Special Notes: The Response Due Date for Letters of Response has been extended to March 14, 2014, by 5:00 P.M. The Response Due has been extended due to Minor Work Type 8.3 Photogrammetric being added under this project procurement. The FDOT Project Manager for this project is Mike Joiner. The estimated contract value is $350,000 over three years. Florida's Turnpike Enterprise will be holding Marketing Sessions for firms interested in pursuing this project advertisement. The Consultant Marketing Sessions will be limited to 30 minutes for each individual firm/team and are scheduled for Tuesday, February 18, 2014 from 9:00 AM to 4:30 PM. Please contact Judi Fernandez at 407-264-3040 or email her at judith.fernandez@dot.state.fl.us to schedule your firm's 30 minute session. Attendance at marketing session is not a requirement for an interested firm to submit a Letter of Response.PLEASE NOTE THAT AS OF THE DATE OF THIS FORMAL ADVERTISEMENT, THE CONSULTANT MARKETING SESSIONS WERE HELD AS SCHEDULED. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 24FEB2014 Longlist(Tech. Rev. Cmte.) Date:  26MAR2014 Time:  03:00PM Shortlst Selection Date :  01APR2014 Time:  09:30AM Shortlist Selection Posting :  01APR2014 Scope Meeting Date :  11APR2014 Time:  10:00AM Final Selection Meeting Date :  19MAY2014 Time:  10:30AM Final Selection Posting Date :  21MAY2014 Rank Consultant 1 TBE GROUP, INC. 2 GEORGE F. YOUNG, INC. 3 CIVILSURV DESIGN GROUP, INC. 4 SOUTHEASTERN SURVEYING AND MAPPING ************************************************************ Contract Number : 14809 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Project Description: TURNPIKE-WIDE MISCELLANEOUS DESIGN SERVICES Project Manager : SHANNON, MICHAEL Special Notes: This contract procurement has been set aside for competition among small businesses only (BDI). The maximum contract amount will be $1,000,000 and work will be assigned through the issuance of Task Work Orders. The Turnpike has scheduled time for interested firms to visit with the Technical Review Committee members for this contract and with members of the Turnpike's technical disciplines. Interested firms will be allotted thirty minutes on an individual firm basis to meet with the Turnpike during these sessions. The sessions for interested firms are scheduled as follows: THURSDAY, JANUARY 2, 2014 from 9:30 AM to 4:00 PM and TUESDAY, JANUARY 7, 2014 from 8:00 AM to 3:30PM. Please note that upon the formal advertisement of this procurement, the Technical Panel Sessions were held as planned. The Technical Review Committee and Selection Committee meetings for this advertised project will be held in the Turnpike Headquarters Building, Turkey Lake Service Plaza, Milepost 168, Ocoee, Florida. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 21JAN2014 Longlist(Tech. Rev. Cmte.) Date:  24FEB2014 Time:  01:30PM Shortlst Selection Date :  12MAR2014 Time:  11:00AM Shortlist Selection Posting :  12MAR2014 Scope Meeting Date :  20MAR2014 Time:  01:00PM Final Selection Meeting Date :  30APR2014 Time:  01:00PM Final Selection Posting Date :  30APR2014 1st Negotiations Meeting :  23JUL2014 Time:  01:00PM 2nd Negotiations Meeting :  25JUL2014 Time:  09:00AM Rank Consultant 1 LOCHRANE ENGINEERING INCORPORATED 2 COMPREHENSIVE ENGINEERING SERVICES 3 PATEL, GREENE & ASSOCIATES, PLLC 4 R. J. BEHAR AND COMPANY, INC. 5 C.H. PEREZ & ASSOCIATES CONSULTING ************************************************************ Contract Number : 14807 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP6 - Traffic Engineering & Operations Studies GROUP8 - Surveying & Mapping GROUP14 - Architect GROUP15 - Landscape Architect Project Description: Turnpike-Wide Miscellaneous Design Services. Project Manager : SHANNON, MICHAEL Special Notes: It is the Turnpike's intention to award two contracts from this advertisement. The Turnpike will be holding 30 minute sessions for firms interested in pursuing these contracts to meet on an individual firm basis with members of the Technical Review Committee and the Turnpike's Technical Disciplines. The following dates have been reserved: THURSDAY, JANUARY 9, 2014 from 9:00 A.M. to 3:30 P.M. and FRIDAY, JANUARY 10, 2014 from 8:30 A.M. to 2:30 P.M. The Scheduled Meetings with the TRC and Technical Disciplines were scheduled and held as planned. Interested firms are required to follow the Department's Response Procedures as stated on the Department's Advertise- ment Webpage under the Notice to Professional Consultants. All Technical Review Committee Meetings and Shortlist and Final Selection Committee Meetings for this advertisement will be held in the Turnpike Enterprise Headquarters Build- ing, located at the Turkey Lake Service Plaza - Milepost 263 of Florida's Turnpike, in Ocoee, Florida. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 13JAN2014 Longlist(Tech. Rev. Cmte.) Date:  06FEB2014 Time:  01:00PM Shortlst Selection Date :  17FEB2014 Time:  01:00PM Shortlist Selection Posting :  17FEB2014 Final Selection Meeting Date :  31MAR2014 Time:  04:00PM Final Selection Posting Date :  31MAR2014 1st Negotiations Meeting :  15MAY2014 Time:  09:00AM Rank Consultant 1 HDR ENGINEERING, INC. 2 PROTEAN DESIGN GROUP, INC. 3 MOFFATT & NICHOL, INC. 4 KIMLEY-HORN & ASSOCIATES, INC. 5 RS&H, INC. 6 INFRASTRUCTURE ENGINEERS, INC. 7 COMPREHENSIVE ENGINEERING SERVICES ************************************************************ Contract Number : 14815 Major Project Selection Procedure: Letter of Response and Interview Financial Management Number(s): TBD Major Work : 3.3 - Controlled Access Highway Design Minor Work : 4.1.1 - Miscellaneous Structures 4.1.2 - Minor Bridge Design 6.3.1 - Intelligent Trans Sys. Analysis & Design 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect 15.0 - Landscape Architect Under-Utilized Work Groups: GROUP3 - Highway Design - Roadway GROUP4 - Highway Design - Bridge GROUP6 - Traffic Engineering & Operations Studies GROUP8 - Surveying & Mapping GROUP14 - Architect GROUP15 - Landscape Architect TURNPIKE-WIDE MISC. DESIGN Project Manager : SHANNON, MICHAEL View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 13JAN2014 Longlist(Tech. Rev. Cmte.) Date:  06FEB2014 Time:  01:00PM Shortlst Selection Date :  17FEB2014 Time:  01:00PM Shortlist Selection Posting :  17FEB2014 Final Selection Meeting Date :  31MAR2014 Time:  04:00PM Final Selection Posting Date :  01APR2014 1st Negotiations Meeting :  28APR2014 Time:  09:00AM Rank Consultant 1 HDR ENGINEERING, INC. 2 PROTEAN DESIGN GROUP, INC. 3 MOFFATT & NICHOL, INC. 4 KIMLEY-HORN & ASSOCIATES, INC. 5 RS&H, INC. 6 INFRASTRUCTURE ENGINEERS, INC. 7 COMPREHENSIVE ENGINEERING SERVICES ************************************************************ Contract Number : 14808 Major Project Selection Procedure: Selection from Expanded Letter of Response Financial Management Number(s): 41505116201 Major Work : 10.1 - Rdwy Construction Engineering Inspection Minor Work : 8.2 - Design, Right of Way, & Const. Surveying 10.4 - Minor Bridge & Misc. Structures(CEI) Under-Utilized Work Groups: GROUP8 - Surveying & Mapping Project Description: Widen HEFT from Killian Parkway to North of SW 72nd Street and Resurfacing Sunset Drive from SR 821 to East of SW 116th Court, Miami-Dade County Project Manager : Akers, Karen Special Notes: PROJECT MANAGER FOR THIS PROJECT: Pacifico Castillo Consultant's interested in responding to this advertisement should adhere to the Department's response procedure shown above and the Expanded Letters of Response shall include, at a minimum, Items a-k of the Department's Response Procedure. Required Forms: DBE Participation Statement, Truth in Negotiations Certificate, Vendor Certification Regarding Scrutinized Companies List, and Proposed consultants for DBE Under-Utilized Work Types. The Under-Utilized work type for this project advertisement is Work Type 8.2. Please refer to Standard Note 8 for additional information. All consultants responding to this advertisement must complete the online Bid Opportunity List form located on the Equal Opportunity Office (EOO) Website. A Shortlist Selection will be held for this project and factors to be considered by the Selection Committee will include, but are not limited to: Performance grades received by the consultant on current and previous Department projects, the volume of work previously awarded to the consultant, the distribution of work among competing consultants and utilization of new consultants; the workload of each consultant, as evidenced by the number of similar projects the consultant is shortlisted on that have not had final selection; as well as the residual fees remaining to be paid to the consultants on active agreements and balancing the needs of the project to the abilities of the consultants; and the general and specific information typically used to longlist the consultants. TECHNICAL REVIEW COMMITTEE EVALUATION AND SCORING CRITERIA: The Expanded Letters of Response for the shortlisted firms will be evaluated by a Technical Review Committee based upon the following: I. AWARENESS AND UNDERSTANDING OF THE PROJECT SCOPE: A) Approach to accomplishing the technical, management and coordination aspects of the projecct, approach to quality control (0-15 points) B) Understanding of the Scope, Constructability Comments (0-15 points) II. STAFFING A) Proposed staff quality (certifications, training, etc.) (0-25 points) B) Proposed Staff Availability and Organizational Chart (0-10 points) C) Proposed Staff Experience (0-25 points) D) Proposed Team's Similar Project Experience, Consultant's past performance (0-10 points) RESPONSE PROCEDURES: Consultant's responding to this advertisement must comply with all requirements as set forth by the Department's Response Procedure listed in the standard language above. If the Department considers the performance of the consultant to be satisfactory and if additional unanticipated projects not having the financial management number listed in this advertisement are let within the general cooridor area and time period that will achieve economic efficiency through the shared use of CEI personnel and other resources, the Department may, at its sole discretion, assign any required CEI services for those projects to the contract resulting from this advertisement. The Technical Review Committee Meeting(s) for this project will be held at the Pompano Operations Building, Milepost 65 of Florida's Turnpike, Pompano Beach, Florida 33069. The Shortlist and Final Selection Meetings for this project will be held at the Turkey Lake Headquarters Building, Milepost 263, Florida's Turnpike, Ocoee, Florida 34761. View proposed scope (Adobe Acrobat® PDF file) Advertisement Status : Final Selection Date of Advertisement : 23DEC2013 Longlist(Tech. Rev. Cmte.) Date:  04FEB2014 Time:  10:00AM Shortlst Selection Date :  14FEB2014 Time:  12:00PM Shortlist Selection Posting :  14FEB2014 Final Selection Meeting Date :  10MAR2014 Time:  11:30AM Final Selection Posting Date :  10MAR2014 1st Negotiations Meeting :  09APR2014 Time:  08:30AM 2nd Negotiations Meeting :  14APR2014 Time:  08:30AM 3rd Negotiations Meeting :  05MAY2014 Time:  12:00PM Rank Consultant 1 HNTB CORPORATION 2 EISMAN & RUSSO, INC. 3 NETWORK ENGINEERING SERVICES, INC. 4 CIMA ENGINEERING CORPORATION ************************************************************ Design/Build Projects Procurement Number : E8N17 Financial Management Number(s): 43383015201 Project Description: Florida's Turnpike Enterprise (FTE) requires a new, full interchange near Milepost 279 at North Hancock Road Extension in Lake County. FTE will call this interchange project the Minneola Interchange at MP 279. This interchange includes ramp toll facilities on the southbound on-ramp and northbound off-ramp. Selection Procedure : ADJUSTED SCORE TYPE Response Requested : LETTER OF INTEREST Maximum Number of Pages: 10 Prequalification Requirements: Contractor must be qualified under Rule, 14-22, Florida Administrative Code - Work Class(s): Grading, Hot Plant Mix-Bituminous Course, Drainage, Flexible Paving Professional Team Member Qualified under Rule 14-75, Florida Administrative Code - Work Class(es): 3.3 - Controlled Access Highway Design 4.1.1 - Miscellaneous Structures 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications 7.1 - Signing, Pavement Marking & Channelization 7.2 - Lighting 7.3 - Signalization 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 8.3 - Photogrammetric Mapping 8.4 - Right of Way Mapping 9.1 - Soil Exploration 9.2 - Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies 14.0 - Architect Additional Bridge Design Work Types : Must be prequalified in work type 4.1.2(Minor Bridge Design) or 4.2.1(Major Bridge Design-Concrete), or 4.2.2(Major Bridge Design-Steel), or 4.2.3(Major Bridge Design- Segmental) NEW FORM MUST BE SUBMITTED FOR THIS PROJECT: Design Build Firms responding to advertisements requiring Group 4 Bridge Design work type qualification must submit a completed and signed Bridge Design Qualification Form (see the link to the "Bridge Qualification Form" above) along with the ELOI by the date/time deadline established for the ELOI. Please refer to this preamble and advertisement for other submittal directions. Technical Questions Should Be Addressed To: Technical Questions should be addressed to: http://www3.dot.state.fl.us/bidquestionsandanswers/ proposal.aspx/searchproposal DBE/MBE Requirements: For this project, the Department has established an aspirational goal of 9.0% DBE usage and an additional 3.0% Non-DBE Small Business usage, representing the a cumulative 12.0% commitment of total contract costs. Firms proposing this project shall aspire to have 9.0% or more of the total contract costs performed by Non-DBE Small Businesses. Special Notes: MAXIMUM BUDGET AMOUNT: For the purposes of bidding, the Department has established a maximum price of $30,000,000 for FM No. 433830-1-52-01. * Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. * The Stipend amount for this project is $55,000. Stipends will be paid to shortlisted firms based on the guidelines noted in the preamble of this advertisement. * RESTRICTIONS ON CONSULTANTS: In accordance with Restriction on Consultants' Eligibility to Compete for Department Contracts (Topic 375-030-006-B), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design Build Firm without approval from the Florida's Turnpike Enterprise Executive Director. The Firms identified below may not re