Public Meeting Notices: Add a Public Noticehttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/AllItems.aspxRSS feed for the Add a Public Notice list.en95 Express Phase 3C Industry Forum http://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4652
  • 2 p.m. Forum  begins
  • 2:30 p.m. Project Presentation (including the project scope, procurement timeline and procurement process for the project)
  • Q & A from industry partners immediately following the presentation 
  • We anticipate a high attendance for this event, so we ask that you take the time to register. Registration for the Forum can be accessed from the link in the upper right corner of the project website home page  http://www.95express.com/pages/related-info/95-express-phase-3.   Deadline to register is 5:00 PM, April 18, 2017.  FDOT reserves the right to limit the number of attendees per team as space is limited. You will be contacted should this be the case. Design-Build Teams interested in the latest project information for 95 Express Phase 3C can obtain a project CD by contacting Stacy-Ann Brown, District Four Procurement Services Office, at stacy.brown@dot.state.fl.us. ----------------------------------------------------------------------Design-Build Teams pursuing the 95 Express Phase 3C Design Build project can request one-on-one meetings with the District Four Management Team and also with the Technical Review Committee (TRC) by checking the box in the registration form on the website. At a minimum, a Design-Build Team constitutes a Lead Contractor and an Engineer of Record. The one-on-one meetings will be held on April 25th, 26th, and 27th at FDOT District Four Office at 3400 West Commercial Blvd, Fort Lauderdale FL 33309. You will receive a call from our public information team to schedule the meeting once your registration information is entered on the website. ----------------------------------------------------------------------- Persons who need special accommodations under the Americans with Disabilities Act or translation services (free of charge) should contact Vanita Saini, PE, FDOT Project Manager, at least seven days prior to the Forum. She can be reached by phone at 954-777-4468 or toll free at 1-866-336-8435 ext. 4468 or by email at Vanita.Saini@dot.state.fl.us. ]]>
    Kelleher, BarbaraTue, 14 Mar 2017 20:33:30 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4652
    I-95 at Boynton Beach & Gateway Boulevards PD&E Study Pond Siting Meetinghttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4692Thuc.Le@dot.state.fl.us.]]>McGinness, ChuckThu, 20 Apr 2017 13:21:20 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4692I-95 Resurfacing Project Open Househttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4688kdempsey@corradino.com.]]>McGinness, ChuckTue, 18 Apr 2017 12:40:42 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4688Public Workshop on Mobility Improvements in Pembroke Pines and Hollywoodhttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4691
  • Pines Boulevard (State Road 820) from SW 209th Avenue to SW 118th Avenue (City of Pembroke Pines)
  • Flamingo Road (State Road 823) from Pembroke Road to NW 4th Street (City of Pembroke Pines)
  • Hollywood Boulevard (State Road 820) from Academy Circle to Calle Largo Drive (City of Hollywood)
  • The workshop will have an open house format and project representatives will be available to answer questions and provide assistance at any time during the workshop. Please drop by at your convenience.

    On Pines Boulevard and Flamingo Road, the project will include ADA pedestrian ramps at intersections, crosswalk upgrades supporting the pedestrian improvements, resurfacing the existing roadway, drainage improvements related with minor widening, the extension length of turn lane movements, and minor lighting and pedestrian signal pushbutton upgrades. On Hollywood Boulevard, the project will add bike lanes on both eastbound and westbound sides by widening, resurfacing and restriping the existing roadway adjacent to the bike lanes, ADA pedestrian ramps and crosswalks impacted by the bike lane addition and improvements to bus stops where impacted by the contractor.

    Construction is scheduled to begin in summer 2018 and completion is expected in winter 2019. The estimated construction cost of the project is $2.1 million.

    Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status,

    Persons needing special accommodations under the Americans with Disabilities Act or persons requiring translation services (free of charge) should contact FDOT Project Manager Casey Graham, P.E. at least seven days prior to the workshop by phone at 954-777-4629 or by email at Casey.Graham@dot.state.fl.us.

     

     

    ]]>
    McGinness, ChuckWed, 19 Apr 2017 12:21:53 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4691