Public Meeting Notices: Add a Public Noticehttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/AllItems.aspxRSS feed for the Add a Public Notice list.enCarFit Technicians Training & Eventhttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4569http://www.car-fit.org]]>Please note that trainees are expected to participate in the actual CARFIT event with drivers on Wednesday, February 22, 2017 from 9 AM to 1 PM at Century Village West/Congn. Torah Ohr, 19146 Lyons Road, Boca Raton FL 33434** ]]>Pullins, CarmenTue, 17 Jan 2017 14:19:26 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4569Martin & St. Lucie Counties Joint Community Traffic Safety Team Meetinghttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4586Carmen.Pullins@dot.state.fl.us]]>Pullins, CarmenMon, 23 Jan 2017 15:33:33 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4586Old Dixie Highway Construction Open Househttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4609
  • Removing old asphalt and repaving the roadway
  • Reducing the width of the travel lanes and modifying shoulders to add four-foot wide bike lanes in each direction throughout the project limits
  • Constructing raided-tables at certain intersections and designated pedestrian crossings
  • Construction sidewalks throughout the project limits
  • Improving existing drainage and adding swales throughout the project limits 
  • Adding a roundabout at the Dixie Highway intersection with NE 16th Court
  • Installing pedestrian lighting
  • Adding landscaping 
  • Traffic Impact During Construction:

    • Daytime lane closures should be expected throughout the project limits Monday through Friday between 8 a.m. and 4:30 p.m.

    Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.

    If you need special accommodation under the Americans with Disabilities Act or require translation services (free of charge) please contact Ms. Casey Liening at least seven days prior to the open house. She can be reached by phone at 954-940-7585 or by email at cliening@corradino.com.

     

     

    ]]>
    Kelleher, BarbaraWed, 15 Feb 2017 17:24:23 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4609
    Construction Open House: SR 615/N 25th St. Resurfacing Projecthttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4619
  • Removing old asphalt and repaving the existing roadway
  • Constructing new sidewalk on both sides of the road from where existing sidewalk ends north to US 1
  • Constructing a six-foot buffered bike lane in each direction
  • Improving sidewalk ramps at driveways and intersections to meet current ADA standards
  • Upgrading pedestrian signal controls and adding countdown timers at the St. Lucie Boulevard/N 25th St and US 1/N 25th St intersections 
  • Installing new highway signs and pavement markings
  • Traffic Impact During Construction:

    • Lane closures should be anticipated at various times and locations within the project limits
    • One lane of traffic will be maintained in each direction at all times
    • Single lane closures will be permitted on US 1 between 9 a.m. and 4 p.m.

    Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.

    If you need special accommodations under the Americans with Disabilities Act or require translation services (free of charge) please contact Kathleen Dempsey, Project Public Information Officer, at least seven days prior to the open house. She can be reached by phone at 772-359-5118 or email at kdempsey@corradino.com.

     

    ]]>
    Kelleher, BarbaraFri, 17 Feb 2017 22:14:47 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4619
    Wave Streetcar Project Small Business Bonding Training & Coaching Launchhttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4617aclark@seregionosdbu.us or by phone, toll free, a 1-866-928-6289 ext. 3-2.  A 4-week Bonding Capacity Building Training Series, that includes one 4-hour session per week, will follow this Launch Event and will support Small Business contractors with becoming ‘bond ready’ to obtain surety credit and thereby meet the performance and payment security requirements to successfully secure awards of transportation-related contracts, such as the Wave Streetcar Project.  The Wave Streetcar Project is a partnership between Broward County, the City of Fort Lauderdale, The Florida Department of Transportation, the Downtown Development Authority Fort Lauderdale, the Broward Metropolitan Planning Organization, the South Florida Regional Transportation Authority and the USDOT Federal Transit Administration. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act (ADA) or require translation services (free of charge) should contact Ms. Adriana Clark, SE Regional Director, US DOT Office of Small Business at least seven (7) days prior to the event. She can be reached by US mail at USDOT Office of Small Business, 11380 NW 27 Avenue, Building 1, Suite 1256-32, Miami, FL 33167; by telephone at 305-237-1392 or toll free at 866-928-6289 ext 3-2; or by email at aclark@seregionsb.us.]]>Kelleher, BarbaraFri, 17 Feb 2017 21:33:50 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4617Bicycle/Pedestrian Safety Outreachhttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4618Kelleher, BarbaraFri, 17 Feb 2017 21:46:41 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4618Public Kick-Off Meeting: PD&E Study I-95 from SW 10th St to Hillsboro Blvdhttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4614Humberto.arrieta@dot.state.fl.us. ]]>Kelleher, BarbaraThu, 16 Feb 2017 21:51:54 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4614Design Public Information Meeting: I-95/Oslo Rd Interchange & Oslo Rd Widenhttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4613Proposed improvements of the New Interchange Project:

    • Building  a new partial clover leave ramps at I-95 and Oslo Road
    • Installing lighting on the entrance and exit ramps
    • Widening of Oslo Road from two lanes to a four-lane divided roadway on either side of I-95
    • Replacing the existing Oslo Road bridge over I-95
    • Realigning 82 Ave at Oslo Road
    • Eliminating 86th Ave SW connection to Oslo Road
    • Constructing new 13th Street SW connecting 86th Ave SW and 90th Ave SW
    • Installing new drainage system
    • Installing Intelligent Transporation System components
    • Installing new highway signs
    • Installing landscaping   
    • Estimated construction cost of these improvements is $29.9 million

    Proposed Improvements of Widening Project:

    • Widening of Oslo Road from  two lanes to a four-lane divided highway
    • Installing new drainage system
    • Installing bike lanes
    • Installing sidewalks with ADA compliant ramps at driveways and intersections
    • Upgrading traffic signals
    • Installing new highway signs and pavement markings
    • Estimated construction cost of these improvements is $20.1 million

    Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.

    If you need special accommodation under the Americans with Disabilities Act (ADA) please contact FDOT's Project Manager Ronald Kareiva, PE at least seven days prior to the open house. He can be reached by phone, toll free, at 1-866-336-8435 ext. 4441 or by email at Ronald.Kareiva@dot.state.fl.us

    ]]>
    Kelleher, BarbaraThu, 16 Feb 2017 21:37:45 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4613
    Peters Road Design Public Involvement Workshophttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4607
  • Removing old asphalt and resurfacing the existing divided two lanes in each direction
  • Widening to accommodate bicycle lanes in each direction
  • Restriping the pavement throughout the project limits and implementing the use of green bicycle lane pavement markings
  • Modifying existing bus stop pads, drainage and roadway signs where impacted by widening
  • Installing ADA compliant pedestrian ramps at intersections
  • Installing lighting at the University Drive-Peters Road intersection
  • Construction will be phased and traffic will be shifted while the work is performed. Access to properties will be maintained throughout the construction.

    Construction is anticipated to begin in summer 2018 with estimated completion late 2019.  The estimated construction cost of this project is $1.6 million.   

    Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status,

    Persons needing special accommodations under the Americans with Disabilities Act or who require translation services (free of charge) should FDOT's Project Manager Binod Basnet at least seven days prior to the workshop. He can be reached by phone at 954-777-4146 or by email at Binod.Basnet@dot.state.fl.us.

     

     

     ]]>
    Kelleher, BarbaraWed, 15 Feb 2017 16:31:26 GMThttp://fdotsp.dot.state.fl.us/sites/publicnotices/Lists/add a public meeting/DispForm.aspx?ID=4607